Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
117
_____________________________________________________________________________________________________________
118
_____________________________________________________________________________________________________________
I PV = N p .I ph
( q.V pv + I pv . Rs )
N p .I 0 .e N s AKT 1
(1)
Eg
q.
3
1 1
T A. K .( Tr T )
I 0 = .I rs . .e
Tr
(2)
the PV reverse saturation current rs is describe by
I rs =
e
scr
Voc
q.
N s .k . A.T
(3)
S
+ K i .(T Tr )].
1000
Where:
DC-DC
Boost
Converter
(4)
IPV
PV Module
VPV
MPPT Control
I ph = [I scr
DC
Load
40
500 W/m
30
20
200 W/m
10
10
15
PV Voltage (V)
20
25
30
119
_____________________________________________________________________________________________________________
Membership function
70
0 C
60
25 C
NB
NS
ZE
PS
PB
PV power (W)
50
30 C
40
35 C
30
45 C
20
-0.016
-0.008
10
0
0.008
0.016
PS
PB
(a)
Membership function
0
10
15
PV Voltege (V)
20
25
30
NB
NS
ZE
A.
( Fuzzy
Pph ( k ) Pph ( k 1)
V ph ( k ) V ph ( k 1)
CE ( k ) = E ( k ) E ( k 1)
E (k ) =
(5)
(6)
Where Pph(k) is the instant power of the photovoltaic
generator.
The input E(k) shows if the load operation point at
the instant k is located on the right or on the left of the
MPP on the P-V characteristic, while the input CE(k)
expresses the moving direction of load operation point.
Fig.6 shows the antecedent and consequent
membership functions.
d
D
Rule Base
Defuzzifie
r
Fuzzifier
Inference
-1
C
E
D
Z
Z 1
CE
-80
-40
40
80
(b)
Membership function
NB
NS
ZE
-0.008
PS
PB
0.008
0.016
dD
-0.016
(c)
Fig. 6. Membership function of (a) error E (b) change error
CE
(c) duty ratio D
i
FEi and FCE
are antecedent linguistic terms
E
CE
NB
PB
PB
NB
ZE
ZE
PB
NS
ZE
ZE
PS
PS
PS
ZE
PS
ZE
ZE
ZE
NS
PS
NS
NS
NS
ZE
ZE
PB
NB
NB
NB
ZE
ZE
120
_____________________________________________________________________________________________________________
(D ) D
j
dD0 =
(8)
j =1
n
(D )
j
j =1
B.
dI PVG
= U PVG VBattery (1 S S 1 ) RL I PVG (10)
dt
dVBattery
VBarrery
= I PVG (1 S S 1 )
C
dt
R
(12)
S S 2 = S S1
Where:
IPVG : Current across the inductor,
VBattery :Voltage in the battery Parameters.
SS1 : Switch position
UPVG :Voltage supplied by PV photovoltaic
array
The main equation associated with duty cycle and
input output voltage of boost converter is given below as
follows:
VBattrey
U PVG
UPVG
PVG
(12)
S2
IPVG
Begin
P&O Algorithm
1
1 D
Battrey
S1
Load
D(K+1)=D(K)+
D
P(K)>0
D(K+1)=D(K) - D
D(K+1)=D(K) - D
D(K+1)=D(K)+
D
Update History
V(K-1)=V(K)
P(K-1)=P(K)
121
in s o la t io n (W / m )
C o n ro l S ig n e l D P a n a l P o w e r (W )
_____________________________________________________________________________________________________________
1000
500
0
10
20
30
40
50
60
70
80
10
20
30
40
50
60
70
80
10
20
30
40
time (s)
100
50
0
1
0.5
P&O Controller
0
100
50
61.92
61.9199
61.9199
61.9198
10
61.9198
15
20
25
30
35
40
25
30
35
40
Conrol Signel D
61.9197
1000
61.9197
61.9196
61.9196
61.9195
500
61.9195
31.05 31.1 31.15 31.2 31.25 31.3 31.35 31.4 31.45 31.5
10
15
20
0.5
P&O Controller
FLC Controller
0
10
15
20
time (s)
25
30
35
Fig. 11. Variation of the panel power, battery power and the
duty ratio D, under standard conditions: temperature (25 C)
and solar irradiation (1000 W/m2)
40
FLC Controller
60
70
80
T em perature (C)
320
P anal P ower (W )
100
Conrol S ignel D
50
300
280
10
20
30
40
50
60
70
80
10
20
30
40
50
60
70
80
10
20
30
40
time (s)
50
0
0.5
P&O Controller
0
50
60
FLC Contoller
70
80
122
_____________________________________________________________________________________________________________
IMPP
s
s
Serie resitance Rs
REFERENCES
[1]