University of Wollongong
CSCI321 Final Year Project
BIT-09-6 Secure House: A building security tool
Project Diary
Page 1 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
Introduction
This project diary consists of a set of documents that are used to keep track of
the project timeline and review on project meetings. It contains the project
plan with milestones and all copies of the minutes conducted by the project
team.
Appendix
Documents Date
Project Plan (Gantt Chart) -
Milestones -
Page 2 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
Project Plan
Milestones
Page 3 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
Minutes of Meeting 1
MEETING PRELIMINARIES
Project : BIT-09-6 Secure House
Subject : Meeting 1
Place : SIM Date : 18 Mar 09
Time : 1330 Pages : 2
BOARD MEMBERS:
APPROVAL:
Minutes By : Wenfeng Date : 18 Mar 09
Vetted By : Jojo Date : 18 Mar 09
Approved By : Jojo Date : 18 Mar 09
Project members agreed and appointed Jojo as the Project Manager to steer this
1.1
project
2.1 Discussion was conducted on proposal layout. Format was generated and agreed
by the team.
Proposal layout:
Introduction
- Project introduction
- Development Stages
Researches
- Applications and devices
2.2 - Strengths and weaknesses
Design Specification
- Methodology
- Development tool and language
Marketing Analysis
- Type of housing
- Targeted audiences
Page 4 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
No. Subject Matter Remark
3 ALLOCATION OF WORKLOAD
3.2 Dateline was set at 19 Mar 09 for further enhancement and consolidation.
4 CONCLUSION
Page 5 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
Minutes of Meeting 2
MEETING PRELIMINARIES
Project : BIT-09-6 Secure House
Subject : Meeting 2
Place : SIM Date : 27 Mar 09
Time : 2000 Pages : 1
BOARD MEMBERS:
APPROVAL:
Minutes By : Wenfeng Date : 27 Mar 09
Vetted By : Jojo Date : 27 Mar 09
Approved By : Jojo Date : 27 Mar 09
1.1 Enhancements are done on 2 sections of the initial proposal. Enhanced sections
included ‘Introduction’ and ‘Researches’ sections.
Inclusion of roles and responsibilities, and project plan (Gantt chart and
Milestones) under the ‘Introduction’ section.
1.2
Additional sources on applications and devices, strength and weaknesses are
provided in the ‘Researches’ section.
2 ALLOCATION OF WORKLOAD
Work allocation:
2.1 Enhancement on Introduction – Wenfeng, Jojo
Enhancement on Researches – Fatimah, Sze Lee
3 CONCLUSION
Page 6 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
No. Subject Matter Remark
Minutes of Meeting 3
MEETING PRELIMINARIES
Project : BIT-09-6 Secure House
Subject : Meeting 3
Place : SIM Date : 04 Apr 09
Time : 1500 Pages : 1
BOARD MEMBERS:
APPROVAL:
Minutes By : Wenfeng Date : 04 Apr 09
Vetted By : Jojo Date : 04 Apr 09
Approved By : Jojo Date : 04 Apr 09
1.2 Applications like JAVA 3D, VB, Flash were shortlisted for further researches.
Any suitable applications can also be added.
2 ALLOCATION OF WORKLOAD
2.1 All team members will conduct research on shortlisted applications and any
sample source codes.
Page 7 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
No. Subject Matter Remark
2.2 Dateline was set at 13 Apr 09 for discussion on researches done.
3 CONCLUSION
Minutes of Meeting 4
MEETING PRELIMINARIES
Project : BIT-09-6 Secure House
Subject : Meeting 4
Place : SIM Date : 13 Apr 09
Time : 2000 Pages : 1
BOARD MEMBERS:
APPROVAL:
Minutes By : Wenfeng Date : 13 Apr 09
Vetted By : Jojo Date : 13 Apr 09
Approved By : Jojo Date : 13 Apr 09
1.2
Jojo conducted researches on JAVA 3D.
Setting up of applets
Using loader to upload models
Found a sample coding on layout of a house
Page 8 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
No. Subject Matter Remark
2 CONCLUSION
Minutes of Meeting 5
MEETING PRELIMINARIES
Project : BIT-09-6 Secure House
Subject : Meeting 5
Place : National Library Date : 19 Apr 09
Time : 1700 Pages : 2
BOARD MEMBERS:
APPROVAL:
Minutes By : Wenfeng Date : 19 Apr 09
Vetted By : Jojo Date : 19 Apr 09
Approved By : Jojo Date : 19 Apr 09
Team members finalize on the suitable application after all refining done. Java
1.1 As refer to Meeting 4.
3D was selected for further enhancement.
2 COMPARSION
2.1 Google SkretchUp 7 was good for building models and able to import models
but not able to implement drag and drop security feature.
VB can only act as a prototype template, no simulation and drag and drop
Page 9 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
No. Subject Matter Remark
security features.
Java 3D was able to setup applets and upload models. Simulation can be done
and, drag and drop feature can be included.
2.2 Team members will conduct more refining on the prototype using Java 3D.
3 PROJECT DOCUMENTATION
4 ALLOCATION OF WORKLOAD
4.1 Implementation:
Jojo & Fatimah will focus more on implementing the application.
Project Documentation:
Wenfeng will start with the technical plan and compiling the project diary.
Project Website:
Sze Lee will continue to build on the project website.
5 CONCLUSION
Page 10 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
Minutes of Meeting 6
MEETING PRELIMINARIES
Project : BIT-09-6 Secure House
Subject : Meeting 6
Place : National Library Date : 25 Apr 09
Time : 1900 Pages : 2
BOARD MEMBERS:
APPROVAL:
Minutes By : Wenfeng Date : 25 Apr 09
Vetted By : Jojo Date : 25 Apr 09
Approved By : Jojo Date : 25 Apr 09
2 IMPLEMENTATION
In-progress
2.2 Constructing internal layout
Drag and drop function
3 DOCUMENTATION
Page 11 of 12
CSCI321 Final Year Project
BIT-09-6 Secure House
Project Diary
No. Subject Matter Remark
Project Proposal
Design Specification
Test Document (in-progress)
Project Review
Project Diary
Project Plan
Milestones
Minutes of Meeting (6 minutes to date)
4 WEBSITE
5 CONCLUSION
5.1 Team members will continue on enhancements and update on regular basis.
Page 12 of 12