IN CASE:

Poper =
Pdesign =
Line pipe Material:

140
140
API Grade X65
PROJECT NAME : HAI SU TRANG GAS PIPELINE PROJECT

CLIENT : PETROVIETNAM / PV GAS


PIPELINE WALL THICKNESS REVIEW

Units
Input Parameters
PIPELINE MATERIAL DATA
Young`s Modulus ( Es)

Mpa

Specified Minimum Yield Stress (SYMS)

Mpa

Specified Minimum Tensile Strength (SMTS)

Mpa

Poisson's ratio()
Water density

kg/m^3

Gravity acceleration (g)

m/c^2

Maximum water depth

CALCULATION OF WALL THICKNESS ( B31.8)


Max Operation pressure

Mpa

Design pressure ( P)

Mpa

Minimum test pressure (Pt) ( Base on AIP 5L)


Design Temperature (Tdes)
Corrosion allowance (tcor)

Mpa

mm

Longitudinal joint factor (E)


Outside diameter (D)

mm

Temperature derating (T)


Design factor (F for Zone 1)
Calculated Wall thickness (tcal)

mm

Selected Wall thickness (t)

mm

Design factor (F for Zone 2 - Riser and 500m within MEZ)


Calculated Wall thickness (tcal)

mm

Selected Wall thickness (t)

mm

HOOP STRESS ( Check in with Elsevier ocean engineering book series: Section 2.3 ; P.26)
Internal Pressure (Pi)
Mpa
Hoop stress (h)

Mpa

Allowable Hoop stress

Mpa

Check with formula: h<=allowable hoop stress


PRESSURE CONTAINMENT (BURSTING) (Check in accordance with DNV 2007: Sec. 5; P.46)
Pressure containment resistance (Pb)

Mpa

Incidental pressure ( Pinc)

Mpa

Local incidental pressure (Pli)

Mpa

Elevation of the reference point ( href)

Elevation of the local pressure point (hl)(positive upwards)

Content density

kg/m3

External pressure( Pe)

Mpa

Yeild stress (fy)

Mpa

Tensile strength (fu)

Mpa

fcb = Min[fy;(fu/1.15)]
Material resistance factor (ym)
Safety class resistance factor (ysc)
De-rating values due to temperature of yeild stress (fy.tem)

Mpa

De-rating values due to temperature of tensile strength (fu.tem)


Minimum wall thickness (t1)
Wall thickness withoat tcor(t2)
Fabrication thickness tolerance
Material strenght factor (au)

Mpa
mm
mm
mm

Check with formula (Pli-Pe)<=(Pb/ym.ysc)


LOCAL BUCKLING ( SYSTEM COLLAPSE)(Check in accordance with DNV 2007: Sec. 5; P.46)
Elastic collapse pressure (Pel)
Plastic collapse pressure (Pp)
Maximum fabrication factor (afab: for seamless)

Mpa

Mpa

Ovality ( fo)
Collapse pressure ( Pc) = y-1/3*b
Mpa
Parameter b = -Pel
Parameter c = -( PP^2+ Pp*Pel*f0*(D/t))
Parameter d = Pel *Pp^2
Parameter u = (1/3)*((-1/3)*b^2 +c)
Paramaeter v = (1/2)*(2/27)*b^3 - (1/3*b*c+d)
Parameter Q = ACos(-v/(-u)^1/3)
Parameter y = -2*(-u)^(1/2)*Cos(Q/3 + (60*3.14)/180)
PROPAGATION BUCKLING (Check in accordance with DNV 2007: Sec. 5; P.47)
Propagating pressure (Ppr)
Check with formula: Pe<(Ppr/ym*ysc)

ZONE 2
PIPELINE MATERIAL DATA
Young`s Modulus ( Es)
Specified Minimum Yield Stress (SYMS)
Specified Minimum Tensile Strength (SMTS)
Poisson's ratio()
Water density
Gravity acceleration (g)
Maximum water depth
PIPELINE GEOMETRY DATA
Max Operation pressure
Design pressure ( P)
Minimum test pressure (Pt) ( Base on AIP 5L)
Design Temperature (T)
Corrosion allowance (tcor)
Calculeted Wall thickness (tcal)
Wall thickness (t)
Longitudinal joint factor (E)
Design factor (F for Zone 2)
Outside diameter (D)
Temperature derating (T)

Mpa
Mpa
Mpa
kg/m^3
m/c^2
m
Mpa

Mpa
Mpa

mm
mm
mm
mm

HOOP STRESS ( Check in with Eleservier ocean engineering book service: Section 2.3 ; P.26)
Internal Pressure (Pi)
Mpa
Mpa
Hoop stress (h)
Mpa
Allowable Hoop stress
Check with formula: h<=allowable hoop stress
PRESSURE CONTAINMENT (BURSTING) (Check in accordance with DNV 2007: Sec. 5; P.46)
Mpa
Pressure containment resistance (Pb)

Incidental pressure ( Pinc)


Local incidental pressure (Pli)
Elevation of the reference point ( href)
Elevation of the locol pressure point (hl)(positive upwards)
Content density
External pressure( Pe)
Yeild stress (fy)
Tensile strength (fu)
fcb = Min[fy;(fu/1.15)]
Material resistance factor (ym)
Safety class resistance factor (ysc)
De-rating values due to temperature of yeild stress (fy.tem)

Mpa
Mpa
m
m
kg/m3
Mpa
Mpa
Mpa

Mpa

Mpa
De-rating values due to temperature of tensile strength (fu.tem)
mm
Minimum wall thickness (t1)
mm
Wall thickness withoat tcor(t2)
mm
Fabrication thickness tolerance
Material strenght factor (au)
Check with formula (Pli-Pe)<=(Pb/ym.ysc)
LOCAL BUCKLING ( SYSTEM COLLAPSE)(Check in accordance with DNV 2007: Sec. 5; P.46)
Mpa
Elastic collapse pressure (Pel)
Plastic collapse pressure (Pp)
Mpa
Maximum fabrication factor (afab: for seamless)
Ovality ( fo)
Collapse pressure ( Pc) = y-1/3*b
Mpa
Parameter b = -Pel
Parameter c = -( PP^2+ Pp*Pel*f0*(D/t))
Parameter d = Pel *Pp^2
Parameter u = (1/3)*((-1/3)*b^2 +c)
Paramaeter v = (1/2)*(2/27)*b^3 - (1/3*b*c+d)
Parameter Q = ACos(-v/(-u)^1/3)
Parameter y = -2*(-u)^(1/2)*Cos(Q/3 + (60*3.14)/180)
PROPAGATION BUCKLING (Check in accordance with DNV 2007: Sec. 5; P.47)
Propagating pressure (Ppr)
Check with formula: Pe<(Ppr/ym*ysc)

Barg
Barg
API Grade X65

ANG GAS PIPELINE PROJECT

Design Code: ASME B31.8


Ref Code: DNV 2007
Elsevier Ocean engineering book series
Date:
Value
D= 14"
207,000.00

D=12"
207,000.00

D=10"
207,000.00

448.00

448.00

448.00

531.00

531.00

531.00

0.30

0.30

0.30

1,025.00

1,025.00

1,025.00

9.81

9.81

9.81

59.30

59.30

59.30

14.00

14.00

14.00

14.00

14.00

14.00

20.70
60.00
3.00

20.70
60.00
3.00

20.70
60.00
3.00

1.00

1.00

1.00

355.60

323.90

273.10

1.00

1.00

1.00

0.72

0.72

0.72

10.72

10.03

8.93

12.70

11.10

11.10

16"

0.50

0.50

0.50

14.11

13.12

11.53

15.09

14.27

12.70

14.00

14.00

14.00

207.25

215.99

182.11

322.56

322.56

322.56

ries: Section 2.3 ; P.26)

PASS

PASS

PASS

nce with DNV 2007: Sec. 5; P.46)


22.83

20.69

24.64

15.40

15.40

15.40

15.54

15.54

15.54

20.00

20.00

20.00

-59.30

-59.30

-59.30

175.20

175.20

175.20

0.60

0.60

0.60

423.36

423.36

423.36

503.04

503.04

503.04

423.36
1.15
1.31
7.00

423.36
1.15
1.31
7.00

423.36
1.15
1.31
7.00

7.00
8.11
9.70
1.59
0.96

7.00
6.71
8.10
1.39
0.96

7.00
6.71
8.10
1.39
0.96

PASS

FAIL

PASS

nce with DNV 2007: Sec. 5; P.46)


9.234
23.097
1.000

7.115
21.175
1.000

11.870
25.113
1.000

0.015
7.749
-9.234
-623.032
4,925.933
-217.152
1,474.961
2.050
4.671
V 2007: Sec. 5; P.47)
1.821
PASS

0.015
6.117
-7.115
-514.305
3,190.134
-177.060
971.838
1.996
3.745

0.015
9.825
-11.870
-740.688
7,486.092
-262.551
2,215.782
2.119
5.868

1.465
PASS

2.245
PASS

207,000.000
448.000
531.000
0.300
1,025.000
9.810
59.300

207,000.000
448.000
531.000
0.300
1,025.000
9.810
59.300

207,000.000
448.000
531.000
0.300
1,025.000
9.810
59.300

14.000
14.000
20.700
60.000
3.000
14.113
15.900
1.000
0.500
355.600
1.000

14.000
14.000
20.700
60.000
3.000
13.122
14.300
1.000
0.500
323.900
1.000

14.000
14.000
20.700
60.000
3.000
11.534
12.700
1.000
0.500
273.100
1.000

14.000
14.000
157.931
152.119
224.000
224.000
PASS
PASS
nce with DNV 2007: Sec. 5; P.46)
28.884
29.499

14.000
144.116
224.000
PASS

E2

g book service: Section 2.3 ; P.26)

29.932

15.400
15.536
20.000
-59.300
175.200
0.596
423.360
503.040
423.360
1.150
1.308
7.000

15.400
15.536
20.000
-59.300
175.200
0.596
423.360
503.040
423.360
1.150
1.308
7.000

15.400
15.536
20.000
-59.300
175.200
0.596
423.360
503.040
423.360
1.150
1.308
7.000

7.000
10.204
12.090
1.886
0.960

7.000
9.486
11.270
1.784
0.960
PASS

7.000
8.113
9.700
1.588
0.960
PASS

PASS
nce with DNV 2007: Sec. 5; P.46)
17.879
19.165
28.788
29.461
1.000
1.000
0.015
0.015
13.694
14.516
-17.879
-19.165
-1,023.260
-1,077.025
14,817.036
16,634.258
-376.606
-399.817
4,147.620
4,616.325
2.174
2.186
7.735
8.128
V 2007: Sec. 5; P.47)
3.158
3.346
PASS
PASS

20.385
30.074
1.000
0.015
15.353
-20.385
-1,122.170
18,436.936
-420.228
5,092.176
2.203
8.558
3.523
PASS

IN CASE:
Poper =
Pdesign =
Line pipe Material:

100
100
API Grade X65
PROJECT NAME : HAI SU TRANG GAS PIPELINE PROJECT

CLIENT : PETROVIETNAM / PV GAS


PIPELINE WALL THICKNESS REVIEW

Units
Input Parameters
PIPELINE MATERIAL DATA
Young`s Modulus ( Es)

Mpa

Specified Minimum Yield Stress (SYMS)

Mpa

Specified Minimum Tensile Strength (SMTS)

Mpa

Poisson's ratio()
Water density

kg/m^3

Gravity acceleration (g)

m/c^2

Maximum water depth

CALCULATION OF WALL THICKNESS ( B31.8)


Max Operation pressure

Mpa

Design pressure ( P)

Mpa

Minimum test pressure (Pt) ( Base on AIP 5L)


Design Temperature (Tdes)
Corrosion allowance (tcor)

Mpa

mm

Longitudinal joint factor (E)


Outside diameter (D)

mm

Temperature derating (T)


Design factor (F for Zone 1)
Calculated Wall thickness (tcal)

mm

Selected Wall thickness (t)

mm

Design factor (F for Zone 2 - Riser and 500m within MEZ)


Calculated Wall thickness (tcal)

mm

Selected Wall thickness (t)

mm

HOOP STRESS ( Check in with Elsevier ocean engineering book series: Section 2.3 ; P.26)
Internal Pressure (Pi)
Mpa
Hoop stress (h)

Mpa

Allowable Hoop stress

Mpa

Check with formula: h<=allowable hoop stress


PRESSURE CONTAINMENT (BURSTING) (Check in accordance with DNV 2007: Sec. 5; P.46)
Pressure containment resistance (Pb)

Mpa

Incidental pressure ( Pinc)

Mpa

Local incidental pressure (Pli)

Mpa

Elevation of the reference point ( href)

Elevation of the local pressure point (hl)(positive upwards)

Content density

kg/m3

External pressure( Pe)

Mpa

Yeild stress (fy)

Mpa

Tensile strength (fu)

Mpa

fcb = Min[fy;(fu/1.15)]
Material resistance factor (ym)
Safety class resistance factor (ysc)
De-rating values due to temperature of yeild stress (fy.tem)

Mpa

De-rating values due to temperature of tensile strength (fu.tem)


Minimum wall thickness (t1)
Wall thickness withoat tcor(t2)
Fabrication thickness tolerance
Material strenght factor (au)

Mpa
mm
mm
mm

Check with formula (Pli-Pe)<=(Pb/ym.ysc)


LOCAL BUCKLING ( SYSTEM COLLAPSE)(Check in accordance with DNV 2007: Sec. 5; P.46)
Elastic collapse pressure (Pel)
Plastic collapse pressure (Pp)
Maximum fabrication factor (afab: for seamless)
Ovality ( fo)
Collapse pressure ( Pc) = y-1/3*b
Parameter b = -Pel
Parameter c = -( PP^2+ Pp*Pel*f0*(D/t))
Parameter d = Pel *Pp^2

Mpa

Mpa
Mpa

Parameter u = (1/3)*((-1/3)*b^2 +c)


Paramaeter v = (1/2)*(2/27)*b^3 - (1/3*b*c+d)
Parameter Q = ACos(-v/(-u)^1/3)
Parameter y = -2*(-u)^(1/2)*Cos(Q/3 + (60*3.14)/180)
PROPAGATION BUCKLING (Check in accordance with DNV 2007: Sec. 5; P.47)
Propagating pressure (Ppr)
Check with formula: Pe<(Ppr/ym*ysc)

ZONE 2
PIPELINE MATERIAL DATA
Young`s Modulus ( Es)
Specified Minimum Yield Stress (SYMS)
Specified Minimum Tensile Strength (SMTS)
Poisson's ratio()
Water density
Gravity acceleration (g)
Maximum water depth
PIPELINE GEOMETRY DATA
Max Operation pressure
Design pressure ( P)
Minimum test pressure (Pt) ( Base on AIP 5L)
Design Temperature (T)
Corrosion allowance (tcor)
Calculeted Wall thickness (tcal)
Wall thickness (t)
Longitudinal joint factor (E)
Design factor (F for Zone 2)
Outside diameter (D)
Temperature derating (T)

Mpa
Mpa
Mpa
kg/m^3
m/c^2
m
Mpa

Mpa
Mpa

mm
mm
mm
mm

HOOP STRESS ( Check in with Eleservier ocean engineering book service: Section 2.3 ; P.26)
Internal Pressure (Pi)
Mpa
Mpa
Hoop stress (h)
Mpa
Allowable Hoop stress
Check with formula: h<=allowable hoop stress
PRESSURE CONTAINMENT (BURSTING) (Check in accordance with DNV 2007: Sec. 5; P.46)
Mpa
Pressure containment resistance (Pb)
Mpa
Incidental pressure ( Pinc)
Mpa
Local incidental pressure (Pli)
m
Elevation of the reference point ( href)
m
Elevation of the locol pressure point (hl)(positive upwards)
kg/m3
Content density
Mpa
External pressure( Pe)
Mpa
Yeild stress (fy)
Mpa
Tensile strength (fu)

fcb = Min[fy;(fu/1.15)]
Material resistance factor (ym)
Safety class resistance factor (ysc)
De-rating values due to temperature of yeild stress (fy.tem)

Mpa

Mpa
De-rating values due to temperature of tensile strength (fu.tem)
mm
Minimum wall thickness (t1)
mm
Wall thickness withoat tcor(t2)
mm
Fabrication thickness tolerance
Material strenght factor (au)
Check with formula (Pli-Pe)<=(Pb/ym.ysc)
LOCAL BUCKLING ( SYSTEM COLLAPSE)(Check in accordance with DNV 2007: Sec. 5; P.46)
Mpa
Elastic collapse pressure (Pel)
Plastic collapse pressure (Pp)
Mpa
Maximum fabrication factor (afab: for seamless)
Ovality ( fo)
Collapse pressure ( Pc) = y-1/3*b
Mpa
Parameter b = -Pel
Parameter c = -( PP^2+ Pp*Pel*f0*(D/t))
Parameter d = Pel *Pp^2
Parameter u = (1/3)*((-1/3)*b^2 +c)
Paramaeter v = (1/2)*(2/27)*b^3 - (1/3*b*c+d)
Parameter Q = ACos(-v/(-u)^1/3)
Parameter y = -2*(-u)^(1/2)*Cos(Q/3 + (60*3.14)/180)
PROPAGATION BUCKLING (Check in accordance with DNV 2007: Sec. 5; P.47)
Propagating pressure (Ppr)
Check with formula: Pe<(Ppr/ym*ysc)

Barg
Barg
API Grade X65

NG GAS PIPELINE PROJECT

Design Code: ASME B31.8


Ref Code: DNV 2007
Elsevier Ocean engineering book series
Date:
Value
D= 14"
207,000.00

D=12"
207,000.00

D=10"
207,000.00

448.00

448.00

448.00

531.00

531.00

531.00

0.30

0.30

0.30

1,025.00

1,025.00

1,025.00

9.81

9.81

9.81

59.30

59.30

59.30

10.00

10.00

10.00

10.00

10.00

10.00

20.70
60.00
3.00

20.70
60.00
3.00

20.70
60.00
3.00

1.00

1.00

1.00

355.60

323.90

273.10

1.00

1.00

1.00

0.72

0.72

0.72

8.51

8.02

7.23

9.53

9.53

9.27

0.50

0.50

0.50

10.94

10.23

9.10

12.70

12.70

12.70

10.00

10.00

10.00

194.10

176.80

153.25

322.56

322.56

322.56

ries: Section 2.3 ; P.26)

PASS

PASS

PASS

nce with DNV 2007: Sec. 5; P.46)


14.90

16.39

18.65

11.00

11.00

11.00

11.14

11.14

11.14

20.00

20.00

20.00

-59.30

-59.30

-59.30

175.20

175.20

175.20

0.60

0.60

0.60

423.36

423.36

423.36

503.04

503.04

503.04

423.36
1.15
1.31
7.00

423.36
1.15
1.31
7.00

423.36
1.15
1.31
7.00

7.00
5.34
6.53
1.19
0.96

7.00
5.34
6.53
1.19
0.96

7.00
5.11
6.27
1.16
0.96

FAIL

PASS

PASS

ce with DNV 2007: Sec. 5; P.46)


2.817
15.549
1.000
0.015
2.541
-2.817
-266.276
681.076

3.728
17.070
1.000
0.015
3.330
-3.728
-323.839
1,086.300

5.505
19.440
1.000
0.015
4.844
-5.505
-425.190
2,080.500

-89.640
214.686
1.827
1.602

-109.490
340.024
1.872
2.087

-145.098
643.922
1.948
3.009

0.677

0.855
FAIL

1.183
PASS

207,000.000
448.000
531.000
0.300
1,025.000
9.810
59.300

207,000.000
448.000
531.000
0.300
1,025.000
9.810
59.300

207,000.000
448.000
531.000
0.300
1,025.000
9.810
59.300

10.000
10.000
20.700
60.000
3.000
10.938
15.900
1.000
0.500
355.600
1.000

10.000
10.000
20.700
60.000
3.000
10.230
14.300
1.000
0.500
323.900
1.000

10.000
10.000
20.700
60.000
3.000
9.096
12.700
1.000
0.500
273.100
1.000

10.000
10.000
131.652
119.916
224.000
224.000
PASS
PASS
nce with DNV 2007: Sec. 5; P.46)
22.826
25.117
11.000
11.000
11.136
11.136
20.000
20.000
-59.300
-59.300
175.200
175.200
0.596
0.596
423.360
423.360
503.040
503.040

10.000
101.109
224.000
PASS

2007: Sec. 5; P.47)

FAIL

E2

g book service: Section 2.3 ; P.26)

29.932
11.000
11.136
20.000
-59.300
175.200
0.596
423.360
503.040

423.360
1.150
1.308
7.000

423.360
1.150
1.308
7.000

423.360
1.150
1.308
7.000

7.000
8.113
9.700
1.588
0.960

7.000
8.113
9.700
1.588
0.960
PASS

7.000
8.113
9.700
1.588
0.960
PASS

PASS
ce with DNV 2007: Sec. 5; P.46)
9.234
12.219
23.097
25.357
1.000
1.000
0.015
0.015
7.563
9.623
-9.234
-12.219
-637.467
-790.140
4,925.933
7,856.742
-221.963
-279.970
1,452.746
2,251.660
2.026
2.072
4.485
5.550
2007: Sec. 5; P.47)
1.821
2.300
PASS
PASS

20.385
30.074
1.000
0.015
14.550
-20.385
-1,180.537
18,436.936
-439.684
4,893.873
2.130
7.755
3.523
PASS

IN CASE:
Poper =
Pdesign =
Line pipe Material:

100
110
API Grade X60
PROJECT NAME : HAI SU TRANG GAS PIPELINE PROJECT

CLIENT : PETROVIETNAM / PV GAS


PIPELINE WALL THICKNESS REVIEW

Units
Input Parameters
PIPELINE MATERIAL DATA
Young`s Modulus ( Es)

Mpa

Specified Minimum Yield Stress (SYMS)

Mpa

Specified Minimum Tensile Strength (SMTS)

Mpa

Poisson's ratio()
Water density

kg/m^3

Gravity acceleration (g)

m/c^2

Maximum water depth

CALCULATION OF WALL THICKNESS ( B31.8)


Max Operation pressure

Mpa

Design pressure ( P)

Mpa

Minimum test pressure (Pt) ( Base on AIP 5L)


Design Temperature (Tdes)
Corrosion allowance (tcor)

Mpa

mm

Longitudinal joint factor (E)


Outside diameter (D)

mm

Temperature derating (T)


Design factor (F for Zone 1)
Calculated Wall thickness (tcal)

mm

Selected Wall thickness (t)

mm

Design factor (F for Zone 2 - Riser and 500m within MEZ)


Calculated Wall thickness (tcal)

mm

Selected Wall thickness (t)

mm

HOOP STRESS ( Check in with Elsevier ocean engineering book series: Section 2.3 ; P.26)
Internal Pressure (Pi)
Mpa
Hoop stress (h)

Mpa

Allowable Hoop stress

Mpa

Check with formula: h<=allowable hoop stress


PRESSURE CONTAINMENT (BURSTING) (Check in accordance with DNV 2007: Sec. 5; P.46)
Pressure containment resistance (Pb)

Mpa

Incidental pressure ( Pinc)

Mpa

Local incidental pressure (Pli)

Mpa

Elevation of the reference point ( href)

Elevation of the local pressure point (hl)(positive upwards)

Content density

kg/m3

External pressure( Pe)

Mpa

Yeild stress (fy)

Mpa

Tensile strength (fu)

Mpa

fcb = Min[fy;(fu/1.15)]
Material resistance factor (ym)
Safety class resistance factor (ysc)
De-rating values due to temperature of yeild stress (fy.tem)

Mpa

De-rating values due to temperature of tensile strength (fu.tem)


Minimum wall thickness (t1)
Wall thickness withoat tcor(t2)
Fabrication thickness tolerance
Material strenght factor (au)

Mpa
mm
mm
mm

Check with formula (Pli-Pe)<=(Pb/ym.ysc)


LOCAL BUCKLING ( SYSTEM COLLAPSE)(Check in accordance with DNV 2007: Sec. 5; P.46)
Elastic collapse pressure (Pel)
Plastic collapse pressure (Pp)
Maximum fabrication factor (afab: for seamless)
Ovality ( fo)
Collapse pressure ( Pc) = y-1/3*b
Parameter b = -Pel
Parameter c = -( PP^2+ Pp*Pel*f0*(D/t))
Parameter d = Pel *Pp^2

Mpa

Mpa
Mpa

Parameter u = (1/3)*((-1/3)*b^2 +c)


Paramaeter v = (1/2)*(2/27)*b^3 - (1/3*b*c+d)
Parameter Q = ACos(-v/(-u)^1/3)
Parameter y = -2*(-u)^(1/2)*Cos(Q/3 + (60*3.14)/180)
PROPAGATION BUCKLING (Check in accordance with DNV 2007: Sec. 5; P.47)
Propagating pressure (Ppr)
Check with formula: Pe<(Ppr/ym*ysc)

ZONE 2
PIPELINE MATERIAL DATA
Young`s Modulus ( Es)
Specified Minimum Yield Stress (SYMS)
Specified Minimum Tensile Strength (SMTS)
Poisson's ratio()
Water density
Gravity acceleration (g)
Maximum water depth
PIPELINE GEOMETRY DATA
Max Operation pressure
Design pressure ( P)
Minimum test pressure (Pt) ( Base on AIP 5L)
Design Temperature (T)
Corrosion allowance (tcor)
Calculeted Wall thickness (tcal)
Wall thickness (t)
Longitudinal joint factor (E)
Design factor (F for Zone 2)
Outside diameter (D)
Temperature derating (T)

Mpa
Mpa
Mpa
kg/m^3
m/c^2
m
Mpa

Mpa
Mpa

mm
mm
mm
mm

HOOP STRESS ( Check in with Eleservier ocean engineering book service: Section 2.3 ; P.26)
Internal Pressure (Pi)
Mpa
Mpa
Hoop stress (h)
Mpa
Allowable Hoop stress
Check with formula: h<=allowable hoop stress
PRESSURE CONTAINMENT (BURSTING) (Check in accordance with DNV 2007: Sec. 5; P.46)
Mpa
Pressure containment resistance (Pb)
Mpa
Incidental pressure ( Pinc)
Mpa
Local incidental pressure (Pli)
m
Elevation of the reference point ( href)
m
Elevation of the locol pressure point (hl)(positive upwards)
kg/m3
Content density
Mpa
External pressure( Pe)
Mpa
Yeild stress (fy)
Mpa
Tensile strength (fu)

fcb = Min[fy;(fu/1.15)]
Material resistance factor (ym)
Safety class resistance factor (ysc)
De-rating values due to temperature of yeild stress (fy.tem)

Mpa

Mpa
De-rating values due to temperature of tensile strength (fu.tem)
mm
Minimum wall thickness (t1)
mm
Wall thickness withoat tcor(t2)
mm
Fabrication thickness tolerance
Material strenght factor (au)
Check with formula (Pli-Pe)<=(Pb/ym.ysc)
LOCAL BUCKLING ( SYSTEM COLLAPSE)(Check in accordance with DNV 2007: Sec. 5; P.46)
Mpa
Elastic collapse pressure (Pel)
Plastic collapse pressure (Pp)
Mpa
Maximum fabrication factor (afab: for seamless)
Ovality ( fo)
Collapse pressure ( Pc) = y-1/3*b
Mpa
Parameter b = -Pel
Parameter c = -( PP^2+ Pp*Pel*f0*(D/t))
Parameter d = Pel *Pp^2
Parameter u = (1/3)*((-1/3)*b^2 +c)
Paramaeter v = (1/2)*(2/27)*b^3 - (1/3*b*c+d)
Parameter Q = ACos(-v/(-u)^1/3)
Parameter y = -2*(-u)^(1/2)*Cos(Q/3 + (60*3.14)/180)
PROPAGATION BUCKLING (Check in accordance with DNV 2007: Sec. 5; P.47)
Propagating pressure (Ppr)
Check with formula: Pe<(Ppr/ym*ysc)

Barg
Barg
API Grade X60

NG GAS PIPELINE PROJECT

Design Code: ASME B31.8


Ref Code: DNV 2007
Elsevier Ocean engineering book series
Date:
Value
D= 14"
207,000.00

D=12"
207,000.00

D=10"
207,000.00

414.00

414.00

414.00

517.00

517.00

517.00

0.30

0.30

0.30

1,025.00

1,025.00

1,025.00

9.81

9.81

9.81

59.30

59.30

59.30

10.00

10.00

10.00

11.00

11.00

11.00

20.70
60.00
3.00

20.70
60.00
3.00

20.70
60.00
3.00

1.00

1.00

1.00

355.60

323.90

273.10

1.00

1.00

1.00

0.72

0.72

0.72

9.56

8.98

8.04

9.53

9.53

9.27

0.50

0.50

0.50

12.45

11.61

10.26

12.70

12.70

12.70

11.00

11.00

11.00

214.62

195.49

169.45

298.08

298.08

298.08

ries: Section 2.3 ; P.26)

PASS

PASS

PASS

nce with DNV 2007: Sec. 5; P.46)


13.75

15.12

17.21

12.10

12.10

12.10

12.24

12.24

12.24

20.00

20.00

20.00

-59.30

-59.30

-59.30

175.20

175.20

175.20

0.60

0.60

0.60

390.72

390.72

390.72

489.60

489.60

489.60

390.72
1.15
1.31
7.00

390.72
1.15
1.31
7.00

390.72
1.15
1.31
7.00

7.00
5.34
6.53
1.19
0.96

7.00
5.34
6.53
1.19
0.96

7.00
5.11
6.27
1.16
0.96

FAIL

FAIL

FAIL

ce with DNV 2007: Sec. 5; P.46)


2.817
14.350
1.000
0.015
2.521
-2.817
-228.545
580.106

3.728
15.754
1.000
0.015
3.300
-3.728
-278.138
925.255

5.505
17.941
1.000
0.015
4.792
-5.505
-365.521
1,772.064

-77.063
181.917
1.843
1.582

-94.257
287.896
1.891
2.057

-125.208
544.456
1.970
2.957

0.625

0.789
FAIL

1.092
PASS

207,000.000
414.000
517.000
0.300
1,025.000
9.810
59.300

207,000.000
414.000
517.000
0.300
1,025.000
9.810
59.300

207,000.000
414.000
517.000
0.300
1,025.000
9.810
59.300

10.000
11.000
20.700
60.000
3.000
12.448
15.900
1.000
0.500
355.600
1.000

10.000
11.000
20.700
60.000
3.000
11.606
14.300
1.000
0.500
323.900
1.000

10.000
11.000
20.700
60.000
3.000
10.256
12.700
1.000
0.500
273.100
1.000

11.000
11.000
145.652
132.668
207.000
207.000
PASS
PASS
nce with DNV 2007: Sec. 5; P.46)
21.066
23.181
12.100
12.100
12.236
12.236
20.000
20.000
-59.300
-59.300
175.200
175.200
0.596
0.596
390.720
390.720
489.600
489.600

11.000
111.861
207.000
PASS

2007: Sec. 5; P.47)

FAIL

E2

g book service: Section 2.3 ; P.26)

27.624
12.100
12.236
20.000
-59.300
175.200
0.596
390.720
489.600

390.720
1.150
1.308
7.000

390.720
1.150
1.308
7.000

390.720
1.150
1.308
7.000

7.000
8.113
9.700
1.588
0.960

7.000
8.113
9.700
1.588
0.960
PASS

7.000
8.113
9.700
1.588
0.960
PASS

PASS
ce with DNV 2007: Sec. 5; P.46)
9.234
12.219
21.316
23.402
1.000
1.000
0.015
0.015
7.600
9.654
-9.234
-12.219
-538.712
-667.368
4,195.659
6,691.973
-189.045
-239.046
1,239.592
1,919.302
2.068
2.117
4.522
5.581
2007: Sec. 5; P.47)
1.681
2.122
PASS
PASS

20.385
27.755
1.000
0.015
14.500
-20.385
-996.340
15,703.642
-378.285
4,153.034
2.171
7.705
3.251
PASS