SCHEDULE A:
SUB HEAD NO-1: DISMANTLING AND DEMOLISHING
Demolishing of stone rubble masonry
menually/ by mechanical means
including stacking of servicable
material and disposal of unservicable
1 material within 50 metres lead as per
direction of Engineer-in-charge.
15.9.2,
1 1.1 In cement morter 95.70 cum 370.75 35,480.78
Page 226
SUB HEAD NO-2: EARTH WORK
Earth work in excavation by
mechanical means (hydraulic
excavator)/ manual means over areas
(exceeding 30cm in depth. 1.5m in
width as well as 10 Sqm on plan)
1 including disposal of excavated earth,
lead upto 50m and lift upto 1.5m;
disposed earth to be levelled and
neatly dressed
5 1.1 All work upto plinth level 110.250 cum 4147.40 457,250.85 5.33
Add or deduct for providig richer or
2 leaner mixes respectively at all floor
levels.
Providing M-35 grade concrete by
using 428kg of cement per cum of
6 2.1 concrete instead of M-25 grade BMC/ 110.25 cum 98.20 10,826.55 5.34.2
RMC