METHOD STATEMENT

TELECOMMUNICATION & SECURITY SYSTEM (TCSS)


1. INTRODUCTION
This method statement describes procedures of telecommunication works to install telecommunication
devices on site as required in the construction drawing.
2. SCOPE
i. GI crossing at 2km interval from RHS to HS.
ii. Installation of handhole at ever! 2"#mm.
iii. $ain duct installation along the mainline at RHS of carriagewa! shoulder.
iv. Installation subduct along the mainline at RHS of carriagewa! shoulder.
v. Testing % &ommissioning
3. WORK PROCEDURE
I'ST((TI)' )* H('+H),
i. -efore e.cavation must ensure the correct site level for the /oint bo..
ii. ,.cavation of /oint bo.es shall be installed with the diameter of 01#mm 234 . 551"mm 24 .
5#"#mm 2+4 with a backhoe machine.
iii. 6oint bo. will be the precast handhole Grade 7#82#.
iv. To install the handhole with either a crane or backhoe machine.
v. (ll surplus material shall be removed clear from site.
I'ST((TI)' )* +9&TI'G
i. Trenching for duct la!ing b! using a backhoe machine: for 2 wa! duct la!ing a 7##mm width shall
be e.cavated to a depth of 5###mm: sand shall be filled over the lower line of the ducts and
carefull! rammed to form a bedding "#mm in thickness.
ii. a!ing of duct with a "#mm in gap apart from each duct and filled with sand to a "#mm from the
duct top.
iii. -ackfilled the remaining portion to the e.isting level and compact
iv. (ll surplus material shall be removed clear form site.
$,TH)+ ST(T,$,'T; T,,&)$$9'I&(TI)' % S,&9RIT< S<ST,$ 2T&SS4
I'ST((TI)' )* S9- +9&T
i. (ll the sub duct shall be laid on the ground before installing into the duct wa!s 22 nos of 72mm and
5 nos of "#m sub duct si=e4
ii. >?& tapping the sub duct b! and interval of 2###mm for securing duct formation
iii. >ulling in the sub duct to the designated duct wa!s b! labour.
iv. Installing a plate at each end of the /oint bo.es and install end cap for each sub duct both sides.
I'ST((TI)' )* G.I +9&T &R)SSI'G
i. Trenching of G.I 5 nos of class @-A will be done b! backhoe machine: depth of trench 5###mm.
ii. &onnection from the trench G.I pipe to the /oint bo. will either be bending of the G.I pipe or using
5##mm corrugated pipe.
iii. The testing method used will be either manuall! or compressor machine: a mandrel used shall be
equivalent to B"#mm in length and 0#mm in diameter.
iv. The mandrel shall be pulled through or b! using compress air to push through the ne.t /oint bo..
T,STI'G
i. The testing method used will be either manuall! or compressor machine: a mandrel used shall be
equivalent to B"#mm in length and 0#mm in diameter.
ii. The mandrel shall be pulled through or b! using compress air to push through the ne.t /oint bo..
4. RESOURCES
a4 $achine and ,quipment
i. -ackhoe ; *or e.cavation works
ii. &ompressor ; *or testing purpose
b4 $anpower
i. -ackhoe ; 5
)perator
ii. *ield Staff ; B
5. QUALITY CONTROL
a4 +ail! Record 2R*I4
b4 Cualit! ?erification &hecklist 2S>D4
c4 ,nsure the installation works and devices in accordance to the construction drawing
specification 2>,,85#218#E8T#28H'+8##5 F >,,85#218#E8T#28H'+8##04
d4 Inspection on received devices to ascertain the qualit! of the product.