Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Career Objectives
I have worked with very reputed multinational contractors,
consultants and project managers in the UAE and Pakistan,
Coordinating with Construction Managers, supervision teams and
ensures that all necessary information is available prior to
commencement of works.
Perform a recon survey and Secondary Station; evaluate field data and
the result obtained. Supervise and direct topographic, construction
engineering, land and building surveys. Plan and analyze the
collection of traverse, triangulation, leveling and isolated
computational or field boundaries. Digitalize field survey data into
CAD programs and process CAD data into final protects.
Perform mass earthwork volume calculation by surveying software.
Operate and write programs for programmable electronic calculators.
Perform observations and compare standardize and calibrate survey
instruments.
Evaluate and verify results of all computations.
Work Experience
Responsible for all construction calculation and activities.
Establish Horizontal and vertical control station.
Co ordinate with construction design team.
Check out the under ground utilities by radio detectors.
Perform Topographic and As-built survey.
Digitalize field data into cad programs and process cad data into
final products.
Evaluate field computations and survey drawings.
Setting out all field activities.
Perform grade elevation, profiles and find mass Earthwork volumes
1. Personal details
Nationality: PAKISTANI
Passport No. KF354903
2. Education:
University/institution Type of study (full time, Date Date
(please include country) Degree/diploma name part time, placement year,
flexible study)
started completed
BOARD OF INTERMEDIATE
SECONDARY EDUCATION
INTERMEDIATE
ABBOTTABAD N.W.F.P (HSSC)
PAKISTAN
GOVERNAMENT
POLYTECNIC INSITUATE
DIPLOMA IN
HARIPUR HAZARA SURVEY
PAKISTAN
VITAL COMPUTER TRAINGING Office Automation
INSTITUTE &Auto cad
EXPERIENCE
UNITED ARAB EMIRATES
RESPONSIBILITIES:
Piling setting out and as built, Topographical survey site wide.
Core wall setting out and as built.
Markings of grids.
Layouts of the footings, walls, columns,
Checking of the civil works.
Prepare survey report.
Coordinate inspection and testing with the consultant.
September 2005 TO 2007
RESPONSIBILITIES:
Civil works, underground piping
Structural steel pipe rack Equipment Foundations
Building and Earth works,
Under ground cable Duct bank work.
Tank Foundation Visal foundations & as built.
Paving slope underground concrete work
Supervision implementation of civil and survey work.
2003TO 2004
RESPONSIBILITIES:
Piling setting out and as built, Topographical survey site wide.
Column and raft setting out and as built.
Marking Grid Line and Leveling site wide.
Prepare material request.
Checking of the civil works.
Surveying (setting out beams slabs water features ……
EXPERIENCE
PAKISTAN
RESPONSIBILITIES:
Topographical survey site wide.
Setting out and Level Work at Spillway Intake and,
Equipment control building.
Marking Grid Line and Leveling.
Coordinate inspection and testing with the consultant.
INSTRUMENT USED: