Give the necessary equipment, tools, materials, supplies and information the candidate is
expected to perform the following five projects.
Assessment place well equipped computer Lab
Total time allotted 4:00 hours
Project 1: connecting hardware peripherals and connecting workstations to the internet
Task 1: connect hardware peripherals and operate personal computer
Task 1.1 Identify and connect the peripherals that you have provided
Task 1.2 start the computer
Task 2: Connect the computer to the internet
Task 2.1 connect the computer provided to the hub/switch or to wall outlet using appropriate
cable
Task 2.2 configure the connection using the following information which you will be provided
with
IP Address
Subnet mask
Default getaway
Preferred DNS server
Task 2.3 Browse www.google.com
Project 2: Installation of Application Software
(Time allotted 30 min)
Task 1: Install Application Software
Task 1.1 Upgrade MS office 2003 to MS office 2007
Task 1.2 Find out all system requirements for installing MS office 2007 (write those
requirements on MS word document and save it by the name requirements on the desktop)







Project 3 Operate personal computer
(Time allotted 1 hour)
Task 1: Operate personal commuter
Task 1.1 Customize your desktop icons
Task 1.2 Change the start menu to classic view
Task 1.3 Crate the following Folder structure in My Document
COC\ICT\SUPPORT
Task 1.4 Change the folder icon COC to a Globe icon
Task 1.5 Create a shortcut for the folder COC in your Desktop
Task 1.6 Hide the folder Support and show when the Assessor asks you
Task 2: Create the following document in MS-Excel Program.
Task 2.1 Write the computer hardware and software Specification that you are using
know
Hardware Specification

Task 2.2 Install a printer and print the above document









Project 4: Install and configure antivirus and window security
(Time allotted 30 min)
Task 1: Install Software Application (UC2)
Hardware Brand or Type
Mouse
Keyboard
CD/DVD disk drive
Monitor
Hardware Capacity or speed
RAM
Processor
Hard disk
NIC
A. Install the antivirus software that you are provided with
B. Configure this antivirus to scan the computer weekly on Friday 3 AM at local time
C. Configure this antivirus to update automatically daily 8 AM at local time
Task 2: Protect Application or System Software
A. Set an Alert for Firewall
B. Set an Alert for Automatic Update
C. Set an Alert for Virus Protection
Task 3: Create a user account
Create a user account that cannot able to access any other users document
Project 5: Accepts user request and prioritize these requests based on problem type and user
level agreement time
(Time allotted 30 min)
Assume that you are IT technician in the commercial bank of Ethiopia. You received
The following client request from different department this morning.
A. Ato Addisu Ejigu from Manager Office reports that his computer is unable to start.
B. Ato Melaku from Finance department his Peachtree program is not functional when he is
trying to prepare a payroll.
C. W/ro Aberash the secretary from Manger Office needs her MS office to be upgraded
D. W/ro Abeba from Human resources department her printer stopped working while printing
attendance
E. Ato Belete from Public relation department needs paper to print his annual report
Task 1: Record all relevant requests using the bellow table template
NO Name of client Department Problem Description Priority






Task 2: set the priority based on the user level agreement and problems type
Task 3: save the above document by the name client Request in the folder COC that you
created on Project 3