Sei sulla pagina 1di 2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of thedocument referenced in Item9A or 10A, as heretoforechanged, remains unchanged and in full forceand effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribedby GSA
FAR (48 CFR) 53.243
The purpose of Amendment No. 0001 under Solicitation No. W912ER-10-R-0028 is to (i) change the date of the site visit; (ii) change the Point
of Contact (POC) information; and (iii) to provide addional information offerors will need to provide to the POC prior to the site visit. The
revised date of the site visit is May 12, 2010 at 10:00AM local time. The POC for the site visit is Mr. David M. Praner, cell phone no.
050-018-4305, email address is david.praner@evab.afcent.af.mil. Offerors are to provide the following information to the POC: (1) A copy,
electronic or paper, of their passport; (2) Iqama (worker permit, if available); (3) Make sure that the passport, iqama number, name, religion
and nationality are readable. Offerors who plan to attend the site visit, are to contact Mr. Praner as soon as possible to finalize their site
visit arrangements.
1. CONTRACT ID CODE PAGE OF PAGES
J
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
28-Apr-2010
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorizedto sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State andZip Code)
X
W912ER-10-R-0028
X
9B. DATED (SEE ITEM 11)
20-Apr-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X Theabovenumbered solicitation is amended as set forth in Item14. Thehour and datespecified for receipt of Offer is extended,
X
is not extended.
Offer must acknowledgereceipt of this amendment prior to thehour and datespecified in thesolicitation or as amended by oneof thefollowing methods:
(a) By completing Items 8 and 15, and returning 1 copies of theamendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separateletter or telegramwhich includes areferenceto thesolicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtueof this amendment you desireto changean offer already submitted, such changemay bemadeby telegramor letter,
provided each telegramor letter makes referenceto thesolicitation and this amendment, and is received prior to theopening hour and datespecified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THISITEM APPLIESONLY TO MODIFICATIONSOF CONTRACTS/ORDERS.
IT MODIFIESTHE CONTRACT/ORDER NO. ASDESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER ISISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER ISMODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying
office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification andauthority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organizedby UCF section headings, including solicitation/contract subject matter
where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Apr-2010
CODE
US ARMY CORPS OF ENGINEERS-CETAM-CT
MIDDLE EAST DISTRICT, CETAM-CT
PO BOX 2250
WINCHESTER VA 22604-1450
W912ER
7. ADMINISTERED BY (If other than item6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W912ER-10-R-0028
0001
Page 2 of 2


SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

Potrebbero piacerti anche