2.4 Design Loads and Moments
(a) Dead load
Beam
"
43& P1
Deck slab 413 pl f
Ba r r i erra11 2x350/5*
;;
140 p1
989 P1
*With composite deck, assume barrier rails distributed equally to
the five double stemmed units (AASHTO 3.23.2.3.1.1).
M
O
;; Wl
2
/ 8 " 0.436 x 40
2/8
+ 0.413 x 40
2/8
+ 0.140x40
2
/ 8
'k
" 87 + 83 + 28 ;; 198 Ibeam
( b) l1 ve load
Use live load distribution for Concrete T-Beams according to
AASHTO Table 3.23.1, considering each stem as one tee for lateral
distribution:
5/6 " 3/6 = 0.5, or 2xO.5 ;; 1.0 for &ft wide double tee.
live load impact (AASHTO 3.8):
50 50
I = ~ ;; 40 + 125 ;; 0.303
Use 0.30
For live load, use moment tables (AASHTO App. A):
HS20 - 40 ft span - military load not considered
"k 1 I k
M
L
,,449.8 Ilane x 2(wheel) x 1.0 x 1.30 292 Ibeam
2.5 Prestressing Strands
Estimate number of strands required based on stresses at service load.
Assume concrete tension in bottom fiber governs.
f
b
" 170x12/1407 + (28+292)12/2220 ;; -3.18 ksi
2-3
Allowable tenslle stress (AASH10 9.15.2.2) = = = -424 psl
Requlred prestress stress In bottom f1ber = 3.18 - 0.42 = 2.76 ks1
Bottom flber stress due to prestress:
P
se
P e
f
b
se
=
-t---
A
c
Sb
where P =
effect1ve prestress force after losses
se
e = strand eccentrlclty
Note: stress calculat10ns for prestress are based on beam sectlon
propertles. Est1mate e = 12 In.
P
se
2.76 = 419 t 1407
solvlng, requ1red P
se
= 253
k
Flnal prestress per strand, assumlng 25% losses:
(0.153 )( 0.70 x 270)0.75 = 21.69
K
Number of strands requlred = 253/21.69 = 11.7
,fA
3.5" to c.g
T
1-112" cover
Try 12-1/2 In. 270K strands
(6 strands per leg)
Orape (two polnt depress) strands at 4 ft each slde
of span center to provlde 3.5 In. from bottom of leg
to center of strands (see sketch). strand eccen-
trlclty w1thln center port1on of span (reglon of
hlghest moment) = 15.8 - 3.5 = 12.3 In.
2-4
2.6 Flexural Strength
Us'ng Group I load'ng comb'nat'on (AASHTO 3.22); strength requ'red:
M
u
= 1.3(M
O
+ 1.67M
L
)
= 1.3(198 + 1.67 x 292) = 891
1k
Use approx1mate value for stress 1n prestressed re1nforcement
(AASHTO 9.17.4):
f* = fl (1 - 0.5 p* f
l
/ f 1)
su S S C
= 270(1 0.5 x 0.000981 x 270/4) 261 ksi
where p* = A*/bd = 12 x 0.153/72 x 26 =
s
fl = 4000 ps' for deck slab
c
0.000981
For rectangular sect'ons (AASHTO 9.17.2); strength prov'ded:
= f;u d(l - 0.6
= 1.0 x 12 x 0.153 x 261 x 26(1 - 0.6 x 0.000981 x 261/4)/12
= 998
1k
> 891 OK
Check "a" as a rectangular sect1on:
a = A* f* 10.85f
l
b
s su c
= 12 x 0.153 x 261/0.85 x 4 x 72 1.96 1n. < 5.5 OK
Note: for factory produced precast prestressed members, = 1.0.
2.7 Max1mum and M'n'mum Steel Percentage
(a) Max'mum steel for rectangular sections (AASHTO 9.18.1):
Re1nforcement 1ndex = p*f* If I 0.3
su c
0.000981 x 261/5 = 0.051 < 0.3 OK
2-5
(b) Minimum steel (AASHTO 9.18.2):
Total amount of prestressed (and non prestressed) reinforcement must be
adequate to develop a design moment strength at least equal to 1.2
times the cracking moment strength ~ M u ~ 1.2 Mer)' where Mer is deter-
mined by summing all the moments that cause a stress in the bottom fiber
equal to the cracking stress f . Referring to the sketch below, for
cr
a prestressed composite member,
P
Pse-e MO
M
a
~
-
(--) + (-) + (-) ;; +f
- A
c
Sb Sb
S cr
c
Solving for
M '"
(f +
P
se
Psee
Sc
- (M
O)
Sc
A
c
+ --)
Sb
a cr
Sb
Since M
'"
M
o
+ M
cr a
Mer
;; (f
P
se
Pse-e
S - M
D
Sc
1) + - + --) (- -
er A
Sb
c
Sb
c
Cast-in-place
Member
A*
S
~ - t - - .
CG Precast
Member
STRESS CONOITIONS fOR EVALUATING CRACKING MOMENT STRENGTH
A* area of
s
A
e
;;
area of
Sb '"
section
prestressed reinforcement
precast member
modulus for bottom of precast member
2-6
Sc = sect10n modulus for bottom of compos1te member
P
se
= effect1ve prestress force
e = eccentr1c1ty of prestress force
M
O
= dead load moment of composite member
M
a
= add1tional moment to cause a stress 1n bottom fiber equal to
crack1ng stress f
cr
M
cr
= (0.530 + 4
21690
+ 260X12.3) 2220 _ 170(2220 _ 1) = 535'k
1407 12 1407
where
fer
=
7 v f ~ = 7.5v5000 = 530 ps1
P
se
=
(12xO.153xO.7x270)0.75 = 260
k
(For 1n1t1a1 estimate, assume 25% losses.)
M
O
= 87 +
83 = 170'k
(Use beam and slab moments only; rema1n1ng portion will
act on compos1te sect1on.)
998/535 = 1.87 1.2 OK
Note: strength ratio sufficiently high; reevaluation with a more exact
estimate of prestress losses will not be necessary.
2.8 Prestress losses
Est1mation of prestress losses will be
procedure presented in AASHTO 9.16.2.
center (critical moment location).
6f
s
= SH + ES + CR + CR
c s
(a) Shrinkage
SH = 17,000 - 150 RH
Assume m1dwest location, RH = 70%
SH =17,000 - 150 x 70 =6500 psi
2-7
based on the approx1mate
Compute loss values at span
(b) Elastic shortening
f
ci r
= concrete stress at level of prestressing steel immediately
after transfer
Assume 10% prestress losses due to elastic shortening and
relaxation at release:
Psi = 0.9(12xO.153xO.7x270) 312
k
312 312(12.3)2
= 419 + 22,230
87x12x12.3
22,230
= 2.291 k st
28
ES = 3.8 x 2291 16,750 psi
(c) Creep of concrete
f d = concrete stress at level of prestressing steel due to
e s
superimposed dead load .... deck slab plus barrier rail
= B3x12x12.3 + 2Bx12(20.B - 3.5) 0.677 ksi
22,230 46,200
CR
e
= 12 x 2291 - 7 x 677 = 22,750 psi
(d) Relaxation of prestressing steel
CR
S
= 20,000
CR
s
= 20,000
0.4 ES - 0.2(SH + CR
e
)
0.4 x 16,750 - 0.2(6500 + 22,750) = 7450 psi
2-8
(e) Total loss of prestress
6f
s
= 6500 + 16,750 + 22,750 + 7450 = 53,450 psi
or 53.4/0.7 x 270 = 28.3% losses
f
se
= effect1ve prestress = 0.7 x 270 - 53.4 = 135.6 ksi
2.9 Concrete Stresses
Prestressing:
Psi = 0.9(0.7 x 270)12 x 0.153 = 312
k
P
se
= 135.6 x 12 x 0.153 = 249
k
Set draped strand pattern to satisfy stress condit10ns at beam ends
(AASHTO 9.15.2.1).
sym.
a = 16.0
1
Depress 0.1 span
po lrrt '\ L.. 4
1-0
...
n.a. of
i.. 3.5"
f
11
ee i.
3.5" to e.g
eli
T
1-1/2" cover
Note: Use 0.1 span depress po1nt so that l1near prestress moment
exceeds parabo11c load moments.
Top fiber stress at prestress transfer 1s l1m1ted
transfer strength at 4000 psi, 3v4000 = 190 ps1.
transfer:
to Assum1ng
Top f1ber stress at
312 312e
e
f
t
= 419 - -z7ff = -0.190
solv1ng. ee = 8.12 1n.
2-9
Bottom fiber stress at transfer is limited to 0 6 0 f ~ 1
0: 2400 psi:
312
312e
e
2.40
f
b
: 419 + ~ =
solving,
ee
:: 7.46 in. say 7.4 1n.
Compression governs; e
l
:: 12.3 - 7.4 :: 4.9 1n.
Note: For this small amount of drape, the end pattern can eas1ly be
adjusted by the prestressed concrete supplier to fit a part1cular
bulkhead.
Sunmariz1ng: P
s1
:: 312
k
P
se
:: 249
k
e
center
::
12.3 in.
e
end
::
7.4 in.
111
of
0
0
..~
0
0
0
~
8.4'1 to e.g.
of strands
At g1rder end
Loads:
MO(beam)
:: 87
1k
MO(beam)
at depress 0:
84
1k
MO(slab)
:: 83
1k
M
O(rai1)
:: 28
l k
M
L
;: 292
1
k
Top of Beam
Section Properties Beam Composite Composite
A (in.
2
) 419 815
c 3
1407 2220 Sb(1n. )
St
2711 5310 14,440
2-10
Concrete stresses at prestress transfer and at serv1ce load (1n ps1)
are summar1zed as follows:
Span End at Depress Pt. at M1dspan at
Prestress Transfer Prestress Transfer Serv1ce Load
P = Pst
P = P
s1
P = P
se
Load
f
b
f
t
f
b
f
t
f
b
f
t OT
f
t SL
P/A
c
745 745 745 745 594 594
--
PelS 1640 -852 2727 -1416 2177 -1130 --
MOblS
-- -- -713 370 -742 385 --
Mo/S
-- -- -- -- -708 367 --
MOrIS
-- -- --
-- -152 23 63
ML/S -- -- -- -- -1578 242 660
Total
Stress 2385 -107 2760 -301 -409 481 723
All owabl e
3V'f '
6vf
l
o 4f
'
0.4f
l
Stress
c1 c
. c
c
(AASHTO 2400 -190 2400 -474 -424 2000 1600
9.15.2)
Beam: OK OK Increase OK, but OK OK OK
fl
= 4000 release must
ct
strength re1nforce
f
= 5000
to 2760
s1nce
c
0.6
Slab: 4600 ps1 -190 ps1
f
::
4000
c
Tens ton (-)
The s11ght 1ncrease 1n requ1red transfer strength to sat1sfy center
span bottom compress1on 1s not uncommon for th1s type of beam sect1on.
Alternat1vely, a deeper sect10n could be used. W1th m1dspan bottom
tens10n and flexural strength requ1rements both w1th1n l1m1t1ng values,
spec1fy = 4600 ps1. Note: H1gher strengths need to be conf1rmed by
local prestressed concrete supp11er.
2-11
2.10 Nonprestressed Reinforcement
Since the top factor stress in tension at depress points exceeds
at prestress transfer, bonded reinforcement must be provided to resist
the total tensile force. Referring to sketch:
Total tensile force: (301;46)2X72 + : 25.1
k
Use Grade 60 steel @24,000 psi:
-301
2
As
:
25.1/24 = 1.05 in.
2.36]
2
11
1
C
6
Use 4 #5 bars (As
: 1.24 in.
2)
Btm.
of flange
24
11
"
+2760
Extend bars from center of span to span location where tensile stress
equals = 3y4600 = 203 psi. If x = distance from support:
f
t
: f
+ fOb; where
MOb
=
_ x)
P
-203 -107 - - 852)
(436x)l2
(40 - x)
=
+
2x2711
solving, x = 10.2 ft
Extend bars 12 ft (including development length) each side of span
center.
Use 4 - #5 X 24
1-0
centered in span
2-12
2.11 Shear Strength
The method of des1gn for shear reinforcement presented 1n the 1979
Interim AASH10 Standard Spec1ficat1ons w1ll be used as an acceptable
alternative to the prov1sions of the 13th Edition, 1983 Specificat1ons.
Check shear at quarter span:
V
o
= wl/4 = 0.989 x 40/4 9.9
k/beam
14
1
40
1-0
14
1
Truck Load
Lane Loading
30 16 2 k
(40 + 40)32 + (40)8 = 37.2 /lane
k
V
L
37.2 x 0.5 x 1.0 x 1.3 24.2 /beam
Note: The HS20 truck loading is applied to the full lane long1tudinally
to obtain maximum lane shear at the span quarter point. The lane shear
is then distributed to an individual beam, with appropriate live load
impact .
V
u
= 1.3 (V
D
+ 1.67 V
L)
= 1.3 (9.9 + 1.67 x 24.2) 65.4
k/beam
Using average web width with two webs per tee:
= 0.06 x 5 (2 x 6.25) 0.96
but not greater than 180 b'jd 0.180
k
= 50.1
2-13
k
x 23.2 ,; 83.5
(2 x 6.25) 0.96 x 23.2
Cons1der1ng strand contr1but1on to shear strength:
Vertical component of effective prestress force (e.g. of strand rises
4.9 1n./10 ft.),
V
p
249 (4.9/10 x 12) ~ 0.3
k
k
V + V ~ 50.1 + 0.3 ~ 50.4
c P
(V
u
- ~ V c s (05.4 - 0.9 x 50.4}12
Av ~ f jd = 2 x 0.9 x 00 x 0.96 x 23.2
sy
where ~ = 0.9 for shear (AASHTO 9.14)
2
= 0.07 in. 1ft
100b's
f
sy
100(2 x 0.25)12
= 60.000
Also must prov1de 2-#3@12 in. = 0.22 1n.
2
/ f t m1n1mum vert1cal ties
for shear transfer between beam and cast-1n-p1ace deck slab
(AASHTO 9.20.4.4).
Use single-leg stirrup of welded wire fabric Wo.S @0 in.
2
spac1ng per stem. (A
y
= 2xO.13 = 0.20 1n. 1ft> 0.25)
Multiple layers of smaller size fabric of equ1valent area could also be
used.
Add additional stirrups at beam ends (AASHTO 9.21.3):
4% p ~ = 0.04(312) ~ 12.48
k
A = 12.48/20 = 0.624 1n.
2
SlY
Use 1 - #4 U-st1rrup per leg at each end of beam.
For shear transfer between beam and cast-in-place deck slab (AASHTO
9.20.4.2). all st1rrup legs must be extended 1nto deck slab, and top
surface of precast beam must be intentionally roughened. Scor1ng the
2-14
surface with a stiff bristled broom is common practice to satisfy the
1l1ntent1onally roughened II requirement.
2.12 Deflections and Camber
For estimating long-time deflections and camber, use data from PCI
Design Handbook. See Design Example No.1, page 1-12.
(a) Prestress at transfer
E
c1
= =33(150)1.5v4600 =4.1 x 10
6
psi
I I
a a
ee r I
. .
.. ....
-------
e
l
Two point depressed
Psi el
2
e
1a
2
fI (8 - -6-)
312 [12.3(40X12)2
4.1x103x22230 8
(b) Beam dead load
5w!4 5xO.436(40X12)4
384EI = 384X12X4.1xl03x22,230
(c) Growth in storage
Using suggested multipliers ...
At transfer
:= 1.10
11
1'
= 0.28
1t
+
= 0.82
11
1'
1.80x1.10 - 1.85xO.28
2-15
At erection = 1.46
11
1'
= 0.25",1.
-;: 1.11"1'
384x12x4.3x10
3X46200
After construct1on
(Ra t l inq )
(d) Superimposed dead load
f ~ = 5000 psi; E
c
= 4.3 x 10 psi
4
(Deck) 5xO.413(40x12)
384x12x4.3xl0
3x22230
5xO.140(40x12)4
(e) Long term dead load
Us1ng appropriate mult1pliers ....
Beam 0 2 8 ~ x 2.40
Camber 1.10"1' x 2.20
Deck 0.25",1. x 2.30
Ra111ng 0 0 4 ~ x 3.00
Net long term
0.61"+
2.42"1'
-;:
0.58
11
+
-;:
Q.:.l2"+
1.05"1'
(f) Live load deflect10n
Est1mate max1mum l1ve load def1ect1on at span center w1th heavy
truck axles closely spaced and centered 1n span.
i
13
1
40'-0
D1str1but1on factor from lane to
beam load1ng:
(D1st.)(Lane)(lmpact)
(1.00)(1/2)(1.3) = 0.650
32k[ __--L- -.--__
- I -Lane Shear Diagram
'------ 32
k
/
+-Lane Moment Diagram
2-16
Using moment-area method:
(416X13
2
+ 416x7x16.5) 1728xO.650 = O.3P or Span
3 4.7xl03x46,200 1300
OK
2.13 Design Summary
Use 24 in. depth x 72 in. width double-stemmed precast beam section with
12 - 1/2" diameter 270K stress-relieved strand (6 strands per stem).
Double depress strands at 4 ft each side of span centerline. Centroid
of strand pattern to be at 3.5 in. above bottom of leg at depress points
and 8.4 in. above bottom of leg at beam ends. Specified concrete
strength to be f ~ = 5000 psi with a release strength of f ~ i = 4600 psi.
Use single-leg stirrups of welded wire fabric W6.5 @> in. spacing per
stem. Use same stirrup detail full span length.
Note: This design results in a heavily prestressed section. If geom-
etry restrictions permit, a deeper section with fewer strands might be
considered. Also. some governing agencies may require a > in. minimum
C.I.P. deck slab.
2 #5 X 24
1
- 0 @span center
c.g.
~ 8.4"
_ 6-1/2" 270K Strands
6'-0
36"
Welded wire fabric
W6.5 @6
11
'I. ,.
r 5-1/2" C.I.P. Deck 1
I - - - - ~ - - - - - - - - - - _""'":::1_ - - - -1
I I
~ I I
I
1
1
'-
C g.i:,
_--, __ 3.5" L
-
'Ot'
N
Strands at
span center
Strands at
span end
REINfORCEMENT DETAILS
2-17
DESIGN EXAMPLE NO.3
SINGLE SPAN I-GIRDER BRIDGE
3.1 Design Conditions
Simple span of 75 ft x 30 ft width
HS20 live load - 2 lanes
Use 4 PCI Standard I-Girders at 8 ft spacing. Consider composite con-
struction with 7-1/2 in. deck slab. Illustrate design for a typical
interior girder only. Design of slab not to be considered in this
example. Allow for 2 in. future wearing surface.
3.2 Materials
Precast concrete: normal weight
~ 5000 psi
~ = 4000 psi (AASHTO 9.22)
Cast-in-place concrete: normal weight
~ = 4000 psi
Prestressing steel:
Reinforcing bars:
1/2 in. diameter 270 ksi stress-relieved strand
Strand area = 0.153 sq in.
E
s
= 28 x 10
6
psi
f = 60,000 psi
y
3-1
3.3 Preliminary Girder Selection
Using span table in "Short Span Br1dges Manual" as a gu1de. both Type
III and Type IV I-Girders are poss1b1l1t1es at a 75 ft span. Cons1der-
1ng the wide girder spacing and provision for future wearing surface.
select a Type IV section. Br1dge layout and girder section properties
are as follows.
30
1-0
1 '-1"
26'-10"
7-1/2
11
(25 psf future wearing surface)
TYPE IV
I-GIRDER
3 @8'-0
3
1-0
Precast
Parapet
(350 pH)
SECTION
ELEVATION
l
,
I
3-2
..
...,.
Ln
c.g
=
~ I ~
M
r-
...,.
N
co
I-
26
11
.
Sect10n Propert1es
A
c
== 789 1n.
2
I == 260,730 1n.
4
Yb == 24.73 t n.
3
Sb ~ 10,543 1n.
St == 8908 1n.
3
w
D
== 822 pl f
PCI STANDARD TYPE IV I-GIRDER
3.4 Compos1te Sect10n Propert1es
Cast-1n-place E
c
== 5 7 v f ~ == 57,OOOv4000 == 3.o0xlO
o
ps1
Precast E
c
== 57.000v5000 == 4.03X10
6
ps1
n == 3.60/4.03 == 0.89
[ffect1ve flange w1dth (AASHTO 9.8.1.1):
1/4 span == (75x12)/4 == 225 1n.
D1stance center-to-center of g1rders == 8 ft == 96 1n. (governs)
12 x slab th1ckness plus flange width == 12x7.5 + 20 == 110 1n.
3-3
C.G. of Compos1te Seet10n
Area Y Ay
7.5x85.4 640 57.75 36,960
789 24.73 19,512
1429 56,472
Yeb 56,472/1429 '" 39.52 1n.
Slab
.
..,.
N
"
,
_r 0.89(96) '" 85.4" 1
I I
r-- G1 rder
e g \) e.g
_ N
(\') It'l
r-
Seet10n Modulus of Compos1te Seet10n
I A
(Y-Ycb)
A(y-y
eb
) 2
Ie
263,732 + 385,282
Slab 3,002 640 18.23 212,693
'"
649,000 1n.
4
G1rder 260,730 789 14.79 172,589
Scb
649,000
16,420 1n.
3
'"
39.52
263,732 385,282
Set
649,000
44,820
. 3
'"
(54-39.52)
'"
, n.
3.5 Des1gn Loads and Moments
(a) Dead load (1nter1or g1rder)
Non-Compos1te:
Girder
'"
822 pH
Slab 150 x 0.625 x 8.0 '" 750 pl f
1572 pH
G1rder
"0
0.822 x 75
2
/ 8
'"
578'1<
G1rder + slab
"0
1.572 x 75
2/8
'"
1105I k
3-4
Composlte: Distribute to 4
Future wearing surface 25
Parapet
girders (AASHTO 3.23.2.3.1.1)
x 26.83/4 = 168 plf
2 x 350/4 = 175 plf
343 p1f
2 'k
M
O
= 0.343 x 75 /8 = 241 /girder
Note: The exterior girder may be critical with large slab
overhang and should be checked in a separate design.
(b) Live load (interior girder)
Use live load distribution for Prestressed Concrete Girders
(AASHTO Table 3.23.1):
lanes/girder = 0.5(S/5.5) = 0.5(8.0/5.5) = 0.727
Live load impact (AASHTO 3.8):
50 50
I = l + 125 = 75 + 125 = 0.25
For live load, use moment tables (AASHTO App. A):
'k
HS20 - 75 ft span - lane moment = 1075.1
lk
M
L
= 1075.1 x 0.727 x 1.25 = 977 /girder
3.6 Prestressing Strands
Determ\ne number of strands required based on stress conditions at
service load.
3-5
Des1gn load stresses at m1dspan:
G1rder f
b
578x12
-0.658 ks1 f
t
578x12
0.778 ks1
10,543
;;
8908
G1rder + slab f
b
11 05x12
-1.258 ks1 f
t
11 05x12
1.488 ks1
10,543
;; ::
8908
=
Composite f
b
241x12
-0.176 ks1 f
t
241x12
0.065 ks1 =
16,420
::
44,820
L1ve load f
b
977x12
-0.714 ks1 f
t
977x12
0.262 I<s1
::
16,420
;; ::
44,820
Total stress f
b
:: -2.148 ks1 f
t
1.815 ks1
(Tension) (Compression)
Allowable stresses (AASHTO 9.15.2):
F1na 1 f
b
:: 6v'f
l
;;
6v'5000 :: 424 psi (Tension)
c
f
t
=
0.4f'
=
0.4x5000
=
2000 psi (Compress1on)
c
In1t1al f
b
::
::
0.6x4000
=
2400 psi (Compress1on)
f
t
==
7.5v'4000
=
474 pS1* (Tens1on)
*When tens1le stress exceeds = 190 ps1, bonded re1nforce-
ment must be prov1ded to res1st the total tens1le force (AASHTO
9.18.2.1).
L1m1ts of Prestress:
Bottom f1ber Top F1ber
F1nal - Total stress 2.148 ks 1 T 1.B15ks1C
Allowable stress .424 ks1 T 2.00 ks1 C
Req1d prestress after losses 1.724I<s1 C 0
In1t1al - Girder stress .658 ks1 T .778 ks1 C
Allowable stress 2.400 ksi C .190 ks1 T
Allowable initial prestress 3.058 ks1 C .968 ksi T
at midspan
3-6
Final bottom fiber stress controls. Required prestress stress in
bottom fiber (after losses) = 1.724 ksi. Bottom fiber stress due to
prestress:
where P
se
e
effective prestress force after losses
strand eccentricity. With e.G. of strands approximately
4 in. from bottom of beam, e = 24.73 - 4 = 20.73 in.
P
se
20.73 P
se
1.724 = 789 + 10,543
solving, required P = 533
K
se
Final prestress per strand, assuming 20% losses:
(O.153xO.70x270)0.80 = 23.1
K
Number of strands required = 533/23.1 = 23.1
Try 24-1/2" 270K strands
strand pattern:
Practices on strand pattern and spacing vary with prestressed concrete
supplier. For this example, use 2 rows of 12 strands each. spaced at 2
in. Locate the rows 3 in. and 5 in. respectively from bottom of girder.
e = 24.73 - 4 = 24.7 in. A straight strand pattern will be used in this
example; however, in some geographic areas, a deflected strand pattern
with the longer spans may be considered more appropriate.
11
/
r
\
12 @ 2"
2"
12 @ 2"
=r3
U
3-7
3.7 Flexural strength
Uslng Group I loadlng comb1natlon (AASHTO 3.22); strength requlred:
M
U
;; 1.3(M
O
+ 1.67M
L)
;; 1.3(1105 + 241 + 1.67x977) ;; 3883
1k
Use approxlmate value for stress ln prestressed re1nforcement
(AASHTO 9. 17 .4) :
f* ;; f ' (l - 0.5 p* fl/fl)
su S S C
;; 270(1 - 0.5xO.000665x270/4) = 264 ksl
where p* A;/bd;; 24xO.153/96x57.5 = 0.000665
b ;; flange wldth = 96 In.
d = 54 + 7.5 - 4 ; 57.5 1n.
For rectangular sectlons (AASHTO 9.17.2); strength provlded:
~ M ;; ~ f* d(l - 0.6 p*f* If I)
u s su su c
;; 1.Ox24xO.153x264x57.5(1 - O.6xO.000665x264/4)/12
;; 4520
' k
> 3883 OK
Check "a" as a rectangular sectlon:
a = A*f* 10.85f 'b
s su c
24xO.153x264/0.85x4x96 ;; 2.96 In. 7.5 OK
Note: For factory produced precast prestressed members, strength
reduction factor ~ = 1.0 (AASHTO 9.14).
For shear deslgn j = (1 - 0.6xO.000665x264/4) 0.97
3-8
3.8 Max1mum and Mlnlmum Steel Percentage
(a) Maxlmum steel for rectangular sectlons (AASHTO 9.18.1):
Reinforcement 1ndex p*f* ff' 0.3
su c
'" 0.000665x264f4 0.044 < 0.3 OK
(b) M1n1mum steel (AASHTO 9.18.2):
Total amount of prestressed reinforcement must be adequate to
develop a des1gn moment strength at least equal to 1.2 times the
cracking moment strength > 1.2 Mer); where, for a prestressed
composite member (See Deslgn Example No.2, page 2-6):
P P -e S
M ( f + + S - M (S - 1)
cr cr A
c
Sb c 0 Sb
(0.530 555 + 555X20.7)16,420 _ 1105(16,420 _ 1)
+ 789 10,543 12 10,543
2563'k
where = '" 530 ps1
= (24xO.153xO.7x270)O.80 = 555
k
(assumlng 20% losses)
'k
= 1105 Use glrder + slab moment only; rema1n\ng
port10n (wearlng surface t parapet) will
act on composlte sectlon.
> 1.2 M
u - cr
4520 > 1.2x2563 '" 3076 OK
3.9 Prestress Losses
Estimatlon of prestress losses w111
cedure presented 1n AASHTO 9.16.2.
(cr1tlcal moment location).
6f
s
= SH + ES + CR
c
+ CR
s
3-9
be based on the approxlmate pro-
Compute loss values at span center
(a) Shrinkage
SH = 17.000 - 150 RH
Assume east coast location. RH = 10%
SH = 17.000 - 150x70 = 6500 psi
(b) Elastic shortening
ES
f
ci r
= concrete stress at level of prestressing steel immediately
after transfer
Assume 10% losses due to elastic shortening and strand relaxation
at release:
Psi = 0.9(24xO.153xO.7x270) = 625
k
_ 625 + 625(20.7)2
f c1r - 789 260,730
578x12x20.7
260.730
= 1.269 kst
E
c1
= 5 7 v f ~ i = 57.000v4000 = 3.6 x 10
6
psi
ES
28
= 3.6 x 1269 = 9870 psi
(c) Creep of concrete
3-10
f
cds
concrete stress at level of prestressing steel due to
superimposed dead load ... deck slab plus parapet.
Note: the parapet is acting on the composite section.
{1105 - 578)20.7x12
260,730
+ 241(39.52 - 4)12
649,000 = 0.660 ksi
CR
C
12x1269 - 7x660 = 10,600 psi
(d) Relaxation of prestressing steel
CR
s
= 20,000
= 20,000
0.4ES - 0.2 (SH + CR )
c
O.4x9870 - 0.2(6500 + 10,600) 12,630 psi
(e) Total loss of prestress
Af
s
= 6500 + 9870 + 10,600 + 12,630 = 39,600 psi
or 39.6/0.7x270 = 20.9% losses
f = effective prestress = 0.7x270-39.6 = 149.4 ksi
se
3.9 Concrete Stresses
Compression (t)
Tension (-)
(a) Initial stresses at Prestress Transfer
Psi = 0.9(24xO.153xO.7x270) = 62S
k
At span center (prestress + girder):
625 625x20.7 578x12
f
t
= 789 --a9OS-- + 8908 = +0.118 ksi < 6 f ~ i OK
3-11
625 625x20.7
f
b
= 789 + 10,543
578x11.
10.543 +1.361 ks1 <
OK
At span ends (prestress only):
625 625x20.7
f
t
= 789 - 8908 = -0.660 ksi >
Since top fiber stress in tension at span ends exceeds 7.5-1f
1
c1
(AASHTO 9.15.2.1), must debond some of the strands. or alterna-
tively, use a draped strand pattern to reduce the stress level.
With the longer spans. a draped strand pattern may be considered
more appropriate; however, to illustrate design procedure a
straight strand pattern with debonded strands will be used in this
example.
Estimate number of debonded strands:
Debonded strands
Total strands
Oebonded strands
(f
t
-
f
t
(660 - 474)24 _ 6 8
660 -.
Try 8 debonded strands. Shield 4 strands 4 ft from end in top
row and 4 strands 6 ft from end in bottom row. Varied shield
lengths are recommended to avoid stress concentrations.
Revised stress at span ends:
Psi
= 625(16/24) = 417
k
f
t
417 417x20.7
= -0.440 ksi
<
= 789 -
8908
f
b
417 417x20.7
+1.347 ksi <
= 789 +
10.543
=
OK
OK
3-12
With debonding, the top fiber stress is now less than the maximum
permitted; however, some bonded reinforcement must also be provided
since the tensile stress still exceeds 190 psi. According
to AASHTO 9.15.2.1, the bonded reinforcement must be designed to
resist the total tensile force. Referring to the sketch:
=
....
II')
Total Tensile force 0.440x13.3x20/2
k
::: 58.5
Use Grade 60 steel @24,000 psi:
A '" 58.5/24
2
::: 2.44 in.
s
Use 6 #6 bars x 12'-0 at each
end of girder
2
(As::: 2.64 in. )
1.347
At 8 ft from span ends:
(Assume strand transfer length ::: 50db
24 in.)
M
Db
::: ::: 220'k
'"
f
t
625 625x20.7
+
220x12
-0.363 ksi <
OK :::
789 8908 8908
:::
f
b
625 725x20.7 220x12
::: +1.770 ksi < OK
'" 7B9 +
10,543 10,543
(b) Service Load Stresses at Span Center
p
::: A*f ::: (24xO.153)149.4 ::: 549
k
se s se
f
t
549 549x20.7 11 05x12
+
( 241 + 977)12
+1.234 ksi < a.4f
' OK :::
789 B90B
+
8908 44,820
;;
c
f
b
549 549x20.7 1105x12 ( 241 + 977)12
-0.374 ks t < 6vf
' OK
::: 789 +
1a, 543 10,543 16,422
:::
c
3-13
3.10 Shear Strength
The method of design for shear reinforcement presented in the 1979
Interim AASHTO Standard Specifications will be used as an acceptable
alternative to the provisions of the 13th Edition, 1983 Specifications.
Check shear at span quarter point:
V
d
= Wl/4 = (1.572 + 0.343)75/4 = 35.9
K/girder
1./4 :::
18.75 1 141 141
P. .t!1U5
V
l
(56.25 42.25)32 (28.25)8
45.0
kllane
=
75 + 75 + 75
=
V
L
= 45xO.727x1.25 = 40.9
k/girder
Note: The HS20 truck loading is applied to the full lane longitudin-
ally to obtain maximum lane shear at the span quarter point. The lane
shear is then distributed to an individual girder by the live load
distribution (lanes/girder), including live load impact.
V
u
1.3 (V
D
+ 1.67V
l
) = 1.3(35.9 + 1.67x40.9) ::: 135
k
V
c
::: O.06ftb'jd = O.06x5x8xO.97x57.5 ::: 134
K
but not greater than 180b'jd ::: 0.180x8xO.97x57.5 80
k
where d 54 + 7.5 - 4.0 = 57.5 in.
j ::: 0.97 (See step 3.7)
3-14
(V
u
- ~ c s (135 - 0.9x80)12 2
A = 2 f jd = 2xO.9x60xO.97x57.5 =0.126 in. 1ft
v ~ sy
but not less than 100b's/f = 100x8x12/60,OOO = 0.16 in.
2
/ f t
sy
Also must provide 2-#3 @12 in. = 0.22 in.
2
/ f t minimum vertical ties
for shear transfer between girder and cast-in-place deck slab
(AASHTO 9.20.4.4).
Check stirrup spacing limitations:
AASHTO 9.20.3.2 - (3/4)54 = 40.5 in.
but not greater than 24 in.
AASHTO 9.20.4.4 - 4(7.5) = 30.0 in.
Use #3 U-Stirrups @12 in. full span length
Add additional stirrups at girder ends (AASHTO 9.21.3):
Conservatively, use full Psi
k 2
4% Psi = 0.04(625) = 25 , A
v
= 25/20 = 1.25 in.
Use 4 - #4 U-Stirrups @3 in. at each end of girder
For shear transfer between girder and cast-in-place deck slab (AASHTO
9.20.4.2), all stirrup legs must be extended into deck slab, and top
surface of girder must be intentionally roughened. Scoring the surface
with a stiff bristled broom is common practice to satisfy the "inten-
tionally roughened II requirement.
3.11 Deflections and Camber
For estimating long-time deflections and camber, use data from PCl
Design Handbook. See Design Example No.1, page 1-12.
3-15
(a) Prestress at transfer
For straight strands (See Design Example No.1):
2
625X20.7(1SX12)2
Psiel
1.40
11
1'
-
3
'"
8E! 8x3.6xl0 x260.730
(b) Girder dead load
SWl
4
sxO .822(7Sx12) 4
'" 0.62
11
+
384EI '" 384x12x3600x260.730
At transfer '" 0.18
11
l'
(e) Growth in storage
1.80xl .40 - 1.85xO.62
(d) Superimposed dead load
At erection '" 1.55" l'
5(750)( 75x12)4
(Deck) - -- - '" 0.51
11
+
384x12x4.0x10
6x260.730
5(168 + 175)(75x12)4
(Railing and fWS) - -- - 0.09
11
+
384x12x4.0x10
6x649.000
After construction = 0.95" l'
(e) Long term dead load
Beam
Camber
Slab
Ra 111ng & FWS
0.62
11
+ x 2.40
1.40
11
1' x 2.20
0.51"+ x 2.30
0.09
11
+ x 3.00
3-16
'" 1 .49
11
+
= 3.08
11
1'
= 1.1 P+
'" 0.2P+
Net long term '" 0.15
11
1'
(f) l1ve load deflect10n
Estimate maximum live load deflection at span center with heavy
truck axles closely spaced and centered in span.
.
l.S
k
30.2
k
I
t
33.8
k
30.5'
"'-HS20 Truck
(D1stribution factor)(impact)
(0.727(1.25) = 0.91
.-lane Shear D1agram
1031
' k
1056
1k
~ ~ ~ l a n e Moment Diagram
Using moment-area method:
(1031X30.5
2
+ 1043x7x34) 1728xO.91
3 4.3X10
3X649.000
or Span < Span* OK
2820 1000
*Since AASHTO does not prov1de gu1dance on acceptable live load
deflect10ns for prestressed concrete bridges. check criteria for
steel girders (AASHTO 10.6). Live load deflection criteria for
steel girders is primarily based on an empirical limitation for
vibration (comfort and rideability).
3-17
3.12 Design Summary
Use pel Standard Type IV I-girder with 24-1/2" d1ameter 210K
stress-re11eved strands. Use stra1ght strand pattern w1th 8 strands
sh1elded at girder ends.
Use '3 U-st1rrups @12 in. full span length w1th 4-'4 U-st1rrups @
3 in. at g1rder ends.
r i m r r ~ 6 #6 x 121_0
'3 U-Stirrups @12"
1..----
4 #4 U-Stirrups @3" at
g1 rder ends
12 @ 2
11
11. @ 2"
24-1/2" 210K Strands
Debond 8 Strands at each end of g1rder
4 for 4'-0 in btm. row
4 for 6'-0 in top row
Note: St1rrup deta11s vary with prestressed concrete suppl1ers.
Detail shown here for 1llustration only.
REINFORCEMENT DETAILS
3-18
Re1nforclng bars:
DESIGN EXAMPLE NO.4
MULTI-SPAN I-GIRDER BRIDGE
4.1 Oes1gn cond tt tons
Continuous span of 65 ft - 80 ft - 65 ft x 30 ft width
HS20 live load - 2 lanes
Use 4 PCI Standard precast I-g1rders at 8 ft spac1ng. w1th girders made
cont1nuous for live load and super1mposed dead load (AASHTO 9.7.2).
Cons1der composlte constructlon with 7-1/2 in. deck slab. Illustrate
design of a typlcal lnterior girder only for the center 80 ft span.
Design of slab not to be considered in th1s example. Allow for 2 in.
future wearing surface.
4.2 Materials
Precast concrete: normal weight
~ = 5000 ps1
~ = 4000 psi (AASHTO 9.22)
Cast-in-place concrete: normal weight
~ = 4000 ps t
Prestress1ng steel: 1/2 1n. diameter 270 ks1 stress-re11eved strand.
Strand area = 0.153 sq. in.
E
s
28 x 10
6
psi
f
y
=: 60.000 psi
4-1
4.3 Prel'm1nary G1rder Select'on
Us\ng span table in "Short Span Bridges Manual" as a guide, select a
Type IV I-girder section based on the BO ft center span. Bridge layout
and g1rder section propert'es are as follows.
30
1-0
3 @8
1-0
= 24
1-0
Precast
Parapet
(350 pl f )
TYPE IV
I-GIRDER
7-1/2" (25 psf future wearing surface)
3'-0
1 '_7
11
SECTION
1
4
65
1-0
.1
4
80
1-0
.1
4
65
1-0
1
r =9=
JI
I
I
ELEVATION
r
4-2
20
11
r 1
\
Section Properties
A
=
789 in.
2
c
4
8
11
1
=
260,730 in.
--.
24.73 in.
= Y
b
=
.-
3
U'"J
c.g Sb =
10,543 in.
=
8908 in.
3
M
St
=
r-
.-
w
o
= 822 pH
N
=
CXl
II' II' 1
-
26
11
PCI Standard Type IV I-Girder
4.4 Composite Section Properties
Cast-in-place E
c
= = 3.60x100 psi
Precast E = = 4.03xl00 psi
c
n = 3.60/4.03 = 0.89
Effective flange width (AASHTO 9.8.1.1):
1/4 span = (80x12)/4 = 240 in.
Distance center-to-center of girders = 8 ft = 9o in. (governs)
12 x slab thickness plus flange width = 12x7.5 + 20 = 110 in.
4-3
Ay y
57.75 3&,9&0
24.73 19,512
5&,472
Area
Ycb = 56,412/1429 = 39.52 1n.
7.5x85.4 = &40
789
1429
C.G. of Compos1te Sect10n
Slab
G1rder
I
) ~ c g
" Compos1te
4i1'
= 85.4" ~ r0.89(9&)
I
r- ~ T
e.g. "
Beam\
='iI'
-
In r ~ ;
.
Sect10n Modulus of Compos1te Sect10n
I A (Y-Y
cb)
2
Ie
263,732 + 385,282
A(Y-Ycb) =
4
Slab 3,002 &40 18.23 212,&93
=
&49.000 1n.
G1rder 2&0,730 789 14.79 172.589
Scb
&49,000
3
= =
1&,4201n.
263,732 385,282 39.52
\t
649,000
3
= =
44.820 1n.
(54-39.52)
S(slab)t
649,000
3
=
= 29,100 1n.
(&1.5-39.52)
4.5 Des1gn Loads and Moments
(a) Dead load (1nter1or g1rder)
Non-Compos1te:
G1rder
Slab 150 x 0.625 x 8.0
= 822 pl f
= 150 p l f
1572 pH
G1rder
G1rder + slab
MOb = 0.822x80
2/8
= 658
l k/g1rder
2 I k
M
o
= 1.572x80 /8 = 1258 /g'rder
4-4
Composite: 0istribute
Future wearing surface
Parapet
to 4 girders
25x26.83/4
(2x350)/4
(AASHTO 3.23.2.3.1.1)
;:: If>8plf
;:: 175 plf
343 PIf
The composite girders will be made continuous when the deck is
cast so that the future wearing surface, parapet, and live load
will act on a three span continuous structure. Using Reference
4-1 "Moments, Shears and Reactions for Continuous Highway
Bridges;" by interpolation between n ;:: 1.2 and 1.3 for 3
cont1nuous spans w1th a span ratio n = 80/65 = 1.23:
moment coeff. at center of center
moment coeff. at interior support
shear coeff. at interior support
span;:: +0.0635
=-0.1259
= 0.615
(+)H
O
= 0.0635 x 0.343 x 65
2
=92'k/glrder ~
0.1259 x 0.343 x 65
2 'k
(-)M
O
::
:: ~ Ig1rder
V
o
:: 0.615 x 0.343 x 65 ;:: 13.7 Ig1rder
(b) Live load (interior girder)
For HS20 10ad1ng on a three span cont1nuous structure w1th N::
1.23; by 1nterpolat1on (Ref. 4-1):
moment at center of center span
moment at 1nter1or support
shear at 1nter1or support
See CLARIFICATIONS, Item 4, page iv.
4-5
:: 725.B
' k/lane
'k
:: 620.4 Ilane
:: 64.9
k/lane
Use live load distribution for Prestressed Concrete Griders
(AASHTO Table 3.23.1):
lanes/girder; 0.5(S/5.5) :: 0.5(8.0/5.5) :: 0.727
Live load impact (AASHTO
positive moment I
negative moment I
3.8) :
; 50/(125
50/(125
+ 80) :: 0.244
+ 72.5) :: 0.254
lk
:: 725.8xO.727xl .244 :: 656 /girder
tk
620.4xO. 727xl.254 :: 566 Igirder
:: 64.9xO.727xl .244 :: 58.7
k/ghder
4.6 Prestressing Strands
Determine number of strands required based on stress conditions at
service load. Assume concrete tension in bottom fiber governs. Design
load stress at midspan:
f _ 1258x12 92x12 656x12
b - 10,543 + 16,420 + 16,420 :: -1.978 ks i
Allowable tensile stress (AASHTO 9.15.2.2) :: 6 ~ f ~ :: ~ :: 424 psi
Required prestress stress in bottom fiber:: 1.978 - 0.424 :: 1.554 ksi
Bottom fiber stress due to prestress:
P P e
se ~
f
b
:: A
c
+ Sb
P
se
P
se
x 20.73
1.554 :: 789 + 10,543
where e :: strand eccentricity. With e.G. of strands approx. 4 in. from
bottom of girder, e :: 24.73 - 4 :: 20.73 in.
k
solving, required P
se
:: 480.0
4-0
Final prestress per strand, assuming 20% losses:
(0.153xO.70x210)0.80 23.l
k
Number of strands required = 480.6/23.1 = 20.8
Try 22-112" 270K strands
(Use even number for symmetry)
strand pattern:
Practices in strand pattern and spacing vary with prestressed concrete
supplier. For this example, use bottom row of 12 strands and top row of
10 strands, with 2 in. spacing between strands. Locate the rows 3 in.
and 5 in., respectively, from bottom of girder. e.G. of strand pattern
; (12x3 + 10x5)/22 = 3.9 in. from bottom. e = 24.73 - 3.9 = 20.83 in.
/
-f
10 Strands @ 2"
12 Strands @ 2
11
4.7 Flexural strength
Using Group I loading combination (AASHTO 3.22); strength required:
M
u
1.3(M
O
+ 1.67M
L
)
1.3(1258 + 92 + 1.67x656)
Use approximate value for stress in prestressed reinforcement
(AASHTO 9. 17 .4) :
f* = f ' (1 0.5 p* f'/f')
su sse
= 270(1 - 0.5 x 0.000609 x 270/4) = 264 ksi
4-7
where p*
=
= 22xO.153/96x57.6 = 0.000609
b
=
flange w1dth = 96 1n.
d
=
54 + 7.5 - 3.9 = 57.6 1n.
f'
=
4000 ps1 for deck slab
c
For rectangular sect10ns (AASHTO 9.17.2); strength prov1ded:
= -
= 1.Ox22xO.153x264x57.6(1 - O.6xO.000609x264/4)/12
= 4162
1k
> 3179 OK
Check "a" as a rectangular sect1on:
a = =22xO.153x264/0.85x4x96
= 2.72 1n. 7.5 OK
Note: For factory produced precast prestressed members. strength
reduct10n factor = 1.0 (AASHTO 9.14).
For shear des1gn. j = (1 - 0.6xO.000609x264/4) = 0.98
4.8 Max1mum and M1n1mum Steel Percentage
(a) Max1mum steel for rectangular sect10ns (AASHTO 9.18.1):
Re1nforcement 1ndex =
P
*f * If I < 0.3
su c-
=0.000609 x 264/4 = 0.04 < 0.3 OK
(b) M1n1mum steel (AASHTO 9.18.2):
Total amount of prestressed re1nforcement must be adequate to
develop a des1gn moment strength at least equal to 1.2 t1mes the
crack1ng moment strength 1.2 Mer); where. for a pre-
stressed compos1te member (See Des1gn Example No.2. page 2-6):
4-8
M
cr
P P e Sc
(f + ~ + ~ S - M (-- - 1)
cr A
c
Sb c 0 Sb
(0.530 + 509 + 509x20.83)16420 _ 1258(16.420 _ 1)
789 10,543 12 10
t543
= 7 5 ~ 5 0 0 0 = 530 ps1
(22xO.153xO.7x270)O.80 = 509
k
(assum1ng 20% losses)
'k
= 1258 Use g1rder + slab moment only; rema1n1ng
port1on (wear1ng surface ¶pet) w1l1
act on compos1te sect1on.
~ M > 1.2 M
u - cr
4162 > 1.2x2283 = 2740 OK
Note: strength rat10 suff1c1ently h1gh; reevaluat10n w1th a more
exact est1mate of prestress losses w11l not be necessary.
4.9 Prestress losses
Est1mat1on of loss of prestress w1ll be based on the approx1mate
procedure presented 1n AASHTO 9.16.2. Compute loss values at span
center (cr1t1cal moment 10cat1on).
(a) Shr1nkage
SH = 17.000 - 150 RH
Assume m1dwest 10cat10n, RH = 70%
SH = 17.000 - 150 x 70 = 6500 ps1
4-9
(b)
ES
E
s
=
-f
f
ci r
=
concrete stress
after transfer.
Psi
P e
2
si .
=
-- +
I
b
A
at level of prestressing steel immed'ately
Assume 10% losses due to elast'c shorten'ng and strand relaxation
at release:
Psi
= 0.9(22xO.153xO.7x270) = 573
k
f
ci r
573 573(20.83)2 65Bx12x20.B3
1.049 ksi =
789 +
260,730 260,730
=
ES
28
1.049 8160 psi =
3.6 x
=
(c) Creep of concrete
f
cds
= concrete stress at level of prestress'ng steel due to
superimposed dead load ... deck slab plus parapet.
Note: the parapet is acting on the composite
(1258 - 658)20.83x12 92(39.52 - 4)12
= 260,730 + 649,000 = 0.636 ksi
CR
e
= 12 x 1049 - 7 x 636 = 8136 psi
(d) Relaxation of prestressing steel
CR
S
= 20,000 0.4 ES - 0.2(SH + CR
e)
= 20,000 - 0.4 x 8160 - 0.2(6500 + 8136) = 13,809 psi
4-10
(e) Total loss of prestress
; 6500 + 8160 + 8136 + 13,809 : 36,605 psi
or 36.6/0.7 x 270 19.4% losses
f
se
: 0.7 x 270 - 36.6 152.4 ksi
4.10 Concrete stresses
Psi 0.9(0.7 x 270)22 x 0.153 = 573
k
P
se
: 152.4 x 22 x 0.153 = 513
k
Load s :
MO(girder)
Mo(girder &slab)
Mo(parapet)
M
L
65S'k
1258'k
92' k
: 656'k
properties
2
A (in. )
c 3
Sb )
3
St (in. )
Beam
789
10,543
8908
ComposHe
1429
16,420
44,820
Top of girder
ComposHe
29,100
Concrete stresses at prestress transfer and at service load (in
are summarized on Page 4-12.
Since the top stress in tension at girder ends due to prestress
at transfer exceeds three alternative solutions, or a combina-
tion, are possible:
(a) Use draped strands to reduce stress level
(b) Use debonded strands to reduce stress level
(c) Provide bonded reinforcement to resist total tensile force
For this example, use a combination of debonded strands plus bonded
reinforcement. See Design Example No.3, page 3-12 for design
procedure.
4-11
Support at Midspan at Midspan at
Prestress Transfer Prestress Transfer Service Load
P = Psi P = Psi
P = P
se
Load
f
b
f
t
f
b
f
t
f
b
ft(girder) ft(slab)
P/A
c
725 725 725 725 650 650 --
PelS 1131 -1338 1131 -1338 1013 -1200
--
MOb/S
- - -- -748 885 -748 885
--
MOs/S
-- -- -- - -683 808 --
MOplS
-- -- -- - -67 25 38
ML/S -- -- -- - -480 176 271
Total 1856 -613 1053 338 -311 1344 309
stress
Allowable
OK 6v'f ' o 4f
l
o 4f
l
stress
c
. c . c
(AASHTO 2400 -474 -424 2000 1600
9.15.2)
Beam: OK Must OK OK OK OK
fl
= 5000 debond
c
or drape
f i '"
4000
strands
Slab:
= 4000
Tension (-)
Debond 12 strands at each end of girder:
4 strands for 3 ft length (2 in bottom row + 2 in top row)
4 strands for 6 ft length (2 in bottom row + 2 in top row)
4 strands for 10 ft length (2 in bottom row + 2 in top row)
Revised stress at prestress transfer:
Psi = 573(10/22) = 260
k
260 260x20.83
f
t
= 789 - 8908 = -0.278 ksi < 7.5
4-12
With 12 debonded strands. the top fiber stress ls less than the maxlmum
permHted; however, some bonded relnforcement must also be prov1ded
slnce the tens1le stress stll1 exceeds = 0.190 ksl.
Use 4 #6 bars x 12
1-0
at top of each end of glrder
4.11 Cont1nuity Reinforcement at P1ers
(a) For l tve load contlnuHy at lnterlor supports, provide negatlve
moment relnforcement wHhin the cast-in-place deck slab (AASHTO
9.7.2.3). Use Grade 60 deformed relnforclng bars.
strength required:
M
u
1.3(M
O
t 1.67M
L
)
= 1.3(182 t 1.61 x 566) = 1465'k
For rectangular sections (AASHTO 8.16.3.2):
1465x12 2
0.9x60(59 _ 4/2) = 5.71 In.
3.101n.
where = 0.9 for flexure (AASHTO 8.16.1.2.2)
d = 54 t 7.5 - 2.5 = 59 in. (Use 2 In. cover)
a 4 In. (1st trial)
A f 5.71x60
= = O.85x5x26 =
check a
recalculate As
1465x12 2
= 0.9x60(59 _ 3.10/2) = 5.67 In.
Use 13 #6 bars ln deck slab over each glrder at pier
2
(As = 5. 72 1n. )
4-13
(b) Check max'mum reinforcement (AASHTO 8.16.3.1):
P = As/bd = 5.72/26x59 = 0.0037
Us'ng AASHTO Eq. (8-18) with f ~ = 5000, f
y
= 60,000, and B
l
= 0.80;
Pb = 0.0335
P
max
= 0.75 Pb = 0.75(0.0335) = 0.0252 > 0.0037 OK
A more complete design would normally consider support settlement,
effects of creep, shr'nkage and temperature, which all require
foundation data not available here and hence will not be covered.
(c) Effect of initial precompression due to prestress in the girders
at the pier may be neglected in negat've moment strength calcula-
t'ons 'f max'mum precompression stress's less than 4 f ~ and
cont'nuity re'nforcement rat,o 'S less than 0.015 (AASHTO
9.7.2.3.2) .
Bottom f'ber stress at support due to in,t'al prestress = 1856 psi.
Reduct'on due to debonded strands, 1856(10/22) = 844 psi < 0.4f' OK
c
Continuity reinforcement ratio P = 0.0037 < 0.015 OK
(d) Compressive stress in ends of girders at the pier, at service
loads, due to the addition of negative live load moment must not
exceed O 6 f ~ = O.6x5000 = 3000 psi (AASHTO 9.7.2.4).
Effective prestress stress:
P
se
= 513(10/22} = 233
k
233 233x20.83
f
b
= 789 + 10543 = 0.756 ksi
4-14
Cont1nu1ty moments acting at p1er section:
II<.
M
O
+ M
L
: 182 + 566 : 748
Check for cracking at top of slab due to serv1ce loads:
748x12
f
t:
29103: 0.308 ks1 < 7 Y f ~ ~ 0.474 ks1
Compute concrete stresses due to service loads assuming an
uncracked section:
748x12 .
f
b
= 16420 = 0.547 kSl
fb(total) = 756 + 547 1303 psi < 3000 OK
(e) Positive moment connection at p1er
Positive moments can develop at the pier section due to creep and
shrinkage in the girders and deck slab, and live load in remote
spans. This subject is discussed and a numerical example is pre-
sented in Reference 4-2 "Design of Continuous Highway Bridges w1th
Precast, Prestressed Concrete Girders."
The computations required to determ1ne the amount of pos1tive
moment reinforcement, us1ng the procedures of Ref. 4-2, are
involved and time consuming. Research is currently in progress to
further evaluate the validity of such computations. In the
interim, empirical methods seem more practical.
Current practice with several state h1ghway bridge des1gn depart-
ments is to provide a standard amount of reinforcement in all but
unusual conditions. A typical standard requires:
4 #6 bars in Type I and Type II I-Girders
6 #6 bars in Type II I and Type IV I-Gi rders.
4-15
The bars are embedded at least one development length 1n the ends
of the g1rder. Agreater embedment length may be requ1red 1f
strands are debonded. The bars project from the ends of the
g1rder approx1mately 12 bar d1ameters, term1nattng w1th a 90
0
bend
(wtthtn the cast-tn-place pter d1aphragm). Common pract1ce 1s to
bend the bar after the gtrder ts cast and removed from the forms.
Extended strands are also somet1mes used.
Computattons ustng the procedures of Reference 4-2 for th1s des1gn
example y1eld a requ1red steel area of 2.13 1n.
2.
Us1ng the
standard 6 #6 bars for the Type IV gtrder, As = 2.64 1n.
2
Use 6 #6 bars proJect1ng from bottom of
each end of gtrder for pos1tive moment
connectton with1n pter diaphragm.
4.12 Shear strength
For continuous span brtdges, shear strength should be checked
throughout the span. To 11lustrate destgn procedure, shear strength
calculations at approxtmately d/2 from the support at the p1er w1ll be
shown. Also, for cont1nuous spans, the method of design for shear re1n-
forcement presented in the 1979 Interim Spectfications is generally too
conservative near support locations. For th1s destgn example, the more
exact shear design provis1ons of the 13th Ed1tion, 1983 Spec1f1cations
will be used (AASHTO 9.20).
Compute shear strength at d/2 = 61/2 = 30.5 in. = 2.54 ft from support.
Shear due to girder + slab dead load (simple span):
k
V
o
= 1.512(40 - 2.54) = 58.9
4-16
Shear due to parapet + wearing surface (continuous span):
k
V
o
= 13.7 - O.343x2.54 = 12.8
Shear due to live load (use shear at support):
k
V
l
= 58.7
Factored shear force:
k
V
u
= 1.3(V
o
+ 1.61V
l
) = 1.3(58.9 + 12.8 + 1.61x58.1) = 221 Ig1rder
Us1ng the more exact shear design prov1s1ons, shear strength provided by
concrete 1s the lesser of V
c1
and V
cw
[AASHTO qs. (9-27) and (9-29)].
Near supports V
cw
generally governs. For this example, only V
cw
will be
evaluated; however, in a more complete design, both V
cw
and V
c1
should
be evaluated.
V
cw
= + 0.3 fpc)b'd + V
p
where fpc = compressive stress in concrete (after allowance for
prestress losses) at centroid of cross section.
V
p
vertical component of prestress force. With stra1ght
strand pattern V
p
= 0
With 12 debonded strands P
se
= 513(10/22) = 233
k
fpC due to prestress 233 233x20.83(39.S2 - 24.73) 0.020 ks1
= 189 - 260730 =
f due to dead load = 1S8x12(39.52 - 24.13) 0.108 ks1
pc 260730 = 0.128 ks1
V
cw
= + O.3x128)8x57.6/1000 = 132
K
= (Vu - _ (221 - O.9x132)12 _ 0 394 1n. 2/ft
Av - 0.9x60x57.6 -.
but not less than 50b
's/f
SY
= 50x8x12/60,OOO = 0.08 in.
2
/ f t
4-17
Also must prov1de 2 #3 @12 1n. = 0.22 1n.
2
/ f t m1n1mum vert1cal t1es
for shear transfer between g1rder and compos1te deck slab (AASHTO
9.20.4.4).
Use #4 U-stirrups @12 in. spac1ng with continuous U portion
2
of stirrup projecting into slab (A
y
= 0.40 in. 1ft)
Add addit10nal stirrups at girder ends (AASHTO 9.21.3):
Use full Psi'"
4% Ps1 = 0.04(573) = 22.9
k
2
A = 22.9/20 = 1.15 in.
y
Use 3 #4 U-stirrups @3 in. at each end of girder.
For shear transfer between girder and compos1te deck slab (AASHTO
9.20.4.2), all stirrup legs must be extended into deck slab, and top
surface of g1rder must be intentionally roughened.
4.13 Deflections and Camber
For est1mating long-time deflect10ns and camber, use data from PCI
Des'gn Handbook. See Des1gn Example No.1, page 1-12.
(a) Prestress at transfer (ignore effects of debonding)
For straight strands (see Design Example No.1):
573x20.83{80x12)2
=
8x3.6xl0
3X260,730
4-18
1 4 6 ~
(b) G1rder dead load
5wi,4
5xO.822(80X12)4
0.81",L.
384EI ::
384x12x3600x260,730
::
At transfer 0.55
11
1'
(c) Growth in storage
1.46x1.80 - O.81x1.B5
At erection 1.13
11
1'
::
(d) Superimposed slab load
5wi,4 5xO.750(80X12)4
0.66
11
+
384[1 :: 384x12x4000x260,730
::
(e) Superimposed rail and FWS on composite section
Using influence tables from Reference 4-1:
of moment
W :: 0.343 k/ft
Multiply by wg,2
for moment
N
CXl
It'l
o
o
+
.
o
+
o
....
It'l
o
o
+
.
o
I
ID
ID
o
o
Using moment-area ... sum 1st
diagram.
I
- - - - ~ ~ ~ - - - L . - - - - _ I
I
elL Span
Use 0.1 span = 8
1
moment about pier end
CXl
0
....
l""'-
N
It'l
....
0
.
0
0
I
I
i
65
1-0
t
Pier
-0.1218 x 4 x 2
::
-0.97
-0.0570 x 8 x 8
::
-3.65
-0.0066 x 8 x 16 -0.84
+0.0294 x 8 x 24 5.64
+0.0510 x 8 x 32 :: 13.06
+0.0582 x 4 x 38 :: 8.85
t
::
22.09
4-19
22.09xO.343x65
2x1728
4000x649,OOO
After construction
=0.02"+
(f) Long term dead load
Beam o.81
11J..
x 2.40 = 1.94"J..
Camber 1.46
11
1' x 2.20 = 3.21"1'
Slab 0.66
11J..
x 2.30 = 1.52"+
Ra 111ng &FWS 0.02"+ x 3.00 = 0.06"+
Net long term
::;
0.31"+
Negngible sag - say OK
( g) L1ve load deflection
Estimate maximum live load deflection at span center with heavy
truck axles closely spaced and centered in span. Use influence
coeff1c1ents and moment-area method.
(D1str1but1on)(1mpact)
(0.727)(1.244) ::; 0.90
80
1
- 0
...
.It. r
.... 1,1') ... 1,1') M
N N l"'- I"'- l"'-
.
. . . . .
c
.. (x 65 ft) for ft-k1p units \DN,..... 1,1')
,.....
\\-f
I
+ + + +
f
I I I
,
I
(use end span)
Using moment-area ... sum 1st moment about pier end of moment
d1agram.
4-20
-6.24 x 65 x 4 x 2
== -
3,245
-2.24 x 65 x 8 x 8 :; - 9,318
+1.75 x 65 x 8 x 16
:;
14,560
+5.74 x 65 x 8 x 24 71 ,635
+9.75 x 65 x 8 x 32 162,240
+10.37 x 65 x 4 x 38
==
102.240
r
==
338,100
338,100xO.90x1728 == 0.20" (Negligible)
4000x649,OOO
4.14 Design Summary
Use PCI Standard Type IV I-Girder with 22-1/2" diameter 270K stress-
re11eved strands. Use straight strand pattern with 12 strands shielded
at each end of girder. Use 4 #6 bars x 12
1-0
at top of girder at each
end. Use 6 #6 bars projecting from bottom of girder at each end for
pos1tive moment connection wlthin p1er diaphragm.
Use 13 #6 bars (continuity relnforcement) in deck slab over each girder
at pier. Prov1de 2 In. min1mum cover for continuity re1nforcement.
Use #4 U-st1rrups @12 In. spac1ng (near support), with 3 #4 U-st1rrups
@3 1n. at g1rder ends. Note: A complete des1gn would requ1re inves-
tigation of shear reinforcement requirements for the full span length.
Selected References
4-1 "Moments, Shears and Reactions for Continuous Highway Bridges," American
Institute of Steel Construct1on, AISC Publication No. T106, 1966.
4-2 "Deslgn of Continuous Highway Bridges w1th Precast, Prestressed Concrete
G1rders," Portland Cement Assoc1at1on, [B014.01E, 1969, 19 pp. Also
PCI Journal, Vol. 14, No.2, April 1969.
4-21
2" Clear
13 #6 (Gr. 60) or
equivalent over pier
Debond Strands at each end:
2 in each row for 3
1-0
2 in each row for 6
1-0
2 in each row for 10
1-0
*St1rrup details should follow local standards.
Detail shown have for illustration only.
4 #6 X 12
1-0
at girder ends
U-St1rrups @12 in. (near support*)
U-Stirrups @3 in. at girder ends.
6 #6 (Gr. 60) at girder ends
or use extended strands
10 @ 2"
if. @ 2"
22 - 1/2
11
270K strands
REINFORCEMENT DETAILS
4-22
NOTES