The Shard will be the tallest building in the European Union. The mixed-use 310 m (1,016 ft) vertical city of high-quality offices,
restaurants, hotel and exclusive residential apartments will total over 900,000 square feet.
Key strategies:


WRAP procurement wording has been used from the client through the supply chain which
drives waste and cost savings.


Top-down construction allows the sub and superstructure to be worked

on simultaneously,
saving time on the programme, which enabled a unique jump start on the core.


Off site manufacture is used extensively, which increases efficiency and reduces site waste.
which are demonstrated in WRAP case studies. There is also a section in WRAPs Designing
Out Waste guide on off site construction.


Mace used WRAPs Material Logistics Plan template for the Shard and have since used this
on other projects in the London Bridge Place development.
Sellar Properties who part own the developers Teighmore Construction worked with WRAP in
2008 to develop waste procurement wording. The Shard main contractor, Mace signed up to
Halving Waste to Landfill in early 2009. Mace have worked extensively with WRAP to develop
guidance on Material Logistics Planning which has been incorporated into the Shard project.
Outcomes:


So far, 92% of site waste is currently being diverted from landfill. 98% of waste from off-site
manufacturing processes is diverted from landfill.


Using off site construction reduced insulation waste to a quarter of traditional construction.


Logistics strategies have helped schedule deliveries, reducing congestion and CO
2

emissions.
November 2011
Waste & Resources
Action Programme
The Old Academy
21 Horse Fair
Banbury, Oxon OX16 OAH
Tel: 01295 819 900
Fax: 01295 819 911
E-mail info@wrap.org.uk
Helpline freephone
0808 100 2040
www.wrap.org.uk
While steps have been taken to ensure its accuracy, WRAP cannot accept responsibility or be held liable to any person
for any loss or damage arising out of or in connection with this

information being inaccurate, incomplete or misleading.
This material is copyrighted. It may be reproduced free of charge subject to the material being accurate and not used in
a misleading context. The source of the material must be identified and the copyright status acknowledged. This
material must not be used to endorse or used to suggest WRAPs endorsement of a commercial product or service.
For more detail, please refer to our Terms & Conditions on our website -

www.wrap.org.uk
For guidance on construction logistics visit:
www.wrap.org.uk/constructionlogistics
For information on good practice procurement visit
www.wrap.org.uk/procurement

Potrebbero piacerti anche