Sei sulla pagina 1di 199

10 MW Biomass Based Power Plant ABEIL

G1. INTRODUCTION
Arr|| 8|o Frergy ard lrdus|r|es l|d (|ercelor|| aoorev|a|ed as A8Fll) |as oeer |rcorpora|ed
as a luo||c l|r||ed Corpary or 29|| Jaruary,2004 . T||s corpary Was proro|ed oy 3|r|.
K.C.0ujar|, C|a|rrar & |arag|rg 0|rec|or ard 3r|. 3ud|a 0ujar|, 0|rec|or. A8Fll |s p|arr|rg
|o se| up ar 11 |w |rdeperder| o|orass oased poWer p|ar| a| Jag| boad |r |ayorg C|rc|e ol
|ar|gaor d|s|r|c| |r Assar. T||s W||| oe ||e l|rs| lrdeperder| 8|orass 8ased loWer l|ar| a|
Assar.
1.1 BACKGROUND AND INTRODUCTION
8|orass |s |roWr |o oe ar |rpor|ar| erergy source lor deve|op|rg cour|r|es |||e lrd|a. l|s
|rpor|arce |s roW oe|rg reall|rred ever oy deve|oped cour|r|es |r v|eW ol ||s rereWao|e ard
erv|rorrer| lr|erd|y c|arac|er. lr our cour|ry a|so, op||rur u||||za||or ol o|orass resources
cou|d ro| or|y |ead |o sav|rgs |r corver||ora| erergy ou| a|so resu|| |r rary |rd|rec| oerel||s.
lr v|eW ol |||s, ||e ||r|s|ry ol Nor Corver||ora| Frergy 3ources |as oeer proro||rg
e|ec|r|c||y gerera||or lror o|orass as a rears ol lu|| exp|o||a||or ol ||s |r|erer| erergy va|ue.
Arorg ||e |ec|ro|og|es oe|rg proro|ed lor |||s purpose |s ||e regaWa|| sca|e poWer
gerera||or ||roug| corous||or us|rg oo||er ard |uro|re ard gas|l|ca||or, us|rg 0as|l|er ard
producer gas erg|res. Corous||or rou|e |s used lor |rdeperder| o|orass poWer p|ar|s ard
a|so |r cogerera||or rode. T|ese projec|s are covered urder ||e 8|orass
loWer|Cogerera||or lrograrre ol ||r|s|ry ol Nor Corver||ora| erergy 3ources, 0ov|. ol
lrd|a. T|e ||r|s|ry |r|||a|ed ||e prograrre lor proro||or ol ||ese rou|es ol o|orass u||||za||or
a|ros| a decade oac| ard s|gr|l|car| ac||everer|s |ave oeer rade |r |||s per|od |oWards
||e|r correrc|a||za||or ard es|ao||s|rer| as a v|ao|e ard erv|rorrer| lr|erd|y e|ec|r|c||y
gerera||or op||or.
1.2 POTENTIAL
T|e arrua| gerera||or ol o|orass ra|er|a|s cover|rg res|dues lror agr|cu||ure, lores|ry, ard
p|ar|a||or opera||ors, |s es||ra|ed a| rore ||ar 550 r||||or |ors. 8|orass |s c|ass|l|ed |r|o
||ree ca|egor|es. Crop res|dues |||e Co||or s|a||s, rus|ard s|a||s, e|c, agro |rdus|ry res|dues
|||e r|ce |us|, oagasse, e|c ard lror Was|e |ards ard lores|. 8|orass |s a|so ca|egor|zed |r|o
|Wo lurc||ora| ca|egor|es |||e, su||ao|e lor lodder ard su||ao|e lor poWer gerera||or. 8|orass
su||ao|e lor lodder |s ro| cors|dered lor poWer gerera||or, ever||oug| ||e o|orass |s surp|us.
l| |as oeer es||ra|ed ||a| aoou| 70-80 ol ||ese Was|es are used as lodder, as lue| lor
10 MW Biomass Based Power Plant ABEIL
dores||c coo||rg ard lor o||er ecoror|c purposes |eav|rg oe||rd 120-150 r||||ors |ors ol
usao|e agro res|dues per year W||c| cou|d oe rade ava||ao|e lor poWer gerera||or. 8y us|rg
||ese surp|us agro res|dues ard ||e Was|es lror lores|ry ard p|ar|a||ors, || |as oeer
es||ra|ed ||a| rore ||ar 1o,000 |w ol gr|d qua|||y poWer car oe gerera|ed. lr add|||or,
arourd 3,500 |w ol poWer car oe produced, |l ||e sugar r|||s |r ||e cour|ry sW||c| over |o
roderr |ec|r|ques ol op||rur co-gerera||or. T|e 3|a|es |av|rg ||e rax|rur po|er||a| lor
oagasse oased cogerera||or |rc|ude |a|aras||ra, u||ar lrades|, Tar|| Nadu, Karra|a|a ard
Ard|ra lrades|, W|||e ||e 3|a|es |av|rg grea|er po|er||a| lor o|orass oased poWer
gerera||or |rc|ude Ard|ra lrades|. Tar|| Nadu, Karra|a|a, C||a|||sgar|, 8||ar, lurjao e|c.
1.3 ACHIEVEMENTS
To |ap |||s |arge po|er||a|, ||e ||r|s|ry |as oeer |rp|erer||rg o|orass poWer & oagasse co-
gerera||or prograrre lor ||e |as| 10 years. 0ver ||ese years, 120 projec|s aggrega||rg |o
805 |w |ave oeer |rs|a||ed |r ||e cour|ry lor leed|rg poWer |o ||e gr|d. lr add|||or, || |s
es||ra|ed ||a| aro||er 91 projec|s aggrega||rg |o 822.43 |w ol e|ec|r|c||y are urder var|ous
s|ages ol |rp|erer|a||or. T|e |rs|a||ed capac||y |rc|udes o0 projec|s ol oagasse oased
cogerera||or aggrega||rg |o 437 |w ard ||e capac||y urder |rp|erer|a||or |rc|udes 42
projec|s aggrega||rg |o 435.43 |w ol oagasse cogerera|ed e|ec|r|c||y. o0 8|orass oased
poWer p|ar|s are a|ready |r opera||or W||| |rs|a||ed capac||y ol 342.5 |w ard 49 projec|s are
urder var|ous s|ages ol corp|e||or. w||| ||e corr|ss|or|rg ol p|pe||re projec|s, 8|orass
8ased loWer p|ar|s W||| cor|r|ou|e 730 |w, ard oagasse oased cogerera||or projec|s - 898
|w. T||s capac||y |s |r add|||or |o ||e 8|orass 0as|l|er sys|ers, aggrega||rg rore ||ar o2
|w. T|e 3|a|es W||c| |ave |a|er a |eaders||p pos|||or |r |rp|erer|a||or ol cogerera||or
projec|s |rc|ude Ard|ra lrades|, Tar|| Nadu, Karra|a|a ard u||ar lrades|, W|||e lor o|orass
poWer projec|s, ||e |ead|rg 3|a|es are Ard|ra lrades|, Karra|a|a ard Tar|| Nadu.
0overrrer| ol lrd|a, |ad arrourced ||e poWer po||cy, W|ere cap||ve poWer p|ar|s are ro|
reed|rg ary approva|. w||| |||s po||cy, ruroer ol |rdus|r|es are op||rg lor cap||ve o|orass
oased poWer p|ar|s.
1.4 MNES POLICY
||r|s|ry ol Nor Corver||ora| Frergy 3ources (|NF3) 0ov|. ol lrd|a |s proro||rg ||e poWer
gerera||or lror rereWao|e erergy sources |r gerera| ard ||e loWer 0roup ol ||r|s|ry |s
10 MW Biomass Based Power Plant ABEIL
spec|a||y proro||rg ||e 8|orass 8ased loWer l|ar|s ard Cogerera||or poWer p|ar|s. |NF3
|s g|v|rg l|sca| ard l|rarc|a| oerel||s |o ||e projec| deve|opers.
||r|s|ry |ad arrourced ||e l|sca| |rcer||ves corror lor a|| rereWao|e erergy projec|s ard
arrourced ca|egory W|se l|rarc|a| |rcer||ves. T|ese l|rarc|a| |rcer||ves are a|so
rod|l|ed|rev|sed lror ||re |o ||re.
Fisca I!c"!#i$"s a%"&
1. Acce|era|ed deprec|a||or -100 |r l|rs| year ol |rves|rer|
2. lrcore |ax exerp||or lor 10 ears
3. 3a|es Tax exerp||or lor p|ar| ard rac||rery
a. 3ore s|a|es |ad g|ver sa|es |ax exerp||or lor ||e equ|prer| used |r ||e
rereWao|e erergy projec|. 3ore s|a|es |ad g|ver add|||ora| pr|ce per ur|| |s
g|ver lror ||e sa|es |ax reverue |o ||e ex|er| ol projec| cos|. Ard sore
s|a|es |ave a||oWed |o oll se| ||e 3a|es |ax payrer| W||| o||er produc|s ol
|rdus|ry
4. Fxc|se du|y or cus|or du|y exerp||or
a. Fxc|se du|y ard cus|or du|y |s exerp|ed or ||e p|ar| ard rac||rery ol ||e
projec|.
||r|s|ry |as a|so ex|erded ||e Cap||a| suos|dy lor 8|orass 8ased loWer p|ar|s ard 8agasse
oased cogerera||or poWer p|ar|s.
A| preser|, 0overrrer| ol lrd|a |ad arrourced ||a| rap|d deprec|a||or W||| oe up|o 80 ol
||e projec| cos| es||ra|es |r ||e l|rs| year, |rs|ead ol 100 as arrourced ear||er.
Fver ||oug| ro||l|ca||or Was gerera||y exerp||rg ||e exc|se du|y lor rereWao|e erergy
projec|s, exc|se depar|rer| |ad ro| g|ver |||s corcess|or |o o|orass oased poWer p|ar|s ard
oagasse oased cogerera||or sys|ers, as ||e oo||er ard |uro|re car oe used lor corver||ora|
sys|ers a|so. ||r|s|ry ol l|rarce, 0ov|. ol lrd|a |ad |ssued ro||l|ca||or ro. 33|2005 da|ed
8.9.2005, c|ear|y |rd|ca||rg ||a|, p|ar| ard rac||rery reeded |o se| up ||e o|orass oased
poWer p|ar|s are exerp|ed lor exc|se ard cus|or du|y. Copy ol ||e ro||l|ca||or |s g|ver oe|oW.
TO BE PUBLISHED IN PART II, SECTION 3, SUB-SECTION (i) OF THE
GAZETTE OF INDIA, EXTRAORDINARY, DATED THE 8TH SEPTEMBER,
200
!" BHADRAPADA, !#2" (SA$A)
10 MW Biomass Based Power Plant ABEIL
GO%ERNMENT OF INDIA
MINISTRY OF FINANCE
(DEPARTMENT OF RE%ENUE)
&&&
N'( D')*i, +,-'+ -*' 8-* S'.-'/0'1, 200
!" B*,+1,.,+, , !#2" (S,2,)
NOTIFICATION
N34 335 200-C'6-1,) E78i9'
G4S4R4 (E)4- I6 '7'18i9' 3: -*' .3('19 836:'11'+ 0; 9<0-9'8-i36 (!) 3:
9'8-i36 A 3: -*' C'6-1,) E78i9' A8-, !#== (! 3: !#==), -*' C'6-1,) G3>'16/'6-
0'i6? 9,-i9:i'+ -*,- i- i9 6'8'99,1; i6 -*' .<0)i8 i6-'1'9- 93 -3 +3, *'1'0; '7'/.-9 ,))
i-'/9 3: /,8*i6'1;, i68)<+i6? .1i/' /3>'19, i69-1</'6-9, ,..,1,-<9 ,6+ ,..)i,68'9,
836-13) ?',1 ,6+ -1,69/i99i36 '@<i./'6- ,6+ ,<7i)i,1; '@<i./'6- (i68)<+i6? -*39'
1'@<i1'+ :31 -'9-i6? ,6+ @<,)i-; 836-13)) ,6+ 83/.36'6-9, 1'@<i1'+ :31 i6i-i,) 9'--i6?
<. 3: , .13A'8- :31 -*' ?'6'1,-i36 3: .3('1 <9i6? 636-836>'6-i36,) /,-'1i,)9,
6,/');, ,?1i8<)-<1,), :31'9-1;, ,?13-i6+<9-1i,), i6+<9-1i,), /<6i8i.,) ,6+ <10,6 (,9-',
0i3 (,9-' 31 .3<)-1; )i--'1, :,))i6? <6+'1 ,6; C*,.-'1 3: -*' Fi19- S8*'+<)' -3 -*'
C'6-1,) E78i9' T,1i:: A8-, !#8( 3: !#8B), :13/ -*' (*3)' 3: -*' +<-; 3: '78i9'
)'>i,0)' -*'1'36 (*i8* i9 9.'8i:i'+ i6 -*' 9,i+ Fi19- S8*'+<)', 9<0A'8- -3 -*'
:3))3(i6? 836+i-i369,-
(i) 0':31' -*' 8)',1,68' 3: -*' ?33+9 :13/ -*' :,8-31;, -*' /,6<:,8-<1'1
.13+<8'9 -3 -*' D'.<-; C3//i99i36'1 3: C'6-1,) E78i9' 31 -*' A99i9-,6-
C3//i99i36'1 3: C'6-1,) E78i9', ,9 -*' 8,9' /,; 0', , 8'1-i:i8,-', :13/ ,6
3::i8'1 63- 0')3( -*' 1,62 3: , D'.<-; S'81'-,1; -3 -*' G3>'16/'6- 3: I6+i,
i6 -*' Mi6i9-1; 3: N36-C36>'6-i36,) E6'1?; S3<18'9 1'83//'6+i6? -*' ?1,6-
3: -*i9 '7'/.-i36 ,6+ -*' 9,i+ 3::i8'1 8'1-i:i'9 -*,- -*' ?33+9 ,1' 1'@<i1'+ :31
i6i-i,) 9'--i6? <. 3: , .13A'8- :31 -*' ?'6'1,-i36 3: .3('1 <9i6? 636-
836>'6-i36,) /,-'1i,)9, 6,/');, ,?1i8<)-<1,), :31'9-1;, ,?13-i6+<9-1i,),
i6+<9-1i,), /<6i8i.,) ,6+ <10,6 (,9-', 0i3 (,9-' 31 .3<)-1; )i--'1C ,6+
(ii) -*' /,6<:,8-<1'1 .13>'9 -3 -*' 9,-i9:,8-i36 3: -*' D'.<-;
C3//i99i36'1 3: C'6-1,) E78i9' 31 -*' A99i9-,6- C3//i99i36'1 3: C'6-1,)
E78i9', ,9 -*' 8,9' /,; 0', -*,- -*'1' i9 , >,)i+ .3('1 .<18*,9' ,?1''/'6-
0'-(''6 -*' i/.31-'1 ,6+ -*' .<18*,9'1, :31 -*' 9,)' ,6+ .<18*,9' 3:
')'8-1i8i-; ?'6'1,-'+ <9i6? 636-836>'6-i36,) /,-'1i,)9, :31 , .'1i3+ 3: 63-
)'99 -*,6 -'6 ;',19 :13/ -*' +,-' 3: 83//i99i36i6? 3: -*' .13A'8-4
DF4N34 =B0 5 == 5200-C<94%E
(AA,;)
U6+'1 S'81'-,1; -3 -*' G3>'16/'6- 3: I6+i,
T|e |rd|ca||ors are ||a|, |NF3 |s p|arr|rg |o g|ve cap||a| suos|dy |rs|ead ol |r|eres| suos|dy.
T||s arour| |s pa|d |o ||e l|rarc|a| |rs|||u||or ||roug| lbF0A al|er corr|ss|or|rg ol ||e poWer
projec|.
10 MW Biomass Based Power Plant ABEIL
1.' STATUS OF BIOMASS BASED PO(ER PLANTS
8|orass 8ased poWer p|ar|s are |r opera||or s|rce 1992 |r lrd|a, W|ereas ||ese p|ar|s are |r
opera||or |r ||e Wor|d s|rce r|d e|g|||es. lr Ca||lorr|a, o|orass oased poWer p|ar|s ol 50 |w
capac||y are a|so |r opera||or.
S#a#)s *+ P%*,"c#s C*--issi*!". a!. )!."% I-/"-"!#a#i*! as *! 30.1.200'
PRO2ECTS BIOMASS PO(ER CO3GENERATION TOTAL
M( N*s. M( N*s. M( N*s
Corr|ss|ored 342.5 o0 4o2.53 o0 805.03 120
urder lrp|erer|a||or 387.04 49 435.43 42 822.43 91
To|a| 729.54 109 897.9o 102 1o27.4o 211
S#a#"3(is" s#a#)s *+ C*--issi*!". 4 U!."% I-/"-"!#a#i*! Bi*-ass P*5"% 6 C*3
G"!"%a#i*! P%*,"c#s as *! 27626200'
S.N. S#a#" C*--issi*!". U!."% I-/"-"!#a#i*!
N*. *+ P%*,"c#s Ca/aci#8
9i! M(:
N*. *+ P%*,"c#s Ca/aci#8
9i! M(:
1 Ard|ra lrades| 48 257.25 19 135.9o
2 C||a|||sgar| 2 11 5 51
3 0ujara| 1 0.50 0 0
4 laryara 2 o 0 0
5 Karra|a|a 15 151.98 20 155.oo
o |ad|ya lrades| 1 1.00 0 0
7 |a|aras||ra 9 3o.00 8 75.80
8 lurjao 3 22 1 o
9 bajas||ar 1 7.8 4 29.10
10 Tar|| Nadu 19 173 9 77.00
11 u||ar lrades| 10 73.00 8 o4.30
T*#a 111 ;31.'3 ;4 '14.72
1.'.1 S#a#)s *+ Assa-
10 MW Biomass Based Power Plant ABEIL
Assar Frergy 0eve|oprer| Agercy |s ||e roda| agercy |o g|ve ||e approva|s lor se|||rg up
8|orass 8ased loWer l|ar|s |r ||e s|a|e ol Assar. 0overrrer| ol Assar |s ro| ye|
arrourced ||e po||cy ol poWer purc|ase lror bereWao|e Frergy lrojec|s. T||s projec| W||| oe
||e l|rs| |rdeperder| o|orass oased poWer projec| ol Assar.
Assar 3|a|e F|ec|r|c||y begu|a|ory Corr|ss|or W|||e |ssu|rg ||e |ar|ll order lor ||e l|rarc|a|
year 2005-0o, |ad g|ver spec|a| erp|as|s |o proro|e rereWao|e erergy projec|s |r ||e s|a|e.
be|evar| por||or ol ||e order |s reproduced oe|oW.
11.28 urder sec||or 8o (e) ol ||e Ac|, ||e Corr|ss|or |o.
`(e) proro|e co-gerera||or ard gerera||or ol e|ec|r|c||y lror rereWao|e sources ol erergy oy
prov|d|rg su||ao|e reasures lor correc||v||y W||| ||e gr|d ard sa|e ol e|ec|r|c||y |o ary persor,
ard a|so spec|ly, lor purc|ase ol e|ec|r|c||y lror suc| sources, a percer|age ol ||e |o|a|
corsurp||or ol e|ec|r|c||y |r ||e area ol a d|s|r|ou||or ||cerce,'
11.29 T|e Corr|ss|or |as cors|dered |||s requ|rerer| ard dec|ded ||a| || |s |oo ear|y |o
prescr|oe ary purc|ase requ|rerer|s or ||e 0|scor W|o |ave or|y oeer es|ao||s|ed |a|e |as|
year.
11.30 T|e Corr|ss|or |s |r|eres|ed |r ercourag|rg rereWao|e erergy lor s|ard a|ore poWer
sys|ers or lor rero|e v|||ages ro| correc|ed |o ||e gr|d W|ere a rereWao|e erergy source
ray oe a rore cos| ellec||ve op||or |o |rprove ||e re||ao||||y ol supp|y |rs|ead augrer||rg ||e
ex|s||rg re|Wor|.
11.31 A3F8 |ad prepared a po||cy lor sra|| |ydro poWer deve|oprer| up |o 25 |w |r ||e
3|a|e ol Assar ard ser| ||e dral| po||cy |o Assar F|ec|r|c||y begu|a|ory Corr|ss|or lor
correr|. AFbC sugges|ed a ruroer ol rod|l|ca||ors |r ||e po||cy.
11.32 To ercourage gerera||or ol poWer lror rereWao|e sources, ||e Corr|ss|or ray
cors|der l|x|rg appropr|a|e |ar|ll lor suc| gerera||or |l suc| a gerera||or sys|er |s correc|ed
|o gr|d. w|ee||rg c|arges lor W|ee||rg ||e gerera|ed erergy W||| a|so oe de|err|red oy ||e
Corr|ss|or.
10 MW Biomass Based Power Plant ABEIL
11.33 T|e Corr|ss|or |s a|so dec|ded |r |||s |ar|ll order |o crea|e ar |rcer||ve lor corsurers
|o sW||c| |o so|ar |o| Wa|er sys|ers. lr Assar, dur|rg W|r|er ror||s very ||g| corsurp||or ol
e|ec|r|c||y |s ooserved dur|rg ||e rorr|rg |ours resu|||rg |r pea||rg ol derard |r rorr|rg |r
add|||or |o rorra| pea| |ours. 0re ol ||e reasor lor Assar F|ec|r|c||y begu|a|ory
Corr|ss|or Tar|ll 0rder l 2005-0o |||s pea||rg ol derard |r ||e rorr|rg dur|rg W|r|er
ra||ers |s use ol Wa|er |ea||rg app||arces |||e geysers, |rrers|or rods e|c. T|ese |ea||rg
app||arces corsure ||g| arour|s ol e|ec|r|c||y.
11.34 lor proper gr|d raragerer| || |s esser||a| ||a| corsurers s|ou|d oe ercouraged |o op|
lor a||erra||ve re||ods |o ree| ||e|r Wa|er |ea||rg requ|rerer|s. 3o|ar Wa|er |ea|ers oller ar
exce||er| a||erra||ve |o e|ec|r|ca| Wa|er |ea||rg sys|er ard car |e|p |r a o|g Way |r reduc|rg
||e derard dur|rg ||e rorr|rg |ours. l| a|so resu||s |r suos|ar||a| reduc||or |r ||e
corsurers'erergy o|||s. 3o use ol so|ar |ea||rg |s, ||us, a W|r-W|r s||ua||or lor corsurers as
We|| as u||||||es.
11.35 lr order |o ercourage corsurers |o sW||c| over |o so|ar Wa|er |ea||rg sys|er, ||e
Corr|ss|or proposes |o |r|roduce a ror|||y reoa|e ol bs.30 lor a|| corsurers W|o |ave
|rs|a||ed suc| so|ar Wa|er |ea||rg sys|ers lor ree||rg ||e|r |o| Wa|er requ|rerer|s ard ||ese
are ac|ua||y used. To ava|| |||s reoa|e, ||e corsurer W||| oe requ|red |o g|ve ||e ||cersee ar
all|dav|| |o ||e ellec| ||a| suc| a sys|er |as oeer |rs|a||ed or ||s prer|ses ard |s oe|rg used
|o ree| ||s Wa|er |ea||rg requ|rerer|s. T|e dec|ara||or car oe ver|l|ed oy ||e ||cersee's
re|er readers | represer|a||ve, |l requ|red. lr case, ary suc| dec|ara||or |s lourd |o oe la|se,
||e ||cersee apar| lror |a||rg appropr|a|e |ega| ac||or aga|rs| suc| corsurer Wou|d oe
er||||ed |o recover ||e er||re reoa|e a||oWed |o suc| corsurers W||| 100 pera||y.
As per ||e es||ra|es ol 200o-07 ||e poWer requ|rerer| ol A3F8 |s rore ||ar ||e ava||ao||||y
dur|rg ||e ror||s ol Apr||, Jure ard 3ep|eroer-leoruary.T|e del|c|| ol 221|u lor ||e year ol
200o-07(al|er cors|der|rg ar expor| ol 140 |u dur|rg ||e surp|us ror||s) |as |o oe rade up
oy purc|as|rg poWer lror |raders a| ar es||ra|ed average cos| ol bs.3.57 per ur||.To |||s ||e
|rd|rec| oerel||s ol rereWao|e erergy reeds |o oe added oelore l|x|rg ||e |ar|ll lor o|orass
oased poWer.
.
1.< ROLE OF FINANCIAL INSTITUTIONS
10 MW Biomass Based Power Plant ABEIL
T|e |ead|rg l|rarc|a| |rs|||u||or ex|erd|rg ||e l|rarc|a| ass|s|arce |s lbF0A. lrd|ar bereWao|e
Frergy 0eve|oprer| Agercy (lbF0A) ||e l|rarc|a| arr ol ||r|s|ry a|so ex|erds ||e l|rarc|a|
ass|s|arce lor se|||rg up ||ese poWer p|ar|s. T|e o||er l|rarc|a| |rs|||u||ors |||e l0lC, l08l,
lClCl, lu0C0 ard ra||ora||zed oar|s |||e 3|a|e 8ar| ol lrd|a, Ard|ra 8ar| e|c are a|so
ex|erd|rg ||e l|rarc|a| ass|s|arce.
lbF0A |s |av|rg ||e l|xed ra|e ol |r|eres|, |rrespec||ve ol ||e proro|er, ou| || |s |av|rg d|llerer|
ra|e ol |r|eres| deperd|rg upor ||e capac||y ol ||e poWer p|ar| ard ||e oo||er pressure.
w|ereas, ||e o||er l|rarc|a| |rs|||u||ors |r|eres| ra|e |s deperd|rg upor ||e cred|| ra||rg ol
proro|er, |.e. llb ra|e ol l|rarc|a| |rs|||u||or ard sore po|r|s.
As per lbF0A's gu|de||res, ||e proro|er |as |o or|rg r|r|rur ol 30 ol projec| cos| as ||e|r
equ||y. T|e |r|eres| ra|e lor ||e o|orass poWer projec|s |s 10.5. bepayrer| ol |oar |s lor ||e
per|od ol 10 years al|er corr|ss|or|rg. T||s per|od |s |rc|us|ve 3 years ol rora|or|ur lo||oWed
oy |oar repayrer|.
3pec|a| corcess|or |s g|ver lor Nor|| Fas|err s|a|es
Corcess|ors g|ver |o Nor|| Fas|err 3|a|es are g|ver oe|oW.
0r|d Correc|ed loWer lrojec|s.
1. beoa|e ol 1.0 pa |r |r|eres| ra|es
2. Fxerp||or lror layrer| ol
a. beg|s|ra||or lees
o. lrspec||or C|arges
c. lega| C|arges (o||er ||ar |rcurred lor becovery)
d. Fxperd||ure lrcurred or Nor|ree 0|rec|ors
e. lror| Frd lee
3. Corcess|or ol 5 |r lroro|ers cor|r|ou||or
4. Cos| ol 0lb prepara||or lor 0r|d Correc|ed projec|s oy 80A3
S"c)%i#8 !*%-s *+ IREDA a%" =i$"! >"*5&
1. Fqu||ao|e ror|gage (|or|gage oy depos|| ol ||||e deeds) ol a|| |rrovao|e proper||es,
2. lypo||eca||or ol rovao|e asse|s, oo|| ex|s||rg ard lu|ure suojec| |o pr|or c|arge ol
8ar|s or spec|l|ed currer| asse|s
3. 0uarar|ees oy proro|ers|proro|er 0|rec|ors ard proro|er corpar|es
4. 0epos|| ol pos| da|ed c|eques |r accordarce W||| repayrer| sc|edu|e ol pr|rc|pa| |oar
arour| ard |r|eres|.
HUDCO&
10 MW Biomass Based Power Plant ABEIL
lu0C0 a|so g|ves ||e |err |oar |o ||e ex|er| ol 70 ol ||e projec| cos|. Cord|||ors ol
lu0C0 are g|ver oe|oW.
lor 8agasse|8|o-|ass 8ased Co-gerera||or 3c|eres.
Ava||ao||||y ol oagasse ard o||er secordary lue| (r|r|rur 125) ol requ|rerer| lor ||e
proposed capac||y ol co-gerera||or sc|ere
3c|ere ray |ave prov|s|or lor use ol a||erra|e loss|| lue| suc| as coa| as per |NF3
rorrs.
0es|gr parare|er s|ou|d oe lor o5 Kg per 3q. cr. pressure | 485 degree C |erpera|ure
or ||g|er s|ear parare|ers.
T|e r|r|rur capac||y ol ||e sugar ur|| s|ou|d oe 2500 TC0.
||r|rur arrua| 03Cb ol 1.2 ard Average 03Cb ol 1.5.
T|e r|r|rur lbb ol ||e projec| s|ou|d oe a| |eas| 15 or 3 rore ||ar lu0C0's ba|e
ol lr|eres| W||c|ever |s ||g|er.
Trac| record ol |Wo successlu| crus||rg seasors ol sugarcare W||| ro ou|s|ard|rg dues |r
care procurerer| ard o||er goods |r case ol oagasse oased co-gerera||or projec|.
T|e agercy s|ou|d ro| |ave oeer |r |oss dur|rg ||e |as| ||ree l|rarc|a| years.
loWever, |r case ol reW|y lorred oorroW|rg agerc|es, ||e proposa| car oe cors|dered or
||e l|rarc|a| s|rerg|| ol ||e projec||parer| corpary W||| add|||ora| r|s| r|||ga||or
reasures, suc| as, reduced deo| exposure or |rcreased rarg|r ol secur||y lor |oar. lr
suc| cases, ||e oa|arce s|ee| ol ||e parer| corpary s|ou|d oe exar|red.
|or|gage||ypo||eca||or ol a|| projec| proper||es (|ard, ou||d|rg ard p|ar| & rac||rery ard
equ|prer|) lor pr|va|e agerc|es. T|e |o|a| secur||y cover s|ou|d oe r|r|rur 150 (|||e|y |o
oe |rcreased |o 175)ol ||e |oar arour| W||c| s|a|| |rc|ude 125 (|||e|y |o oe |rcreased |o
150)cover |oWards pr|re secur||y ard r|r|rur 25 |r ||e lorr ol co||a|era| secur||y (lor
pr|va|e sec|or sc|eres or|y).
T|e 25 co||a|era| secur||y cover car oe ||roug| ary or coro|ra||or ol ||e ||ers |rd|ca|ed
oe|oW.
a. Cas| depos||s (r|r|rur ol 15 ol |oar arour|)
o. l|rs| c|arge (p|edge ol equ||y s|ares ol ary o||er ||s|ed Corpary | |ypo||eca||or |
ror|gage) or persora| proper||es ol proro|ers.
c. l|rs| c|arge (p|edge | |ypo||eca||or| ror|gage) or o||er urercuroered proper||es ol
||e corpary (o||er ||ar projec| asse|s) or o||er ur-ercuroered proper||es ol ary
o||er persor | corpary.
d. lar|-passu c|arge (|ypo||eca||or ol rovao|e proper||es ard|or ror|gage ol
|rrovao|e proper||es ro| l|rarced oy lu0C0) W||| o||er |erders.
I! a..i#i*! #* #?" a>*$"@ a="!c8 s?a +)%!is? #?" +**5i!=& 3
lersora| guarar|ee ol lroro|ers.
Corpora|e 0uarar|ee (|l proro|er |s a Corpary)
10 MW Biomass Based Power Plant ABEIL
A |e||er ol urder|a||rg lror ||e Agercy |o cred|| |r|o ||e TbA a|| ||e 0ov|. suos|d|es
(|rc|ud|rg |NF3 suos|d|es) T||s TbA accour| W||| oe urder ||e cor|ro| ol lu0C0.
Ass|grrer| ol cor|rac|ua| r|g||s, ||||e, |r|eres|, oerel||, c|a|rs urder var|ous projec|
docurer|s, agreerer|s ard a|| ||cerses, perr||s, approva|s ard corser|s |r respec|
ol ||e projec|.
loWer ol A||orrey |o se|| ||e projec| asse|s.
Ass|grrer| ol a|| |rsurarce po||c|es re|a||rg |o ||e projec| up |o ||e sa||slac||or ol
lu0C0.
l|edg|rg ol 51 ol equ||y s|ares (|l ava||ao|e) |o lu0C0.
0per|rg ol Trus| ard be|er||or Accour||FscroW Accour| as per lu0C0 rorrs W|||
l|rs| c|arge or a|| rece|vao|es |r lu0C0's lavour.
Corpora|e guarar|ee accep|ao|e |o lu0C0.
T|e va|ua||or ol ||e proper||es s|ou|d oe dore oy a va|uer recogr|zed oy ||e lrcore
Tax 0epar|rer| | Na||ora||sed 8ar|s| 0overrrer| approved va|uer lor ||e purpose ol
ror|gage ol ||e proper||es.
los| da|ed c|eques ol ||e c|ose|y |e|d Corpar|es|l|rrs|Assoc|a||or ol persors.
1.; ASSAM GOVT POLICIES
||r|s|ry ol Nor Corver||ora| Frergy 3ources, 0ov|. ol lrd|a, |ad g|ver ||e gu|de||res or
poWer purc|ase oy s|a|e e|ec|r|c||y ooards. Assar 0overrrer| |s ye| |o arrource ||e po||cy
oased or ||e gu|de||res ol |NF3. 8ased or ||e projec|ed del|c|| ol 221|u lor 200o-07 lor
W||c| poWer |s oe|rg purc|ased a| ar average ra|e ol bs.3.57 per ur||,||e cap ra|el lor ||e
sa|e ol rereWao|e poWer |o ||e gr|d car oe l|xed a| bs.3.50 per ur|| lor a quar|ur ol 200|u
per arrur.
1.7 ADVANTAGES OF BIOMASS BASED PO(ER PLANTS
8|orass oased projec| s||ua|ed |r rura| areas W||| cor|r|ou|e ||e lo||oW|rg.
Frp|oyrer| 0erera||or
3oc|a| Cors|dera||or
lrpac| or Na||ora| loWer
1.7.1 E-/*8-"!# G"!"%a#i*!
8|orass oased poWer p|ar| pure|y deperds or ||e o|orass co||ec||or. 8|orass |s oo|a|red as
crop res|due ard agro |rdus|r|a| res|due. As ||e o|orass |s |av|rg |oW ou|| ders||y ard reeds
a sc|er||l|c approac| lor co||ec||or urerp|oyed you||s car lorr a N00 |o co||ec| ||e o|orass
ard se|| ||e sare |o projec|. lr ru|s|e|| o|orass oar| W||| oe crea|ed. 8|orass prepara||or
sys|er lo||oWed oy |rarspor|a||or W||| |e|p ||e |oca|s |o oe erp|oyed. Fver poWer p|ar| reeds
||e opera||rg persors. T||s p|ar| W||| |eep ||e s||||ed rarpoWer |erce ||e |oca| you|| are
10 MW Biomass Based Power Plant ABEIL
exposed |o ||e s||||ed joos. T|ere |s ar |rd|rec| erp|oyrer| gerera||or, as rore |rdus|r|es
W||| core up |r ||e area, due |o |ess proo|ers ol poWer |r ||a| |oca||or. lerce ||ere W||| oe
requ|rerer| ol add|||ora| rarpoWer.
1.7.2 S*cia C*!si."%a#i*!s
T|e se|||rg up ol ||e proposed p|ar| W||| |ave a very pos|||ve |rpac| or ||e purc|as|rg
capac||y ol |rd|v|dua|s as ||ey W||| oe ao|e |o ge| rorey lor ||e crop res|due, W||c| a| preser|
|s e|||er, ourr| or |oo ruc| urder u||||zed.
1.7.3 I-/ac# *! Na#i*!a P*5"%
Today ros| ol ||e s|a|es are |av|rg d|s|r|ou||or |osses ol rore ||ar 20. As ||e poWer |s
ava||ao|e a| |oca| po|r|, |||s poWer W||| oe equ|va|er| |o 120 ol ||e corver||ora| poWer p|ar|
gerera||or. T||s W||| save ||e |rarsr|ss|or |osses ard a|so assures ||e re||ao||||y |r poWer
supp|y.
T|e poWer gerera||or lror o|orass p|ays ar |rpor|ar| ro|e |r supp|erer||rg ||e poWer
requ|rerer| |r rura| areas. T||s poWer gerera||or |eads |o decer|ra||zed poWer gerera||or
ard |rproves ||e gerera| cord|||or ol rura| rasses. A| preser| o|orass |s oe|rg used |o
gerera|e s|ear ard poWer |r agro |rdus|r|es |||e 3ugar l|ar|s ard r|ce r|||s. T|e o|orass |s
a|so used as lodder, dores||c lue| ard |el| ou| |s ourr| |r ||e oper areas.
8|orass |s produced as crop res|due, agro |rdus|ry res|due ard Was|e lror oarrer ard
urcu|||vao|e |ard ard lores|s. Fver ||oug| ca|||e a|so gerera|e o|orass as durg, ||e quar|||y
|s corsured as dores||c lue| |r coro|ra||or W||| Wood.
8|orass corsurp||or |s |a|er lor dores||c lue|, ca|||e leed, rarure, ||a|c||rg e|c. 8|orass
|s corsured |r |rdus|ry, |o gerera|e s|ear. Today ||e surp|us o|orass |s ourr| |r ||e oper
l|e|ds due |o ror-ava||ao||||y ol a||rac||ve proposa|.
8|orass 8ased loWer l|ar|s W||| ge| ||e oerel|| ol C0|.
1.1 Ci-a#ic C?a!=" P%*>"- a!. R"s/*!s"
1.1.1 T?" U!i#". Na#i*!s F%a-"5*%A C*!$"!#i*! *! Ci-a#" C?a!="@ UNFCCC
lr Jure 1992, ||e `ur||ed Na||ors lrareWor| Corver||or or C||ra|e C|arge' (uNlCCC)
Was s|gred |r b|o de Jare|ro oy over 150 ra||ors. T|e c||ra|e corver||or |s ||e oase or
10 MW Biomass Based Power Plant ABEIL
|r|erra||ora| co-opera||or W||||r ||e c||ra|e c|arge area. lr ||e corver||or ||e c||ra|e
proo|er's ser|ousress |s s|ressed. T|ere |s a corcerr ||a| |urar ac||v|||es are er|arc|rg ||e
ra|ura| greer|ouse ellec|, W||c| car |ave ser|ous corsequerces or |urar se|||erer|s ard
ecosys|ers. T|e corver||or's overa|| oojec||ve |s ||e s|ao|||za||or ol greer|ouse gas
corrcer|ra||ors |r ||e a|rosp|ere a| a |eve| ||a| Wou|d prever| dargerous ar||ropoger|c
|r|erlererce W||| ||e c||ra|e sys|er.' T|e pr|rc|p|e corr||rer| app|y|rg |o par||es ol ||e
corver||or |s ||e adop||or ol po||c|es ard reasures or ||e r|||ga||or ol c||ra|e c|arge, oy
||r|||rg ar||ropoger|c er|ss|ors 0|ooa| Frv|rorrer|a| Corcerrs greer|ouse gases ard
pro|ec||rg ard er|arc|rg greer|ouse gas s|r|s ard reservo|rs. T|e corr||rer| |rc|udes ||e
prepara||or ard corrur|ca||or ol ra||ora| |rver|or|es ol greer|ouse gases. T|e C||ra|e
corver||or does ro| |ave ary quar|||a||ve |arge|s or ||re|ao|es lor |rd|v|dua| ra||ors.
loWever, ||e overa|| oojec||ve car oe |r|erpre|ed as s|ao|||za||or ol er|ss|ors ol greer|ouse
gases oy year 2000 a| 1990 |eve|s. T|e dec|d|rg oody ol ||e c||ra|e corver||or |s ||e
Corlererce ol lar||es (C0l). A| ||e C0l ree||rgs, oo||ga||ors rade oy ||e par||es are
exar|red ard ||e oojec||ves ard |rp|erer|a||or ol ||e c||ra|e corver||or are lur||er del|red
ard deve|oped. T|e l|rs| C0l Was |e|d |r 8er||r, 0errary |r 1995 ard ||e |a|es| (C0l 10)
Was |e|d |r 0eceroer 2004,8ueros A|res, Arger||ra.
1.1.2 T?" K8*#* P%*#*c*
T|ere |s a sc|er||l|c corsersus ||a| |urar ac||v|||es are caus|rg g|ooa| Warr|rg ||a| cou|d
resu|| |r s|gr|l|car| |rpac|s suc| as sea |eve| r|se, c|arges |r Wea||er pa||errs ard adverse
|ea||| ellec|s. As || oecare apparer| ||a| rajor ra||ors suc| as ||e ur||ed 3|a|es ard Japar
Wou|d ro| ree| ||e vo|ur|ary s|ao|||za||or |arge| oy 2000, lar||es |o ||e Corver||or dec|ded |r
1995 |o er|er |r|o rego||a||ors or a pro|oco| |o es|ao||s| |ega||y o|rd|rg ||r||a||ors or
reduc||ors |r greer|ouse gas er|ss|ors. l| Was dec|ded oy ||e lar||es ||a| |||s rourd ol
rego||a||ors Wou|d es|ao||s| ||r||a||ors or|y lor ||e deve|oped cour|r|es, |rc|ud|rg ||e lorrer
Corrur|s| cour|r|es (ca||ed arrex A cour|r|es). Nego||a||ors or ||e Kyo|o lro|oco| |o ||e
ur||ed Na||ors lrareWor| Corver||or or C||ra|e C|arge (uNlCCC) Were corp|e|ed
0eceroer 11, 1997, corr||||rg ||e |rdus|r|a||zed ra||ors |o spec|ly, |ega||y o|rd|rg reduc||ors
|r er|ss|ors ol s|x greer|ouse gases. T|e o rajor greer|ouse gases covered oy ||e pro|oco|
are caroor d|ox|de (C02), re||are (Cl4), r||rous ox|de (N20), |ydro l|uorocaroors (llCs),
per l|uorocaroors (llCs), ard su|lur |xal|uor|de (3l o).
E-issi*!s R".)c#i*!s
10 MW Biomass Based Power Plant ABEIL
T|e ur||ed 3|a|es Wou|d oe oo||ga|ed urder ||e lro|oco| |o a curu|a||ve reduc||or |r ||s
greer|ouse gas er|ss|ors ol 7 oe|oW 1990 |eve|s lor ||ree greer|ouse gases (|rc|ud|rg
caroor d|ox|de), ard oe|oW 1995 |eve|s lor ||e ||ree rar-rade gases, averaged over ||e
corr||rer| per|od 2008 |o 2012.
T|e lro|oco| s|a|es ||a| deve|oped cour|r|es are corr|||ed, |rd|v|dua||y or jo|r||y, |o ersur|rg
||a| ||e|r aggrega|e ar||ropoger|c caroor d|ox|de equ|va|er| er|ss|ors ol greer|ouse gases
do ro| exceed arour|s ass|gred |o eac| cour|ry W||| a v|eW |o reduc|rg ||e|r overa||
er|ss|ors ol suc| gases oy a| |eas| 5 oe|oW 1990 |eve|s |r ||e corr||rer| per|od 2008 |o
2012. T|e arour|s lor eac| cour|ry are ||s|ed as percer|ages ol ||e oase year, 1990 ard
rarge lror 92 (a reduc||or ol 8) lor ros| Furopear cour|r|es--|o 110 (ar |rcrease ol
10) lor lce|ard.
D"$"*/i!= C*)!#%8 R"s/*!si>ii#i"s
Aro||er proo|era||c area |s ||a| ||e |rea|y |s aro|guous regard|rg ||e ex|er| |o W||c|
deve|op|rg ra||ors W||| par||c|pa|e |r ||e ellor| |o ||r|| g|ooa| er|ss|ors. T|e or|g|ra| 1992
c||ra|e |rea|y rade || c|ears ||a|, W|||e ||e deve|oped ra||ors ros| respors|o|e lor ||e currer|
ou||dup ol greer|ouse gases |r ||e a|rosp|ere s|ou|d |a|e ||e |ead |r coroa||rg c||ra|e
c|arge, deve|op|rg ra||ors a|so |ave a ro|e |o p|ay |r pro|ec||rg ||e g|ooa| c||ra|e.
0eve|op|rg cour|r|es, |rc|ud|rg lrd|a ard C||ra, do ro| |ave |o corr|| |o reduc||ors |r |||s
l|rs| ||re per|od oecause ||e|r per-cap||a er|ss|ors are ruc| |oWer ||ar ||ose ol deve|oped
cour|r|es, ard ||e|r ecoror|es are |ess ao|e |o aosoro ||e |r|||a| cos|s ol c|arg|rg |o c|earer
lue|s. T|ey |ave ro| cor|r|ou|ed s|gr|l|car||y |o |oday's |eve|s ol po||u||or ||a| |as oeer ||e
produc| ol ||e deve|oped Wor|d's lrdus|r|a| bevo|u||or. T|e |dea |s ||a| deve|op|rg cour|r|es
W||| oe oroug|| rore ac||ve|y |r|o ||e agreerer| as reW erergy |ec|ro|og|es deve|ops ard as
||ey |rdus|r|a||ze lur||er.
A!!"B I a!. A!!"B II Pa%#i"s
Arrex l par||es are cour|r|es W||c| |ave corr||rer|s accord|rg |o ||e Kyo|o pro|oco|. T|e
er||re Arrex l par||es are ||s|ed |r ||e Tao|e 9.1 oe|oW. lur||er Arrex l par||es s|oWr |r oo|d
are a|so ca||ed Arrex ll par||es. T|ese Arrex ll par||es |ave a spec|a| oo||ga||or |o prov|de
`reW ard add|||ora| l|rarc|a| sources' |o deve|op|rg cour|r|es (ror Arrex l) |o |e|p ||er
|ac||e c||ra|e c|arge, as We|| as |o lac||||a|e ||e |rarsler ol c||ra|e lr|erd|y |ec|ro|og|es |o
oo|| deve|op|rg cour|r|es ard |o ecoror|es |r |rars|||or. Corr||rer|s are preser|ed as
percer|age ol oase year er|ss|or |eve|s |o oe ac||eved dur|rg oe|Weer 2008 - 2012.
10 MW Biomass Based Power Plant ABEIL
Ac#i*!s %"C)i%". +%*- ."$"*/". a!. ."$"*/i!= Na#i*!s
T|e Kyo|o lro|oco| does ca|| or a|| lar||es (deve|oped ard deve|op|rg) |o |a|e a ruroer ol
s|eps |o lorru|a|e ra||ora| ard reg|ora| progrars |o |rprove |oca| er|ss|or lac|ors,' ac||v||y
da|a, rode|s, ard ra||ora| |rver|or|es ol greer|ouse gas er|ss|ors ard s|r|s ||a| rerove
||ese gases lror ||e a|rosp|ere. A|| lar||es are a|so corr|||ed |o lorru|a|e, puo||s|, ard
upda|e c||ra|e c|arge r|||ga||or ard adap|a||or reasures, ard |o coopera|e |r proro||or
ard |rarsler ol erv|rorrer|a||y sourd |ec|ro|og|es ard |r sc|er||l|c ard |ec|r|ca| researc| or
||e c||ra|e sys|er.
(?* is >*)!. >8 #?" K8*#* P%*#*c*D
T|e Kyo|o lro|oco| |as |o oe s|gred ard ra||l|ed oy 55 cour|r|es (|rc|ud|rg ||ose respors|o|e
lor a| |eas| 55 ol ||e deve|oped Wor|d's 1990 caroor d|ox|de er|ss|ors) oelore || car er|er
|r|o lorce. NoW ||a| buss|a |as ra||l|ed, |||s oeer ac||eved ard ||e lro|oco| W||| er|er |r|o
lorce or 1o leoruary 2005.
1.1.3 I!.iaEs G%""!?*)s" Gas E-issi*!s
lrd|a |as exper|erced a drara||c groW|| |r loss|| lue| C02 er|ss|ors, ard ||e da|a corp||ed
oy var|ous agerc|es s|oWs ar |rcrease ol rear|y 5.9 s|rce 1950. A| preser| lrd|a |s ra|ed
as ||e o|| |arges| cor|r|ou|or ol C02 er|ss|ors oe||rd C||ra, ||e 2rd |arges| cor|r|ou|or.
loWever, our per cap||a C02 ol 0.93 |ors per arrur |s We|| oe|oW ||e Wor|d average ol 3.87
|ors per arrur. loss|| lue| er|ss|ors |r lrd|a cor||rue |o resu|| |arge|y lror coa| ourr|rg.
lrd|a |s ||g||y vu|rerao|e |o c||ra|e c|arge as ||s ecorory |s |eav||y re||ar| or c||ra|e
sers|||ve sec|ors |||e agr|cu||ure ard lores|ry. T|e vas| |oW-|y|rg ard derse|y popu|a|ed
coas|||re |s suscep||o|e |o r|se |r sea |eve|. T|e erergy sec|or |s ||e |arges| cor|r|ou|or ol
caroor d|ox|de er|ss|ors |r lrd|a. T|e ra||ora| |rver|ory ol greer|ouse gases |rd|ca|es ||a|
55 ol ||e |o|a| ra||ora| er|ss|ors core lror erergy sec|or. T|ese |rc|ude er|ss|ors lror
road |rarspor|, ourr|rg ol |rad|||ora| o|o-rass lue|s, coa| r|r|rg, ard lug|||ve er|ss|ors lror
o|| ard ra|ura| gas. Agr|cu||ure sec|or cors|||u|es ||e rex| rajor cor|r|ou|or, accour||rg lor
rear|y 34. T|e er|ss|ors urder |||s sec|or |rc|ude ||ose lror er|er|c lerrer|a||or |r
dores||c ar|ra|s, rarure raragerer|, r|ce cu|||va||or, ard ourr|rg ol agr|cu||ure res|dues.
Fr|ss|ors lror lrdus|r|a| sec|or ra|r|y care lror cerer| produc||or.
I!.ia! R"s/*!s" #* Ci-a#ic C?a!="
urder ||e uNlCCC, deve|op|rg cour|r|es suc| as lrd|a do ro| |ave o|rd|rg 0l0 r|||ga||or
corr||rer|s |r recogr|||or ol ||e|r sra|| cor|r|ou||or |o ||e greer|ouse proo|er as We|| as
10 MW Biomass Based Power Plant ABEIL
|oW l|rarc|a| ard |ec|r|ca| capac|||es. T|e ||r|s|ry ol Frv|rorrer| ard lores|s |s ||e roda|
agercy lor c||ra|e c|arge |ssues |r lrd|a. l| |as cors|||u|ed wor||rg 0roups or ||e uNlCCC
ard Kyo|o lro|oco|. wor| |s currer||y |r progress or lrd|a's |r|||a| Na||ora| Corrur|ca||or
(NATC0|) |o ||e uNlCCC. lrd|a ra||l|ed ||e Kyo|o lro|oco| |r 2002.
10 MW Biomass Based Power Plant ABEIL
1.1.4 T?" C*!+"%"!c" *+ #?" Pa%#i"s 9COP:
T|e Corlererce ol ||e lar||es |s ||e suprere oody ol ||e C||ra|e C|arge Corver||or. T|e
vas| rajor||y ol ||e Wor|d's cour|r|es are reroers (185 as ol Ju|y 2001). T|e Corver||or
er|ers |r|o lorce lor a cour|ry 90 days al|er ||a| cour|ry ra||l|es ||. T|e C0l |e|d ||s l|rs|
sess|or |r 1995 ard W||| cor||rue |o ree| arrua||y ur|ess dec|ded o||erW|se. loWever,
var|ous suos|d|ary ood|es ||a| adv|se ard suppor| ||e C0l ree| rore lrequer||y. T|e
Corver||or s|a|es ||a| ||e C0l rus| per|od|ca||y exar|re ||e oo||ga||ors ol ||e lar||es ard
||e |rs|||u||ora| arrargerer|s urder ||e Corver||or. l| s|ou|d do |||s |r ||g|| ol ||e
Corver||or's oojec||ve, ||e exper|erce ga|red |r ||s |rp|erer|a||or, ard ||e currer| s|a|e ol
sc|er||l|c |roW|edge.
EBc?a!=" *+ I!+*%-a#i*!
T|e C0l assesses |rlorra||or aoou| po||c|es ard er|ss|ors ||a| ||e lar||es s|are W||| eac|
o||er ||roug| ||e|r ra||ora| corrur|ca||ors. l| a|so proro|es ard gu|des ||e deve|oprer|
ard per|od|c rel|rerer| ol corparao|e re||odo|og|es, W||c| are reeded lor quar||ly|rg re|
greer|ouse gas er|ss|ors ard eva|ua||rg ||e ellec||veress ol reasures |o ||r|| ||er. 8ased
or ||e |rlorra||or ava||ao|e, ||e C0l assesses ||e lar||es ellor|s |o ree| ||e|r |rea|y
corr||rer|s ard adop|s ard puo||s|es regu|ar repor|s or ||e Corver||or's |rp|erer|a||or.
S)//*%# +*% D"$"*/i!= c*)!#%i"s
0eve|op|rg cour|r|es reed suppor| so ||a| ||ey car suor|| ||e|r ra||ora| corrur|ca||ors,
adap| |o ||e adverse ellec|s ol c||ra|e c|arge, ard oo|a|r erv|rorrer|a||y sourd
|ec|ro|og|es. T|e C0l ||erelore oversees ||e prov|s|or ol reW ard add|||ora| resources oy
deve|oped cour|r|es. T|e |||rd sess|or ol ||e Corlererce ol ||e lar||es adop|ed ||e Kyo|o
lro|oco|.
1.1.' T?" F"Bi>" M"c?a!is-s
T|e Kyo|o pro|oco| g|ves ||e Arrex l cour|r|es ||e op||or |o lu|l||| a par| ol ||e|r corr||rer|s
||roug| ||ree `l|ex|o|e rec|ar|srs'. T|roug| ||ese rec|ar|srs, a cour|ry car lu|l||| a par| ol
||e|r er|ss|ors reduc||ors |r aro||er cour|ry or ouy er|ss|or a||oWarces lror aro||er
cour|ry. T|ere are ||ree l|ex|o|e rec|ar|srs.
10 MW Biomass Based Power Plant ABEIL
|. Fr|ss|ors |rad|rg
||. Jo|r| |rp|erer|a||or
|||. C|ear deve|oprer| rec|ar|sr
i: E-issi*!s #%a.i!=
Ar||c|e 17 ol ||e Kyo|o pro|oco| opers up lor er|ss|ors |rad|rg oe|Weer cour|r|es ||a| |ave
rade corr||rer|s |o reduce greer|ouse gas er|ss|ors. T|e cour|r|es |ave ||e op||or |o
de|ega|e |||s r|g|| ol er|ss|ors |rad|rg |o corpar|es or o||er orgar|sa||ors.lr a sys|er lor
er|ss|ors |rad|rg, ||e |o|a| arour| ol er|ss|ors perr|||ed |s pre-del|red. T|e correspord|rg
er|ss|ors a||oWarces are ||er |ssued |o ||e er||||rg |rs|a||a||ors ||roug| auc||or or |ssued
lree|y. T|roug| |rad|rg, |rs|a||a||ors W||| |oW cos|s lor reduc||ors are s||ru|a|ed |o ra|e
reduc||ors ard se|| ||e|r surp|us ol er|ss|ors a||oWarces |o orgar|za||ors W|ere reduc||ors
are rore expers|ve. 8o|| ||e se|||rg ard ouy|rg corpary W|rs or |||s l|ex|o||||y ||a| |rade
ollers W||| pos|||ve ellec|s or ecorory, resource ell|c|ercy ard c||ra|e. T|e erv|rorrer|a|
advar|age |s ||a| ore |roWs, |r advarce, ||e arour| ol greer|ouse gases ||a| W||| oe
er|||ed. T|e ecoror|ca| advar|age |s ||a| ||e reduc||ors are dore W|ere ||e reduc||or cos|s
are ||e |oWes|. T|e sys|er a||oWs lor a cos| ellec||ve Way |o reac| a predel|red |arge| ard
s||ru|a|es erv|rorrer|a| |ec|ro|ogy deve|oprer|.
i: 2*i!# I-/"-"!#a#i*!@ 2I
urder ar||c|e o ol ||e Kyo|o pro|oco| ar Arrex l cour|ry ||a| |as rade a corr||rer| lor
reduc|rg greer|ouse gases, car oller |o, or oo|a|r lror aro||er Arrex l cour|ry greer|ouse
gas er|ss|ors reduc||ors. T|ese er|ss|ors reduc||ors s|a|| core lror projec|s W||| ||e
oojec||ves |o reduce ar||ropoger|c er|ss|ors lror sources or |rcrease ||e ar||ropoger|c
up|a|e |r s|r|s. lr order |o oe accep|ed as Jl-projec|s, ||e projec|s |ave |o oe accep|ed oy
oo|| par||es |r advarce. l| a|so |as |o oe prover ||a| ||e projec|s W||| |ead |o er|ss|ors
reduc||ors ||a| are ||g|er ||ar W|a| o||erW|se Wou|d |ave oeer oo|a|red. Jl-projec|s are ar
|rs|rurer| lor ore |rdus|r|a| cour|ry |o |rves| |r aro||er |rdus|r|a| cour|ry ard |r re|urr oo|a|r
er|ss|ors reduc||ors. T|ese reduc||ors car oe used |o |e|p lu|l||| ||e|r oWr reduc||or
corr||rer|s a| a |oWer cos| ||ar |l ||ey |ad |o do ||e reduc||ors |r ||e|r oWr cour|ry.
10 MW Biomass Based Power Plant ABEIL
C"a! D"$"*/-"!# M"c?a!is- 9CDM:
Ar||c|e 12 ol ||e Kyo|o pro|oco| del|res ||e C|ear 0eve|oprer| |ec|ar|sr, C0|. T|e
purpose ol C0| |s |o.
a) Cor|r|ou|e |o sus|a|rao|e deve|oprer| |r deve|op|rg cour|r|es,
o) le|p Arrex l-cour|r|es urder ||e Kyo|o lro|oco| |o ree| ||e|r |arge|.
w||| ||e |e|p ol C0|, cour|r|es W||c| |ave se| ||erse|ves ar er|ss|or reduc||or |arge|
urder ||e Kyo|o lro|oco| (Arrex l cour|r|es) car cor|r|ou|e |o ||e l|rarc|rg ol projec|s |r
deve|op|rg cour|r|es (ror-Arrex l cour|r|es), W||c| do ro| |ave a reduc||or |arge|. T|ese
projec|s s|ou|d reduce ||e er|ss|or ol greer|ouse gases W|||e cor|r|ou||rg |o ||e sus|a|rao|e
deve|oprer| ol ||e |os| cour|ry |rvo|ved. T|e ac||eved er|ss|or reduc||ors car oe
purc|ased oy ||e Arrex l cour|ry |r order |o ree| ||s reduc||or |arge|.
lr order |o oe accep|ed as C0|-projec|s, ||e projec|s |ave |o oe accep|ed oy oo|| par||es |r
advarce. l| a|so |as |o oe prover ||a| ||e projec|s W||| |ead |o er|ss|ors reduc||ors ||a| are
||g|er ||ar W|a| o||erW|se Wou|d |ave oeer oo|a|red. T|e d|llererce oe|Weer Jl-projec|s ard
C0|-projec|s |s ||a| Jl-projec|s are dore oe|Weer cour|r|es ||a| oo|| |ave corr||rer|s,
W|||e ||e C0|-projec|s |s oe|Weer ore cour|ry ||a| |as corr||rer|s ard aro||er cour|ry
||a| does ro| |ave corr||rer|s. Fr|ss|ors reduc||ors ||a| |ave oeer dore ||roug| C0|-
projec|s dur|rg ||e per|od 2000 |o 2007 car oe used lor lu|l||||rg corr||rer|s |r Arrex l
cour|r|es lor ||e per|od 2008-2012.
H*5 CDM 5*%AsD
Ar |rves|or lror a deve|oped cour|ry, car |rves| |r, or prov|de l|rarce lor a projec| |r a
deve|op|rg cour|ry ||a| reduces greer|ouse gas er|ss|ors so ||a| ||ey are |oWer ||ar ||ey
Wou|d |ave oeer W|||ou| ||e ex|ra |rves|rer| - |.e. corpared |o W|a| Wou|d |ave |appered
W|||ou| ||e C0| urder a ous|ress as usua| ou|core. T|e |rves|or ||er ge|s cred||s - caroor
cred||s - lor ||e reduc||ors ard car use ||ose cred||s |o ree| ||e|r Kyo|o |arge|. ll ||e C0|
Wor|s perlec||y || W||| ro| resu|| |r rore or |ess er|ss|or reduc||ors oe|rg ac||eved ||ar Were
agreed urder ||e Kyo|o lro|oco|, || W||| s|rp|y c|arge ||e |oca||or |r W||c| sore ol ||e
reduc||ors W||| |apper. lor exarp|e, a lrerc| corpary reeds |o reduce ||s er|ss|ors as par|
ol ||s cor|r|ou||or |o ree||rg lrarce's er|ss|or reduc||or |arge| urder ||e Kyo|o lro|oco|.
lrs|ead ol reduc|rg er|ss|ors lror ||s oWr ac||v|||es |r lrarce, ||e corpary prov|des lurd|rg
lor ||e cors|ruc||or ol a reW o|orass p|ar| |r lrd|a ||a| Wou|d ro| |ave oeer ao|e |o go a|ead
W|||ou| |||s |rves|rer|. T||s, ||ey argue, prever|s ||e cors|ruc||or ol reW loss||-lue|ed p|ar|s
10 MW Biomass Based Power Plant ABEIL
|r lrd|a, or d|sp|aces corsurp||or ol e|ec|r|c||y lror ex|s||rg ores, |ead|rg |o 0|ooa|
Frv|rorrer|a| Corcerrs reduc||or |r greer|ouse gas er|ss|ors |r lrd|a. T|e lrerc| |rves|or
ge|s cred|| lor ||ose reduc||ors ard car use ||er |o |e|p ree| ||e|r reduc||or |arge| |r
lrarce.
1.1.< R"C)i%"-"!#s +*% Pa%#ici/a#i!= i! CDM
P%*,"c# C8c" +*% CDM
0|ooa| Frv|rorrer|a| Corcerrs w|||e |rves|ors prol|| lror C0| projec|s oy oo|a|r|rg
reduc||ors a| cos|s |oWer ||ar |r ||e|r oWr cour|r|es, ||e ga|rs |o ||e deve|op|rg cour|ry |os|
par||es are |r ||e lorr ol l|rarce, |ec|ro|ogy, ard sus|a|rao|e deve|oprer| oerel||s. lrojec|s
s|ar||rg |r ||e year 2000 are e||g|o|e |o earr Cer||l|ed Fr|ss|or beduc||ors (CFbs) |l ||ey |ead
|o rea|, reasurao|e, ard |org-|err 0l0 reduc||ors, W||c| are add|||ora| |o ary ||a| Wou|d
occur |r ||e aoserce ol ||e C0| projec|. T||s |rc|udes allores|a||or ard relores|a||or projec|s,
W||c| |ead |o ||e seques|ra||or ol caroor d|ox|de. A| C0l-7, || Was dec|ded ||a| ||e lo||oW|rg
|ypes ol projec|s Wou|d qua||ly lor las|-|rac| approva| procedures.
- bereWao|e erergy projec|s W||| ou|pu| capac||y up |o 15 |w
- Frergy ell|c|ercy |rproverer| projec|s, W||c| reduce erergy corsurp||or or ||e supp|y
ard|or derard s|de oy up |o 15 0w| arrua||y
- 0||er projec| ac||v|||es ||a| oo|| reduce er|ss|ors oy sources ard d|rec||y er|| |ess ||ar 15
|||o|ors C02 equ|va|er| arrua||y.
T|e C0| W||| oe superv|sed oy ar execu||ve ooard, ard a s|are ol ||e proceeds lror projec|
ac||v|||es W||| oe used |o ass|s| deve|op|rg cour|r|es |r ree||rg ||e cos|s ol adap|a||or |o
c||ra|e c|arge.
I!.ia! I!i#ia#i$"s *! CDM
0overrrer| ol lrd|a |as oeer W||||rg |o lu|l||| ||s respors|o||||y urder ||e C0|. l| |as
deve|oped ar |r|er|r cr||er|or lor approva| ol C0| projec| ac||v|||es, W||c| |s roW ava||ao|e |o
s|a|e|o|ders. l| |as urder|a|er var|ous capac||y ou||d|rg ac||v|||es |||e |o|d|rg ol Wor|s|ops,
|r|||a||or ol var|ous s|ud|es, ard or|el|rg ree||rg W||| ||e s|a|e|o|ders. lrd|a |as oeer ac||ve|y
par||c|pa||rg |r ||e C0| reg|re ard |as a|ready approved projec|s lor lur||er deve|oprer|.
urder C0|, projec|s suc| as erergy ell|c|er| |ydrocaroor relr|gera|ors, roderr|za||or ol
10 MW Biomass Based Power Plant ABEIL
sra|| sca|e lourdry ur||s ard rerova||or, roderr|za||or ol ||erra| poWer s|a||ors e|c. are
oe|rg |a|er up.
1.1.; P%*#*#8/" Ca%>*! F)!. 9PCF:
becogr|z|rg ||a| g|ooa| Warr|rg W||| |ave ||e ros| |rpac| or ||s oorroW|rg c||er| cour|r|es,
||e wor|d 8ar| approved ||e es|ao||s|rer| ol ||e lro|o|ype Caroor lurd (lCl). T|e lCl |s
|r|erded |o |rves| |r projec|s ||a| W||| produce ||g| qua|||y greer|ouse gas er|ss|or
educa||ors ||a| cou|d oe reg|s|ered W||| ||e ur||ed Na||ors lrareWor| Corver||or or C||ra|e
C|arge uNlCCC) lor ||e purposes ol ||e Kyo|o lro|oco|. To |rcrease ||e |||e|||ood ||a| ||e
duc||ors W||| oe recogr|zed oy ||e lar||es |o ||e uNlCCC, |rdeperder| exper|s W||| lo||oW
va||da||or, ver|l|ca||or ard cer||l|ca||or procedures ||a| respord |o uNlCCC ru|es as ||ey
deve|op. T|e lCl W||| p||o| produc||or ol er|ss|or reduc||ors W||||r ||e lrareWor| ol Jo|r|
lrp|erer|a||or (Jl) ard ||e C|ear 0eve|oprer| |ec|ar|sr (C0|). T|e lCl W||| |rves|
cor|r|ou||ors rade oy corpar|es ard goverrrer|s |r projec|s des|gred |o produce er|ss|or
reduc||ors lu||y cors|s|er| W||| ||e Kyo|o lro|oco| ard ||e ererg|rg lrareWor| lor Jl ard ||e
C0|. Cor|r|ou|ors, or lar||c|par|s |r ||e lCl, W||| rece|ve a pro ra|a s|are ol ||e er|ss|or
reduc||ors, ver|l|ed ard cer||l|ed |r accordarce W||| agreerer|s reac|ed W||| ||e respec||ve
cour|r|es |os||rg ||e projec|s.
1.1.7 SiF" *+ Ma%A"# +*% E-issi*!s R".)c#i*!s
A|| es||ra|es ol rar|e| vo|ure are specu|a||ve a| |||s ear|y s|age |r ||e rar|e|'s
deve|oprer|.
0re Way ol |oo||rg a| ||e po|er||a| s|ze ol ||e rar|e| |s |o assure ||a| aoou| ore o||||or
|orres ol caroor er|ss|ors rus| oe reduced per year dur|rg ||e corr||rer| per|od ol 2008-
2012 |r order lor ||e |rdus|r|a||zed cour|r|es |o ree| ||e|r oo||ga||ors ol a 5 reduc||or |r ||e|r
1990 |eve|s ol er|ss|ors.
urder lro|o|ype caroor lurd prograrre ol ||e wor|d 8ar|. 0overrrer| ol lrd|a |as
approved a rur|c|pa| so||d Was|e erergy projec| lor |rp|erer|a||or |r C|erra|, W||c|
proposes |o use ||e s|a|e ol ar| |ec|ro|ogy lor ex|rac||rg erergy lror ary so||d Was|e
|rrespec||ve ol ||e erergy cor|er|. |ary |rdus|r|a| orgar|za||ors |r ||e pr|va|e sec|or |ave
a|so soug|| ass|s|arce urder |||s lurd.
10 MW Biomass Based Power Plant ABEIL
SIGNIFICANCE OF CDM
Ac||eve sus|a|rao|e deve|oprer|
beduce |rpac| or erv|rorrer|
Add|||ora| s|rear ol |rcore ||roug| sa|e ol er|ss|or reduc||ors
Cor|r|ou|es lor rura| deve|oprer|
beduce po||u||or |eve|s
Tec|ro|ogy |rproverer|
lrproves ecoror|cs ol projec|
le|ps deve|oped cour|r|es |o ac||eve ||e|r er|ss|or reduc||or corr||rer|s
10 MW Biomass Based Power Plant ABEIL
2. DEMAND ANALYSIS AND 2USTIFICATION OF THE PRO2ECT
2.0 INTRODUCTION
l| |s a We||-|roWr lac| ||a| e|ec|r|c||y |s ||e ros| esser||a| |rpu| lor groW|| ard deve|oprer| ol
ary s|a|e. Assar |s p|arr|rg |o groW rap|d|y |r oo|| ||e |rdus|r|a| ard agr|cu||ura| sec|ors ard
corsequer||y ||e derard lor poWer |s or ||e r|se. loWever, ||e groW|| |r |rs|a||ed poWer
gerera||rg capac||y |as ro| |ep| pace W||| ||e projec|ed derard.
2.1 PO(ER SECTOR REFORMS IN ASSAM
0ov|. ol Assar dec|ded |o relorrs ||s loWer 3ec|or W||| ||e oojec||ve ol crea||rg cord|||ors
lor sus|a|rao|e deve|oprer| ol ||e loWer 3ec|or ard |rprov|rg ell|c|ercy ard qua|||y ol
serv|ce |o ||e corsurers oy a||oW|rg pr|va|e par||c|pa||or |r ||e 3|a|e loWer 3ec|or.
T|e 0ov|. ol Assar es|ao||s|ed Assar F|ec|r|c||y begu|a|ory Corr|ss|or (AFbC). |o
regu|a|e ||e lurc||or|rg ol ||e loWer 3ec|or or sourd correrc|a| pr|rc|p|es, |o saleguard ||e
|r|eres|s ol ||e Corsurers |r respec| ol qua|||y, re||ao||||y ard la|r pr|ce lor e|ec|r|c||y ard |o
se| cos| ard ell|c|ercy oased |ar|ll |o ersure cred|| Wor|||ress ard v|ao||||y ol ||e loWer 3ec|or
so as |o progress|ve|y e||r|ra|e |ar|ll d|s|or||ors ard suos|d|es. T|e Corr|ss|or |s lu||y
lurc||ora| ard regu|a||rg ||e 3|a|e loWer 3ec|or u||||||es.
Assar s|a|e W||| 0|spur as ||s cap||a| |as ar area ol 78,438 sq. Kr ard a popu|a||or ol
22.4 r||||or. Adr|r|s|ra||ve|y || |s d|v|ded |r|o 23 d|s|r|c|s corpr|s|rg ol 87 |oWrs ard 28,590
v|||ages (as per 1991 cersus).
T|e s|a|e |s predor|rar||y agrar|ar W||| 89 percer| ol ||e popu|a||or oe|rg rura|. Aoou|
o3 ol ||s popu|a||or |s ergaged |r agr|cu||ure ard a|||ed ac||v|||es, ol W||c| |ea p|ar|a||or
|s ||e ros| |rpor|ar|. Assar |s erdoWed W||| r|c| r|rera| resources. l| |as reserves ol
coa|, ||res|ore, pe|ro|eur ard ra|ura| gas.
2.2 G%*5#? *+ P*5"% S"c#*%
3|gr|l|car| groW|| |r loWer 3ec|or |r ||e 3|a|e W||| ||e es|ao||s|rer| ol ||e 3|a|e
F|ec|r|c||y 8oard |oo| p|ace. Apar| lror ou||d|rg up |rs|a||ed capac||y ol 554 |w as or 31s|
|arc| 1997 as aga|rs| 132 |w |r 1975, e|ec|r|c||y |s ex|erded |o 19,019 ou| ol 24,o85
v|||ages (|ao||a|ed) cover|rg 77 ol v|||ages |r ||e 3|a|e as or 31s| |arc| 1997 as aga|rs|
10 MW Biomass Based Power Plant ABEIL
190 |r 1975. A3F8 |s serv|rg 9,11,514 corsurers as or 30|| Jure, 2001 - up lror
7,12,714 corsurers as or 31s| |arc| 1997 ard 1,08,o13 |r 1975. T|e per cap||a
corsurp||or |r ||e 3|a|e over ||e |as| |Wo decades |s surrar|zed or|el|y |r ||e |ao|e
oe|oW.
Pa%#ic)a%s 11;' 111<31;
lrs|a||ed Capac||y (|w) 132 554
Frergy Ava||ao|e (|u) 55o 2,o09
lerg|| ol lT l|res (c|| |r) 5,45o 42,o15
lerg|| ol lT l|res (c|| |r) 8,7o3 41,872
3uos|a||ors (33|v & aoove) (|vA) o78 2,518
0|s|r|ou||or Trarslorrers (|vA) 391 1,o57
ToWrs & v|||ages e|ec|r|l|ed (Nos.) 190 21,887
Nuroer ol corsurers served 1,08,o13 7,12,714
ler cap||a corsurp||or (|w||persor) 31 104
Pa%#ic)a%s 11;' 111<31;
lrs|a||ed Capac||y (|w) 132 554
Frergy Ava||ao|e (|u) 55o 2,o09
lerg|| ol lT l|res (c|| |r) 5,45o 42,o15
2.4 E!"%=8 R"s*)%c"s
Assar |as r|c| reserves ol coa|, pe|ro|eur ard ra|ura| gas. T|e Nor||-eas|err reg|or |s
erdoWed W||| aoou| 37 ol a|| lrd|a |ydroe|ec|r|c resources. T|e es||ra|ed |ydroe|ec|r|c
po|er||a| ol ||e reg|or |s aoou| 31,857 |w a| o0 |oad lac|or, ou| ol W||c| 315 |w |ave
a|ready oeer exp|o||ed ard 305 |w are urder deve|oprer|. Assar oe|rg ar |r|egra| par|
ol ||e Nor||-Fas|err reg|or, || Wou|d oe ||e oerel|c|ary ol deve|oprer| ol |ydro po|er||a| |r
||e reg|or.
2.4.1 I!.)s#%8 S#%)c#)%"
Assar 3|a|e F|ec|r|c||y 8oard (A3F8) cors|||u|ed urder ||e F|ec|r|c||y Ac| 1948 |s
respors|o|e lor gerera||or, |rarsr|ss|or ard d|s|r|ou||or ol e|ec|r|c||y |r ||e 3|a|e. Ar
F|ec|r|c||y 8oard Was cors|||u|ed |r 1958 |r ||e corpos||e s|a|e ol Assar. T|e ex|s||rg
8oard covers or|y par| ol ||e o|d 3|a|e W||c| Was |r|lurca|ed |r|o Assar, |eg|a|aya ard
||zorar |r 1972.
10 MW Biomass Based Power Plant ABEIL
Nor|| Fas|err F|ec|r|c loWer Corpora||or (NFFlC0), a 0overrrer| ol lrd|a Corpora||or,
Was es|ao||s|ed |r 197o lor es|ao||s||rg ard opera||rg |ydro ard ||erra| poWer p|ar|s W|||
|rarsr|ss|or re|Wor| |r ||e Nor||-eas|err reg|or supp|erer||rg ||e ellor|s ol ||e 3|a|es |r
poWer deve|oprer| |r ||e reg|or.
loWer 0r|d Corpora||or ol lrd|a (l0Cll), a 0overrrer| ol lrd|a Corpora||or, Was
es|ao||s|ed |r 1989 lor p|arr|rg, cors|ruc||or ard opera||or ol cer|ra| |rarsr|ss|or sys|er
|r ||e cour|ry |ad |a|er over ||e |rarsr|ss|or re|Wor| ol NFFlC0 |r ||e reg|or. l0Cll
|as oeer rade respors|o|e lor rajor Wor|s |r ||e lu|ure |r |rarsr|ss|or sec|or.
lrdeperder| loWer lroducers (lll) suc| as 0ll |as a|so s|ar|ed opera||rg s|rce 1997 |r
||e sou||err par| ol ||e 3|a|e W||| a |o|a| |rs|a||ed capac||y ol 24.5 |w.
LIST OF CAPTIVE PO(ER PLANTS IN ASSAM.
S.N*. C*-/a!8 I!.)s#%8 F)" Ca/aci#8 L*ca#i*!
1. l|rdus|ar laper
Corp., Jag|road
laper Coa| 2x15 |w Jag|road, 0|s|-
Nagaor
2. l|rdus|ar laper
Corp., larc|grar
laper Coa| 2x15 |w larc|grar, 0|s|-
Cac|ar
3. 8orga|gaor bel|rery
& le|ro C|er|ca|s
l|d.
0|| 0|||0as 3x1o |w 0|a||gaor, 0|s|-
8orga|gaor
4. 0|| lrd|a l|d.
0u||ajar
0|| 0as 2x15 |w

2x3 |w
0u||ajar, 0|s|-
T|rsu||a
|orar, 0|s|-
3|osagar.
5. l|rdus|ar ler||||zer
Corp. Narrup
ler||||zer 0as 1x20 |w
1x7 |w
2x1 |w
Narrup, 0|s|-
0|orugar|
o. lrd|ar 0|| Corp. l|d.
0uWa|a|| bel|rery
0|| 0||(bC0) 2x8 |w Noorra||
0uWa|a||.
7. lrd|ar 0|| Corp. l|d.
0|goo| bel|rery
0|| 0as|0|| 3x8.5 |w 0|goo|, 0|s|-
T|rsu||a
8. 0N0C l|d.
budrasagar
0|| &
Na|ura|
0as
0as 2x3 |w budrasagar, 0|s|-
3|osagar
9. 0N0C l|d. 0e|e|y 0|| &
Na|ura|
0as
0as 3x3 |w 0e|e|y, 0|s|-
3|osagar.
10 MW Biomass Based Power Plant ABEIL
10. 0N0C l|d. la|Wa 0|| &
Na|ura|
0as
0as 3x3 |w la|Wa, 0|s|-
3|osagar
11. Assar lrdus|r|a|
0ev. Corp. 3ac|
cral| lrojec|
laper Coa| 1x5 |w
(c|osed)
0||rg, 0|s|,
Nagaor
12. ||s. lrag 8os|r|
3yr||e||cs l|d.
3|paj|ar
lo|yes|er
l|ore
0|ese| 2x1.o |w
4x2.7 |w
3|paj|ar, 0|s|-
0arrarg
13. As|o| laper ||||s,
Jog|g|opa,
laper 0|ese| 1x8.3 |w
ro| urder
opera||or
Jog|g|opa, 0|s|-
8orga|gaor
14. CCl, 8o|ajar Cerer| 0|ese| 1x4 |w 8o|ajar, 0|s|-
Karo| Arg|org
15. Nura||gar| bel|rery
l|d. 0o|ag|a|
0|| 0as
0|ese|
2x34 |w
1x1.17 |vA
Nura||gar|, 0|s|-
Jor|a|.
1o. 0as Au||or||y ol
lrd|a l|d. la|Wa
0as 0as
0|ese|
2x3.125 |w
2x0.2 |w
la|Wa, 0|s|-
3|osagar
17. l0C (A00) 0|goo| 0|| 0as 1x20 |w 0|goo|
2.' T?" C)%%"!# P*5"% Sc"!a%i* i! Assa-
2.'.1 I!s#a". Ca/aci#8
T|e |rs|a||ed capac||y |r ||e 3|a|e as or 31s| |arc| 2002 |s 574.4 |w. lr add|||or |o ||s oWr
|rs|a||ed capac||y, ||e 3|a|e |as a s|are ol 288 |w lror Cer|ra| 3ec|or 0erera||rg 3|a||ors
oWred oy NFFlC0 ard NllC. 8es|des |||s, ||e 3|a|e |as a|so 24.5 |w ol pr|va|e poWer (lll)
gerera||or. T|e |o|a| capac||y ||us ava||ao|e lor ||e 3|a|e |s 88o.9 |w. T|e de|a||s ol |rs|a||ed
capac||y are g|ver oe|oW.
T8/" *+ G"!"%a#i*! Ca/aci#8 i! M(
lydro 2.0
Coa| 240.0
0|| o0.0
0as 274.4
3|a|e's lrs|a||ed Capac||y. 574.4
lr|va|e 3ec|or 24.5
lrpor| lror 0||er 3ec|ors 288.0
To|a| Ava||ao||||y. 88o.9
10 MW Biomass Based Power Plant ABEIL
lr add|||or, ||e 3|a|e |as cap||ve gerera||rg capac||y ol 451 |w ol W||c| 207 |w W|||
rel|rer|es, 0|| lrd|a, 0N0Cl ard paper r|||s e|c. ard 244 |w W||| |ea garders ard o||er
|rdus|r|es.
T|e s|a||or W|se de|a||s ol A3F8's |rs|a||ed capac||y are g|ver oe|oW.
S N*. S#a#i*! Ca/aci#8 9M(:
1 8orga|gaor T|erra| (coa| l|red) 240.0
2 C|ardrapur T|erra| (o|| l|red) o0.0
3 la|Wa T|erra| (gas l|red) 120.0
4 Narrup T|erra| (gas l|red) 133.5
5 |oo||e (gas l|red) 18.9
o lydro 2.0
2.'.2 G"!"%a#i*!@ P)%c?as" a!. Sa"s
A3F8 |as gerera|ed 8o8.54 |u (exc|ud|rg aux|||ary corsurp||or) dur|rg 2000-2001 ard
purc|ased 2292.77 |u lror Cer|ra| 3ec|or, |eg|a|aya, lll ard Fas|err reg|or. T||s |rc|udes
135.33 |u lree poWer lror NFFlC0 |ydro gerera||or. T|e |o|a| erergy ||us ava||ao|e lor sa|e
Was 31o1.31 |u.
2.'.3 P*5"% s)//8 /*si#i*! i! #?" S#a#"
T|e pea| derard ard erergy requ|rerer| re| dur|rg 2000-2001 |s 580.0 |w ard 8.0 |u (per
day) respec||ve|y. 8u| a| |||s |eve| ol supp|y oo|| pea| ard erergy Was s|or| ol ||e rea| derard.
T|e urres|r|c|ed pea| derard ard erergy requ|rerer| are assessed a| o00 |w ard 9.0 |u
(per day) respec||ve|y. T|e urres|r|c|ed pea| derard ard erergy requ|rerer| |ave |o oe s|ud|ed
lur||er.
2.'.4 C*!s)-"% P%*+i" a!. E!"%=8 Sa"s.
A3F8 serves 9.11 la|| corsurers as or 2001-2002 W||| |oa| correc|ed |oad ol 1,o50 |w. T|e
rura| dores||c ard correrc|a| corsurers ruroer|rg 1.5 la|| (1o.5 ol |o|a| ruroer ol
corsurers) are ro| re|ered. loWever, a|| ||e serv|ces re|eased lror 1992 are re|ered. T|e
3|a|e |as aoou| 2009 |rr|ga||or purpse|s. T|e lrr|ga||or 0ep||. opera|es ros| ol ||ese purpse|s
ard ||e corsurp||or |s re|ered.
10 MW Biomass Based Power Plant ABEIL
GENERATION
Assam State Electricty Board has four major Thermal Generating Stations
I!s#a". Ca/aci#8
STATION BTPS CTPS LTPS NTPS MOBILE HYDRO
CAlAClT 240.0 o0.0 120.0 133.5 18.9 2.0
ur||-W|se de|a||s are.
8Tl3. 4 x o0 |w Coa| l|red 3|ear Turo|re.
CTl3. 2 x 30 |w 0|| l|red 3|ear Turo|re.
lTl3. 4 x 15 |w + 3 x 20 |w 0as Turo|re.
NTl3. 3 x 23 |w + 1 x 12.5 |w 0as Turo|re + 1 x 30 |w 0as l|red 3|ear Turo|re + 1 x
22 |w was|e lea| becovery ur||.
|oo||e. 3 x 2.7 + 4 x 2.7 |w
lydro. 2.0 |w
To|a| gerera||rg capac||y. 574.4 |w
T8/" *+ I!s#a". Ca/aci#8
T8/" *+ G"!"%a#i*! M(
lydro 2.0
Coa| 240.0
0|| o0.0
0as 274.4
3|a|e's lrs|a||ed Capac||y. 574.4
2.< R)%a E"c#%i+ica#i*!
A3F8 |ad s|ar|ed ||e bura| F|ec|r|l|ca||or (bF) prograrre |r 19oo-o7 W||| a Ce|| |eaded oy ar
Fxecu||ve Frg|reer urder C||el Frg|reer (F|ec|r|ca|). To cope up W||| |erpo ol bF Wor|s, ||e
Ce|| Was upgraded a| var|ous s|ages, |o ||e C|rc|e, Zore & w|rg |eve| oe|rg |eaded oy
3uper|r|erd|rg Frg|reer, Add|||ora| C||el Frg|reer & C||el Frg|reer respec||ve|y. loWever,
dur|rg s|ac| per|od ||e w|rg Was pu| urder ACF or a leW occas|ors. A| preser| bF w|rg |s
|eaded oy C||el Frg|reer ard er|rus|ed W||| prepara||or ol sc|eres, ror||or|rg progress ol bF
Wor|s W||c| are oe|rg carr|ed ou| oy respec||ve 0&| 0|v|s|ors urder C||el Frg|reer
(0|s|r|ou||or).
10 MW Biomass Based Power Plant ABEIL
2.<.1 S#a#)s *+ E"c#%i+ica#i*!&
A3F8 |as e|ec|r|l|ed 19,019 v|||ages urder var|ous bF sc|eres, 5,ooo ros ol v|||ages are ye| |o
oe e|ec|r|l|ed (l|s| ol ure|ec|r|l|ed v|||ages). |os| ol ||e sc|eres Were l|rarced oy bFC l|d. or
|org |err |oar arour||rg |o bs. 329.84 Crore. A leW sc|eres Were a|so |a|er urder 3|a|e l|ar.
0|s|r|c|-W|se s|a|us ol e|ec|r|l|ed v|||ages are g|ver as oe|oW.
0|s|r|c|-W|se ruroer ol F|ec|r|l|ed Cersus v|||ages as per 1991 cersus
S N* Na-" *+ Dis#%ic# T*#a /*/)a#".
$ia="
N* *+ $ia="s ""c#%i+i".
)/ #* 31.03.01
N* *+ $ia="s #*
>" ""c#%i+i".
1 0oa|para 745 70o 39
2 0|uor| 1,284 1,057 227
3 Ko|raj|ar 923 839 84
4 8orga|gaor 858 81o 42
5 0ararg 1,328 1,218 110
o 3or||pur 1,o91 1,42o 2o5
7 8arpe|a 1,04o 948 98
8 Na|oar| 803 800 3
9 Karrup 1,300 1,234 oo
10 Nagaor 1,379 1,249 12o
11 |ar|gaor 5o9 432 137
12 3|osagar 873 817 5o
13 0o|ag|a| 1,059 o58 481
14 Jor|a| 798 o14 184
15 la|||rpur 1,140 854 28o
1o 0|eraj| 1,110 342 7o8
17 Cac|ar 1,024 923 101
18 la||a|ard| 327 290 37
19 Kar|rgarj 893 535 358
20 0|orugar| 1,30o 1,13o 170
21 T|rsu||a 1,13o 825 311
22 Karo| Arg|org 2,520 1,039 1,481
23 N. C. l|||s 577 2o1 31o
-- To|a| 24,o85 19,019 5,ooo
10 MW Biomass Based Power Plant ABEIL
0overrrer| ol lrd|a |as a|so erv|sages ||e use ol Nor-Corver||ora| sources ol erergy lor
e|ec|r|l|ca||or ol rero|e v|||ages W|ere 0r|d poWer carro| oe ex|erded ecoror|ca||y. lr ||e l|rs|
p|ase aoou| 300 rero|e v|||ages |r Assar |ave oeer proposed |o oe e|ec|r|l|ed W||| Nor-
Corver||ora| sources ol erergy v|z. l|o|o vo||a|c Ce||, ||cro lydro ard 8|o|ass.
2.; B%i"+ N*#" *! Ta%i++ P"#i#i*!s +*% FY 0<30;

Assar 3|a|e F|ec|r|c||y 8oard (A3F8) ard ||s l|ve successor er||||es suor|||ed pe||||or lor Arrua|
beverue bequ|rerer|s (Abb) lor l200o-2007 a|org W||| |ar|ll rev|s|or proposa|s |o ree| ||e
add|||ora| reverue requ|rerer|s oelore ||e lor'o|e Assar F|ec|r|c||y begu|a|ory Corr|ss|or (AFbC)
as per prov|s|ors ol T|e F|ec|r|c||y ac| 2003.

As per ||e prov|s|ors ol Assar F|ec|r|c||y belorr l|rs| Trarsler 3c|ere 2004, ro||l|ed oy ||e 3|a|e
0overrrer| as per ||e prov|s|or ol T|e F|ec|r|c||y Ac|, ||e A3F8 |s roW carry|rg ou| ||e lurc||or ol
ou|| purc|aser ard ou|| supp||er. Accord|rg|y A3F8 |as l||ed pe||||or oelore ||e Corr|ss|or lor 8u||
3upp|y Tar|ll app||cao|e lor d|s|r|ou||or corpar|es.
A3F8 |ad projec|ed ar experd||ure olbs.717.27 crores |r ||s Abb l|||rgs lor 200o-07 lor ||e purc|ase
ol 3809.48 |u |o ree| ||e requ|rerer|s ol 0l3C0| sa|es ol 2354.98 |u ard |rad|rg sa|es ol 140
|u.Aga|rs| |||s, ||e Corr|ss|or |as approved a quar|ur o 4098.3o|u |o ree| ||e requ|rerer| ol
0l3C0| sa|es ol 2417.o3 |u ard |rad|rg sa|es.T|e 0l3C0| sa|es ol 2417.o3|u exc|ude ||e
d|s|r|ou||or |osses arour||rg |o 910.38 |u W||c| averages |o 27.3o.

l| |as oeer es||ra|ed ||a| |r 200o-07 ||ere W||| oe a del|c|| ol 221 |u ever al|er ||e purc|ases ol
A3F8(c||ed aoove) lor W||c| poWer |as |o oe purc|ased lror Traders a| ar average ra|e ol bs.3.57
per ur||.A sc|edu|e ol |||s del|c|| |s g|ver oe|oW |r |aou|ar lorr.
10 MW Biomass Based Power Plant ABEIL
2.7 NEED FOR THE PRO2ECT
T|e del|c|| |r ||e |rs|a||ed capac||y as We|| as |r ||e erergy ava||ao||||y as d|scussed |r ||e
prev|ous paragrap|s |s |||e|y |o |rcrease |r lu|ure ur|ess correc||ve reasures are p|arred
r|g|| roW. T||s prov|des arp|e jus||l|ca||or lor ||e |rs|a||a||or ol 11 |w poWer p|ar| a| Jag|
boad |r |ayorg C|rc|e ol |ar|gaor d|s|r|c| |r Assar. Al|er cors|der|rg arourd ore |w lor
|r|erra| corsurp||or(aux|||ar|es e|c), a re| quar|ur ol 10 |w W||| oe |rjec|ed |o ||e A3F8
gr|d. T||s poWer p|ar| |s erv|rorrer|a| lr|erd|y ard car oe c|a|red lor caroor cred||.
10 MW Biomass Based Power Plant ABEIL
3. BIOMASS POTENTIAL
3.0 INTRODUCTION
Arr|| 8|o Frergy ard lrdus|r|es l|r||ed |as p|arred |o se| up a 11 |w |rdeperder| o|orass
oased poWer p|ar| W||| r|ce |us| as lue| a| Jag| boad |r |ayorg c|rc|e ol |or|gaor d|s|r|c| |r
Assar. T||s poWer p|ar| |s cors|s||rg ol ore |rave||rg gra|e oo||er ol 50 Tll capac||y
opera||rg a| o7 oar ard 485
0
C, ore ex|rac||or cur corders|rg |uro|re ol 11 |w capac||y.
8|orass assessrer| Was carr|ed ou| |r lu|| Karrup ard |or|gaor d|s|r|c|. lor s|udy, o|oc|s
la|||rg |r Karrup ard |or|gaor d|s|r|c| are cors|dered.
It is planned to have a Plant capacity utilization of 90% from the
frst year itself. This Plant Load Factor will include the annual
maintenance and any unscheduled stoppaes due to machine !rea"down
or non availa!ility of fuel . The plant will thus !e operatin for #$%.&
days. 'ice hus" re(uirement for this plant on the !asis of a!ove will !e
)0%*0& +T.The internal consumption of the plant ,au-iliaries etc. is
e-pected to !e around ) +/ and the !alance )0 +/ of power will !e
sold to 0123.
3.1 8l0CK3 lN KA|bul & |0bl0A0N 0l3TblCT
Ka-%)/ Dis#%ic# M*%i=a*! Dis#%ic#
3ua||uc|| |ayorg
lajo |or|aoar|
0oro|rar| la|ar|g|a|
C||aygaor 8|uroard|a
C|ardrapur Kap|||
0|ror|a
C|ayar| 8arduar
8o|o
8orgaor
C|arar|a
10 MW Biomass Based Power Plant ABEIL
Ka-%)/ Dis#%ic# M*%i=a*! Dis#%ic#
bar|
barpur
8ezera
Kara|pur
barg|a
0oresWar
8||d|a Jaj||ora
3.1 DISTRICT PROFILE
KAMRUP DISTRICT
Karrup 0|s|r|c| |s ||e Cap||a| 0|s|r|c| ol Assar. l| |s s||ua|ed oe|Weer 25.43 ard 2o.51 Nor||
la|||ude ard oe|Weer 90.3o ard 92.12 Fas| lorg||ude. T|e grea|er par| ol ||e d|s|r|c|
cors|s|s ol W|de p|a|rs, ||roug| ||e |oWer por||or ol W||c| ||e r|g||y r|ver 8ra|rapu|ra
ra|es ||s Way, l|oW|rg a s|eady course lror eas| |o Wes|.
MORIGAON DISTRICT
|or|gaor |s oas|ca||y ar agrar|ar d|s|r|c|. T|e 0|s|r|c| |s s||ua|ed |r ||e 8ra|rapu|ra va||ey
Zore ol ||e Assar. l| ||es oe|Weer 2o.15 |o 2o.5 Nor|| |a|||ude ard 92 |o 95.5 eas|
|org||ude. |or|gaor d|s|r|c| |s ||e secord sra||es| d|s|r|c| ol Assar
3.1.1 S*is
T|e ra|r so||s |r ||e d|s|r|c| are A||uv|a| so||. T|e so||s |r gerera| are ler|||e |r ra|ure. T|e
0|s|r|c| |s r|c||y erdoWed W||| ra|ura| ard |urar resources ard oller exce||er| scope lor
deve|oprer| ol agr|cu||ure ard a|||ed |rdus|r|es.
3.1.2 Ci-a#" a!. Rai!+a
T|e average |erpera|ure |s rodera|e, aoou| 84 degrees l (29 degrees C) |r ||e |o||es|
ror|| ol Augus|. T|e average va||ey |erpera|ure |r Jaruary |s o1 degrees l (1o degrees C).
lr |||s seasor, |eavy logs ard a |||||e ra|r rar| ||e c||ra|e ol ||e va||ey.
10 MW Biomass Based Power Plant ABEIL
Assar does ro| |ave ||e rorra| lrd|ar |o|, dry seasor. 3ore ra|r occurs lror |arc|
orWards, ou| ||e rea| lorce ol ||e rorsoor W|rds |s laced lror Jure orWard. ba|rla|| |r
Assar rar|s arorg ||e ||g|es| |r ||e Wor|d, ||s arrua| ra|rla|| var|es lror 70 |rc|es |r ||e
Wes| |o 120 |rc|es per year |r ||e eas|. large corcer|ra|ed dur|rg ||e ror||s lror Jure |o
3ep|eroer, || ol|er resu||s |r W|despread des|ruc||ve l|oods. |uc| ol ||e s|a|e |s covered W|||
derse |rop|ca| lores|s ol oarooo ard, a| ||g|er e|eva||ors, evergreers. Corror ar|ra|s ol
Assar |rc|ude ||e e|ep|ar|, ||ger, |eopard, r||roceros, ard oear.
KAMRUP DISTRICT
T||s d|s|r|c| gerera||y exper|erces 3uo |rop|ca| W||| ser| -dry surrer & co|d |r W|r|er
ex|rere cord|||ors. T|e rax|rur ard r|r|rur |erpera|ure |r ||e d|s|r|c| |s arourd 38.5 C
ard 7 C. T|e arrua| ra|rla|| |r ||e d|s|r|c| rarges oe|Weer 1500 rr |o 2o00 rr.
MORIGAON DISTRICT
T|e average arrua| ra|rla|| |s 1597.48 rr. T|e rax|rur |erpera|ure |s le|| dur|rg Jure-
Ju|y W|||e ||e r|r|rur dur|rg Jaruary.
3.1.3 D"-*=%a/?ic Pa%#ic)a%s
KAMRUP DISTRICT
As per 2001 cersus, ||ere are 1342 |r|ao||ed v|||ages |r ||e d|s|r|c|. T||s d|s|r|c| |as a |o|a|
popu|a||or ol 2522324 as ol 2001 Cersus. T|e |||eracy percer|age ol ||e d|s|r|c| |s 74.1o .
T||s d|s|r|c| |s |av|rg uroar popu|a||or ol 908217 & rura| popu|a||or ol 1o14107 respec||ve|y.
T|e |o|a| |a|e popu|a||or |s 132o981 ard lera|e popu|a||or |s 1195343. T||s d|s|r|c| |s |av|rg
popu|a||or ders||y ol 581 sq. |rs, W||| sex ra||o ol 901 lor 1000 ra|es.
MORIGAON DISTRICT
As per 2001 cersus, ||ere are 592 |r|ao||ed v|||ages |r ||e d|s|r|c|. T||s d|s|r|c| |as a |o|a|
popu|a||or ol 77o25o as ol 2001 Cersus. T|e |||eracy percer|age ol ||e d|s|r|c| |s 58.53 .
10 MW Biomass Based Power Plant ABEIL
T||s d|s|r|c| |s |av|rg uroar popu|a||or ol 37988 & rura| popu|a||or ol 7382o8 respec||ve|y. T|e
|o|a| |a|e popu|a||or |s 39892o ard lera|e popu|a||or |s 377330. T||s d|s|r|c| |s |av|rg
popu|a||or ders||y ol 45o sq. |rs, W||| sex ra||o ol 94o lor 1000 ra|es.
3.1.4 A=%ic)#)%"
3.1.4.1 La!. Cassi+ica#i*!
T|e c|ass|l|ca||or ol geograp||ca| area urder d|llerer| ca|egor|es ol |ard u||||sed |s s|a|ed |r
||e |ao|e oe|oW.
3.2 La!. Cassi+ica#i*! 9A%"a i! H"c#a%"s:
Pa%#ic)a%s Ka-%)/ M*%i=a*! TOTAL
0eograp||ca| Area 44o402 1587o5 o051o7
lores| 11oo94 17o2o 134320
lard pu| |o ror- agr|cu||ura| uses 7724o 20198 97444
8arrer ard urcu||urao|e |ard 2029o 5120 2541o
lerrarer| las|ures & o||er graz|rg |ard 2123o 8331 295o7
lard urder r|sc. |ress groves 25409 4489 29898
Cu||urao|e Was|e |ard 4573 o90 52o3
la||oW & currer| la||oW 12428 939 133o7
Ne| soWr area 92o80 101372 194052
!Source" Statistical #oo$ of Assam%
l| car oe ooserved lror ||e |ao|e aoove, a re|a||ve|y |arge area (97444 |a) |s ro| ava||ao|e lor
agr|cu||ure, W|||e area (134320 |a) |s des|gra|ed as lores| |r ||e d|s|r|c|. 0r|y aoou| 84881|a
|ard |s c|ass|l|ed as oarrer ard urcu|||vao|e |ard, perrarer| pas|ures ard o||er r|sc. |rees.
3.1.4.3 C%*//i!= Pa##"%!&
T|e ra|r crops groWr |r ||e d|s|r|c| are w|ea|, laddy, Ju|e, |us|ard e|c.
3.3 C%*//i!= /a##"%! 9A%"a i! Ha:
S"as*! 200430' 2003304 2002303 2001302 2000301
Ka-%)/ Dis#%ic#
K|ar|l 110047 105798 105339 105011 104119
bao| 105071 102754 10170o 102o00 101323
T*#a 21'117 207''2 20;04' 20;<11 20'442
10 MW Biomass Based Power Plant ABEIL
M*%i=a*! Dis#%ic#
K|ar|l 35202 34585 34013 34530 3382o
bao| ooo11 oo083 o5419 o5o23 o5923
T*#a 101713 100<<7 11432 1001'3 11;41
G%a!. T*#a 31<131 301220 30<4;; 30;;<4 30'111
3.4 C%*//". A%"a K?a%i+ 4 Ra>i S"as*!s 9A%"a i! Ha:
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
KAMRUP DISTRICT
Kharif
S)aA)c?i
laddy 4498 4424 4449 4432 442o
|a|ze 13 10 20 11 30
Ar|ar 13 13 1o 14 1o
3ugarcare 91 90 100 o4 100
Ju|e 57o 518 522 524 4oo
Cas|or 5 o 4 o 4
0rourd Nu| 7 o 4 4 o
0||er lu|ses 515 524 4o5 518 418
Ha,*
laddy 142o4 138o4 13850 13871 1387o
|a|ze 30 2o 18 28 24
Ar|ar 20 24 20 20 18
3ugarcare 42 43 28 44 28
Ju|e 700 o14 o12 o12 o14
Cas|or 4 0 0 0 0
0rourd Nu| 0 0 0 0 0
0||er lu|ses 877 8oo 818 814 820
G*%*i-a%i
laddy 28o5 2880 2880 2887 28oo
|a|ze 30 23 1o 2o 10
Ar|ar 80 84 88 88 oo
3ugarcare 43 42 44 24 42
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
Ju|e 220 224 218 218 224
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 0 0 0
0||er lu|ses 38 44 oo 43 o4
C??a8=a*!
laddy 2850 272o 270o 2733 2720
|a|ze 110 110 98 115 101
Ar|ar 10 10 4 o 0
3ugarcare 35 3o o0 38 3o
Ju|e 75 78 oo 79 o0
Cas|or 0 0 0 0 0
0rourd Nu| 5 5 0 0 0
0||er lu|ses 1o5 174 132 124 144
C?a!.%a/)%
laddy 1188 11o5 1121 1170 1102
|a|ze 0 o 4 4 o
Ar|ar 0 4 o o 4
3ugarcare 2 o 4 4 4
Ju|e 2 14 24 19 25
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 2 o 0
0||er lu|ses 30 24 22 25 30
Di-*%ia
laddy 4300 4303 4308 4308 424o
|a|ze 5 18 24 20 28
Ar|ar 50 50 53 48 52
3ugarcare 20 25 20 24 54
Ju|e 100 9o 100 94 100
Cas|or 2 2 0 4 0
0rourd Nu| 27 14 10 14 0
0||er lu|ses 200 184 1o4 188 124
C?a8a!i Ba%.)a%
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
laddy 1732 1o02 1542 1o10 1542
|a|ze 9 24 24 25 28
Ar|ar 10 10 24 10 18
3ugarcare 92 94 o8 84 72
Ju|e o79 o81 o94 o18 o24
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 0 0 0
0||er lu|ses 213 21o 210 212 218
B*A*
laddy 4o04 453o 4549 4557 453o
|a|ze 225 184 178 188 1oo
Ar|ar 55 5o 84 52 52
3ugarcare 450 418 41o 398 244
Ju|e 330 318 3o8 324 3oo
Cas|or 550 485 418 38o o18
0rourd Nu| 170 13o 0 144 0
0||er lu|ses o35 o24 o24 o18 o18
B*!=a*!
laddy 2738 2o7o 2o94 2o92 2o90
|a|ze 45 3o 24 38 29
Ar|ar 35 24 20 18 18
3ugarcare 50 54 52 o4 52
Ju|e 3o0 324 320 318 318
Cas|or 112 110 100 114 oo
0rourd Nu| 0 0 128 0 100
0||er lu|ses 114 115 109 9o 110
C?a-a%ia
laddy 15o4o 1284o 12878 1285o 12850
|a|ze 2 4 o 4 o
Ar|ar 578 518 521 524 518
3ugarcare 79 o4 54 84 84
Ju|e 1753 1724 1718 1801 1724
Cas|or 2 2 4 4 0
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
0rourd Nu| 2 0 0 0 0
0||er lu|ses o38 o24 o10 o18 o24
Ra!i
laddy 4200 427o 4242 4282 4290
|a|ze 0 1o 18 18 1o
Ar|ar 240 21o 27o o 281
3ugarcare 3o0 31o 300 384 278
Ju|e 500 5o1 518 484 529
Cas|or 140 121 118 111 1o8
0rourd Nu| 410 384 274 285 124
0||er lu|ses 200 19o 124 184 110
Ra-/)%
laddy 200o 208o 2078 2087 20o1
|a|ze 10 24 28 2o 24
Ar|ar 10 24 18 20 o
3ugarcare 111 98 oo 121 110
Ju|e 239 134 14o 125 145
Cas|or 1 2 o 4 o
0rourd Nu| 0 0 0 19 0
0||er lu|ses 22o 218 210 224 188
B"F"%a
laddy 321o 31o1 3208 310o 3135
|a|ze o 4 4 4 4
Ar|ar 12 14 14 1o 10
3ugarcare 21 20 78 22 38
Ju|e 25 1o 28 34 24
Cas|or 4 2 0 0 0
0rourd Nu| 50 48 50 42 41
0||er lu|ses 250 2o4 288 21o 2o2
Ka-a/)%
laddy 1330 1359 1284 1358 1327
|a|ze 2 2 4 0 0
Ar|ar 2 0 o 0 4
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
3ugarcare 9 0 20 12 18
Ju|e 5 5 o 0 o
Cas|or 0 0 0 0 0
0rourd Nu| 12 1o o o 4
0||er lu|ses 211 178 194 178 17o
Ra!=ia
laddy 13540 13574 13549 1340o 1333o
|a|ze 303 222 324 284 218
Ar|ar 14 0 10 12 19
3ugarcare o8 oo 1o o3 o4
Ju|e 29 24 34 24 33
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 0 28 20
0||er lu|ses 338 324 324 31o 324
G*%"s5a%
laddy 112o5 11229 11333 1130o 11238
|a|ze 24 18 1o 18 o
Ar|ar 29 34 24 18 25
3ugarcare 1o1 144 121 138 24
Ju|e 547 524 484 3oo 318
Cas|or 0 0 0 0 0
0rourd Nu| 29 34 24 18 20
0||er lu|ses 103 112 111 98 112
Bi?.ia 2a,iA*!a
laddy 2789 2858 2810 2870 2808
|a|ze 7 o o o o
Ar|ar 18 o o 4 1o
3ugarcare 98 100 9o 100 94
Ju|e 12o 133 122 111 9o
Cas|or o 1 0 0 0
0rourd Nu| 25 24 18 o 0
0||er lu|ses 705 724 o9o 711 712
K?a%i+ T*#a 11004; 10';17 10'331 10'011 104111
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
Rabi
S)aA)c?i
laddy 420o 431o 4424 4324 4428
w|ea| o79 o84 o18 o85 o24
0rar 14 18 24 21 20
3easurur 54 o2 o4 5o oo
l|rseed 48 44 48 o8 oo
|us|ard 503 524 51o 505 418
0||er 0||seeds 5 o 4 o o
vege|ao|es 742 718 721 724 718
Ha,*
laddy 552o 5418 5424 5420 542o
w|ea| o70 o18 o24 o21 o28
0rar 22 20 18 22 10
3easurur 177 170 138 179 1oo
l|rseed 81 88 oo 78 88
|us|ard 721 524 710 718 71o
0||er 0||seeds 0 0 2 o 2
vege|ao|es 405 444 418 414 424
G*%*i-a%i
laddy 4370 441o 4524 4420 4518
w|ea| 355 324 31o 327 31o
0rar 15 1o 1o 18 10
3easurur 30 34 30 40 28
l|rseed 81 24 22 40 24
|us|ard 127 120 118 124 124
0||er 0||seeds 0 0 0 0 0
vege|ao|es 290 224 21o 228 21o
C??a8=a*!
laddy 4197 4124 4135 4125 4128
w|ea| 210 210 208 214 210
0rar 10 10 10 13 10
3easurur o 2 o o o
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
l|rseed 55 5o 28 5o 52
|us|ard 90 94 98 98 o8
0||er 0||seeds 75 78 oo 84 73
vege|ao|es 450 418 481 424 478
C?a!.%a/)%
laddy 1100 1124 112o 1128 119o
w|ea| 30 3o 24 38 34
0rar 0 o 4 o 2
3easurur 0 0 0 0 o
l|rseed 10 o 4 15 10
|us|ard 30 32 18 24 24
0||er 0||seeds 2 4 4 o 4
vege|ao|es 200 200 184 202 180
Di-*%ia
laddy 4oo7 4o14 4o30 4o24 4587
w|ea| 122 118 120 120 118
0rar 50 44 24 42 22
3easurur 50 44 42 52 54
l|rseed 5 5 0 o o
|us|ard 105 113 110 115 110
0||er 0||seeds 25 2o 20 28 2o
vege|ao|es 1200 1200 1212 1211 1210
C?a8a!i Ba%.)a%
laddy 4823 4o18 4o24 4o20 441o
w|ea| 181 19o 184 199 18o
0rar 19 20 20 18 18
3easurur 32 34 30 24 24
l|rseed 0 2 0 o 2
|us|ard 179 184 188 188 1o8
0||er 0||seeds 49 52 o4 5o 10
vege|ao|es 200 224 218 218 210
B*A*
laddy 53o9 5218 5220 5220 5210
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
w|ea| 198 118 108 120 100
0rar 75 72 84 o4 84
3easurur 250 218 21o 2o5 188
l|rseed 215 198 11o 187 214
|us|ard 475 418 420 41o 418
0||er 0||seeds 252 21o 218 284 184
vege|ao|es 542 518 521 524 510
B*!=a*!
laddy 3594 3524 3225 3520 3445
w|ea| 145 144 118 145 111
0rar 41 40 20 38 18
3easurur 33 3o 24 35 o4
l|rseed 15 o 4 18 10
|us|ard 395 384 385 324 324
0||er 0||seeds 2 4 o o o
vege|ao|es 285 21o 210 21o 208
C?a-a%ia
laddy 3851 38o4 3818 38o5 3824
w|ea| 1301 128o 1210 1288 1224
0rar 40 40 18 3o 18
3easurur 228 218 210 218 21o
l|rseed 135 198 112 135 124
|us|ard 1149 418 11o0 1155 1155
0||er 0||seeds o1 21o o7 73 4o
vege|ao|es 205 212 210 212 41o
Ra!i
laddy 3799 3o18 3o24 3o24 3o24
w|ea| 510 4oo 41o 4o7 415
0rar 0 0 o o o
3easurur 100 94 o8 100 o4
l|rseed 390 384 318 224 309
|us|ard 570 524 548 534 524
0||er 0||seeds 498 418 410 484 3o5
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
vege|ao|es 485 4oo 418 418 41o
Ra-/)%
laddy 3389 34o5 3218 34oo 3228
w|ea| 1o0 145 125 147 125
0rar 11 12 24 10 1o
3easurur 34 28 18 24 24
l|rseed 0 o o o o
|us|ard 1o4 1o2 1o0 1o8 1o2
0||er 0||seeds 41 24 20 31 24
vege|ao|es 243 218 231 224 224
B"F"%a
laddy 4418 4424 4424 441o 4400
w|ea| 193 148 128 144 132
0rar 4 o o 4 o
3easurur 150 132 122 14o 138
l|rseed 8 o 0 o o
|us|ard 7o o4 oo 84 78
0||er 0||seeds 23 24 28 24 18
vege|ao|es 219 200 224 218 202
Ka-a/)%
laddy 4331 4418 4421 451o 4321
w|ea| o4 o4 77 o4 o2
0rar 24 18 14 24 25
3easurur 24 20 18 22 18
l|rseed 40 3o 24 3o 24
|us|ard 77 o5 3o 32 24
0||er 0||seeds 10 10 10 12 24
vege|ao|es 20o 200 200 194 182
Ra!=ia
laddy 7750 7721 7o24 7318 7724
w|ea| 502 518 514 534 524
0rar 121 118 9o 88 oo
3easurur 38 44 44 3o 40
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
l|rseed 0 0 0 o o
|us|ard 771 71o o84 oo4 597
0||er 0||seeds 0 0 o o o
vege|ao|es 1339 1324 1224 1284 1214
G*%"s5a%
laddy 5o91 5o84 5518 5425 5324
w|ea| 175 1o4 184 18o 184
0rar 20 1o 18 24 25
3easurur o7 oo 34 o2 38
l|rseed 122 110 9o 112 9o
|us|ard 1095 10oo 90o 1044 1018
0||er 0||seeds 30 24 33 24 18
vege|ao|es 2o5 248 218 224 21o
Bi?.ia 2a,iA*!a
laddy 9795 9729 9o18 9o24 9o18
w|ea| 79 oo 88 80 78
0rar 5 o 8 o 4
3easurur o8 o8 oo 54 24
l|rseed 75 o2 o4 o4 88
|us|ard 308 311 288 224 184
0||er 0||seeds 5o 4o 24 4o 34
vege|ao|es 289 294 300 21o 198
Ra>i T*#a 10'0;1 102;'4 101;0< 102<00 101323
Ka-%)/ T*#a 21'117 207''2 20;04' 20;<11 20'442
MORIGAON DISTRICT
Kharif
Ma8*!=
laddy 11o89 11o47 11582 11o74 1152o
|a|ze 55 50 50 28 38
Ar|ar 5 o 0 o 4
3ugarcare 115 9o 98 100 9o
Ju|e 520 544 518 518 4o4
Cas|or 10 4 0 0 0
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
0rourd Nu| 0 0 4 o 4
0||er lu|ses 13 18 18 14 24
M*%ia>a%i
laddy 1478 1512 1497 1442 1472
|a|ze 0 0 0 0 0
Ar|ar 5 0 0 5 0
3ugarcare o85 485 o18 598 514
Ju|e 434 444 388 31o 325
Cas|or 0 0 0 0 0
0rourd Nu| 15 o4 48 13 o
0||er lu|ses 50 24 1o o4 78
La?a%i=?a#
laddy 8822 8724 8o14 8818 8o50
|a|ze 0 0 0 0 0
Ar|ar 0 0 2 4 0
3ugarcare 194 200 200 19o 145
Ju|e 3000 2818 2o24 289o 294o
Cas|or 0 0 0 0 0
0rourd Nu| 1o0 85 o 132 124
0||er lu|ses 102 98 9o 98 o4
B?)%>a!.?a
laddy 2412 2502 2294 2399 2404
|a|ze 0 0 0 0 0
Ar|ar 10 4 0 5 0
3ugarcare 200 200 184 184 155
Ju|e 847 844 818 8o4 818
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 o 4 o
0||er lu|ses o2 o4 9o oo o5
Ka/ii
laddy 15o4 1558 1700 1542 1534
|a|ze 0 0 0 0 0
Ar|ar 0 0 0 0 0
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
3ugarcare 4o oo 18 38 2o
Ju|e 2385 2214 2224 221o 2114
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 o 0 0
0||er lu|ses 324 314 288 284 224
K?a%i+ T*#a 3'202 34'7' 34013 34'30 3372<
Rabi
Ma8*!=
laddy 19405 19412 19212 19345 19228
w|ea| 375 384 285 301 288
0rar 14 18 24 19 24
3easurur 245 188 214 194 218
l|rseed 110 9o 9o o4 9o
|us|ard 74o 718 718 oo8 718
0||er 0||seeds 430 287 218 221 384
vege|ao|es 880 8o4 824 75o 88o
M*%ia>a%i
laddy 9830 9824 9o24 9824 9818
w|ea| 382 288 2o5 214 19o
0rar 0 0 0 5 o
3easurur 78 oo o8 7o o4
l|rseed 75 o4 78 o4 78
|us|ard 2o1 212 244 255 244
0||er 0||seeds 0 o 4 o 4
vege|ao|es 94 98 9o o4 95
La?a%i=?a#
laddy 13002 13024 13125 13000 1309o
w|ea| 351 3o4 384 324 318
0rar 100 85 8o 88 74
3easurur 180 19o 144 132 198
l|rseed 72 72 74 78 74
|us|ard 331 324 324 318 324
0||er 0||seeds 4o 4o 84 18 o4
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
vege|ao|es 300 218 210 288 304
B?)%>a!.?a
laddy 13822 1381o 13o1o 13814 13800
w|ea| 194 1o5 200 144 1o4
0rar 0 0 0 0 0
3easurur 379 410 318 404 384
l|rseed 95 94 98 78 92
|us|ard 578 51o 5oo 578 518
0||er 0||seeds 0 0 0 0 0
vege|ao|es 95 84 8o 100 o5
Ka/ii
laddy 3037 3024 3038 3024 3014
w|ea| 104 98 78 105 9o
0rar 0 0 0 2 12
3easurur 38 24 o4 88 44
l|rseed 0 o 1o 18 4
|us|ard 817 8o4 812 810 79o
0||er 0||seeds 0 0 0 0 0
vege|ao|es 145 128 12o 13o 135
Ra>i T*#a <<<11 <<073 <'411 <'<23 <'123
M*%i=a*! T*#a 101713 100<<7 11432 1001'3 11;41
G%a!. T*#a 31<131 301220 30<4;; 30;;<4 30'111
3.1.' Li$"s#*cA P*/)a#i*!
T|e ||ves|oc| popu|a||or ol Karrup ard |or|gaor d|s|r|c|s |s g|ver |r |ao|e oe|oW.
3.' Li$"s#*cA P*/)a#i*! ."#ais
Pa%#ic)a%s Ka-%)/ M*%i=a*!
Ca|||e o10748 14o951
8ulla|oes 131o7 4729
0oa|s 241o59 o3952
l|gs 1o4919 8544
10 MW Biomass Based Power Plant ABEIL
Pa%#ic)a%s Ka-%)/ M*%i=a*!
lou||ry 14o5574 357188
T*#a 241<0<; '713<4
!Source" Statistics de&tt' Assamand Animal (us#andry )e&artment'%
3.1.< I!.)s#%i"s
3.1.<.1 Ric" Mis&
T|ere are arourd 5 b|ce r|||s |r ||e Karrup d|s|r|c| ard 3 r|ce r|||s |r |or|gaor d|s|r|c| as per
r|ce r||| assoc|a||or, ou| as per survey || |s revea|ed ||a| ||ere are rore ro. ol sra|| capac||y
|u||ers |r Karrup ard |or|gaor d|s|r|c|. T|e r|ce r|||s are r||||rg ||e paddy cor|rg lror ||e
d|s|r|c| ard rearoy area. T|e r|ce r|||s are gerera||rg r|ce |us| ard r|ce orar.
S.N. Na-" *+ Ric" Mi
Ka-%)/
1 3|arra b|ce ||||
2 3r| laxr| b|ce ||||
3 3agar b|ce ||||
4 3urara lrdus|r|es
5 0|aeras|War| b|ce ||||
M*%i=a*!
1 Arard b|ce ||||
2 |ar|a| b|ce ||||
3 3ur|| b|ce ||||
3.1.<.2 Sa5 Mis&
T|ere are arourd 47 3aWr|||s |r ||e Karrup d|s|r|c| ard 13 saWr|||s |r |or|gaor d|s|r|c|.
T|ese saWr|||s are ge|||rg Wood lror ||e rear oy v|||ages. T|e ra|r spec|es are 8aooo|,
seasur, ||ejed| e|c. T|e saW r|||s are gerera||rg Wood c||ps ard saW dus|.
3.2 BIOMASS PO(ER PLANT LOCATION DETAILS
10 MW Biomass Based Power Plant ABEIL
8|orass assessrer| Was carr|ed ou| |r lu|| Karrup ard |or|gaor d|s|r|c|. lor s|udy, o|oc|s
la|||rg |r Karrup ard |or|gaor d|s|r|c|s are cors|dered.
3.2.1 D"-*=%a/?ic F"a#)%"s
C|rc|e W|se popu|a||or, |ouse|o|ds lor Karrup ard |or|gaor d|s|r|c|s are g|ver oe|oW.
3.< D"-*=%a/?ic F"a#)%"s
Ci%c" Na-" H*)s"?*. P*/)a#i*!
Ka-%)/ Dis#%ic#
0oresWar 30770 17257o
barg|a 32205 18097o
Kara|pur 2o900 152720
lajo 3879o 224381
C||aygaor 3o4o3 209740
C|arar|a 1o147 99919
Nagaroera 10743 o1514
8o|o 18o28 99935
la|asoar| 499o3 2oo92o
0uWa|a|| 184454 809895
Nor|| 0uWa|a|| 12417 o5813
0|spur 30o7 1o140
3orapur 23049 124043
C|ardrapur 7138 3774o
M*%i=a*! Dis#%ic#
|ayorg 34752 203o41
8|uragaor 1o55o 10o140
la|ar|g|a| 29742 183420
|ar|gaor 307o2 1o4835
||||ro|e|a 21o4o 118220
|ayorg 34752 203o41
8|uragaor 1o55o 10o140
C|ardgad 34907 180781
!Source" As &er *001 census%
10 MW Biomass Based Power Plant ABEIL
3.2.2 C%*//i!= Pa##"%!&
T|e seasor W|se & crop W|se cropp|rg pa||err lor l|ve years lor ||e o|oc|s covered W||||r ||e
Karrup ard |or|gaor d|s|r|c| are g|ver oe|oW.
3.2.3 B*cA 5is" C%*//i!= /a##"%! i! ?"c#a%"s
T|e ra|r crops groWr |r ||e d|s|r|c|s are w|ea|, laddy, Ju|e, |us|ard e|c.
3.; C%*//i!= /a##"%! 9A%"a i! Ha:
S"as*! 200430' 2003304 2002303 2001302 2000301
Ka-%)/ Dis#%ic#
K|ar|l 110047 105798 105339 105011 104119
bao| 105071 102754 10170o 102o00 101323
T*#a 21'117 207''2 20;04' 20;<11 20'442
M*%i=a*! Dis#%ic#
K|ar|l 35202 34585 34013 34530 3382o
bao| ooo11 oo083 o5419 o5o23 o5923
T*#a 101713 100<<7 11432 1001'3 11;41
G%a!. T*#a 31<131 301220 30<4;; 30;;<4 30'111
3.7 C%*//". A%"a K?a%i+ 4 Ra>i S"as*!s 9A%"a i! Ha:
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
Ka-%)/ Dis#%ic#
Kharif
S)aA)c?i
laddy 4498 4424 4449 4432 442o
|a|ze 13 10 20 11 30
Ar|ar 13 13 1o 14 1o
3ugarcare 91 90 100 o4 100
Ju|e 57o 518 522 524 4oo
Cas|or 5 o 4 o 4
0rourd Nu| 7 o 4 4 o
0||er lu|ses 515 524 4o5 518 418
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
Ha,*
laddy 142o4 138o4 13850 13871 1387o
|a|ze 30 2o 18 28 24
Ar|ar 20 24 20 20 18
3ugarcare 42 43 28 44 28
Ju|e 700 o14 o12 o12 o14
Cas|or 4 0 0 0 0
0rourd Nu| 0 0 0 0 0
0||er lu|ses 877 8oo 818 814 820
G*%*i-a%i
laddy 28o5 2880 2880 2887 28oo
|a|ze 30 23 1o 2o 10
Ar|ar 80 84 88 88 oo
3ugarcare 43 42 44 24 42
Ju|e 220 224 218 218 224
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 0 0 0
0||er lu|ses 38 44 oo 43 o4
C??a8=a*!
laddy 2850 272o 270o 2733 2720
|a|ze 110 110 98 115 101
Ar|ar 10 10 4 o 0
3ugarcare 35 3o o0 38 3o
Ju|e 75 78 oo 79 o0
Cas|or 0 0 0 0 0
0rourd Nu| 5 5 0 0 0
0||er lu|ses 1o5 174 132 124 144
C?a!.%a/)%
laddy 1188 11o5 1121 1170 1102
|a|ze 0 o 4 4 o
Ar|ar 0 4 o o 4
3ugarcare 2 o 4 4 4
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
Ju|e 2 14 24 19 25
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 2 o 0
0||er lu|ses 30 24 22 25 30
Di-*%ia
laddy 4300 4303 4308 4308 424o
|a|ze 5 18 24 20 28
Ar|ar 50 50 53 48 52
3ugarcare 20 25 20 24 54
Ju|e 100 9o 100 94 100
Cas|or 2 2 0 4 0
0rourd Nu| 27 14 10 14 0
0||er lu|ses 200 184 1o4 188 124
C?a8a!i Ba%.)a%
laddy 1732 1o02 1542 1o10 1542
|a|ze 9 24 24 25 28
Ar|ar 10 10 24 10 18
3ugarcare 92 94 o8 84 72
Ju|e o79 o81 o94 o18 o24
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 0 0 0
0||er lu|ses 213 21o 210 212 218
B*A*
laddy 4o04 453o 4549 4557 453o
|a|ze 225 184 178 188 1oo
Ar|ar 55 5o 84 52 52
3ugarcare 450 418 41o 398 244
Ju|e 330 318 3o8 324 3oo
Cas|or 550 485 418 38o o18
0rourd Nu| 170 13o 0 144 0
0||er lu|ses o35 o24 o24 o18 o18
B*!=a*!
laddy 2738 2o7o 2o94 2o92 2o90
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
|a|ze 45 3o 24 38 29
Ar|ar 35 24 20 18 18
3ugarcare 50 54 52 o4 52
Ju|e 3o0 324 320 318 318
Cas|or 112 110 100 114 oo
0rourd Nu| 0 0 128 0 100
0||er lu|ses 114 115 109 9o 110
C?a-a%ia
laddy 15o4o 1284o 12878 1285o 12850
|a|ze 2 4 o 4 o
Ar|ar 578 518 521 524 518
3ugarcare 79 o4 54 84 84
Ju|e 1753 1724 1718 1801 1724
Cas|or 2 2 4 4 0
0rourd Nu| 2 0 0 0 0
0||er lu|ses o38 o24 o10 o18 o24
Ra!i
laddy 4200 427o 4242 4282 4290
|a|ze 0 1o 18 18 1o
Ar|ar 240 21o 27o o 281
3ugarcare 3o0 31o 300 384 278
Ju|e 500 5o1 518 484 529
Cas|or 140 121 118 111 1o8
0rourd Nu| 410 384 274 285 124
0||er lu|ses 200 19o 124 184 110
Ra-/)%
laddy 200o 208o 2078 2087 20o1
|a|ze 10 24 28 2o 24
Ar|ar 10 24 18 20 o
3ugarcare 111 98 oo 121 110
Ju|e 239 134 14o 125 145
Cas|or 1 2 o 4 o
0rourd Nu| 0 0 0 19 0
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
0||er lu|ses 22o 218 210 224 188
B"F"%a
laddy 321o 31o1 3208 310o 3135
|a|ze o 4 4 4 4
Ar|ar 12 14 14 1o 10
3ugarcare 21 20 78 22 38
Ju|e 25 1o 28 34 24
Cas|or 4 2 0 0 0
0rourd Nu| 50 48 50 42 41
0||er lu|ses 250 2o4 288 21o 2o2
Ka-a/)%
laddy 1330 1359 1284 1358 1327
|a|ze 2 2 4 0 0
Ar|ar 2 0 o 0 4
3ugarcare 9 0 20 12 18
Ju|e 5 5 o 0 o
Cas|or 0 0 0 0 0
0rourd Nu| 12 1o o o 4
0||er lu|ses 211 178 194 178 17o
Ra!=ia
laddy 13540 13574 13549 1340o 1333o
|a|ze 303 222 324 284 218
Ar|ar 14 0 10 12 19
3ugarcare o8 oo 1o o3 o4
Ju|e 29 24 34 24 33
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 0 28 20
0||er lu|ses 338 324 324 31o 324
G*%"s5a%
laddy 112o5 11229 11333 1130o 11238
|a|ze 24 18 1o 18 o
Ar|ar 29 34 24 18 25
3ugarcare 1o1 144 121 138 24
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
Ju|e 547 524 484 3oo 318
Cas|or 0 0 0 0 0
0rourd Nu| 29 34 24 18 20
0||er lu|ses 103 112 111 98 112
Bi?.ia 2a,iA*!a
laddy 2789 2858 2810 2870 2808
|a|ze 7 o o o o
Ar|ar 18 o o 4 1o
3ugarcare 98 100 9o 100 94
Ju|e 12o 133 122 111 9o
Cas|or o 1 0 0 0
0rourd Nu| 25 24 18 o 0
0||er lu|ses 705 724 o9o 711 712
K?a%i+ T*#a 11004; 10';17 10'331 10'011 104111
Rabi
S)aA)c?i
laddy 420o 431o 4424 4324 4428
w|ea| o79 o84 o18 o85 o24
0rar 14 18 24 21 20
3easurur 54 o2 o4 5o oo
l|rseed 48 44 48 o8 oo
|us|ard 503 524 51o 505 418
0||er 0||seeds 5 o 4 o o
vege|ao|es 742 718 721 724 718
Ha,*
laddy 552o 5418 5424 5420 542o
w|ea| o70 o18 o24 o21 o28
0rar 22 20 18 22 10
3easurur 177 170 138 179 1oo
l|rseed 81 88 oo 78 88
|us|ard 721 524 710 718 71o
0||er 0||seeds 0 0 2 o 2
vege|ao|es 405 444 418 414 424
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
G*%*i-a%i
laddy 4370 441o 4524 4420 4518
w|ea| 355 324 31o 327 31o
0rar 15 1o 1o 18 10
3easurur 30 34 30 40 28
l|rseed 81 24 22 40 24
|us|ard 127 120 118 124 124
0||er 0||seeds 0 0 0 0 0
vege|ao|es 290 224 21o 228 21o
C??a8=a*!
laddy 4197 4124 4135 4125 4128
w|ea| 210 210 208 214 210
0rar 10 10 10 13 10
3easurur o 2 o o o
l|rseed 55 5o 28 5o 52
|us|ard 90 94 98 98 o8
0||er 0||seeds 75 78 oo 84 73
vege|ao|es 450 418 481 424 478
C?a!.%a/)%
laddy 1100 1124 112o 1128 119o
w|ea| 30 3o 24 38 34
0rar 0 o 4 o 2
3easurur 0 0 0 0 o
l|rseed 10 o 4 15 10
|us|ard 30 32 18 24 24
0||er 0||seeds 2 4 4 o 4
vege|ao|es 200 200 184 202 180
Di-*%ia
laddy 4oo7 4o14 4o30 4o24 4587
w|ea| 122 118 120 120 118
0rar 50 44 24 42 22
3easurur 50 44 42 52 54
l|rseed 5 5 0 o o
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
|us|ard 105 113 110 115 110
0||er 0||seeds 25 2o 20 28 2o
vege|ao|es 1200 1200 1212 1211 1210
C?a8a!i Ba%.)a%
laddy 4823 4o18 4o24 4o20 441o
w|ea| 181 19o 184 199 18o
0rar 19 20 20 18 18
3easurur 32 34 30 24 24
l|rseed 0 2 0 o 2
|us|ard 179 184 188 188 1o8
0||er 0||seeds 49 52 o4 5o 10
vege|ao|es 200 224 218 218 210
B*A*
laddy 53o9 5218 5220 5220 5210
w|ea| 198 118 108 120 100
0rar 75 72 84 o4 84
3easurur 250 218 21o 2o5 188
l|rseed 215 198 11o 187 214
|us|ard 475 418 420 41o 418
0||er 0||seeds 252 21o 218 284 184
vege|ao|es 542 518 521 524 510
B*!=a*!
laddy 3594 3524 3225 3520 3445
w|ea| 145 144 118 145 111
0rar 41 40 20 38 18
3easurur 33 3o 24 35 o4
l|rseed 15 o 4 18 10
|us|ard 395 384 385 324 324
0||er 0||seeds 2 4 o o o
vege|ao|es 285 21o 210 21o 208
C?a-a%ia
laddy 3851 38o4 3818 38o5 3824
w|ea| 1301 128o 1210 1288 1224
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
0rar 40 40 18 3o 18
3easurur 228 218 210 218 21o
l|rseed 135 198 112 135 124
|us|ard 1149 418 11o0 1155 1155
0||er 0||seeds o1 21o o7 73 4o
vege|ao|es 205 212 210 212 41o
Ra!i
laddy 3799 3o18 3o24 3o24 3o24
w|ea| 510 4oo 41o 4o7 415
0rar 0 0 o o o
3easurur 100 94 o8 100 o4
l|rseed 390 384 318 224 309
|us|ard 570 524 548 534 524
0||er 0||seeds 498 418 410 484 3o5
vege|ao|es 485 4oo 418 418 41o
Ra-/)%
laddy 3389 34o5 3218 34oo 3228
w|ea| 1o0 145 125 147 125
0rar 11 12 24 10 1o
3easurur 34 28 18 24 24
l|rseed 0 o o o o
|us|ard 1o4 1o2 1o0 1o8 1o2
0||er 0||seeds 41 24 20 31 24
vege|ao|es 243 218 231 224 224
B"F"%a
laddy 4418 4424 4424 441o 4400
w|ea| 193 148 128 144 132
0rar 4 o o 4 o
3easurur 150 132 122 14o 138
l|rseed 8 o 0 o o
|us|ard 7o o4 oo 84 78
0||er 0||seeds 23 24 28 24 18
vege|ao|es 219 200 224 218 202
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
Ka-a/)%
laddy 4331 4418 4421 451o 4321
w|ea| o4 o4 77 o4 o2
0rar 24 18 14 24 25
3easurur 24 20 18 22 18
l|rseed 40 3o 24 3o 24
|us|ard 77 o5 3o 32 24
0||er 0||seeds 10 10 10 12 24
vege|ao|es 20o 200 200 194 182
Ra!=ia
laddy 7750 7721 7o24 7318 7724
w|ea| 502 518 514 534 524
0rar 121 118 9o 88 oo
3easurur 38 44 44 3o 40
l|rseed 0 0 0 o o
|us|ard 771 71o o84 oo4 597
0||er 0||seeds 0 0 o o o
vege|ao|es 1339 1324 1224 1284 1214
G*%"s5a%
laddy 5o91 5o84 5518 5425 5324
w|ea| 175 1o4 184 18o 184
0rar 20 1o 18 24 25
3easurur o7 oo 34 o2 38
l|rseed 122 110 9o 112 9o
|us|ard 1095 10oo 90o 1044 1018
0||er 0||seeds 30 24 33 24 18
vege|ao|es 2o5 248 218 224 21o
Bi?.ia 2a,iA*!a
laddy 9795 9729 9o18 9o24 9o18
w|ea| 79 oo 88 80 78
0rar 5 o 8 o 4
3easurur o8 o8 oo 54 24
l|rseed 75 o2 o4 o4 88
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
|us|ard 308 311 288 224 184
0||er 0||seeds 5o 4o 24 4o 34
vege|ao|es 289 294 300 21o 198
Ra>i T*#a 10'0;1 102;'4 101;0< 102<00 101323
Ka-%)/ T*#a 21'117 207''2 20;04' 20;<11 20'442
M*%i=a*! Dis#%ic#
Kharif
Ma8*!=
laddy 11o89 11o47 11582 11o74 1152o
|a|ze 55 50 50 28 38
Ar|ar 5 o 0 o 4
3ugarcare 115 9o 98 100 9o
Ju|e 520 544 518 518 4o4
Cas|or 10 4 0 0 0
0rourd Nu| 0 0 4 o 4
0||er lu|ses 13 18 18 14 24
M*%ia>a%i
laddy 1478 1512 1497 1442 1472
|a|ze 0 0 0 0 0
Ar|ar 5 0 0 5 0
3ugarcare o85 485 o18 598 514
Ju|e 434 444 388 31o 325
Cas|or 0 0 0 0 0
0rourd Nu| 15 o4 48 13 o
0||er lu|ses 50 24 1o o4 78
La?a%i=?a#
laddy 8822 8724 8o14 8818 8o50
|a|ze 0 0 0 0 0
Ar|ar 0 0 2 4 0
3ugarcare 194 200 200 19o 145
Ju|e 3000 2818 2o24 289o 294o
Cas|or 0 0 0 0 0
0rourd Nu| 1o0 85 o 132 124
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
0||er lu|ses 102 98 9o 98 o4
B?)%>a!.?a
laddy 2412 2502 2294 2399 2404
|a|ze 0 0 0 0 0
Ar|ar 10 4 0 5 0
3ugarcare 200 200 184 184 155
Ju|e 847 844 818 8o4 818
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 o 4 o
0||er lu|ses o2 o4 9o oo o5
Ka/ii
laddy 15o4 1558 1700 1542 1534
|a|ze 0 0 0 0 0
Ar|ar 0 0 0 0 0
3ugarcare 4o oo 18 38 2o
Ju|e 2385 2214 2224 221o 2114
Cas|or 0 0 0 0 0
0rourd Nu| 0 0 o 0 0
0||er lu|ses 324 314 288 284 224
K?a%i+ T*#a 3'202 34'7' 34013 34'30 3372<
Rabi
Ma8*!=
laddy 19405 19412 19212 19345 19228
w|ea| 375 384 285 301 288
0rar 14 18 24 19 24
3easurur 245 188 214 194 218
l|rseed 110 9o 9o o4 9o
|us|ard 74o 718 718 oo8 718
0||er 0||seeds 430 287 218 221 384
vege|ao|es 880 8o4 824 75o 88o
M*%ia>a%i
laddy 9830 9824 9o24 9824 9818
w|ea| 382 288 2o5 214 19o
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
0rar 0 0 0 5 o
3easurur 78 oo o8 7o o4
l|rseed 75 o4 78 o4 78
|us|ard 2o1 212 244 255 244
0||er 0||seeds 0 o 4 o 4
vege|ao|es 94 98 9o o4 95
La?a%i=?a#
laddy 13002 13024 13125 13000 1309o
w|ea| 351 3o4 384 324 318
0rar 100 85 8o 88 74
3easurur 180 19o 144 132 198
l|rseed 72 72 74 78 74
|us|ard 331 324 324 318 324
0||er 0||seeds 4o 4o 84 18 o4
vege|ao|es 300 218 210 288 304
B?)%>a!.?a
laddy 13822 1381o 13o1o 13814 13800
w|ea| 194 1o5 200 144 1o4
0rar 0 0 0 0 0
3easurur 379 410 318 404 384
l|rseed 95 94 98 78 92
|us|ard 578 51o 5oo 578 518
0||er 0||seeds 0 0 0 0 0
vege|ao|es 95 84 8o 100 o5
Ka/ii
laddy 3037 3024 3038 3024 3014
w|ea| 104 98 78 105 9o
0rar 0 0 0 2 12
3easurur 38 24 o4 88 44
l|rseed 0 o 1o 18 4
|us|ard 817 8o4 812 810 79o
0||er 0||seeds 0 0 0 0 0
vege|ao|es 145 128 12o 13o 135
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" 200430' 2003304 2002303 2001302 2000301
Ra>i T*#a <<<11 <<073 <'411 <'<23 <'123
M*%i=a*! T*#a 101713 100<<7 11432 1001'3 11;41
G%a!. T*#a 31<131 301220 30<4;; 30;;<4 30'111
3.2.4 Li$"s#*cA P*/)a#i*!
T|e ||ves|oc| popu|a||or ol Karrup ard |or|gaor d|s|r|c|s |s g|ver |r |ao|e oe|oW.
3.1 Li$"s#*cA P*/)a#i*! ."#ais
Pa%#ic)a%s Ka-%)/ M*%i=a*!
Ca|||e o10748 14o951
8ulla|oes 131o7 4729
0oa|s 241o59 o3952
l|gs 1o4919 8544
lou||ry 14o5574 357188
T*#a 241<0<; '713<4
!Source" Statistics de&tt' Assamand Animal (us#andry )e&artment'%
3.2.' I!.)s#%i"s
3.2.'.1 Ric" Mis&
T|ere are arourd 5 b|ce r|||s |r ||e Karrup d|s|r|c| ard 3 r|ce r|||s |r |or|gaor d|s|r|c| as per
r|ce r||| assoc|a||or, ou| as per survey || |s revea|ed ||a| ||ere are rore ro. ol sra|| capac||y
|u||ers |r Karrup ard |or|gaor d|s|r|c|. T|e r|ce r|||s are r||||rg ||e paddy cor|rg lror ||e
d|s|r|c| ard rearoy area. T|e r|ce r|||s are gerera||rg r|ce |us| ard r|ce orar.
S.N. Na-" *+ Ric" Mi
Ka-%)/ Dis#%ic#
1 3|arra b|ce ||||
2 3r| laxr| b|ce ||||
3 3agar b|ce ||||
4 3urara lrdus|r|es
5 0|aeras|War| b|ce ||||
10 MW Biomass Based Power Plant ABEIL
S.N. Na-" *+ Ric" Mi
M*%i=a*! Dis#%ic#
1 Arard b|ce ||||
2 |ar|a| b|ce ||||
3 3ur|| b|ce ||||
3.2.'.2 Sa5 Mis&
T|ere are arourd 47 3aWr|||s |r ||e Karrup d|s|r|c| ard 13 saWr|||s |r |or|gaor d|s|r|c|.
T|ese saWr|||s are ge|||rg Wood lror ||e rear oy v|||ages. T|e ra|r spec|es are 8aooo|,
seasur, ||ejed| e|c. T|e saW r|||s are gerera||rg Wood c||ps ard saW dus|.
3.3 FINDING FROM HOUSEHOLD SURVEY
To arr|ve corsurp||or arourd o0 |ouse|o|ds |r eac| o|oc|s lror ||e surrourd|rg v|||ages ol
||e poWer p|ar| s||e lor survey. T|e survey l|rd|rg |s g|ver |r ||e |ao|e oe|oW.

3.10 Fi!.i!=s +%*- H*)s"?*. s)%$"8
Ca#"=*%8 Mi! MaB A$=. G HH
3|ze ol ||e lar||y 2 13 o
Agr|cu||ure lard 0Wred (|a) 0.4 42 9 4o.1o
Cooking/Heating Devices Used (Hours/Day)
C|u||a 1 9 4 79.10
|ud 3|ove 2 2 2 11.79
Kerosere 3|ove 1 3 2 17.o9
0as 3|ove 1 o 3 78.97
F|ec|r|ca| 3|ove 3 4 4 5.90
Lighting Devices Used (Hours/Day)
Kerosere larp 1 4 2 2o.52
0as larp 1 4 3 9.79
F|ec|r|c larp 3 18 11 97.55
0||er larps 1 2 1 23.14
T8/" O+ F)" 9K=6Da8:
lue| wood 2 8 2.o o8.88
10 MW Biomass Based Power Plant ABEIL
Ca#"=*%8 Mi! MaB A$=. G HH
Crop bes|due 0.5 3 1 21.03
0urg Ca|e 3 20 11 23.24
Kerosere (l||||or||) 2 o 4 38.97
ll0 (Cy||rders||or||) 0.5 1.5 0.9 72.o3
F|ec|r|c||y (|w||TWo |or||) 152 175 1o2 95.00
Crop Yied (!ons/Hectare)
laddy 3|raW 1.17 1.9o 1.8o
w|ea| 3|raW 1.27 1.93 1.79
|a|ze 3|a|| 2.1o 2.8o 2.35
3.4 Bi*-ass G"!"%a#i*!
T|e rajor sources ol o|orass gerera||or are lror Crop res|dues, Was|e|ards ard lores|ry,
ard Agro |rdus|ry res|dues. 8|orass |s ca|egor|zed |r|o su||ao|e lor lodder ard a|so ro|
su||ao|e lor lodder. Froug| care |as oeer |a|er |o ro| |o use ||e lodder ra|er|a| lor poWer
p|ar|.
3.' C%*/ R"si.)"s
Fx|ers|ve survey Was carr|ed ou| |o es|ao||s| ||e y|e|ds ard crop res|due ra||os. T||s
|rlorra||or |s ga||ered lror ||e v|||age |eads, ard |||era|ure. Fs||ra|es Were rade oased or
||e l|e|d da|a ard agr|cu||ure depar|rer| da|a.
T|e o|orass gerera|ed |s c|ass|l|ed |r|o ||e o|orass su||ao|e lor lodder ard a|so lor ourr|rg.
8|orass gerera|ed Was es||ra|ed or ||e average va|ues ol y|e|ds ard crop res|due ra||os.
8|oc| W|se o|orass 0erera||or lor seasor W|se |s g|ver |r ||e lo||oW|rg |ao|e.
10 MW Biomass Based Power Plant ABEIL
3.11 B*cA 5is" C%*/ %"si.)" ="!"%a#i*!
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
KAMRUP DISTRICT
"uakuchi
Kharif
laddy 4498 1.o9 7o01.o2 3|raW 1.33 10110.15
|a|ze 13 0.73 9.49 3|a||s 1.8o 17.o5
Coos 0.3 2.85
Ar|ar 13 0.59 7.o7 3|a||s 1.03 7.90
3ugarcare 91 38.43 3497.13 Tops & leaves 0.0o 209.83
Tras| 0.04 139.89
Ju|e 57o 1.87 1077.12 3|a||s 1.83 1971.13
Cas|or 5 0.89 4.45 3|a||s 1.23 5.47
0rourd Nu| 7 1.03 7.21 3|a||s 1.78 12.83
0||er lu|ses 515 0.53 272.95 3|a||s 1.01 275.o8
Rabi
laddy 420o 1.o3 o855.78 3|raW 1.31 8981.07
w|ea| o79 1.03 o99.37 3|raW 1.3o 951.14
0rar 14 0.5o 7.84 3|a||s 1.02 8.00
3easurur 54 0.59 31.8o 3|a||s 1.51 48.11
l|rseed 48 0.48 23.04 3|a||s 1.43 32.95
|us|ard 503 1.01 508.03 3|a||s 1.o1 817.93
0||er 0||seeds 5 0.53 2.o5 3|a||s 1.42 3.7o
vege|ao|es 742 1.4o 1083.32 3|raW 1 1083.32
TOTAL 21<71.'3 24<;1.<<
Ha#o
Kharif
laddy 142o4 1.o9 2410o.1o 3|raW 1.33 320o1.19
|a|ze 30 0.73 21.90 3|a||s 1.8o 40.73
Coos 0.3 o.57
Ar|ar 20 0.59 11.80 3|a||s 1.03 12.15
3ugarcare 42 38.43 1o14.0o Tops & leaves 0.0o 9o.84
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
Tras| 0.04 o4.5o
Ju|e 700 1.87 1309.00 3|a||s 1.83 2395.47
Cas|or 4 0.89 3.5o 3|a||s 1.23 4.38
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses 877 0.53 4o4.81 3|a||s 1.01 4o9.4o
Rabi
laddy 552o 1.o3 9007.38 3|raW 1.31 11799.o7
w|ea| o70 1.03 o90.10 3|raW 1.3o 938.54
0rar 22 0.5o 12.32 3|a||s 1.02 12.57
3easurur 177 0.59 104.43 3|a||s 1.51 157.o9
l|rseed 81 0.48 38.88 3|a||s 1.43 55.o0
|us|ard 721 1.01 728.21 3|a||s 1.o1 1172.42
0||er 0||seeds 0 0.53 0.00 3|a||s 1.42 0.00
vege|ao|es 405 1.4o 591.30 3|raW 1 591.30
TOTAL 37;03.11 417;1.14
$oroi%ari
Kharif
laddy 28o5 1.o9 4841.85 3|raW 1.33 o439.oo
|a|ze 30 0.73 21.90 3|a||s 1.8o 40.73
Coos 0.3 o.57
Ar|ar 80 0.59 47.20 3|a||s 1.03 48.o2
3ugarcare 43 38.43 1o52.49 Tops & leaves 0.0o 99.15
Tras| 0.04 oo.10
Ju|e 220 1.87 411.40 3|a||s 1.83 752.8o
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses 38 0.53 20.14 3|a||s 1.01 20.34
Rabi
laddy 4370 1.o3 7123.10 3|raW 1.31 9331.2o
w|ea| 355 1.03 3o5.o5 3|raW 1.3o 497.28
0rar 15 0.5o 8.40 3|a||s 1.02 8.57
3easurur 30 0.59 17.70 3|a||s 1.51 2o.73
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
l|rseed 81 0.48 38.88 3|a||s 1.43 55.o0
|us|ard 127 1.01 128.27 3|a||s 1.o1 20o.51
0||er 0||seeds 0 0.53 0.00 3|a||s 1.42 0.00
vege|ao|es 290 1.4o 423.40 3|raW 1 423.40
TOTAL 1'100.37 17023.31
Chhaygaon
Kharif
laddy 2850 1.o9 481o.50 3|raW 1.33 o405.95
|a|ze 110 0.73 80.30 3|a||s 1.8o 149.3o
Coos 0.3 24.09
Ar|ar 10 0.59 5.90 3|a||s 1.03 o.08
3ugarcare 35 38.43 1345.05 Tops & leaves 0.0o 80.70
Tras| 0.04 53.80
Ju|e 75 1.87 140.25 3|a||s 1.83 25o.oo
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 5 1.03 5.15 3|a||s 1.78 9.17
0||er lu|ses 1o5 0.53 87.45 3|a||s 1.01 88.32
Rabi
laddy 4197 1.o3 o841.11 3|raW 1.31 89o1.85
w|ea| 210 1.03 21o.30 3|raW 1.3o 294.17
0rar 10 0.5o 5.o0 3|a||s 1.02 5.71
3easurur o 0.59 3.54 3|a||s 1.51 5.35
l|rseed 55 0.48 2o.40 3|a||s 1.43 37.75
|us|ard 90 1.01 90.90 3|a||s 1.o1 14o.35
0||er 0||seeds 75 0.53 39.75 3|a||s 1.42 5o.45
vege|ao|es 450 1.4o o57.00 3|raW 1 o57.00
TOTAL 143<1.20 1;237.;'
Chandrapur
Kharif
laddy 1188 1.o9 2007.72 3|raW 1.33 2o70.27
|a|ze 0 0.73 0.00 3|a||s 1.8o 0.00
Coos 0.3 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
Ar|ar 0 0.59 0.00 3|a||s 1.03 0.00
3ugarcare 2 38.43 7o.8o Tops & leaves 0.0o 4.o1
Tras| 0.04 3.07
Ju|e 2 1.87 3.74 3|a||s 1.83 o.84
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses 30 0.53 15.90 3|a||s 1.01 1o.0o
Rabi
laddy 1100 1.o3 1793.00 3|raW 1.31 2348.83
w|ea| 30 1.03 30.90 3|raW 1.3o 42.02
0rar 0 0.5o 0.00 3|a||s 1.02 0.00
3easurur 0 0.59 0.00 3|a||s 1.51 0.00
l|rseed 10 0.48 4.80 3|a||s 1.43 o.8o
|us|ard 30 1.01 30.30 3|a||s 1.o1 48.78
0||er 0||seeds 2 0.53 1.0o 3|a||s 1.42 1.51
vege|ao|es 200 1.4o 292.00 3|raW 1 292.00
TOTAL 42'<.27 '440.7<
Di%oria
Kharif
laddy 4300 1.o9 72o7.00 3|raW 1.33 9oo5.11
|a|ze 5 0.73 3.o5 3|a||s 1.8o o.79
Coos 0.3 1.10
Ar|ar 50 0.59 29.50 3|a||s 1.03 30.39
3ugarcare 20 38.43 7o8.o0 Tops & leaves 0.0o 4o.12
Tras| 0.04 30.74
Ju|e 100 1.87 187.00 3|a||s 1.83 342.21
Cas|or 2 0.89 1.78 3|a||s 1.23 2.19
0rourd Nu| 27 1.03 27.81 3|a||s 1.78 49.50
0||er lu|ses 200 0.53 10o.00 3|a||s 1.01 107.0o
Rabi
laddy 4oo7 1.o3 7o07.21 3|raW 1.31 99o5.45
w|ea| 122 1.03 125.oo 3|raW 1.3o 170.90
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
0rar 50 0.5o 28.00 3|a||s 1.02 28.5o
3easurur 50 0.59 29.50 3|a||s 1.51 44.55
l|rseed 5 0.48 2.40 3|a||s 1.43 3.43
|us|ard 105 1.01 10o.05 3|a||s 1.o1 170.74
0||er 0||seeds 25 0.53 13.25 3|a||s 1.42 18.82
vege|ao|es 1200 1.4o 1752.00 3|raW 1 1752.00
TOTAL 170''.41 2243'.<4
Chayani &arduar
Kharif
laddy 1732 1.o9 2927.08 3|raW 1.33 3893.02
|a|ze 9 0.73 o.57 3|a||s 1.8o 12.22
Coos 0.3 1.97
Ar|ar 10 0.59 5.90 3|a||s 1.03 o.08
3ugarcare 92 38.43 3535.5o Tops & leaves 0.0o 212.13
Tras| 0.04 141.42
Ju|e o79 1.87 12o9.73 3|a||s 1.83 2323.o1
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses 213 0.53 112.89 3|a||s 1.01 114.02
Rabi
laddy 4823 1.o3 78o1.49 3|raW 1.31 10298.55
w|ea| 181 1.03 18o.43 3|raW 1.3o 253.54
0rar 19 0.5o 10.o4 3|a||s 1.02 10.85
3easurur 32 0.59 18.88 3|a||s 1.51 28.51
l|rseed 0 0.48 0.00 3|a||s 1.43 0.00
|us|ard 179 1.01 180.79 3|a||s 1.o1 291.07
0||er 0||seeds 49 0.53 25.97 3|a||s 1.42 3o.88
vege|ao|es 200 1.4o 292.00 3|raW 1 292.00
TOTAL 1<433.13 1;11'.7;
&oko
Kharif
laddy 4o04 1.o9 7780.7o 3|raW 1.33 10348.41
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
|a|ze 225 0.73 1o4.25 3|a||s 1.8o 305.51
Coos 0.3 49.28
Ar|ar 55 0.59 32.45 3|a||s 1.03 33.42
3ugarcare 450 38.43 17293.50 Tops & leaves 0.0o 1037.o1
Tras| 0.04 o91.74
Ju|e 330 1.87 o17.10 3|a||s 1.83 1129.29
Cas|or 550 0.89 489.50 3|a||s 1.23 o02.09
0rourd Nu| 170 1.03 175.10 3|a||s 1.78 311.o8
0||er lu|ses o35 0.53 33o.55 3|a||s 1.01 339.92
Rabi
laddy 53o9 1.o3 8751.47 3|raW 1.31 114o4.43
w|ea| 198 1.03 203.94 3|raW 1.3o 277.3o
0rar 75 0.5o 42.00 3|a||s 1.02 42.84
3easurur 250 0.59 147.50 3|a||s 1.51 222.73
l|rseed 215 0.48 103.20 3|a||s 1.43 147.58
|us|ard 475 1.01 479.75 3|a||s 1.o1 772.40
0||er 0||seeds 252 0.53 133.5o 3|a||s 1.42 189.oo
vege|ao|es 542 1.4o 791.32 3|raW 1 791.32
TOTAL 3;'41.1' 27;';.23
&ongaon
Kharif
laddy 2738 1.o9 4o27.22 3|raW 1.33 o154.20
|a|ze 45 0.73 32.85 3|a||s 1.8o o1.10
Coos 0.3 9.8o
Ar|ar 35 0.59 20.o5 3|a||s 1.03 21.27
3ugarcare 50 38.43 1921.50 Tops & leaves 0.0o 115.29
Tras| 0.04 7o.8o
Ju|e 3o0 1.87 o73.20 3|a||s 1.83 1231.9o
Cas|or 112 0.89 99.o8 3|a||s 1.23 122.o1
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses 114 0.53 o0.42 3|a||s 1.01 o1.02
Rabi
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
laddy 3594 1.o3 5858.22 3|raW 1.31 7o74.27
w|ea| 145 1.03 149.35 3|raW 1.3o 203.12
0rar 41 0.5o 22.9o 3|a||s 1.02 23.42
3easurur 33 0.59 19.47 3|a||s 1.51 29.40
l|rseed 15 0.48 7.20 3|a||s 1.43 10.30
|us|ard 395 1.01 398.95 3|a||s 1.o1 o42.31
0||er 0||seeds 2 0.53 1.0o 3|a||s 1.42 1.51
vege|ao|es 285 1.4o 41o.10 3|raW 1 41o.10
TOTAL 14307.73 1<7'4.'7
Cha%aria
Kharif
laddy 15o4o 1.o9 2o441.74 3|raW 1.33 351o7.51
|a|ze 2 0.73 1.4o 3|a||s 1.8o 2.72
Coos 0.3 0.44
Ar|ar 578 0.59 341.02 3|a||s 1.03 351.25
3ugarcare 79 38.43 3035.97 Tops & leaves 0.0o 182.1o
Tras| 0.04 121.44
Ju|e 1753 1.87 3278.11 3|a||s 1.83 5998.94
Cas|or 2 0.89 1.78 3|a||s 1.23 2.19
0rourd Nu| 2 1.03 2.0o 3|a||s 1.78 3.o7
0||er lu|ses o38 0.53 338.14 3|a||s 1.01 341.52
Rabi
laddy 3851 1.o3 o277.13 3|raW 1.31 8223.04
w|ea| 1301 1.03 1340.03 3|raW 1.3o 1822.44
0rar 40 0.5o 22.40 3|a||s 1.02 22.85
3easurur 228 0.59 134.52 3|a||s 1.51 203.13
l|rseed 135 0.48 o4.80 3|a||s 1.43 92.oo
|us|ard 1149 1.01 11o0.49 3|a||s 1.o1 18o8.39
0||er 0||seeds o1 0.53 32.33 3|a||s 1.42 45.91
vege|ao|es 205 1.4o 299.30 3|raW 1 299.30
TOTAL 42;;1.27 '4;41.''
Rani
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
Kharif
laddy 4200 1.o9 7098.00 3|raW 1.33 9440.34
|a|ze 0 0.73 0.00 3|a||s 1.8o 0.00
Coos 0.3 0.00
Ar|ar 240 0.59 141.o0 3|a||s 1.03 145.85
3ugarcare 3o0 38.43 13834.80 Tops & leaves 0.0o 830.09
Tras| 0.04 553.39
Ju|e 500 1.87 935.00 3|a||s 1.83 1711.05
Cas|or 140 0.89 124.o0 3|a||s 1.23 153.2o
0rourd Nu| 410 1.03 422.30 3|a||s 1.78 751.o9
0||er lu|ses 200 0.53 10o.00 3|a||s 1.01 107.0o
Rabi
laddy 3799 1.o3 o192.37 3|raW 1.31 8112.00
w|ea| 510 1.03 525.30 3|raW 1.3o 714.41
0rar 0 0.5o 0.00 3|a||s 1.02 0.00
3easurur 100 0.59 59.00 3|a||s 1.51 89.09
l|rseed 390 0.48 187.20 3|a||s 1.43 2o7.70
|us|ard 570 1.01 575.70 3|a||s 1.o1 92o.88
0||er 0||seeds 498 0.53 2o3.94 3|a||s 1.42 374.79
vege|ao|es 485 1.4o 708.10 3|raW 1 708.10
TOTAL 311;3.11 2477'.;0
Ra%pur
Kharif
laddy 200o 1.o9 3390.14 3|raW 1.33 4508.89
|a|ze 10 0.73 7.30 3|a||s 1.8o 13.58
Coos 0.3 2.19
Ar|ar 10 0.59 5.90 3|a||s 1.03 o.08
3ugarcare 111 38.43 42o5.73 Tops & leaves 0.0o 255.94
Tras| 0.04 170.o3
Ju|e 239 1.87 44o.93 3|a||s 1.83 817.88
Cas|or 1 0.89 0.89 3|a||s 1.23 1.09
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
0||er lu|ses 22o 0.53 119.78 3|a||s 1.01 120.98
Rabi
laddy 3389 1.o3 5524.07 3|raW 1.31 723o.53
w|ea| 1o0 1.03 1o4.80 3|raW 1.3o 224.13
0rar 11 0.5o o.1o 3|a||s 1.02 o.28
3easurur 34 0.59 20.0o 3|a||s 1.51 30.29
l|rseed 0 0.48 0.00 3|a||s 1.43 0.00
|us|ard 1o4 1.01 1o5.o4 3|a||s 1.o1 2oo.o8
0||er 0||seeds 41 0.53 21.73 3|a||s 1.42 30.8o
vege|ao|es 243 1.4o 354.78 3|raW 1 354.78
TOTAL 14413.11 1404<.71
&e'era
Kharif
laddy 321o 1.o9 5435.04 3|raW 1.33 7228.o0
|a|ze o 0.73 4.38 3|a||s 1.8o 8.15
Coos 0.3 1.31
Ar|ar 12 0.59 7.08 3|a||s 1.03 7.29
3ugarcare 21 38.43 807.03 Tops & leaves 0.0o 48.42
Tras| 0.04 32.28
Ju|e 25 1.87 4o.75 3|a||s 1.83 85.55
Cas|or 4 0.89 3.5o 3|a||s 1.23 4.38
0rourd Nu| 50 1.03 51.50 3|a||s 1.78 91.o7
0||er lu|ses 250 0.53 132.50 3|a||s 1.01 133.83
Rabi
laddy 4418 1.o3 7201.34 3|raW 1.31 9433.7o
w|ea| 193 1.03 198.79 3|raW 1.3o 270.35
0rar 4 0.5o 2.24 3|a||s 1.02 2.28
3easurur 150 0.59 88.50 3|a||s 1.51 133.o4
l|rseed 8 0.48 3.84 3|a||s 1.43 5.49
|us|ard 7o 1.01 7o.7o 3|a||s 1.o1 123.58
0||er 0||seeds 23 0.53 12.19 3|a||s 1.42 17.31
vege|ao|es 219 1.4o 319.74 3|raW 1 319.74
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
TOTAL 14311.24 1;14;.<4
Ka%apur
Kharif
laddy 1330 1.o9 2247.70 3|raW 1.33 2989.44
|a|ze 2 0.73 1.4o 3|a||s 1.8o 2.72
Coos 0.3 0.44
Ar|ar 2 0.59 1.18 3|a||s 1.03 1.22
3ugarcare 9 38.43 345.87 Tops & leaves 0.0o 20.75
Tras| 0.04 13.83
Ju|e 5 1.87 9.35 3|a||s 1.83 17.11
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 12 1.03 12.3o 3|a||s 1.78 22.00
0||er lu|ses 211 0.53 111.83 3|a||s 1.01 112.95
Rabi
laddy 4331 1.o3 7059.53 3|raW 1.31 9247.98
w|ea| o4 1.03 o5.92 3|raW 1.3o 89.o5
0rar 24 0.5o 13.44 3|a||s 1.02 13.71
3easurur 24 0.59 14.1o 3|a||s 1.51 21.38
l|rseed 40 0.48 19.20 3|a||s 1.43 27.4o
|us|ard 77 1.01 77.77 3|a||s 1.o1 125.21
0||er 0||seeds 10 0.53 5.30 3|a||s 1.42 7.53
vege|ao|es 20o 1.4o 300.7o 3|raW 1 300.7o
TOTAL 1027'.73 13014.13
Rangia
Kharif
laddy 13540 1.o9 22882.o0 3|raW 1.33 30433.8o
|a|ze 303 0.73 221.19 3|a||s 1.8o 411.41
Coos 0.3 oo.3o
Ar|ar 14 0.59 8.2o 3|a||s 1.03 8.51
3ugarcare o8 38.43 2o13.24 Tops & leaves 0.0o 15o.79
Tras| 0.04 104.53
Ju|e 29 1.87 54.23 3|a||s 1.83 99.24
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses 338 0.53 179.14 3|a||s 1.01 180.93
Rabi
laddy 7750 1.o3 12o32.50 3|raW 1.31 1o548.58
w|ea| 502 1.03 517.0o 3|raW 1.3o 703.20
0rar 121 0.5o o7.7o 3|a||s 1.02 o9.12
3easurur 38 0.59 22.42 3|a||s 1.51 33.85
l|rseed 0 0.48 0.00 3|a||s 1.43 0.00
|us|ard 771 1.01 778.71 3|a||s 1.o1 1253.72
0||er 0||seeds 0 0.53 0.00 3|a||s 1.42 0.00
vege|ao|es 1339 1.4o 1954.94 3|raW 1 1954.94
TOTAL 41132.0' '202'.04
$ores(ar
Kharif
laddy 112o5 1.o9 19037.85 3|raW 1.33 25320.34
|a|ze 24 0.73 17.52 3|a||s 1.8o 32.59
Coos 0.3 5.2o
Ar|ar 29 0.59 17.11 3|a||s 1.03 17.o2
3ugarcare 1o1 38.43 o187.23 Tops & leaves 0.0o 371.23
Tras| 0.04 247.49
Ju|e 547 1.87 1022.89 3|a||s 1.83 1871.89
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 29 1.03 29.87 3|a||s 1.78 53.17
0||er lu|ses 103 0.53 54.59 3|a||s 1.01 55.14
Rabi
laddy 5o91 1.o3 927o.33 3|raW 1.31 12151.99
w|ea| 175 1.03 180.25 3|raW 1.3o 245.14
0rar 20 0.5o 11.20 3|a||s 1.02 11.42
3easurur o7 0.59 39.53 3|a||s 1.51 59.o9
l|rseed 122 0.48 58.5o 3|a||s 1.43 83.74
|us|ard 1095 1.01 1105.95 3|a||s 1.o1 1780.58
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
0||er 0||seeds 30 0.53 15.90 3|a||s 1.42 22.58
vege|ao|es 2o5 1.4o 38o.90 3|raW 1 38o.90
TOTAL 3;441.<7 42;1<.;;
&ihdia )a#ikona
Kharif
laddy 2789 1.o9 4713.41 3|raW 1.33 o2o8.84
|a|ze 7 0.73 5.11 3|a||s 1.8o 9.50
Coos 0.3 1.53
Ar|ar 18 0.59 10.o2 3|a||s 1.03 10.94
3ugarcare 98 38.43 37oo.14 Tops & leaves 0.0o 225.97
Tras| 0.04 150.o5
Ju|e 12o 1.87 235.o2 3|a||s 1.83 431.18
Cas|or o 0.89 5.34 3|a||s 1.23 o.57
0rourd Nu| 25 1.03 25.75 3|a||s 1.78 45.84
0||er lu|ses 705 0.53 373.o5 3|a||s 1.01 377.39
Rabi
laddy 9795 1.o3 159o5.85 3|raW 1.31 20915.2o
w|ea| 79 1.03 81.37 3|raW 1.3o 110.oo
0rar 5 0.5o 2.80 3|a||s 1.02 2.8o
3easurur o8 0.59 40.12 3|a||s 1.51 o0.58
l|rseed 75 0.48 3o.00 3|a||s 1.43 51.48
|us|ard 308 1.01 311.08 3|a||s 1.o1 500.84
0||er 0||seeds 5o 0.53 29.o8 3|a||s 1.42 42.15
vege|ao|es 289 1.4o 421.94 3|raW 1 421.94
TOTAL 2<024.47 21<34.1;
MORIGAON DISTRICT
*ayong
Kharif
laddy 11o89 1.o9 19754.41 3|raW 1.33 2o273.37
|a|ze 55 0.73 40.15 3|a||s 1.8o 74.o8
Coos 0.3 12.05
Ar|ar 5 0.59 2.95 3|a||s 1.03 3.04
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
3ugarcare 115 38.43 4419.45 Tops & leaves 0.0o 2o5.17
Tras| 0.04 17o.78
Ju|e 520 1.87 972.40 3|a||s 1.83 1779.49
Cas|or 10 0.89 8.90 3|a||s 1.23 10.95
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses 13 0.53 o.89 3|a||s 1.01 o.9o
Rabi
laddy 19405 1.o3 31o30.15 3|raW 1.31 41435.50
w|ea| 375 1.03 38o.25 3|raW 1.3o 525.30
0rar 14 0.5o 7.84 3|a||s 1.02 8.00
3easurur 245 0.59 144.55 3|a||s 1.51 218.27
l|rseed 110 0.48 52.80 3|a||s 1.43 75.50
|us|ard 74o 1.01 753.4o 3|a||s 1.o1 1213.07
0||er 0||seeds 430 0.53 227.90 3|a||s 1.42 323.o2
vege|ao|es 880 1.4o 1284.80 3|raW 1 1284.80
TOTAL '1<12.10 ;3<7<.'3
*oriabari
Kharif
laddy 1478 1.o9 2497.82 3|raW 1.33 3322.10
|a|ze 0 0.73 0.00 3|a||s 1.8o 0.00
Coos 0.3 0.00
Ar|ar 5 0.59 2.95 3|a||s 1.03 3.04
3ugarcare o85 38.43 2o324.55 Tops & leaves 0.0o 1579.47
Tras| 0.04 1052.98
Ju|e 434 1.87 811.58 3|a||s 1.83 1485.19
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 15 1.03 15.45 3|a||s 1.78 27.50
0||er lu|ses 50 0.53 2o.50 3|a||s 1.01 2o.77
Rabi
laddy 9830 1.o3 1o022.90 3|raW 1.31 20990.00
w|ea| 382 1.03 393.4o 3|raW 1.3o 535.11
0rar 0 0.5o 0.00 3|a||s 1.02 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
3easurur 78 0.59 4o.02 3|a||s 1.51 o9.49
l|rseed 75 0.48 3o.00 3|a||s 1.43 51.48
|us|ard 2o1 1.01 2o3.o1 3|a||s 1.o1 424.41
0||er 0||seeds 0 0.53 0.00 3|a||s 1.42 0.00
vege|ao|es 94 1.4o 137.24 3|raW 1 137.24
TOTAL 4<';7.07 21;04.;7
Laharighat
Kharif
laddy 8822 1.o9 14909.18 3|raW 1.33 19829.21
|a|ze 0 0.73 0.00 3|a||s 1.8o 0.00
Coos 0.3 0.00
Ar|ar 0 0.59 0.00 3|a||s 1.03 0.00
3ugarcare 194 38.43 7455.42 Tops & leaves 0.0o 447.33
Tras| 0.04 298.22
Ju|e 3000 1.87 5o10.00 3|a||s 1.83 102oo.30
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 1o0 1.03 1o4.80 3|a||s 1.78 293.34
0||er lu|ses 102 0.53 54.0o 3|a||s 1.01 54.o0
Rabi
laddy 13002 1.o3 21193.2o 3|raW 1.31 277o3.17
w|ea| 351 1.03 3o1.53 3|raW 1.3o 491.o8
0rar 100 0.5o 5o.00 3|a||s 1.02 57.12
3easurur 180 0.59 10o.20 3|a||s 1.51 1o0.3o
l|rseed 72 0.48 34.5o 3|a||s 1.43 49.42
|us|ard 331 1.01 334.31 3|a||s 1.o1 538.24
0||er 0||seeds 4o 0.53 24.38 3|a||s 1.42 34.o2
vege|ao|es 300 1.4o 438.00 3|raW 1 438.00
TOTAL '0;41.;0 <0;21.<1
&hurbandha
Kharif
laddy 2412 1.o9 407o.28 3|raW 1.33 5421.45
|a|ze 0 0.73 0.00 3|a||s 1.8o 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
Coos 0.3 0.00
Ar|ar 10 0.59 5.90 3|a||s 1.03 o.08
3ugarcare 200 38.43 7o8o.00 Tops & leaves 0.0o 4o1.1o
Tras| 0.04 307.44
Ju|e 847 1.87 1583.89 3|a||s 1.83 2898.52
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses o2 0.53 32.8o 3|a||s 1.01 33.19
Rabi
laddy 13822 1.o3 22529.8o 3|raW 1.31 29514.12
w|ea| 194 1.03 199.82 3|raW 1.3o 271.7o
0rar 0 0.5o 0.00 3|a||s 1.02 0.00
3easurur 379 0.59 223.o1 3|a||s 1.51 337.o5
l|rseed 95 0.48 45.o0 3|a||s 1.43 o5.21
|us|ard 578 1.01 583.78 3|a||s 1.o1 939.89
0||er 0||seeds 0 0.53 0.00 3|a||s 1.42 0.00
vege|ao|es 95 1.4o 138.70 3|raW 1 138.70
TOTAL 3;10<.30 4031'.1'
Kapii
Kharif
laddy 15o4 1.o9 2o43.1o 3|raW 1.33 3515.40
|a|ze 0 0.73 0.00 3|a||s 1.8o 0.00
Coos 0.3 0.00
Ar|ar 0 0.59 0.00 3|a||s 1.03 0.00
3ugarcare 4o 38.43 17o7.78 Tops & leaves 0.0o 10o.07
Tras| 0.04 70.71
Ju|e 2385 1.87 4459.95 3|a||s 1.83 81o1.71
Cas|or 0 0.89 0.00 3|a||s 1.23 0.00
0rourd Nu| 0 1.03 0.00 3|a||s 1.78 0.00
0||er lu|ses 324 0.53 171.72 3|a||s 1.01 173.44
Rabi
laddy 3037 1.o3 4950.31 3|raW 1.31 o484.91
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" A%"a
9?a:
Yi".
9T6?a:
P%*.)c#i*!
9T*!s:
R"si.)" T8/" CRR G"!"%a#i*!
9T*!s:
w|ea| 104 1.03 107.12 3|raW 1.3o 145.o8
0rar 0 0.5o 0.00 3|a||s 1.02 0.00
3easurur 38 0.59 22.42 3|a||s 1.51 33.85
l|rseed 0 0.48 0.00 3|a||s 1.43 0.00
|us|ard 817 1.01 825.17 3|a||s 1.o1 1328.52
0||er 0||seeds 0 0.53 0.00 3|a||s 1.42 0.00
vege|ao|es 145 1.4o 211.70 3|raW 1 211.70
TOTAL 1'1'1.33 20231.11
3.12 S)--a%8 *+ Dis#%ic# 5is" C%*/ %"si.)" ="!"%a#i*! i! #*!s
Dis#%ic# K?a%i+ Ra>i T*#a
Karrup 244391.05 205853.89 450244.93
|or|gaor 88443.o8 13o29o.38 224740.0o
G%a!. #*#a 332734.;3 3421'0.2; <;4174.11
3.4.2 Bi*-ass +%*- F*%"s# a!. O#?"% (as#" La!.s
8es|des ||e 3|a|e lores| ||ere are o||er areas, W||c| |rc|ude Was|e |ards |r ||e d|s|r|c|.
lr|erac||or W||| ||e larrers, dur|rg ||e survey revea|ed ||a| ||e arrua| sus|a|rao|e
produc||v||y ol ||e lores| |ard |r ||e d|s|r|c| |s 1.5 |T|year ard Was|e|ards, W||c| |rc|udes
oarrer urcu|||va|ao|e, perrarer| pas|ure ard graz|rg |ard are 0.8 |T|year.
8|orass lror Was|e|ards |s ca|cu|a|ed ||roug| ru|||p|y|rg ||e |o|a| area urder oarrer
urcu|||vao|e, perrarer| pas|ure ard graz|rg |ard oy ||e average arrua| sus|a|rao|e
produc||v||y ol Was|e|ards. T|e lo||oW|rg |ao|e |rd|ca|es ||e area ard o|orass gerera|ed lror
lores| ard o||er |ards |r ||e d|s|r|c|.
3.13 Bi*-ass ="!"%a#i*! +%*- +*%"s# 4 *#?"% a!. s*)%c"s i! #*!s
Dis#%ic# F*%"s# a!. O#?"% (as#" a!.s T*#a
Karrup 175041 57211 232252
|or|gaor 2o439 14904 41343
10 MW Biomass Based Power Plant ABEIL
Dis#%ic# F*%"s# a!. O#?"% (as#" a!.s T*#a
G%a!. T*#a 201480 72115 273595
3.4.3 A=%* I!.)s#%8 R"si.)"s
|ajor Agro |rdus|r|a| res|dues ava||ao|e W||||r d|s|r|c| are r|ce |us|, r|ce orar, Wood c||ps, saW
dus| e|c.
3.14 Dis#%ic# 5is" >i*-ass ="!"%a#i*! +%*- I!.)s#%i"s i! #*!s
Pa%#ic)a%s Ka-%)/ M*%i=a*! TOTAL
Rice *is
lus| o3591 3084o 94437
8rar 14453 7010 214o3
"a( *is
wood c||ps 2115 585 2700
3aW dus| 423 117 540
3.4.4 S)--a%8 *+ Bi*-ass G"!"%a#i*! +%*- a S*)%c"s
8|orass lror crop res|dues, agro |rdus|r|es ra|r|y lror r|ce r|||s, ard lores| ard Was|e|ards
|s es||ra|ed ard g|ver oe|oW.
3.1' Dis#%ic# 5is" >i*-ass ="!"%a#i*! +%*- a s*)%c"s i! #*!s
Dis#%ic#s C%*/ R"si.)" F*%"s# 4
*#?"% a!.s
A=%*3
I!.)s#%8
T*#a
Karrup 450244.93 232252 80582 7o3079
|or|gaor 224740.0o 41343 38558 304o41
G%a!. #*#a <;4174.11 2;3'1' 111140 10<;;20
To|a| o|orass gerera||or |r ||e oo|| d|s|r|c|s |s o74984.99 |ors ol crop res|due, 273595 |ors
ol Wood ard 119140 |ors ol agro |rdus|r|a| res|due W||c| |rc|udes oagasse, r|ce |us|, Wood
c||ps e|c. T|e |o|a| o|orass gerera||or lror a|| sources |s 10o7720.
3.' Bi*-ass C*!s)-/#i*!
10 MW Biomass Based Power Plant ABEIL
T|e rajor areas ol o|orass corsurp||or are lor dores||c lue|, lodder ard sra|| |o|e|s e|c.
As per ||e survey, ||e average corsurp||or ol Woody o|orass corsured per |ouse|o|d per
arrur |s arourd 50-70 |gs |r ||e oo|| d|s|r|c|s.
3.'.1 D*-"s#ic F)" C*!s)-/#i*!
T||s area |s deve|oped ore ard ||e purc|as|rg capac||y |s ruc| ||g|er. 3|oW|y dores||c lue|
|s oe|rg s||l|ed lror ||e Wood, durg ca|es |o ll0. T|e Wood ard crop res|due corsurp||or
|s cors|dered or ar average oas|s as 50-70 Kgs ard 2o-44 |gs per arrur per persor |r
Karrup ard |or|gaor d|s|r|c| respec||ve|y. T||s l|gure |s arr|ved oased or ||e |ouse|o|d
survey carr|ed ou| |r o0 |ouse|o|ds |r se|ec|ed v|||age ol eac| o|oc|s.
lr every o|oc| ore or |Wo v|||age Was se|ec|ed lor |ouse|o|d survey, lor dores||c ard lodder
corsurp||ors ard o||er r|sce||areous purposes.
0ores||c lue| requ|rerer| |r ||e d|s|r|c| g|ver oe|oW.
3.1< Dis#%ic# 5is" D*-"s#ic +)" c*!s)-/#i*! i! #*!s
Dis#%ic#s D*-"s#ic F)" 9T*!s:
(**. C%*/ R"si.)" T*#a
Karrup 112987 41958.80 154945.80
|or|gaor 33222 32o80.10 o5902.10
T*#a 14<201.00 ;4<37.10 22074;.10
3.'.2 F*.."% C*!s)-/#i*!
lr |||s area ca|||e a|so ser| lor graz|rg. 0r ar average, ||e corsurp||or ol lodder |s arourd
4-o |g|day per ca|||e.
3.1; Dis#%ic# 5is" F*.."% c*!s)-/#i*! i! #*!s
Dis#%ic#s F*.."% C*!s)-/#i*! Ric" B%a! T*#a
Karrup 403488.80 14453 417941.80
|or|gaor 189989.o7 7010 19o999.o7
G%a!. #*#a '134;7.4; 214<3 <14141.4;
10 MW Biomass Based Power Plant ABEIL
10 MW Biomass Based Power Plant ABEIL
3.'.3 I!.)s#%ia F)" C*!s)-/#i*!
T|e lo||oW|rg |ao|e g|ves ||e de|a||s ol corsurp||or ol o|orass |r |rdus|r|a| sec|or W||||r
Karrup ard |or|gaor d|s|r|c|s.
3.17 Dis#%ic# 5is" I!.)s#%ia Bi*-ass c*!s)-/#i*! i! #*!s
Dis#%ic# Sa5 -i B%icA Ki!s@ P*)#%8 +a%-s@ H*#"s T*#a
(**. Ric" H)sA (**. c?i/s Sa5 .)s#
Karrup 84o0 330o7 2115 423 440o5
|or|gaor 2340 1o040 585 117 19082
G%a!. #*#a 10700 4110; 2;00 '40 <314;
3.'.4 S)--a%8 *+ Bi*-ass C*!s)-/#i*!
T|e lo||oW|rg |ao|e g|ves ||e surrary ol o|orass corsurp||or |r d|llerer| sec|ors W||||r ||e
d|s|r|c|.
3.11 S)--a%8 *+ Bi*-ass c*!s)-/#i*! i! #*!s
Dis#%ic# D*-"s#ic F*.."% I!.)s#%8 T*#a
Karrup 154945.80 417941.80 440o5 o1o952.o0
|or|gaor o5902.10 19o999.o7 19082 281983.77
G%a!. #*#a 22074;.10 <14141.4; <314; 71713<.3;
3.< Bi*-ass S)%/)s
Al|er es||ra||rg ||e o|orass gerera||or lror ||e poss|o|e sources, ard es||ra||rg ||e
corsurp||or ol o|orass as lodder ard a|so lor dores||c lue|, W||c| cor|r|ou|es ||e rajor
corsurp||or, ||e o||er corsurp||ors rare|y lor saW r|||s e|c car oe accour|ed |r ||e Wood,
por||or, ||e re| o|orass surp|us ava||ao|e lror eac| o|oc| ol d|s|r|c| are g|ver oe|oW.
3.<.1 B*cA 5is" C%*/ R"si.)" Baa!c"
T|e lo||oW|rg |ao|e g|ves ||e de|a||s ol surp|us o|orass lror d|llerer| sources W||||r ||e
d|s|r|c|.
10 MW Biomass Based Power Plant ABEIL
3.20 B*cA 5is" c%*/ %"si.)" >aa!c" i! #*!s
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
KAMRUP DISTRICT
"uakuchi
Kharif
laddy 3|raW 10110.15 980o.85 303.30 0.00 0.00
|a|ze 3|a||s 17.o5 17.o5 0.00 0.00 0.00
Coos 2.85 0.00 0.00 2.85 0.00
Ar|ar 3|a||s 7.90 0.00 0.00 7.90 0.00
3ugarcare Tops & leaves 209.83 209.83 0.00 0.00 0.00
Tras| 139.89 0.00 0.00 139.89 0.00
Ju|e 3|a||s 1971.13 0.00 0.00 1971.13 0.00
Cas|or 3|a||s 5.47 5.47 0.00 0.00 0.00
0rourd Nu| 3|a||s 12.83 12.83 0.00 0.00 0.00
0||er lu|ses 3|a||s 275.o8 0.00 0.00 275.o8 0.00
Rabi
laddy 3|raW 8981.07 8981.07 0.00 0.00 0.00
w|ea| 3|raW 951.14 951.14 0.00 0.00 0.00
0rar 3|a||s 8.00 8.00 0.00 0.00 0.00
3easurur 3|a||s 48.11 0.00 0.00 48.11 0.00
l|rseed 3|a||s 32.95 0.00 0.00 32.95 0.00
|us|ard 3|a||s 817.93 0.00 0.00 817.93 0.00
0||er 0||seeds 3|a||s 3.7o 0.00 0.00 3.7o 0.00
vege|ao|es 3|raW 1083.32 1083.32 0.00 0.00 0.00
TOTAL 24<;1.<< 210;<.1; 303.30 3300.11 0.00
Ha#o
Kharif
laddy 3|raW 320o1.19 31740.58 320.o1 0.00 0.00
|a|ze 3|a||s 40.73 40.73 0.00 0.00 0.00
Coos o.57 0.00 0.00 o.57 0.00
Ar|ar 3|a||s 12.15 0.00 0.00 12.15 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
3ugarcare Tops & leaves 9o.84 9o.84 0.00 0.00 0.00
Tras| o4.5o 0.00 0.00 o4.5o 0.00
Ju|e 3|a||s 2395.47 0.00 0.00 2395.47 0.00
Cas|or 3|a||s 4.38 4.38 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 4o9.4o 0.00 0.00 4o9.4o 0.00
Rabi
laddy 3|raW 11799.o7 11799.o7 0.00 0.00 0.00
w|ea| 3|raW 938.54 938.54 0.00 0.00 0.00
0rar 3|a||s 12.57 12.57 0.00 0.00 0.00
3easurur 3|a||s 157.o9 0.00 0.00 157.o9 0.00
l|rseed 3|a||s 55.o0 0.00 0.00 55.o0 0.00
|us|ard 3|a||s 1172.42 0.00 0.00 1172.42 0.00
0||er 0||seeds 3|a||s 0.00 0.00 0.00 0.00 0.00
vege|ao|es 3|raW 591.30 591.30 0.00 0.00 0.00
TOTAL 417;1.14 4'224.<1 320.<1 4333.12 0.00
$oroi%ari
Kharif
laddy 3|raW o439.oo o117.o8 321.98 0.00 0.00
|a|ze 3|a||s 40.73 40.73 0.00 0.00 0.00
Coos o.57 0.00 0.00 o.57 0.00
Ar|ar 3|a||s 48.o2 0.00 0.00 48.o2 0.00
3ugarcare Tops & leaves 99.15 99.15 0.00 0.00 0.00
Tras| oo.10 0.00 0.00 oo.10 0.00
Ju|e 3|a||s 752.8o 0.00 0.00 752.8o 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 20.34 0.00 0.00 20.34 0.00
Rabi
laddy 3|raW 9331.2o 9331.2o 0.00 0.00 0.00
w|ea| 3|raW 497.28 497.28 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
0rar 3|a||s 8.57 8.57 0.00 0.00 0.00
3easurur 3|a||s 2o.73 0.00 0.00 2o.73 0.00
l|rseed 3|a||s 55.o0 0.00 0.00 55.o0 0.00
|us|ard 3|a||s 20o.51 0.00 0.00 20o.51 0.00
0||er 0||seeds 3|a||s 0.00 0.00 0.00 0.00 0.00
vege|ao|es 3|raW 423.40 423.40 0.00 0.00 0.00
TOTAL 17023.31 1<'17.0; 321.17 1173.33 0.00
Chhaygaon
Kharif
laddy 3|raW o405.95 o085.o5 320.30 0.00 0.00
|a|ze 3|a||s 149.3o 149.3o 0.00 0.00 0.00
Coos 24.09 0.00 0.00 24.09 0.00
Ar|ar 3|a||s o.08 0.00 0.00 o.08 0.00
3ugarcare Tops & leaves 80.70 80.70 0.00 0.00 0.00
Tras| 53.80 0.00 0.00 53.80 0.00
Ju|e 3|a||s 25o.oo 0.00 0.00 25o.oo 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 9.17 9.17 0.00 0.00 0.00
0||er lu|ses 3|a||s 88.32 0.00 0.00 88.32 0.00
Rabi
laddy 3|raW 89o1.85 89o1.85 0.00 0.00 0.00
w|ea| 3|raW 294.17 294.17 0.00 0.00 0.00
0rar 3|a||s 5.71 5.71 0.00 0.00 0.00
3easurur 3|a||s 5.35 0.00 0.00 5.35 0.00
l|rseed 3|a||s 37.75 0.00 0.00 37.75 0.00
|us|ard 3|a||s 14o.35 0.00 0.00 14o.35 0.00
0||er 0||seeds 3|a||s 5o.45 0.00 0.00 5o.45 0.00
vege|ao|es 3|raW o57.00 o57.00 0.00 0.00 0.00
TOTAL 1;237.;' 1<243.<1 320.30 <;4.74 0.00
Chandrapur
Kharif
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
laddy 3|raW 2o70.27 2483.35 18o.92 0.00 0.00
|a|ze 3|a||s 0.00 0.00 0.00 0.00 0.00
Coos 0.00 0.00 0.00 0.00 0.00
Ar|ar 3|a||s 0.00 0.00 0.00 0.00 0.00
3ugarcare Tops & leaves 4.o1 4.o1 0.00 0.00 0.00
Tras| 3.07 0.00 0.00 3.07 0.00
Ju|e 3|a||s o.84 0.00 0.00 o.84 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 1o.0o 0.00 0.00 1o.0o 0.00
Rabi
laddy 3|raW 2348.83 2348.83 0.00 0.00 0.00
w|ea| 3|raW 42.02 42.02 0.00 0.00 0.00
0rar 3|a||s 0.00 0.00 0.00 0.00 0.00
3easurur 3|a||s 0.00 0.00 0.00 0.00 0.00
l|rseed 3|a||s o.8o 0.00 0.00 o.8o 0.00
|us|ard 3|a||s 48.78 0.00 0.00 48.78 0.00
0||er 0||seeds 3|a||s 1.51 0.00 0.00 1.51 0.00
vege|ao|es 3|raW 292.00 292.00 0.00 0.00 0.00
TOTAL '440.7< '1;0.71 17<.12 73.13 0.00
Di%oria
Kharif
laddy 3|raW 9oo5.11 9375.1o 289.95 0.00 0.00
|a|ze 3|a||s o.79 o.79 0.00 0.00 0.00
Coos 1.10 0.00 0.00 1.10 0.00
Ar|ar 3|a||s 30.39 0.00 0.00 30.39 0.00
3ugarcare Tops & leaves 4o.12 4o.12 0.00 0.00 0.00
Tras| 30.74 0.00 0.00 30.74 0.00
Ju|e 3|a||s 342.21 0.00 0.00 342.21 0.00
Cas|or 3|a||s 2.19 2.19 0.00 0.00 0.00
0rourd Nu| 3|a||s 49.50 49.50 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
0||er lu|ses 3|a||s 107.0o 0.00 0.00 107.0o 0.00
Rabi
laddy 3|raW 99o5.45 99o5.45 0.00 0.00 0.00
w|ea| 3|raW 170.90 170.90 0.00 0.00 0.00
0rar 3|a||s 28.5o 28.5o 0.00 0.00 0.00
3easurur 3|a||s 44.55 0.00 0.00 44.55 0.00
l|rseed 3|a||s 3.43 0.00 0.00 3.43 0.00
|us|ard 3|a||s 170.74 0.00 0.00 170.74 0.00
0||er 0||seeds 3|a||s 18.82 0.00 0.00 18.82 0.00
vege|ao|es 3|raW 1752.00 1752.00 0.00 0.00 0.00
TOTAL 2243'.<4 2131<.<< 271.1' ;41.03 0.00
Chayani &arduar
Kharif
laddy 3|raW 3893.02 3o59.44 233.58 0.00 0.00
|a|ze 3|a||s 12.22 12.22 0.00 0.00 0.00
Coos 1.97 0.00 0.00 1.97 0.00
Ar|ar 3|a||s o.08 0.00 0.00 o.08 0.00
3ugarcare Tops & leaves 212.13 212.13 0.00 0.00 0.00
Tras| 141.42 0.00 0.00 141.42 0.00
Ju|e 3|a||s 2323.o1 0.00 0.00 2323.o1 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 114.02 0.00 0.00 114.02 0.00
Rabi
laddy 3|raW 10298.55 10298.55 0.00 0.00 0.00
w|ea| 3|raW 253.54 253.54 0.00 0.00 0.00
0rar 3|a||s 10.85 10.85 0.00 0.00 0.00
3easurur 3|a||s 28.51 0.00 0.00 28.51 0.00
l|rseed 3|a||s 0.00 0.00 0.00 0.00 0.00
|us|ard 3|a||s 291.07 0.00 0.00 291.07 0.00
0||er 0||seeds 3|a||s 3o.88 0.00 0.00 3o.88 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
vege|ao|es 3|raW 292.00 292.00 0.00 0.00 0.00
TOTAL 1;11'.7; 14;37.;4 233.'7 2143.'' 0.00
&oko
Kharif
laddy 3|raW 10348.41 10037.9o 310.45 0.00 0.00
|a|ze 3|a||s 305.51 305.51 0.00 0.00 0.00
Coos 49.28 0.00 0.00 49.28 0.00
Ar|ar 3|a||s 33.42 0.00 0.00 33.42 0.00
3ugarcare Tops & leaves 1037.o1 1037.o1 0.00 0.00 0.00
Tras| o91.74 0.00 0.00 o91.74 0.00
Ju|e 3|a||s 1129.29 0.00 0.00 1129.29 0.00
Cas|or 3|a||s o02.09 o02.09 0.00 0.00 0.00
0rourd Nu| 3|a||s 311.o8 311.o8 0.00 0.00 0.00
0||er lu|ses 3|a||s 339.92 0.00 0.00 339.92 0.00
Rabi
laddy 3|raW 114o4.43 114o4.43 0.00 0.00 0.00
w|ea| 3|raW 277.3o 277.3o 0.00 0.00 0.00
0rar 3|a||s 42.84 42.84 0.00 0.00 0.00
3easurur 3|a||s 222.73 0.00 0.00 222.73 0.00
l|rseed 3|a||s 147.58 0.00 0.00 147.58 0.00
|us|ard 3|a||s 772.40 0.00 0.00 772.40 0.00
0||er 0||seeds 3|a||s 189.oo 0.00 0.00 189.oo 0.00
vege|ao|es 3|raW 791.32 791.32 0.00 0.00 0.00
TOTAL 27;';.23 247;0.;7 310.4' 3';<.00 0.00
&ongaon
Kharif
laddy 3|raW o154.20 584o.49 307.71 0.00 0.00
|a|ze 3|a||s o1.10 o1.10 0.00 0.00 0.00
Coos 9.8o 0.00 0.00 9.8o 0.00
Ar|ar 3|a||s 21.27 0.00 0.00 21.27 0.00
3ugarcare Tops & leaves 115.29 115.29 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
Tras| 7o.8o 0.00 0.00 7o.8o 0.00
Ju|e 3|a||s 1231.9o 0.00 0.00 1231.9o 0.00
Cas|or 3|a||s 122.o1 122.o1 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s o1.02 0.00 0.00 o1.02 0.00
Rabi
laddy 3|raW 7o74.27 7o74.27 0.00 0.00 0.00
w|ea| 3|raW 203.12 203.12 0.00 0.00 0.00
0rar 3|a||s 23.42 23.42 0.00 0.00 0.00
3easurur 3|a||s 29.40 0.00 0.00 29.40 0.00
l|rseed 3|a||s 10.30 0.00 0.00 10.30 0.00
|us|ard 3|a||s o42.31 0.00 0.00 o42.31 0.00
0||er 0||seeds 3|a||s 1.51 0.00 0.00 1.51 0.00
vege|ao|es 3|raW 41o.10 41o.10 0.00 0.00 0.00
TOTAL 1<7'4.'7 144<2.31 30;.;1 2074.47 0.00
Cha%aria
Kharif
laddy 3|raW 351o7.51 34815.84 351.o8 0.00 0.00
|a|ze 3|a||s 2.72 2.72 0.00 0.00 0.00
Coos 0.44 0.00 0.00 0.44 0.00
Ar|ar 3|a||s 351.25 0.00 0.00 351.25 0.00
3ugarcare Tops & leaves 182.1o 182.1o 0.00 0.00 0.00
Tras| 121.44 0.00 0.00 121.44 0.00
Ju|e 3|a||s 5998.94 0.00 0.00 5998.94 0.00
Cas|or 3|a||s 2.19 2.19 0.00 0.00 0.00
0rourd Nu| 3|a||s 3.o7 3.o7 0.00 0.00 0.00
0||er lu|ses 3|a||s 341.52 0.00 0.00 341.52 0.00
Rabi
laddy 3|raW 8223.04 8223.04 0.00 0.00 0.00
w|ea| 3|raW 1822.44 1822.44 0.00 0.00 0.00
0rar 3|a||s 22.85 22.85 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
3easurur 3|a||s 203.13 0.00 0.00 203.13 0.00
l|rseed 3|a||s 92.oo 0.00 0.00 92.oo 0.00
|us|ard 3|a||s 18o8.39 0.00 0.00 18o8.39 0.00
0||er 0||seeds 3|a||s 45.91 0.00 0.00 45.91 0.00
vege|ao|es 3|raW 299.30 299.30 0.00 0.00 0.00
TOTAL '4;41.'' 4'3;4.20 3'1.<7 1023.<7 0.00
Rani
Kharif
laddy 3|raW 9440.34 9157.13 283.21 0.00 0.00
|a|ze 3|a||s 0.00 0.00 0.00 0.00 0.00
Coos 0.00 0.00 0.00 0.00 0.00
Ar|ar 3|a||s 145.85 0.00 0.00 145.85 0.00
3ugarcare Tops & leaves 830.09 830.09 0.00 0.00 0.00
Tras| 553.39 0.00 0.00 553.39 0.00
Ju|e 3|a||s 1711.05 0.00 0.00 1711.05 0.00
Cas|or 3|a||s 153.2o 153.2o 0.00 0.00 0.00
0rourd Nu| 3|a||s 751.o9 751.o9 0.00 0.00 0.00
0||er lu|ses 3|a||s 107.0o 0.00 0.00 107.0o 0.00
Rabi
laddy 3|raW 8112.00 8112.00 0.00 0.00 0.00
w|ea| 3|raW 714.41 714.41 0.00 0.00 0.00
0rar 3|a||s 0.00 0.00 0.00 0.00 0.00
3easurur 3|a||s 89.09 0.00 0.00 89.09 0.00
l|rseed 3|a||s 2o7.70 0.00 0.00 2o7.70 0.00
|us|ard 3|a||s 92o.88 0.00 0.00 92o.88 0.00
0||er 0||seeds 3|a||s 374.79 0.00 0.00 374.79 0.00
vege|ao|es 3|raW 708.10 708.10 0.00 0.00 0.00
TOTAL 2477'.;0 2042<.<7 273.21 41;'.71 0.00
Ra%pur
Kharif
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
laddy 3|raW 4508.89 4238.35 270.53 0.00 0.00
|a|ze 3|a||s 13.58 13.58 0.00 0.00 0.00
Coos 2.19 0.00 0.00 2.19 0.00
Ar|ar 3|a||s o.08 0.00 0.00 o.08 0.00
3ugarcare Tops & leaves 255.94 255.94 0.00 0.00 0.00
Tras| 170.o3 0.00 0.00 170.o3 0.00
Ju|e 3|a||s 817.88 0.00 0.00 817.88 0.00
Cas|or 3|a||s 1.09 1.09 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 120.98 0.00 0.00 120.98 0.00
Rabi
laddy 3|raW 723o.53 723o.53 0.00 0.00 0.00
w|ea| 3|raW 224.13 224.13 0.00 0.00 0.00
0rar 3|a||s o.28 o.28 0.00 0.00 0.00
3easurur 3|a||s 30.29 0.00 0.00 30.29 0.00
l|rseed 3|a||s 0.00 0.00 0.00 0.00 0.00
|us|ard 3|a||s 2oo.o8 0.00 0.00 2oo.o8 0.00
0||er 0||seeds 3|a||s 30.8o 0.00 0.00 30.8o 0.00
vege|ao|es 3|raW 354.78 354.78 0.00 0.00 0.00
TOTAL 1404<.71 12330.<1 2;0.'3 144'.'7 0.00
&e'era
Kharif
laddy 3|raW 7228.o0 7011.75 21o.8o 0.00 0.00
|a|ze 3|a||s 8.15 8.15 0.00 0.00 0.00
Coos 1.31 0.00 0.00 1.31 0.00
Ar|ar 3|a||s 7.29 0.00 0.00 7.29 0.00
3ugarcare Tops & leaves 48.42 48.42 0.00 0.00 0.00
Tras| 32.28 0.00 0.00 32.28 0.00
Ju|e 3|a||s 85.55 0.00 0.00 85.55 0.00
Cas|or 3|a||s 4.38 4.38 0.00 0.00 0.00
0rourd Nu| 3|a||s 91.o7 91.o7 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
0||er lu|ses 3|a||s 133.83 0.00 0.00 133.83 0.00
Rabi
laddy 3|raW 9433.7o 9433.7o 0.00 0.00 0.00
w|ea| 3|raW 270.35 270.35 0.00 0.00 0.00
0rar 3|a||s 2.28 2.28 0.00 0.00 0.00
3easurur 3|a||s 133.o4 0.00 0.00 133.o4 0.00
l|rseed 3|a||s 5.49 0.00 0.00 5.49 0.00
|us|ard 3|a||s 123.58 0.00 0.00 123.58 0.00
0||er 0||seeds 3|a||s 17.31 0.00 0.00 17.31 0.00
vege|ao|es 3|raW 319.74 319.74 0.00 0.00 0.00
TOTAL 1;14;.<4 1;110.'0 21<.7< '40.27 0.00
Ka%apur
Kharif
laddy 3|raW 2989.44 2780.18 209.2o 0.00 0.00
|a|ze 3|a||s 2.72 2.72 0.00 0.00 0.00
Coos 0.44 0.00 0.00 0.44 0.00
Ar|ar 3|a||s 1.22 0.00 0.00 1.22 0.00
3ugarcare Tops & leaves 20.75 20.75 0.00 0.00 0.00
Tras| 13.83 0.00 0.00 13.83 0.00
Ju|e 3|a||s 17.11 0.00 0.00 17.11 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 22.00 22.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 112.95 0.00 0.00 112.95 0.00
Rabi
laddy 3|raW 9247.98 9247.98 0.00 0.00 0.00
w|ea| 3|raW 89.o5 89.o5 0.00 0.00 0.00
0rar 3|a||s 13.71 13.71 0.00 0.00 0.00
3easurur 3|a||s 21.38 0.00 0.00 21.38 0.00
l|rseed 3|a||s 27.4o 0.00 0.00 27.4o 0.00
|us|ard 3|a||s 125.21 0.00 0.00 125.21 0.00
0||er 0||seeds 3|a||s 7.53 0.00 0.00 7.53 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
vege|ao|es 3|raW 300.7o 300.7o 0.00 0.00 0.00
TOTAL 13014.13 124;;.;' 201.2< 32;.12 0.00
Rangia
Kharif
laddy 3|raW 30433.8o 30129.52 304.34 0.00 0.00
|a|ze 3|a||s 411.41 411.41 0.00 0.00 0.00
Coos oo.3o 0.00 0.00 oo.3o 0.00
Ar|ar 3|a||s 8.51 0.00 0.00 8.51 0.00
3ugarcare Tops & leaves 15o.79 15o.79 0.00 0.00 0.00
Tras| 104.53 0.00 0.00 104.53 0.00
Ju|e 3|a||s 99.24 0.00 0.00 99.24 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 180.93 0.00 0.00 180.93 0.00
Rabi
laddy 3|raW 1o548.58 1o548.58 0.00 0.00 0.00
w|ea| 3|raW 703.20 703.20 0.00 0.00 0.00
0rar 3|a||s o9.12 o9.12 0.00 0.00 0.00
3easurur 3|a||s 33.85 0.00 0.00 33.85 0.00
l|rseed 3|a||s 0.00 0.00 0.00 0.00 0.00
|us|ard 3|a||s 1253.72 0.00 0.00 1253.72 0.00
0||er 0||seeds 3|a||s 0.00 0.00 0.00 0.00 0.00
vege|ao|es 3|raW 1954.94 1954.94 0.00 0.00 0.00
TOTAL '202'.04 411;3.'< 304.34 1;4;.14 0.00
$ores(ar
Kharif
laddy 3|raW 25320.34 250o7.14 253.20 0.00 0.00
|a|ze 3|a||s 32.59 32.59 0.00 0.00 0.00
Coos 5.2o 0.00 0.00 5.2o 0.00
Ar|ar 3|a||s 17.o2 0.00 0.00 17.o2 0.00
3ugarcare Tops & leaves 371.23 371.23 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
Tras| 247.49 0.00 0.00 247.49 0.00
Ju|e 3|a||s 1871.89 0.00 0.00 1871.89 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 53.17 53.17 0.00 0.00 0.00
0||er lu|ses 3|a||s 55.14 0.00 0.00 55.14 0.00
Rabi
laddy 3|raW 12151.99 12151.99 0.00 0.00 0.00
w|ea| 3|raW 245.14 245.14 0.00 0.00 0.00
0rar 3|a||s 11.42 11.42 0.00 0.00 0.00
3easurur 3|a||s 59.o9 0.00 0.00 59.o9 0.00
l|rseed 3|a||s 83.74 0.00 0.00 83.74 0.00
|us|ard 3|a||s 1780.58 0.00 0.00 1780.58 0.00
0||er 0||seeds 3|a||s 22.58 0.00 0.00 22.58 0.00
vege|ao|es 3|raW 38o.90 38o.90 0.00 0.00 0.00
TOTAL 42;1<.;; 37311.'7 2'3.20 4143.17 0.00
&ihdia )a#ikona
Kharif
laddy 3|raW o2o8.84 5955.39 313.44 0.00 0.00
|a|ze 3|a||s 9.50 9.50 0.00 0.00 0.00
Coos 1.53 0.00 0.00 1.53 0.00
Ar|ar 3|a||s 10.94 0.00 0.00 10.94 0.00
3ugarcare Tops & leaves 225.97 225.97 0.00 0.00 0.00
Tras| 150.o5 0.00 0.00 150.o5 0.00
Ju|e 3|a||s 431.18 0.00 0.00 431.18 0.00
Cas|or 3|a||s o.57 o.57 0.00 0.00 0.00
0rourd Nu| 3|a||s 45.84 45.84 0.00 0.00 0.00
0||er lu|ses 3|a||s 377.39 0.00 0.00 377.39 0.00
Rabi
laddy 3|raW 20915.2o 20915.2o 0.00 0.00 0.00
w|ea| 3|raW 110.oo 110.oo 0.00 0.00 0.00
0rar 3|a||s 2.8o 2.8o 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
3easurur 3|a||s o0.58 0.00 0.00 o0.58 0.00
l|rseed 3|a||s 51.48 0.00 0.00 51.48 0.00
|us|ard 3|a||s 500.84 0.00 0.00 500.84 0.00
0||er 0||seeds 3|a||s 42.15 0.00 0.00 42.15 0.00
vege|ao|es 3|raW 421.94 421.94 0.00 0.00 0.00
TOTAL 21<34.1; 2;<13.11 313.44 1<2<.;3 0.00
MORIGAON DISTRICT
Ma8*!=
K?a%i+
laddy 3|raW 2o273.37 25747.90 525.47 0.00 0.00
|a|ze 3|a||s 74.o8 74.o8 0.00 0.00 0.00
Coos 12.05 0.00 0.00 12.05 0.00
Ar|ar 3|a||s 3.04 0.00 0.00 3.04 0.00
3ugarcare Tops & leaves 2o5.17 2o5.17 0.00 0.00 0.00
Tras| 17o.78 0.00 0.00 17o.78 0.00
Ju|e 3|a||s 1779.49 0.00 0.00 1779.49 0.00
Cas|or 3|a||s 10.95 10.95 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s o.9o 0.00 0.00 o.9o 0.00
bao|
laddy 3|raW 41435.50 41435.50 0.00 0.00 0.00
w|ea| 3|raW 525.30 525.30 0.00 0.00 0.00
0rar 3|a||s 8.00 8.00 0.00 0.00 0.00
3easurur 3|a||s 218.27 0.00 0.00 218.27 0.00
l|rseed 3|a||s 75.50 0.00 0.00 75.50 0.00
|us|ard 3|a||s 1213.07 0.00 0.00 1213.07 0.00
0||er 0||seeds 3|a||s 323.o2 0.00 0.00 323.o2 0.00
vege|ao|es 3|raW 1284.80 1284.80 0.00 0.00 0.00
TOTAL ;3<7<.'3 <13'2.27 '2'.4; 3707.;7 0.00
M*%ia>a%i
K?a%i+
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
laddy 3|raW 3322.10 3023.11 298.99 0.00 0.00
|a|ze 3|a||s 0.00 0.00 0.00 0.00 0.00
Coos 0.00 0.00 0.00 0.00 0.00
Ar|ar 3|a||s 3.04 0.00 0.00 3.04 0.00
3ugarcare Tops & leaves 1579.47 1579.47 0.00 0.00 0.00
Tras| 1052.98 0.00 0.00 1052.98 0.00
Ju|e 3|a||s 1485.19 0.00 0.00 1485.19 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 27.50 27.50 0.00 0.00 0.00
0||er lu|ses 3|a||s 2o.77 0.00 0.00 2o.77 0.00
bao|
laddy 3|raW 20990.00 20990.00 0.00 0.00 0.00
w|ea| 3|raW 535.11 535.11 0.00 0.00 0.00
0rar 3|a||s 0.00 0.00 0.00 0.00 0.00
3easurur 3|a||s o9.49 0.00 0.00 o9.49 0.00
l|rseed 3|a||s 51.48 0.00 0.00 51.48 0.00
|us|ard 3|a||s 424.41 0.00 0.00 424.41 0.00
0||er 0||seeds 3|a||s 0.00 0.00 0.00 0.00 0.00
vege|ao|es 3|raW 137.24 137.24 0.00 0.00 0.00
TOTAL 21;04.;7 2<212.43 217.11 3113.3< 0.00
Laharighat
Kharif
laddy 3|raW 19829.21 19333.48 495.73 0.00 0.00
|a|ze 3|a||s 0.00 0.00 0.00 0.00 0.00
Coos 0.00 0.00 0.00 0.00 0.00
Ar|ar 3|a||s 0.00 0.00 0.00 0.00 0.00
3ugarcare Tops & leaves 447.33 447.33 0.00 0.00 0.00
Tras| 298.22 0.00 0.00 298.22 0.00
Ju|e 3|a||s 102oo.30 0.00 0.00 102oo.30 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 293.34 293.34 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
0||er lu|ses 3|a||s 54.o0 0.00 0.00 54.o0 0.00
Rabi
laddy 3|raW 277o3.17 277o3.17 0.00 0.00 0.00
w|ea| 3|raW 491.o8 491.o8 0.00 0.00 0.00
0rar 3|a||s 57.12 57.12 0.00 0.00 0.00
3easurur 3|a||s 1o0.3o 0.00 0.00 1o0.3o 0.00
l|rseed 3|a||s 49.42 0.00 0.00 49.42 0.00
|us|ard 3|a||s 538.24 0.00 0.00 538.24 0.00
0||er 0||seeds 3|a||s 34.o2 0.00 0.00 34.o2 0.00
vege|ao|es 3|raW 438.00 438.00 0.00 0.00 0.00
TOTAL <0;21.<1 47724.12 41'.;3 11401.;< 0.00
&hurbandha
Kharif
laddy 3|raW 5421.45 4987.74 433.72 0.00 0.00
|a|ze 3|a||s 0.00 0.00 0.00 0.00 0.00
Coos 0.00 0.00 0.00 0.00 0.00
Ar|ar 3|a||s o.08 0.00 0.00 o.08 0.00
3ugarcare Tops & leaves 4o1.1o 4o1.1o 0.00 0.00 0.00
Tras| 307.44 0.00 0.00 307.44 0.00
Ju|e 3|a||s 2898.52 0.00 0.00 2898.52 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 33.19 0.00 0.00 33.19 0.00
Rabi
laddy 3|raW 29514.12 29514.12 0.00 0.00 0.00
w|ea| 3|raW 271.7o 271.7o 0.00 0.00 0.00
0rar 3|a||s 0.00 0.00 0.00 0.00 0.00
3easurur 3|a||s 337.o5 0.00 0.00 337.o5 0.00
l|rseed 3|a||s o5.21 0.00 0.00 o5.21 0.00
|us|ard 3|a||s 939.89 0.00 0.00 939.89 0.00
0||er 0||seeds 3|a||s 0.00 0.00 0.00 0.00 0.00
10 MW Biomass Based Power Plant ABEIL
C%*/ Na-" R"si.)" T8/" Bi*-ass
G"!"%a#i*!
Bi*-ass C*!s)-/#i*! C*"c#a>"
S)%/)s
F*.."% T?a#c?i!= D*-"s#ic
+)"
vege|ao|es 3|raW 138.70 138.70 0.00 0.00 0.00
TOTAL 4031'.1' 3'3;3.4; 433.;2 4'7;.1; 0.00
Kapii
Kharif
laddy 3|raW 3515.40 3199.02 31o.39 0.00 0.00
|a|ze 3|a||s 0.00 0.00 0.00 0.00 0.00
Coos 0.00 0.00 0.00 0.00 0.00
Ar|ar 3|a||s 0.00 0.00 0.00 0.00 0.00
3ugarcare Tops & leaves 10o.07 10o.07 0.00 0.00 0.00
Tras| 70.71 0.00 0.00 70.71 0.00
Ju|e 3|a||s 81o1.71 0.00 0.00 81o1.71 0.00
Cas|or 3|a||s 0.00 0.00 0.00 0.00 0.00
0rourd Nu| 3|a||s 0.00 0.00 0.00 0.00 0.00
0||er lu|ses 3|a||s 173.44 0.00 0.00 173.44 0.00
Rabi
laddy 3|raW o484.91 o484.91 0.00 0.00 0.00
w|ea| 3|raW 145.o8 145.o8 0.00 0.00 0.00
0rar 3|a||s 0.00 0.00 0.00 0.00 0.00
3easurur 3|a||s 33.85 0.00 0.00 33.85 0.00
l|rseed 3|a||s 0.00 0.00 0.00 0.00 0.00
|us|ard 3|a||s 1328.52 0.00 0.00 1328.52 0.00
0||er 0||seeds 3|a||s 0.00 0.00 0.00 0.00 0.00
vege|ao|es 3|raW 211.70 211.70 0.00 0.00 0.00
TOTAL 20231.11 1014;.3; 31<.31 1;<7.23 0.00
3.<.2 Bi*-ass S)%/)s +%*- A=%*3i!.)s#%i"s
T|e or|y o|orass ava||ao|e |r surp|us lror agro |rdus|r|es |s r|ce |us|. 0||er o|orass
gerera|ed lror agro |rdus|r|es |s lu||y corsured |r |rdus|r|a| ard o||er sec|ors. T|e d|s|r|c|
W|se surp|us o|orass ava||ao|e |s g|ver |r ||e |ao|e oe|oW.
10 MW Biomass Based Power Plant ABEIL
3.21 Dis#%ic# 5is" Bi*-ass S)%/)s +%*- A=%*3i!.)s#%i"s i! T*!s
Dis#%ic# Ric" H)sA T*#a
Karrup 30524 30524
|or|gaor 1480o 1480o
G%a!. #*#a 4'330 4'330
3.<.3 Bi*-ass S)%/)s +%*- F*%"s# a!. *#?"% a!.
T|e lo||oW|rg |ao|e g|ves ||e de|a||s regard|rg ||e o|orass ava||ao|e lror ||e lores| ard
o||er Was|e|ard W||||r d|s|r|c|s |s g|ver oe|oW.
3.22 Dis#%ic# 5is" Bi*-ass S)%/)s +%*- F*%"s# a!. *#?"% a!. i! T*!s
Dis#%ic# S)%/)s (**. T*#a
Karrup 110805 110805
|or|gaor 5781 5781
G%a!. #*#a 11<'7< 11<'7<
3.<.4 S)--a%8 *+ S)%/)s Bi*-ass A$aia>ii#8
T|e lo||oW|rg |ao|e g|ves ||e surrary ol surp|us o|orass lror d|llerer| sources W||||r ||e
d|s|r|c|.
3.23 S)--a%8 *+ s)%/)s >i*-ass i! T*!s
Dis#%ic#s C%*/ %"si.)" F*%"s# a!.
*#?"% a!.
A=%*3
i!.)s#%8
T*#a
Karrup 0.00 110805 30524 141329
|or|gaor 0.00 5781 1480o 20587
G%a!. #*#a 0.00 11<'7< 4'330 1<111<
3.; PO(ER GENERATION POTENTIAL
T|e surp|us ava||ao|e lor ||e poWer gerera||or purpose |s 1o191o |ors|year, W||c| ra|r|y
cors|s|s ol ||e Wood lror ||e lores||ards ard r|ce |us|.
10 MW Biomass Based Power Plant ABEIL
T|e poWer po|er||a| ava||ao|e W||| ||e surp|us Wood |s aoou| 11.oo |w, ard W||| ||e Agro-
|rdus|r|es res|dues |.e r|ce |us| |s aoou| 4.53 |w. T|e |o|a| poWer po|er||a| ava||ao|e |r
Karrup ard |or|gaor d|s|r|c|s |s 1o.19 |w.
3.7 BIOMASS CHARACTERISTICS@ AVAILABILITY AND COST
3.7.1 Bi*-ass C?a%ac#"%is#ics
8|orass |s a rereWao|e source ol erergy ||a| car oe rade use ol ellec||ve|y lor ||erra| as
We|| as e|ec|r|ca| erergy gerera||or. A|| ||e processes |r W||c| o|orass |s used as lue| |ave a
del|r||e oear|rg or ||e proper||es ol ||e o|orass ra|er|a|. T|us ||e c|arac|er|za||or ol
o|orass ra|er|a| |s esser||a|. T|e c|arac|er|za||or ol o|orass |rvo|ves ||e lrox|ra|e ard
u|||ra|e Ara|ys|s.
3.7.1.1 P%*Bi-a#" A!a8sis
T|e prox|ra|e ara|ys|s g|ves ||e proxy |rlorra||or ol o|orass cors|||uer|s suc| as ro|s|ure,
vo|a|||es, l|xed caroor ard as| cor|er|. T|e caroor cor|er| de|err|red ||roug| |||s re||od |s
ro| ac|ua| caroor cor|er| |r ||e o|orass ou| or|y ||e ror-vo|a|||e par| ol caroor cor|er|, sore
ol ||e caroor preser| |r ||e o|orass escapes a|org W||| vo|a|||es. T|e prox|ra|e ara|ys|s ol
sore o|orass |s g|ver |r ||e |ao|e.
Bi*-ass
Ca*%i+ic Va)"
9Aca6A=:
As? 9G: V*a#i"
-a##"% 9G:
FiB".
Ca%>*! 9G:
laddy s|raW 3730 15.50 o8.30 1o.20
w|ea| s|raW 414o 7.70 80.o0 11.70
|a|ze 3|a||s 3200 |o 3800 1 |o 20 o0 |o 85 10 |o 20
|us|ard s|a|| 4178 4.90 78.00 17.10
Care |ras| 4120 10.90 70.40 18.70
wood 3700 |o 4200 1 |o 3 70 |o 85 15 |o 20
b|ce |us| 3200 19.20 oo.20 14.o0
3.7.1.2 U#i-a#" A!a8sis
T|e u|||ra|e ara|ys|s |rvo|ves ||e de|err|ra||or ol ||e e|erer|a| corpos|||or ol ||e lue| |.e.
caroor, r||roger, oxyger, |ydroger, su|p|ur e|c. T|e de|err|ra||or ol ||e |o|a| caroor ard
10 MW Biomass Based Power Plant ABEIL
|ydroger ard ||e|r (C|l) ra||o g|ves ar |rd|ca||or ol ||e |ype ol vo|a|||es preser| |r ||e
o|orass |.e. sa|ura|ed or ursa|ura|ed |ydrocaroors W||c| goverrs ||e |ar lorra||or. T|e
u|||ra|e ara|ys|s ol sore o|orass |s g|ver |r ||e |ao|e.
Bi*-ass Ca%>*!
9G:
H8.%*="!
9G:
Ni#%*="!
9G:
OB8="!
9G:
As? 9G:
laddy s|raW 35.97 5.28 0.17 43.08 15.50
|us|ard 3|a||s 40.89 5.92 o.37 39.12 7.70
|a|ze 3|a|| 35 |o 40 o |o 8 0.5 |o 1 50 |o 55 1 |o 20
Care |ras| 39.75 5.55 0.17 4o.82 7.71
wood 45 |o 50 5 |o 7 0.5 |o 0.9 40 |o 48 1 |o 3
b|ce |us| 3o.42 4.91 0.59 35.88 22.20
3.7.2 Bi*-ass C*"c#i*!@ ?a!.i!=@ a!. /%"/a%a#i*!&
As rer||ored ear||er, o|orass |s gerera|ed lror crop res|dues, agro |rdus|ry, oarrer ard
lores| |ards. T|e o|orass oo|a|red as crop res|due ard agro |rdus|ry res|due W||| |ave |oW
ou|| ders||y. T|e |ype ol crop res|due gerera|ed deperds or ||e crop ard a|so |arves||rg
re||ods. lor exarp|e, |l coro|res are used lor |arves||rg ol paddy crop, a|ros| 5 ol s|raW
|s |el| |r ||e l|e|d. T|e |arves|ed s|raW |s |r ||e lorr ol poWder W||| |oW ou|| ders||y. T||s
s|raW reeds |o ders|l|ed us|rg or|que|||rg |ec|r|que. T|e s|raW |el| |r ||e l|e|d, reeds rarua|
|arves||rg. |arua| |arves|ed s|raW car oe ders|l|ed us|rg oa|||rg. ll ||e paddy crop car oe
|arves|ed rarua|, |o|a| s|raW car oe co||ec|ed ard car oe ell|c|er||y used. w|ea| s|raW |s
a|so oe|rg |arves|ed s|r||ar|y.
bes|due lror o|| seeds ard pu|ses are or||||e Woody |ype. T||s |ype ol ra|er|a| reeds
rec|ar|sr |o orea| |r|o p|eces ol 2 |o o |rc|es. usua||y c|oppers are used lor |||s purpose.
8|orass oo|a|red lror erergy p|ar|a||or or Wood lror lores| ard oarrer |ard reeds spec|a|
a||er||or ol prepara||or. T||s ra|er|a| |s |eavy ard |rarspor|a||or proo|ers are |ess corpared
W||| |oW ou|| res|dues.
0eperd|rg or ||e s|ze ard qua|||y ol ra|er|a|, s|redders, cu||ers, c|oppers ard c||ppers car
oe used.
10 MW Biomass Based Power Plant ABEIL
3.7.3 S"as*!a Bi*-ass A$aia>ii#8 a!. C*s#
T|e rajor crops |r |||s area are paddy, ra|ze W|ea|, sugarcare ard oar|ey. T|e res|dues
lror ||ese crops |||e lror ||ese crops |||e paddy s|raW, W|ea| s|raW, ra|ze s|a||s are used as
lodder. |a|ze coos, care |ras|, T|| ard |us|ard s|a||s are used as dores||c lue|. b|ce |us|
ard wood are ||e rajor o|orass ava||ao|e |||s area W||c| |s used lor |rdus|r|a| purpose ard
dores||c. Al|er ||e corsurp||or ol d|llerer| o|orasses |r var|ous sec|ors care |ras|, |us|ard
ard T|| s|a||s, |a|ze coos, Wood ard r|ce |us| are ava||ao|e |r surp|us quar|||y, W||c| car oe
used lor poWer gerera||or.
As ||e poWer p|ar| s|ar| Wor||rg, o|orass pr|ces ray |rcrease |o |ure |o 5 |o 10 |r ||e oll-
seasor.
3.7.4 T%a!s/*%#a#i*! M*."s
Trac|or |ro||eys ard ou||oc| car|s are ||e ros| |rpor|ar| rears ol |rarspor| ava||ao|e W|||
larrers. T|e larrers are |av|rg adequa|e rears lor ||e |rarspor|a||or ol ||e o|orass.
0|llerer| rodes ol |rarspor| |||e |ead |oad, |ard car|s, ou||oc| car|s, |rac|ors, |ruc|s e|c. are
used lor ||e Wood |rarspor|a||or. wood |r |arge quar|||y |s |rarspor|ed e|||er oy rears ol
|rac|or or |ruc|s. w|||e lor |rarspor||rg sra|| quar|||y |ardcar|s or ou||oc| car|s are used.
3.7.4.1 B)*cA Ca%#s
lr rura| areas, ou||oc| car| |as oeer ||e ros| corror rode ol |rarspor|. A|||oug| |rac|or
|ro||eys |ave a|so oeer adop|ed ou| s|||| ou||oc| car| |s qu||e corror par||cu|ar|y W||| ||e
sra|| ard red|ur larrs ever roW. larrers usua||y do ro| c|arge lor ||r|rg ol ou||oc| car|s.
3.7.4.2 T%ac#*% T%*"8s
A|| ||e |rac|or oWrers do ro| oWr a |ro||ey. As suc| spec|a| lour-W|ee| Wagors car oe
deve|oped W||c| ray carry |arge quar|||y ol crop res|due s|a||s ard Wood. 0re suc| Wagor,
|av|rg capac||y ol 3-5 |ores ol crop res|due s|a||s ard 5-7 |ores ol Wood. T||s capac||y |s |ess
||ar ||a| ol a |ruc|. T|e |r|||a| cos| ol a Wagor ard |ro||ey |s bs. 25000 ard bs. 20000
respec||ve|y.
3.7.4.3 T%)cAs
10 MW Biomass Based Power Plant ABEIL
Truc|s are ro| a| a|| corror |r rura| areas lor |rarspor| ol agr|cu||ura| Was|es. loWever, lor
|ard||rg |arge vo|ures ol ar|ar s|a||s, ||e use ol |ruc|s ray oecore recessary oecause ol
||re lac|or. T|ese are las| rov|rg ve||c|es. T|e capac||y ol a |ruc| as rer||ored aoove |s
aoou| 5-7 |orres lor crop res|due s|a||s ard aoou| 8-10 |orres lor wood.
3.7.' S#*%a="
Approx|ra|e o|orass oa|arce lor year rep||ca|es ||e o|orass |s ava||ao|e |r surp|us |r |arge
quar|||y or|y |r ||e ror|| ol |arves||rg. T||s |arge surp|us o|orass quar|||y |as |o oe s|ored
ard s|ou|d oe used lor res| ol ||e year. lerce |||s o|orass |as |o oe procured |r ||ese
ror||s ard s|ored.
T|e lo||oW|rg po|r|s ray oe |a|er |r|o accour| W|||e p|arr|rg s|orage lac|||||es.
A We||-dra|red s||e ray oe c|oser.
leave a| |eas| 40 crs. 3pace oe|Weer eac| s|ac| |o ersure proper dra|rage ard
ver|||a||or.
l|ar d|llerer| s|orage s||es as a sale|y precau||or aga|rs| ||e l|re. Arp|e l|reguards ard
precau||ors ray oe |a|er a| eac| ol ||e s||e.
T|ere s|ou|d oe adequa|e ra|ura| ver|||a||or arrargerer|s ard ro ra|ura| s|ade ol ary
||rd s|ou|d oe rear ||e s|ac|s.
0r s|orage, ||e as| cor|er| |rcrease, vo|a|||e ra||er decrease, l|xed caroor |rcreases ard ro
apprec|ao|e c|arge or |ore ol ra|er|a|. T|e |oss ol v| |s |o oe correc|ed W||| |oss ol We|g||.
3.1 BIOMASS REHUIREMENT&
8|orass loWer p|ar| W||| oe opera||rg a| a lll ol 90 arl ||e r|ce |us| requ|rerer| W||| oe
108405 |T per arrur.
3.10 CATEGORY (ISE BIOMASS AVAILABLE&
T|e ca|egory W|se o|orass ava||ao|e lror d|llerer| sources |s s|oWr |r ||e |ao|e oe|oW
3.2' Ca#"=*%8 5is" a$aia>ii#8 *+ Bi*-ass
10 MW Biomass Based Power Plant ABEIL
Bi*-ass T8/" R"si.)" Bi*-ass A$aia>"
A=%* R"si.)"
b|ce lus| lus| 45330
F*%"s# 4 *#?"% a!.s
wood wood 11o58o
G%a!. T*#a 1<111<
3.10 AVERAGE COST OF BIOMASS&
T|e average cos| ol ||e o|orass |s |a|er as bs.1500 per |or,as per currer| ra|es W||| arrua|
esca|a||or ol 5. .
10 MW Biomass Based Power Plant ABEIL
4. PLANT AND EHUIPMENT DESIGN CRITERIA
4.0 GENERAL
T||s poWer p|ar| W||| oe us|rg ||e corous||or |ec|ro|ogy. T|e oas|c s|eps |rvo|ve, o|orass
|ard||rg, oo||er, |uroo gerera|or ard evacua||or sys|er.
loWer gerera||or |s |av|rg d|rec| oear|rg or ||e pressure ard super|ea|ed |erpera|ure ol
s|ear. Norra||y o7 oar ard 490 0eg C, |s used lor o|orass oased poWer p|ar|s. C|ear|y, ||e
|ec|ro|og|ca| |rproverer|s car a||oW us |o recover ard pu| |o use ||e erergy, W||c| Wou|d
o||erW|se oe Was|ed. lr ||a| process, ||e reed lor reW erergy projec|s car oe reduced,
resources car oe preserved, ard erergy cos|s ard erv|rorrer|a| darage car oe r|r|r|zed,
ard ||ese oerel||s car oe ||e grea|es| W|er aourdar| rereWao|e o|orass |s ||e poWer
gerera||or lue|. l|g| pressure ard ||g| |erpera|ure cyc|es are cruc|a| lor |rcreas|rg ||e
opera||rg ell|c|ercy ard ||e poWer ou|pu| lror ||e 8|orass loWer l|ar|s. T|e c|o|ce ol ||e
|eve| ol ||e pressure ard |erpera|ure lor ||e cyc|e deperds or ||e |eve| ol corl|derce |r ||e
p|ar| opera|ors, qua|||y ol ||e leed Wa|er ard ||e Wa|er |rea|rer| sys|ers ava||ao|e ard ||e
cos| ol ||e ||g| pressure| |erpera|ure oo||er ard Turoo gerera|or sys|ers ard ||e l|rarc|a|
oerel||s rea||zao|e lror ||e poWer p|ar| oy Way ol ||e sa|e ol ||e expor|ao|e poWer.
T|errodyrar|ca||y, erergy recovery lror ||e bar||re Cyc|e |s rore deperder| or ||e s|ear
|r|e| |erpera|ure ||ar ||e pressure ard ||e ||g|er ||e |r|e| s|ear |erpera|ure, ||g|er ||e
cyc|e ell|c|ercy. loWever, ||e prac||ca||y a||a|rao|e ||r||s ol |erpera|ures are |rl|uerced oy ||e
re|a||urgy ol ||e oo||er |uo|rg, p|p|rg ard ||e |uro|re corporer|s ard ||e corp|ex||y ol ||e
Creep la||gue |r|erac||or lor ||e ra|er|a|s a| ||g|er |erpera|ures.
Terpera|ures up|o 400
0
C requ|re ||e use ol ord|rary caroor s|ee| ard oeyord 400
0
C |oW
a||oy s|ee|s are erp|oyed. Aoove 500
0
C, ||e requ|rerer|s oecore s|r|rger| ard expers|ve
ard aoove 550
0
C, ||e requ|rerer|s are very s|r|rger| ard pro||o|||ve|y expers|ve. l| |s
ex|rere|y |rpor|ar| ||a| ||e se|ec||or ol ||e |erpera|ure |s dore |eep|rg |r r|rd ||e ra|ure ol
||e |rdus|ry. Cors|dera||ors suc| as cos|, ra|r|a|rao||||y, prov|s|or ol adequa|e sale|y
rarg|rs, ||e exper|erce ol ||e |rdus|ry so lar ard ||e |eve| ol ||e opera||rg persorre|
ava||ao|e |r ||e |rdus|ry, lorce us |o a se|ec||or ol arourd 485
0
C as ||e prac||ca| ||r|| lor ||e
s|ear |erpera|ures. l| |s a|so |rpor|ar| |o |eep |r r|rd ||a| ||e super|ea|ed s|ear
|erpera|ure resporse |s a |||||e erra||c, ever W||| a good s|ear |erpera|ure cor|ro| sys|er,
10 MW Biomass Based Power Plant ABEIL
ra|r|y oecause ol ||e ra|ure ol ||e lue| ard ||e d|ll|cu||y |o ersure a correc||y re|ered
quar|||y ol lue| l|oW |o ||e oo||er. lror |||s po|r| ol v|eW a|so 485
0
C |s a sale se|ec||or.
loo||rg lror pure|y ||e Cyc|e Fll|c|ercy po|r| ol v|eW, W||| ||e se|ec||or ol 485
0
C as ||e
s|ear |erpera|ure, ||e T|errodyrar|cs |aWs, |yp|ca| cors|ruc||or ol ||e |uro|re o|ad|rg ard
||e prac||ca| ex|er| ol s|ear expars|or poss|o|e |r ||e |uro|res, d|c|a|e ||e ||r||s ol cyc|e
pressure. Keep|rg ||e aoove |erpera|ure, ||ere |s a |||||e ||errodyrar|c ell|c|ercy advar|age
|o oe ga|red oy pressures exceed|rg o7 a|a.
T|e cyc|e parare|ers are dec|ded as o4 A|a ard 480
0
C a| ||e |uro|re ||ro|||e va|ve |r|e|.
Correspord|rg|y ||e oo||er ou||e| parare|ers s|a|| oe o7 A|a ard 485
0
C, accour||rg lor ||e
pressure ard |erpera|ure |osses |r ||e p|p|rg.
As ||e proposed poWer p|ar| W||| oe opera||rg W||| ||e oo||er ou||e| s|ear parare|ers ol o7
A|a ard 485 5
0
C, a leed Wa|er raragerer| prograr W||| oe |rp|erer|ed W|ereoy ||e
corp|e|e leed Wa|er requ|rerer|s ol ||e oo||er W||| oe re| esser||a||y oy ||e cordersa|e. T|e
s|ear Cordersa|e W||| oe ava||ao|e a| 45
0
C ard W||| oe d|rec||y used |r ||e leed Wa|er c|rcu||,
a|||oug| W||| cer|a|r ror||or|rg lor cer|a|r c|rcu||s. T|e ra|e up lor ||e p|ar| opera||or W||| oe
der|rera||zed Wa|er ard a 0er|rera||zed Wa|er |rea|rer| p|ar| ol adequa|e capac||y W||| oe
prov|ded.
T|e oo||er oe|rg proposed lor ||e o|orass poWer p|ar|, W||| oe W||| ||e s|ear parare|ers ol
o7 A|a ard 485 5
0
C a| ||e oo||er ou||e|. T|e oo||er W||| oe des|gred W||| a |rave|||rg gra|e
W||| e|ec|r|c dr|ve |o ourr ||e o|orass. T|e s|ear |o o|orass percer|age W||| oe ac||eved W|||
a r|r|rur ell|c|ercy ol 80 W||| ||e dr|ed o|orass.
T|e poWer gerera||or |uro|re W||| oe a corders|rg rac||re. T|e |uro|re s|ear |r|e|
parare|ers W||| oe o4 a|a ard 480
0
C. T|e poWer p|ar| W||| oe opera||rg lor rear|y 330 days.
T|e oo||er W||| oe opera||rg or 100 ol eac| o|orass ard a|so |r coro|ra||or ol var|ous
o|orasses.
T|e poWer gerera||or cyc|e W||| oe prov|ded W||| a deaera|or serv|rg ||e dua| purpose ol
deaera||rg ||e leed Wa|er as We|| as |ea||rg ||e leed Wa|er W||| ||e ex|rac||or s|ear. T|e
deaera|or W||| oe opera||rg a| 2.7 a|a pressure, W||| ||e deaera|ed leed Wa|er |erpera|ure a|
105
0
C. T|e poWer gerera||or |r ||e |uroo gerera|or W||| oe a| 11 |v |eve|. T|e |uroo gerera|or
10 MW Biomass Based Power Plant ABEIL
W||| oe opera||rg |r para||e| W||| ||e A3F8 0r|d. T|e er||re poWer requ|rerer|s ol ||e p|ar|
ard ||e poWer requ|rerer|s ol ||e aux|||ar|es arour||rg |o 1 |w(approx) ol ||e poWer p|ar|
W||| oe re| oy ||e poWer gerera|ed |r ||e reW |uroogerera|or. T|e oa|arce ol ||e poWer
gerera|ed |.e.10 |w |r ||e p|ar| W||| oe expor|ed |o ||e gr|d.
T|e expor|ao|e poWer W||| oe s|epped up |o 132 |v ard W||| oe correc|ed |o Jag| boad suo-
s|a||or 132|11 |v ol A3F8 |oca|ed a| 1-2 |rs d|s|arce. Adequa|e space ard |rarslorrer
capac|||es are ava||ao|e a| ||e suo-s|a||or, lor rece|v|rg ||e expor|ao|e quar|ur ol poWer lror
||e poWer p|ar|.
A|| ||e p|ar| ard sys|ers s|a|| oe des|gred |o ac||eve ||e oes| poss|o|e ell|c|ercy urder ||e
spec|l|ed opera||rg cord|||ors. T|e poWer p|ar| cyc|e s|a|| oe des|gred W||| ore 0eaera|or lor
leed Wa|er |ea||rg. T|e s|ear requ|rerer|s ol ||e deaera|or s|a|| oe re| W||| ||e ex|rac||or
lror ||e |uro|re & |oW |oad lb03.
T|e corp|e|e p|ar| |rs|rurer|a||or ard cor|ro| sys|er s|a|| oe oased or 0|s|r|ou|ed Cor|ro|
3ys|er (0C3) p|||osop|y, cover|rg ||e |o|a| lurc||or|rg requ|rerer|s ol reasur|rg,
ror||or|rg, a|arr|rg ard cor|ro|||rg, |ogg|rg, sequerce |r|er|oc|s ard equ|prer| pro|ec||or
e|c.
T|e as| co||ec||or po|r|s are, 0ra|e as| lror ||e lurrace oo||or ard l|y as| lror ||e A|r
lea|ers ard F|ec|ro 3|a||c lrec|p||a|or |oppers. As| |ard||rg sys|er W||| |ave a coro|ra||or
ol suorerged scrapper corveyor or preura||c corveyors. A|| ||e as| s|a|| oe |a|er ard
s|ored |r o|rs ard d|sposed oll |r |ruc|s |o oe used as |ardl||| or |o oe used as ru|r|er|s |o ||e
l|e|ds, or |o oe d|sposed ol |o 8r|c| K||r 0Wrers.
T|e op||rur arrargerer| ol ||e equ|prer| s|a|| oe de|err|red oy ||e cors|dera||or ol
lurc||ora| requ|rerer|s, ecorory ol equ|prer| suppor|s, |rs|a||a||or ard ra|r|erarce access
requ|rerer|s.
T||s sec||or ol ||e repor| g|ves ||e oas|c cr||er|a lor des|gr ol ||e poWer p|ar|. T|e des|gr
parare|ers |||e ||e s|ze, |ayou|, ra||rgs, quar||||es, ra|er|a|s ol cors|ruc||or, |ype ol
equ|prer| e|c., descr|oed |r |||s repor| are approx|ra|e. Necessary c|arges cou|d occur as
||e de|a||ed erg|reer|rg ol ||e p|ar| progresses, ard suc| c|arges are perr|||ed as |org as
||e de|a||ed erg|reer|rg ol ||e p|ar| ac||eves ||e |r|er| ol |||s sc|ere.
10 MW Biomass Based Power Plant ABEIL
4.1 AMBIENT CONDITIONS
l|ar| F|eva||or aoove |ear 3ea leve| (|3l) . 2o2 re|ers
4.1.1 T"-/"%a#)%"s
|ax|rur day |erpera|ure . 37 C
||r|rur day |erpera|ure . 7 C
Average day |erpera|ure . 30 C
l|ar| des|gr |erpera|ure (dry ou|o) . 35 C
l|ar| des|gr We| ou|o |erpera|ure . 27 C
l|ar| des|gr |erpera|ure lor e|ec|r|ca| equ|prer| . 45 C
4.1.2 R"a#i$" H)-i.i#8
|ax|rur . 85.0
||r|rur . 45.0
l|ar| des|gr re|a||ve |ur|d||y . o0.0
4.1.3 P%"ci/i#a#i*!
To|a| Arrua| ba|rla|| . 1500 -2o00 rr
4.1.4 (i!.
0es|gr ard ve|oc||y . As per l3. 875
4.1.' S"is-ic C*"++ici"!#
0es|gr . As per l3. 893
4.2 DESIGN AND GUARANTEE FUEL
T|e des|gr ard guarar|ee lue| lor ||e poWer p|ar| |s r|ce |us| ard Wood. 0e|a||ed ava||ao||||y
|s g|ver |r C|ap|er 3.
4.3 RA( (ATER
T|e raW Wa|er supp|y W||| oe lror cara| | oore We||s. T|e d|s|arce ol cara| lror poWer p|ar| |s
2 Krs. T||s raW Wa|er |s used as a ra|eup ol ||e |osses |r ||e oo||er o|oW doWr, coo||rg
|oWer o|oW doWr, serv|ce Wa|er e|c. T|e raW Wa|er requ|rerer| lor poWer p|ar| |s 1980 Kl per
day. 8oreWe||s are |o oe dug. T|e raW Wa|er W||| oe ara|yzed.
10 MW Biomass Based Power Plant ABEIL
4.4 MAIN PLANT AND EHUIPMENT
4.4.1 S#"a- G"!"%a#*% 4 A)Biia%i"s
T|e s|ear gerera||rg sys|er lor ||e poWer p|ar| W||| use o|orass co||ec|ed lror ||e l|e|ds,
sugar |rdus|ry, ard r|ce r|||s. 8o||er W||| oe des|gred |o l|re ||e o|orass |||e co||or s|a||s, ard
rus|ard s|a||s lror crops, W||| a |ax|rur Cor||ruous ba||rg (|Cb) ol 50 |p|, W||| ||e
ou||e| s|ear parare|ers a| o7 A|a ard 485C. T|e var|a||or or ||e super|ea|er ou||e|
|erpera|ure s|a|| oe 5 C. T|e corous||or sys|er ol ||e oo||er s|a|| oe |rave|||rg gra|e W|||
spreader s|o|er. T|e oo||er ell|c|ercy, l|r|rg 100 rus|ard s|a||s, s|a|| oe a r|r|rur ol 80.0
or ||e 0Cv oas|s. T|e dus| corcer|ra||or |r ||e l|ue gases |eav|rg ||e oo||er s|a|| oe a
rax|rur ol 115 rg|Nr.
T|e des|gr ol ||e oo||er s|a|| oe ol o|-drur, ra|ura| c|rcu|a||or, rad|ar| lurrace W||| Wa|er
coo|ed rerorare Wa||s, |Wo-s|age super|ea|er W||| |r|ers|age desuper|ea|er ard oa|arced
dral|. T|e oo||er s|a|| oe |op suppor|ed ard s|a|| oe ser|-ou|door |ype. T|e oo||er s|a|| oe
capao|e ol a pea| gerera||or ol 110 ol ||e |Cb gerera||or lor a per|od ol ore (1) |our |r a
s||l|. T|e opera||rg excess a|r percer|age a| ||e ou||e| ol ||e oo||er s|a|| oe |ess ||ar 30.
+) &oier ,eed -ater
T|e oo||er s|a|| oe capao|e ol opera||rg W||| ||e lo||oW|rg leed Wa|er qua|||y
requ|rerer|s
pl . 8.8-9.2
0xyger . 0.005 ppr
lardress . 0
To|a| lror . 0.01 ppr
To|a| Copper . 0.01 ppr
To|a| 3|||ca . 0.02 ppr
lydraz|re . 0.01-0.02 ppr
3pec|l|c e|ec|r|ca| corduc||v||y . 0.5 r|cro o|rs | cr
A| 25 C reasured al|er ca||or exc|arger |r ||e l + lorr ard al|er C0
2
rerova|
(rax)
.) "tea% /urity
T|e oo||er s|a|| oe capao|e ol supp|y|rg ur|r|errup|ed s|ear a| ||e |Cb ra||rg W|||
lo||oW|rg s|ear pur||y |eve|s.
To|a| d|sso|ved so||ds . 0.1 ppr (rax)
3|||ca (rax) . 0.02 ppr
10 MW Biomass Based Power Plant ABEIL
0) /erfor%ance $uarantee !ests
8o||er ell|c|ercy a| |Cb or 0Cv oas|s W|||e l|r|rg rus|ard s|a||s.
8o||er ell|c|ercy a| |Cb or 0Cv oas|s W|||e l|r|rg co||or s|a||s.
Aux|||ary poWer corsurp||or urder |Cb opera||rg cord|||ors.
3|ear pur||y lor a|| opera||rg |oads.
0us| corcer|ra||or |r ||e l|ue gases |eav|rg ||e F3l, W|||e l|r|rg r|ce |us|.
T|e oo||er W||| oe ol ru|||lue| |ype, W||| prov|s|or |o ourr |rd|v|dua| o|orass W|||
100. T|e 3|ac| s|a|| oe ol bCC cors|ruc||or, 50 r|r ||g| W||| |o|a| |r|erra|
relrac|ory or|c| ||r|rg.
4.4.2 T)%>* ="!"%a#*% 4 A)Biia%i"s
T|e |uroo gerera|or s|a|| oe a o|eed cur corders|rg rac||re. T|e o|eed s|a|| oe a| 2.5 A|a.
T|e lo||oW|rg s|a|| oe ||e sa||er| des|gr parare|ers. T|e speed ol ||e |uro|re s|a|| oe approx.
8000 rpr.
3|ear l|oW a| ||e |uro|re s|op va|ve a| |uro|re |Cb (|g||r) . 50,000
3|ear pressure a| ||e |uro|re s|op va|ve (A|a) . o4
3|ear |erpera|ure a| ||e |uro|re s|op va|ve (C) . 480
Corderser opera||rg pressure (A|a) . 0.1
Corderser coo||rg Wa|er |r|e| |erpera|ure (C) . 32.0
loWer lac|or (|agg|rg) . 0.8
0erera||or vo||age (|v) . 11.0 + 10
Aro|er| |erpera|ure lor e|ec|r|ca| equ|prer| des|gr (C) . 45.0
lara||e| opera||or W||| gr|d . bequ|red W||| A3F8 gr|d.
0r|d vo||age . 132 |v
0u|y requ|rerer|s . Cor||ruous 8000 |rs.
Corderser s|z|rg . 30 |p|
3ys|er lrequercy . 50 5 lz
A|rosp|er|c Cord|||ors . 0us|y
|ax|rur ro|se pressure |eve|s a| 1.0 r|r d|s|arce lor ary . 85 d8(A)
Fqu|prer| lror ||e Fqu|prer| surlace s|a|| oe equa| |o or
less ||ar do (A)
4.4.3 P"%+*%-a!c" G)a%a!#"" T"s#s
T|e perlorrarce |es| s|a|| oe corduc|ed lor ||e lo||oW|rg parare|ers as per A3|F lTC o
ard 0lN 1943.
loWer ou|pu| a| gerera|or |err|ra|s W||| ||e |r|e| s|ear parare|ers ol o4 A|a ard
480C spec|l|ed poWer lac|or ard coo||rg Wa|er |r|e| |erpera|ure ol 32C. 8o|| ||e
ex|rac||ors s|a|| oe a| ||e |rd|ca|ed Norra| l|oW cord|||ors.
urcor|ro||ed ex|rac||or pressure ard |erpera|ure W||| ||e |r|e| s|ear parare|ers ol
o4 A|a ard 480 C.
Aux|||ary poWer corsurp||or urder guarar|eed cord|||ors.
10 MW Biomass Based Power Plant ABEIL
Coo||rg Wa|er corsurp||or urder guarar|eed cord|||ors.
|ax|rur |erpera|ure r|se |r ||e gerera|or W|rd|rgs.
lea| ra|e urder guarar|eed cord|||ors.
4.' AUIILIARY PLANT AND EHUIPMENT
4.'.1 Bi*-ass Ha!.i!=
T|e lue| lor ||e poWer p|ar| |s a r|ce |us| ard Wood. T|ere W||| oe ore separa|e our|er lor
|us| ard Wood. T|e lue| lror ||e s|orage |s corveyed |o ||e oo||er oy a coro|ra||or ol oe||
corveyors. T|e sys|er s|a|| |ave prov|s|or lor re|urr|rg ||e excess lue| |o ||e s|orage yard
lror ||e oo||er. T|e lue| |ard||rg sys|er s|a|| oe des|gred lor a capac||y ol 1o Tll. A||oWao|e
|rc||ra||or lor ||e oe|| corveyors |s 18. T|e oe|| speed s|a|| oe approx|ra|e|y 1.0 r|sec.
4.'.2 As? Ha!.i!=
T|e as| |ard||rg sys|er erv|saged lor ||e poWer p|ar| |s ol |Wo |ypes.
0rav||y sys|er lor l|y as|
lreura||c 3ys|er.
T|e as| |ard||rg sys|er s|a|| oe des|gred |o |a|e care ol 100 o|orass ourr|rg. T|e |o|a|
as| quar|||y gerera|ed |r ||e oo||er, oy ||e ourr|rg ol |us| |s approx|ra|e|y 1875 |g||r. T||s
as| cor|er| |s rax|rur, as Wood W||| gerera|e or|y 280 |gs||r ol as|. As| reroved lror ||e
gra|e |s approx|ra|e|y 750 |g||r ard ||e l|y as| quar|||y |s approx|ra|e|y 1125 |g||r. T|e as|
ders||y |s 120 |g|r.
T|e as| rece|ved |r ||e gra|e d|sc|arge |oppers W||| oe arourd 500C, W||| as| |urps ol s|ze
200 rr rax|rur. T|e as| lror as| r|dd|rg |opper W||| oe dry ard poWdery |r ra|ure ard
occas|ora||y W||| |o| so||ds. T|e |erpera|ure ol ||e as| W||| oe arourd 200C rax|rur.
T|e l|y as| lror F|ec|ros|a||c lrec|p||a|or loppers W||| oe dry ard poWdery |r ra|ure ard
occas|ora||y W||| |o| so||ds. T|e |erpera|ure ol as| W||| oe arourd 200C rax|rur.
T|e l|y as| lror ||e A|r lea|er lopper W||| oe dry ard poWdery |r ra|ure ard occas|ora||y W|||
|o| so||ds. T|e |erpera|ure ol ||e as| W||| oe arourd 250C rax|rur.
10 MW Biomass Based Power Plant ABEIL
4.'.2 C**i!= T*5"%
T|e coo||rg |oWer s|a|| oe bCC cour|er l|oW |rduced dral| coo||rg |oWer ol capac||y ol
1800 r||r capac||y |av|rg |Wo (2) ce||s. T|e coo||rg |oWer s|a|| oe des|gred lor a coo||rg
rarge ol 8C, ard ar approac| ol 5 C W|||e opera||rg urder ||e a|rosp|er|c We| ou|o
|erpera|ure ol aoou| 27C. T|e coo||rg |oWer s|a|| oe ol bCC cors|ruc||or. T|e bCC lrare
ol ||e |oWer s|a|| oe |r|egra| W||| ||e oas|r. T|e s|ruc|ure s|a|| oe des|gred lor W|rd ard o||er
|oad as per l3. 875 ard ear||qua|e res|s|arce as per l3. 1893. T|e coo||rg |oWer s|a|| oe
carelu||y s||ed suc| ||a| ||ere |s ro re-er|er|a|rrer| ol ||e vapors |r |o ||e coo||rg |oWer.
4.'.3 P)-/s
T|e |ead|l|oW c|arac|er|s||c ol purps W||| oe suc| ||a| ||e |ead cor||ruous|y r|ses W|||
decreas|rg capac||y ur||| a rax|rur |ead |s reac|ed a| zero l|oW. |ax|rur rurou| l|oW
s|ou|d a| |eas| oe 130 ol du|y po|r| l|oW.
T|e s|u| oll |ead s|ou|d oe a| |eas| 1.1 ||res ||e du|y po|r| |ead ard s|ou|d ro| oe rore
||ar 1.2 ||res ||e du|y po|r| |ead.
T|e poWer curve s|ou|d oe ror-over|oad|rg |ype W||| ||e rax|rur poWer occurr|rg a| or
rear du|y po|r| or |oWards rax|rur rurou| l|oW.
Nl3lb curve s|ou|d oe a cor||ruous|y r|s|rg ore |r ||e rarge ol opera||or, lror ||e r|r|rur
l|oW |r ||e rarge |o ||e rax|rur l|oW |r ||e rarge. bequ|red Nl3l va|ues s|a|| ro| exceed
ava||ao|e va|ues over ||e er||re rarge lror r|r|rur |o ra|ed l|oW.
T|e ell|c|ercy curve s|ou|d oe la|r|y l|a| |r ||e rarge ol +1 ol ||e 8Fl l|oW. T|e du|y po|r| ol
||e equ|prer| s|ou|d prelerao|y ||e |r |||s l|a| reg|or, ou| ro| a| a l|oW ||g|er ||ar ||e 8Fl
l|oW.
4.'.4 C*!."!sa#" S8s#"-
T|e cordersa|e lror ||e surlace corderser ard ||e cordersa|e lror ||e process p|ar| W|||
oe used |o ree| ||e corp|e|e leed Wa|er requ|rerer|s ol ||e ||g|-pressure oo||er. urder ||e
rorra| c|rcurs|arces ||e ra|e up Wa|er lor ||e cyc|e W||| oe 0er|rera||zed Wa|er.
4.'.' DM Pa!#
10 MW Biomass Based Power Plant ABEIL
T|e 0| p|ar| s|a|| oe des|gred |o |ave s|rg|e s|rear W||| a capac||y ol 8 Tll. T|e 0| p|ar|
s|a|| oe des|gred oased or ||e raW Wa|er ara|ys|s lurr|s|ed e|seW|ere |r |||s sec||or ol |||s
repor|. 0.|.Tar| capac||y s|a|| oe 3o r
3
.
T|e der|rera||zed Wa|er qua|||y a| ||e ou||e| ol ||e 0| p|ar| s|a|| oe as lo||oWs.
lardress (ppr) . 0
pl _ 25 C . 8.8-9.2
Corduc||v||y _ 25C (r|cros|erers|cr) . 0.05
0xyger (rax) (ppr) . 0.005
To|a| |ror (rax) (ppr) . 0.01
To|a| copper (rax) (ppr) . 0.01
To|a| s|||ca (rax) (ppr) . 0.02
bes|dua| lydraz|re (ppr) . 0.01-0.02
T|e raW Wa|er a| ||e |r|e| ol ||e 0| p|ar| W||| oe de||vered a| a pressure ol 3.0|g|cr. T|e
|rea|ed Wa|er a| ||e ou||e| ol ||e 0| p|ar| W||| oe de||vered a| a pressure ol 3.0 |g|cr.
A|| vesse|s s|a|| oe des|gred W||| adequa|e lree ooards. 0r|y sear|ess p|pe s|a|| oe used
W|erever ruooer ||r|rg |s dore. A|| laor|ca|ed vesse|s s|a|| oe des|gred accord|rg |o l3
2825.T|e regererar|s |||e lydroc||or|c ac|d ard Caus||c 3oda s|a|| oe s|ored |r ou|| |r ||e
0| p|ar| prer|ses, ard purped |o ||e 0| p|ar| lor regerera||or. |arua| |ard||rg ol ||e
regererar|s s|a|| oe avo|ded |o ||e rax|rur ex|er|.
Adequa|e|y s|zed reu|ra||z|rg p|| s|a|| oe prov|ded rear ||e 0| p|ar| lor co||ec||rg ||e
d|sc|arges lror ||e 0| p|ar| ard ellec||ve|y reu|ra||z|rg ||e sare oelore purp|rg ||e Was|e
|o ||e p|ar|'s ell|uer| |rea|rer| sys|er.
4.'.< V"ss"s 4 H"a# EBc?a!="%s
T|e des|gr s|a|| oe as per A3|F 3ec. vlll, lFl & TF|A. A|| |ea| exc|argers ard vesse|s lor
s|ear app||ca||or s|a|| oe des|gred lor lu|| vacuur cord|||ors. T|e |ea| exc|argers s|a|| oe
prov|ded W||| s|ar|up ver| correc||ors. T|e des|gr s|a|| |ave prov|s|or lor corp|e|e dra|rage
or oo|| s|e|| ard |uoe s|des. T|e |ea| exc|argers s|a|| oe prov|ded W||| erergercy dra|rs,
Tuoe & 3|e|| s|de sale|y va|ves, ard |rd|v|dua| oypasses W||| rarua| va|ves.
A r|r|rur corros|or a||oWarce ol 1.o rr s|a|| oe prov|ded. T|e |uoe ourd|e s|a|| oe ol
rerovao|e |ype. T|e |uoe ra|er|a| s|a|| oe s|a|r|ess s|ee|, ur|ess o||erW|se spec|l|ed |r ||e
spec|l|ca||ors.
10 MW Biomass Based Power Plant ABEIL
4.'.; Ta!As
T|e poWer p|ar| |ar|s W||| |ave s|orage capac|||es as requ|red oy des|gr ol ||e sys|ers.
Tar|s W||| oe ol ||e c|osed |op |ype. Tar|s W||| oe laor|ca|ed |r accordarce W||| gu|de||res
es|ao||s|ed oy All or AwwA as de|err|red oy ||e serv|ce. A corros|or a||oWarce ol 1.5 rr
s|a|| oe prov|ded.
0verl|oW correc||ors ard ||res s|a|| oe prov|ded W|ere requ|red ard W||| oe a||eas| ore p|pe
s|ze |arger ||ar ||e |arges| |rpu| ||re or coro|ra||or ol |rpu|s ||a| car d|sc|arge
s|ru||areous|y.
|a|r|erarce dra|r correc||ors s|a|| oe prov|ded ol ar adequa|e s|ze |o lac||||a|e dra|rage ol
|ar|s W||||r a reasorao|e ||re. |ar|o|es W|ere prov|ded or |ar|s ard pressure vesse|s s|a||
oe ol s|ze 450 N8 s|ze. ladders ard c|earou| doors s|a|| oe prov|ded or |arge |ar|s. 0|
Wa|er |ar| s|a|| oe |r|erra||y ||red W||| ra|ura| ruooer or pa|r|ed W||| ||ree coa|s ol Fpoxy
Coa||rg.
4.'.7 Pi/i!=
A|| p|p|rg sys|er s|a|| oe des|gred as per A3|F 8 31.1. lr add|||or s|a|u|ory requ|rerer|s ol
lrd|ar 8o||er begu|a||ors (l8b) s|a|| oe corp||ed W||| lor ||ose ||res urder ||e purv|eW ol
l8b. 3|ress ara|ys|s s|a|| oe carr|ed ou| lor a|| poss|o|e opera||rg rodes ard s|a|| oe as per
A3|F 8 31.1 requ|rerer|s. 3uppor|s, gu|des, 0|rec||ora| bes|ra|r|s ard Arc|ors s|a|| oe
se|ec|ed |o sa||sly a|| ||e opera||rg cord|||ors.
+) /ipe "i'ing
A|| p|p|rg s|a|| oe s|zed cors|der|rg ||e a||oWao|e ve|oc||y ard a||oWao|e pressure
drop |r ||e sys|er. T|e sugges|ed l|oW ve|oc|||es ol var|ous red|urs are
3uper|ea|ed . 40 |o 55 r|sec
3a|ura|ed s|ear . 15 |o 30 r|sec
8o||er leed Wa|er lurp suc||or . < 1 r|sec
lurp d|sc|arge . 2.5 |o 4 r|sec
wa|er
lurp suc||or . < 1 r|sec
lurp d|sc|arge . 2.5 r|sec
Cordersa|e
lurp suc||or . 0.o |o 0.7 r|sec
lurp d|sc|arge . 2.5 r|sec
10 MW Biomass Based Power Plant ABEIL
Corpressed a|r . 12 |o 18 r|sec
luoe o||
lurp suc||or . 0.3 |o 0.4 r|sec
lurp d|sc|arge . 1.0 r|sec
.) /iping *aterias
T|e p|p|rg ra|er|a| se|ec||or s|a|| oe oased or ||e lo||oW|rg recorrerda||ors.
lor |erpera|ure aoove 510 C, 3A 335 0r. l22 s|a|| oe used.
lor |erpera|ure 400 C |o 510 C, 3A 335 0r. l11|l12|l22 s|a|| oe used.
lor |erpera|ure 399 C ard oe|oW, 3A 10o 0r. 8|C or A3T| A-53 sear|ess
s|ee| s|a|| oe used.
A|| p|pe l||||rgs o||er ||ar ||ose rer||ored s|a|| corlorr |o A3T| A 234
s|ardard ard d|rers|ors as per AN3l 8 1o.9 | 8 1o.28 | 8 1o.11
lor coo||rg Wa|er, raW Wa|er, serv|ce Wa|er, sale|y | re||el va|ve ex|aus| l3.
1239 | l3. 3589 Fbw|Flw p|pes s|a|| oe used.
lor serv|ce a|r app||ca||ors ||e p|p|rg s|a|| oe l3. 1239 8|ac| |ed|ur C|ass.
lor |rs|rurer| a|r app||ca||ors. 0a|var|zed p|pe (lror l|pe) |o l3. 1239 lar| l
s|a|| oe used.
T|e l||||rgs lor Fbw app||ca||ors s|a|| oe as per l3 . 1239 lar| ll.
4.'.1 I!s)a#i*!
A|| exposed por||or ol ||e p|ar| W||c| opera|e a| |erpera|ure ol o0C ard aoove dur|rg
rorra| opera||or s|a|| oe ||erra||y |rsu|a|ed so ||a| ||e |erpera|ure or ||e ou|er surlace ol
||e c|add|rg s|a|| ro| exceed 20C aoove aro|er|, oased or ar aro|er| |erpera|ure
|rd|ca|ed |r s||e da|a. T|e spec|l|ed |rsu|a||or |||c|ress s|a|| ro| |rc|ude ||e |||c|ress ol W|re
re|||rg, l|r|s||rg cerer| or ary o||er l|r|s||rg or Wea||erprool|rg app||ca||or. lrsu|a||or s|a||
ro| l||| ||e cor|ours ol ||e expars|or oe||oWs. l|p|rg ard equ|prer| ||a| are ro| |rsu|a|ed ou|
|av|rg a surlace |erpera|ure exceed|rg 50C s|a|| oe |rsu|a|ed lor persorre| pro|ec||or.
lr relrac|ory Wa||s su||ao|e expars|or gaps s|a|| oe prov|ded a| regu|ar |r|erva|s.
4.< Ci$i 4 S#%)c#)%a
T|e re|rlorced corcre|e s|ruc|ures s|a|| oe des|gred |r accordarce W||| ||e |a|es| vers|or ol
l3. 45o, `Code ol prac||ce lor p|a|r ard re|rlorced corcre|e'. T|e s|ruc|ura| s|ee| des|gr s|a||
oe as per l3. 800. T|e des|gr W|rd speed ard se|sr|c||y s|a|| oe |r accordarce W||| l3. 875
ard l3. 1893 respec||ve|y.
10 MW Biomass Based Power Plant ABEIL
T|e s|ruc|ures s|a|| oe des|gred |o W|||s|ard ||e ca|cu|a|ed dead |oads, ||ve |oads, a|org W|||
||e W|rd ard se|sr|c |oads |r appropr|a|e coro|ra||ors recorrerded oy ||e Codes. T|e
r|r|rur dead ard ||ve |oads lor ||e des|gr ol ||e p|a|lorrs ard Wa||Ways s|a|| oe 500 |g|r.
3|ruc|ura| s|ee| s|apes, p|a|es ard o||er s|ruc|ura| ra|er|a|s s|a|| corlorr |o l3. 800, W||| a
r|r|rur y|e|d s|rerg|| ol 25 |g|rr ||e correc||or oo||s s|a|| corlorr |o l3. 13o7.
we|d|rg e|ec|rodes s|a|| oe as per Aw3. l30 re|rlorcerer| s|ee| oars s|a|| corlorr |o l3.
178o. A|| s|ruc|ura| s|ee| (l3 20o2) ard |3 reroers W||| oe pa|r|ed W||| |Wo coa|s ol red
ox|de z|rc c|rora|e pa|r| ard |Wo coa|s ol syr||e||c erare| pa|r|.
A|| lourda||ors s|a|| oe ol ||e spread loo||rg or ra| |ype. 3o|| oear|rg capac||y s|a|| oe 18
||r a| 2 |o 2.5 re|er dep|| ard se|||erer| s|a|| oe 25 rr a| a dep|| ol 2.0 r oe|oW grourd
|eve|. T|e aoove so|| oear|rg capac||y s|a|| oe ver|l|ed oy so|| |rves||ga||or oelore l|ra| des|gr.
T|e s||e |s assured |o oe re|a||ve|y l|a|, requ|r|rg r|r|ra| grad|rg ard |eve||rg (|eve||rg ard
grad|rg up|o 0.5 r). No rajor grad|rg | |eve||rg Wor| |s erv|saged.
A|| excava||or Wor| s|a|| oe dore oy corver||ora| rarua| re||ods or oy rec|ar|ca|
equ|prer| re||od (W|erever requ|red). lor suos|ruc|ures ard supers|ruc|ures ord|rary
lor||ard cerer| (grade 43) W||| oe used. 0rade ol corcre|e lor s|ear |uroogerera|or
lourda||ors s|a|| oe |-25 ard a|| o||er lourda||ors | pedes|a|s | ou||d|rgs e|c. s|a|| oe ol |-
20.
4.; E"c#%ica S8s#"-
A|| equ|prer| lor ||e poWer p|ar| s|a|| oe des|gred lor sa||slac|ory opera||or lor a ||le||re ol
r|r|rur 30 years urder spec|l|ed s||e cord|||ors. A|| equ|prer|s s|a|| oe su||ao|e lor ra|ed
vo||age ol 10 ard lrequercy ol 50 lz W||| 5 var|a||or ard 10 (aoso|u|e sur)
coro|red vo||age ard lrequercy var|a||or.
T|e gerera|or s|a|| oe ol syrc|rorous |ype W||| orus||ess exc||a||or sys|er ard s|a|| oe
des|gred lor ra|ed vo||age ard lrequercy ol 11 |v ard 50 lz, W||| correspord|rg var|a||ors ol
10 ard 5 respec||ve|y. T|e gerera|or s|a|| |ave c|osed c|rcu|| a|r-coo|ed sys|er W|||
ex|erra| Wa|er c|rcu|| (CACw coo||rg) ard ||e W|rd|rgs s|a|| |ave c|ass 'l' |rsu|a||or, W|||
|erpera|ure r|se ||r||ed |o c|ass '8' |rsu|a||or ||r||s, urder spec|l|ed coo||rg Wa|er ard aro|er|
a|r |erpera|ures.
10 MW Biomass Based Power Plant ABEIL
Aux|||ar|es ol ||e poWer p|ar| s|a|| oe correc|ed |o ||e 415 v |eve|, oy prov|d|rg ore (1)
ruroer 1.25 |vA, 11 | 0.433 |v d|s|r|ou||or |rarslorrer. T|e surp|us poWer lror ||e poWer
p|ar|, al|er leed|rg ||e |r-|ouse |oads(10|w), s|a|| oe expor|ed |o ||e A3F8 gr|d oy s|epp|rg
up ||e poWer |o 132 |v, ||roug| ore ruroer 12.5 |vA. 11|132 |v gerera|or |rarslorrer.
Trarsr|ss|or sys|er lor 132 |v W||| recessary |ar|ll re|er|rg ard o||er |err|ra| equ|prer|
s|a|| oe arrarged oe|Weer ||e p|ar| ard ||e A3F8's suos|a||or a| Jag| boad.
l| |s erv|saged |o s|ar| up ||e poWer p|ar| ur|| oy |rs|a|||rg 2x500 |vA 00 se|s.
0rce ||e poWer p|ar| |s ready |o |a|e-up ||e |oads, ||e T0 se| W||| oe rorer|ar||y
syrc|ror|zed W||| ||e 00 se| |o avo|d |r|errup||or ol supp|y |o ||e poWer p|ar| aux|||ary |oads
ard ||er ||e T0 W||| oe syrc|ror|zed W||| ||e gr|d ||roug| 12.5 |vA 132 | 11 |v |rarslorrer.
T|e ror|ra| vo||age ol ra|r 0C sys|er lor pro|ec||or ard cor|ro| sys|ers, |uro|re
erergercy o|| purps ard erergercy ||g|||rg s|a|| oe 110 v.
ul3 sys|er W||| ra|ed vo||age ol 220 v AC s|a|| oe erv|saged, lor ree||rg ul3 poWer
requ|rerer|s ol ||e p|ar| 0C3 ard o||er |rs|rurer|a||or | cor|ro| |oads, erergercy |uoe o||
purp.
A|| equ|prer| s|a|| corp|y W||| ||e app||cao|e prov|s|ors ol re|evar| l3|lFC|lFFF s|ardards,
as ||s|ed e|seW|ere |r |||s docurer|.
+1 &reakers for various syste%s sha be as beo(2
132 |v orea|er . 3lo c|rcu|| orea|er
11 |v orea|er . vC8 | 3lo C8
415 v orea|ers . A|r orea| c|rcu|| orea|er
A|| correc||ors a| 11 |v (oe|Weer 11 |v sW||c|gear ard gerera|or | gerera|or
|rarslorrer | d|s|r|ou||or |rarslorrer) s|a|| oe carr|ed ou| ||roug| 11 |v, uF grade,
arrored, XllF |rsu|a|ed cao|es. Correc||or oe|Weer secordary ol ||e d|s|r|ou||or
|rarslorrer ard ||e lCC | lare|s s|a|| oe ||roug| ror-segrega|ed p|ase ous-duc|,
W||| e|ec|ro|y||c grade a|ur|rur ous-oars ard a|ur|rur a||oy erc|osure. A|| o||er lT
correc||ors (poWer as We|| as cor|ro|) s|a|| oe W||| lvC |rsu|a|ed, arrored,
a|ur|rur | copper cao|es.
10 MW Biomass Based Power Plant ABEIL
.1 "i'ing of cabes sha be as foo(s2
Cao|es s|a|| oe se|ec|ed |o ||r|| ||e rax|rur vo||age drop a| equ|prer| |err|ra|s,
dur|rg rorra| opera||or ard s|ar||rg cord|||ors, |o oe We|| W||||r perr|ss|o|e va|ues.
Cao|es |r c|rcu||s cor|ro||ed oy c|rcu|| orea|ers s|a|| oe capao|e ol W|||s|ard|rg ||e
rax|rur sys|er lau|| currer|s |||| ||a| orea|er oper oy ra|r pro|ec||or. luse
pro|ec|ed cao|es s|a|| W|||s|ard rax|rur |e| ||roug| lau|| currer| lor luse opera||rg
||re. 11 |v grade cao|es s|a|| oe su||ao|e lor carry|rg rax|rur ear|| lau|| currer| ol
||e 11 |v sys|er lor 3 sec.
Currer| ra||rg ol ||e cao|es s|a|| oe ass|gred cors|der|rg cor||ruous corduc|or
|erpera|ure ol ro| rore ||ar 70C lor lvC ard 90C lor XllF. Cao|es s|ou|d a|so
oe s|zed |o carry sys|er lau|| currer| lor ||e dura||or spec|l|ed |r aoove W|||ou|
exceed|rg ||e |erpera|ure ||r|| ol 1o0C lor lvC ard 250 C lor XllF.
lor 415 v sys|er, AC8s s|a|| oe prov|ded lor ra||rg 800A ard aoove, ard luse sW||c|
| sW||c| luse ur|| s|a|| oe prov|ded lor |esser ra||rgs. |o|or leeders s|a|| |ave luse
sW||c| | sW||c| luse ur||s, over |oad re|ays ard a|r-orea| cor|ac|ors. |o|or ol ra||rg
aoove 37 |w s|a|| oe prov|ded W||| s|ar-de||a s|ar|ers, deperd|rg or app||ca||or, ard
s|a|| oe prov|ded W||| s|a||c ro|or pro|ec||or re|ays.
|o|or lor aux|||ar|es s|a|| oe ol ||ree-p|ase |rduc||or squ|rre| cage |ype excep| lor lar
ro|ors, W||c| car oe ol s||p-r|rg |ype lor ra||rgs aoove 90 |w. A|| ro|ors s|a|| |ave
c|ass 'l' |rsu|a||or, W||| |erpera|ure r|se ||r||ed |o c|ass '8' ||r||s urder spec|l|ed
aro|er| ard vo||age lrequercy cord|||ors.
4.;.1 Fa)# L"$"
A|| equ|prer| s|a|| oe des|gred |o W|||s|ard ||e rax|rur lau||, urder vo||age var|a||or ol
10, 25 |A lor 3 sec |r 33 |v & 11|v sys|ers ard 50 |A lor 1 sec |r 415 v sys|er.
0|s|r|ou||or |rarslorrer ard a|| accessor|es s|a|| oe capao|e ol W|||s|ard|rg lor |Wo secords
W|||ou| darage dur|rg ary ex|erra| s|or| c|rcu|| a| ||e |err|ra|.
A|| sW||c|gears, |CC & 0|s|r|ou||or 8oards s|a|| oe capao|e ol W|||s|ard|rg ||e rax|rur
lau|| currer|s ||a| ray ar|se, du|y cors|der|rg ||e rax|rur lau|| |eve|s or ||g| vo||age
sys|er, rega||ve |o|erarce or |rarslorrer |rpedarce ard rax|rur poss|o|e ro|or
10 MW Biomass Based Power Plant ABEIL
cor|r|ou||or lor rax|rur poss|o|e lau|| c|ear|rg ||re or u|||ra|e oac|up pro|ec||or ou| ro|
|oWer ||ar ore secord |r ary case.
4.;.2 D"=%"" *+ P%*#"c#i*!
11 |v 3W||c|gear . ll42
lT 3W||c|gear . ll52
3W||c|gear |oca|ed ou|doors . ll52
lT ousduc| erc|osure . ll52 (|r ||e |rdoor por||or)
ll55 (|r ||e ou|door por||or)
Cor|ro| pare| . ll42 (|r a|r-cord|||ored area)
ll52 (|r o||er area)
lus| ou||or s|a||ors . ll54 (|rdoor)
ll55 (ou|door)
3yrc|rorous gerera|or . ll54
lrduc||or ro|ors . ll54 (|rdoor)
ll55 (ou|doors)
4.;.3 N")#%a G%*)!.i!=
11 |v sys|er reu|ra| ear||||rg s|a|| oe |oW res|s|arce ear||ed |ype |o ||r|| ||e ear|| lau||
currer| |o 70 A, W||c| s|a|| oe ear||ed oy prov|d|rg reu|ra| grourd|rg res|s|or ol ||e reu|ra| ol
||e gerera|or.
A|| 415 v |rarslorrer reu|ra|s ard 132 |v |rarslorrer reu|ra| s|a|| oe so||d|y ear||ed ||roug|
oo||ed ||r|s.
T|e sys|er s|a|| oe corpa||o|e lor accep||rg | serd|rg s|gra|s lror | |o 0C3. w|rd|rg,
oear|rg ard coo||rg c|rcu|| (W|ere app||cao|e) bT0s s|a|| oe |oo|ed up |o 0C3 lor s|gra|
process|rg ard recessary |r|pp|rgs s|a|| oe arrarged lror 0C3, lor |r|pp|rg ol ||e
correspord|rg ro|or.
3|gra|s lror a|| |rarslorrers lor W|rd|rg |erpera|ures, o|| |erpera|ures, o|| |eve| gauges,
ouc||o|z re|ay ou|pu|s lor a|arr ard |r|pp|rgs s|a|| oe oroug|| |o 0C3.
3|a|us (0N|0ll|Tbll) ol a|| orea|ers, lT orea|ers |r lCCs ard a|| ro|or leeders s|a|| oe
oroug|| |o 0C3, lor p|ar| ror||or|rg. Cor|ro| ol ro|or leeders, as per sys|er requ|rerer|,
s|a|| a|so oe arrarged lor cor|ro| lror ||e 0C3 sys|er.
4.7 INSTRUMENTATION 4 CONTROL SYSTEM
10 MW Biomass Based Power Plant ABEIL
T|e p|ar|'s lrs|rurer|a||or ard Cor|ro| sys|er, oased or 0|s|r|ou|ed Cor|ro| 3ys|er
p|||osop|y, W||| oe des|gred |o prov|de ror||or|rg ard cor|ro| capao|||||es |o ersure sale ard
re||ao|e opera||or, r|r|r|ze opera|or rarua| ac||ors ard a|er| opera|ors |o ary cord|||ors or
s||ua||ors requ|r|rg rarua| |r|erver||or |r a ||re|y rarrer. T|e cor|ro| lurc||ors s|a|| oe
oac|ed-up oy |r|er|oc|s ard sale|y sys|ers, W||c| cause pre-p|arred ac||ors |r case W|ere
ursale cord|||ors deve|op las|er ||ar cor|ro|s or ||e opera|or car oe, expec|ed |o respord. A||
l& C equ|prer| W||| oe ol prover des|gr ard W||| oe se|ec|ed |o ac||eve ||g|es| |eve| ol p|ar|
ava||ao||||y ard lac||||a|e equ|prer| ra|r|erarce.
A|| l|e|d cor|ro| e|erer|s lor rodu|a||rg cor|ro|s W||| |ave ac|ua|ors ol preura||c |ype.
3|gra|s lror var|ous process parare|ers are e|ec|r|ca| s|gra|s gerera|ed oy l|e|d rour|ed
e|ec|ror|c |rarsr|||ers. T|e aoove s|gra|s are processed |r ||e 0C3 cao|re|s |o produce
e|ec|r|ca| s|gra| ou|pu| ol 4-20 rA, 0C, W||c| W||| oe corver|ed |o cor|ro| preura||c s|gra| ol
0.2-1.0 |g|cr(g), ||roug| F|l corver|ers |o opera|e ||e preura||c ac|ua|ors. A|| corpu|a||or
ard s|gra| cord|||or|rg ard cor|ro| lurc||or gerera||or W||| oe corl|gured |r ||e 0C3.
10 MW Biomass Based Power Plant ABEIL
'. DESCRIPTION OF THE MECHANICAL SYSTEMS IN THE PO(ER PLANT
'.0 GENERAL DESCRIPTION
T|e proposed poWer sys|er W||| cors|s| ol 1 ro. l|g|-pressure oo||er ol capac||y,50 Tll, o7
a|a 485
0
C ard 1 ro. 8|eed cur corders|rg s|ear |uro|re ol ror|ra| capac||y 11 |w. T|e
s|ear pressure a| ||e |r|e| ol ||e |uro|re W||| oe o4 a|a ard |erpera|ure 480
0
C.
Apar| lror ||e oo||er ard |uroogerera|or, ||e poWer p|ar| W||| cors|s| ol lue| |ard||rg sys|er,
oo||er leed Wa|er sys|er, coo||rg Wa|er sys|er, e|ec|r|ca| sys|er, poWer evacua||or sys|er,
cor|ro| sys|er, u||||||es |||e corpressed a|r sys|er, as| |ard||rg sys|er, l|re pro|ec||or
sys|er e|c.,
'.1 BOILER SYSTEM
'.1.1 B*i"%
T|e oo||er W||| oe des|gred lor l|r|rg o|orass |||e r|ce |us|, ard Wood. T|e super |ea|er ou||e|
s|ear W||| |ave a pressure ol o7 a|a ard a |erpera|ure ol 485
0
C. T|e oo||er W||| oe des|gred
lor ou|door |rs|a||a||or. T|e oo||er W||| |ave suo sys|ers |||e pressure par|s, leed|rg sys|er,
l|r|rg sys|er, dral| sys|er, leed Wa|er sys|er, F3l ard c||rrey.
'.1.2 P%"ss)%" /a%#s
T|e oo||er pressure par| cors|s|s ol a Wa|er-coo|ed lurrace, oo||er oar|, s|ear ard Wa|er
drurs, pr|rary ard secordary super|ea|ers, ecoror|zer, r|sers ard doWr corers.
8as|ca||y ||e oo||er W||| oe a rad|ar| lurrace, 8|-0rur, ra|ura| c|rcu|a||or, ser| ou|door |ype
W||| |Wo-s|age super|ea|er. T|e oo||er s|a|| oe des|gred W||| Wa|er coo|ed rerorare | l|r
We|ded Wa||s ard ||e relrac|ory Wor| s|a|| oe |ep| |o ||e oares| r|r|rur poss|o|e.
No |eader s|a|| oe p|aced |r ||e l|ue gas pa||. A|| |eaders |r ||e oo||er W||| |ave l|a| erd
covers. A r|r|rur ol |Wo |ard |o|es lor ||e purpose ol c|ear|rg ard |rspec||or s|a|| oe
prov|ded, lor eac| ol ||e |eaders, e|||er or ||e erd covers or or ||e oody ol ||e |eaders.
T|e oo||er W||| prelerao|y oe |op suppor|ed W||| adequa|e prov|s|ors lor ||e ||erra| expars|or
ol ||e oo||er |r a|| d|rec||ors.
10 MW Biomass Based Power Plant ABEIL
T|e oo||er W||| oe prov|ded W||| ore s|ear ard ore Wa|er drur ard drurs W||| oe ol lus|or
We|ded |ype. 8o|| ||e drurs W||| oe prov|ded W||| 3er|-F|||pso|da| d|s|ed erds l|||ed W||| 320
x 420 rr e|||p||ca| rarWays a| e|||er erd. T|e rarWay doors W||| oe arrarged |o oper
|rWards. T|e drur s|e||, d|s|ed erds ard ||e rarWay doors W||| corlorr |o 3A 515 0r. 70 or
equ|va|er| ra|er|a| spec|l|ca||or.
T|e s|ear drur W||| oe ||oera||y s|zed |o assure |oW s|ear space |oad|rg, W||| adequa|e
space |o accorroda|e ||e |r|erra|s. T|e drur des|gr pressure W||| |ave a r|r|rur rarg|r
ol o over drur opera||rg pressure.
T|e s|ear drur s|a|| oe prov|ded W||| |r|erra|s ol prover des|gr, s|a|| oe oo||ed |ype, ard ol
s|ze ||a| W||| erao|e rerova| ||roug| ||e rarWays. T|e sys|er ol |r|erra|s cors|s||rg ol ||e
pr|rary ard secordary separa|ors W||| ersure s|ear ol ||g|es| pur||y W||| d|sso|ved s|||ca
carry over ||r||ed |o a rax|rur ol 0.02 ppr, a| a|| |oads ol ||e oo||er. A|| ||e corporer|s ol
||e |r|erra|s, excep| ||e dryer screers, s|a|| oe caroor s|ee| ard ||e dryer s|a|| oe ol 304
s|a|r|ess s|ee|.
T|e recessary rozz|e correc||ors lor ||e lo||oW|rg, ou| ro| ||r||ed |o, s|ear ou||e|s, sale|y
va|ves, leed Wa|er |r|e|s, cor||ruous o|oW doWr, |eve| |rd|ca|ors, c|er|ca| leed|rg, ver|s ard
dra|rs, sarp||rg correc||ors, doWr corers W||| oe prov|ded or ||e drurs as app||cao|e. A||
rozz|e correc||ors or ||e drurs W||| oe ol We|ded |ype ard ||e leed Wa|er |r|e| W||| oe
prov|ded W||| a su||ao|y des|gred ||erra| s|eeve.
T|e recessary drur suspers|or | suppor| arrargerer|s s|a|| oe prov|ded.
+) ,urnace 3 -ater (a "yste%
T|e lurrace erve|ope W||| oe cors|ruc|ed ol lu||y Wa|er-coo|ed rerorare | l|r We|ded Wa||s
ard adequa|e|y suppor|ed. T|e cors|ruc||or W||| oe lu||y gas pressure ||g||, ard ||e lurrace
W||| oe s|rerg||ered oy prov|d|rg ouc|s|ay ard ||e-oar sys|er.
Necessary prov|s|ors W||| oe rade |r ||e lurrace lor adr||||rg ||e requ|red quar|||y ol over-
l|re a|r a| var|ous |eve|s.
Adequa|e ruroer ol |r|e| ard ou||e| |eaders, W||| ||e recessary s|uos, corrersura|e W|||
||e arrargerer| ol ||e lurrace W||| oe prov|ded. T|e doWr-corers supp|y p|pes ard re||el
|uoe s|z|rg W||| oe oased or ||e c|rcu|a||or ca|cu|a||ors.
10 MW Biomass Based Power Plant ABEIL
.) &ank !ubes
T|e oar| des|gr W||| oe ol |r||re arrargerer| ard ||e |uoe spac|rg W||| erao|e easy rerova|
ol ||e |uoes |r case ol ary la||ure. T|e oar| |uoes W||| oe exparded |r|o oo|| ||e |op ard ||e
oo||or drurs, ard ||e |uoes al|er expars|or W||| oe oe|| rou||ed. T|ere W||| oe adequa|e
approac| space |o ||e |uoes ol ||e oar| lor ra|r|erarce.
Adequa|e ruroer ol soo| o|oWers W||| oe prov|ded |o cover ||e rax|rur surlace area ol ||e
oar|. T|e l|ue gas ve|oc||y |r ||e oar| area W||| oe res|r|c|ed |o a rax|rur ol 15 re|er|sec.
0) "uperheater "yste%
T|e super |ea|er (3l) sys|er W||| oe ol TWo (2) s|age des|gr W||| |r|ers|age desuper|ea||rg
|o ac||eve ||e ra|ed s|ear |erpera|ure over o0 |o 100 |oad rarge. T|e super|ea|er W||| oe
ol corvec||or or a coro|ra||or ol corvec||or ard rad|a||or |ype arrarged |o g|ve ||e r|r|rur
re|a| |erpera|ure. T|e super|ea|er pressure drop, ||e |r|e| ard ou||e| |eader s|z|rg,
arrargerer| ard s|z|rg ol ||e|r respec||ve |r|e| ard |a|e oll correc||ors W||| oe so as |o g|ve
r|r|rur uroa|arce ard ||e |uoe e|erer| ra|er|a| se|ec||or W||| oe oased or ||e ac|ua| re|a|
|erpera|ure ca|cu|a||ors.
4) 5tte%perator "yste%
T|e spray |ype a||erpera|or sys|er |o cor|ro| ||e |erpera|ure ol ||e l|ra| super|ea|er ou||e|
s|ear |erpera|ure W||||r ||e spec|l|ed va|ue W||| oe prov|ded |r oe|Weer ||e |Wo s|ages ol ||e
super|ea|ers.
T|e desuper|ea||rg sys|er W||| oe corp|e|e W||| a|| requ|red cor|ro| va|ve, oypass, p|p|rg ard
suppor|s, e|c.
6) 7cono%i'er
T|e Fcoror|zer W||| oe |oca|ed |rred|a|e|y doWrs|rear ol ||e oo||er oar|. T|e des|gr W||| oe
ol oare |uoe cors|ruc||or W||| |r||re, cour|er l|oW, ard dra|rao|e arrargerer|.
T|e ecoror|zer W||| oe des|gred lor ar |r|e| leed Wa|er |erpera|ure ol 105C. T|e co||
arrargerer| W||| |a|e care ol proper ca|cu|a|ed erd gaps |o aver| gas oypass|rg ard ||e
corsequer| eros|or ol ||e e|erer| |uoes. Tuoes W||| oe ol sear|ess |ype.
10 MW Biomass Based Power Plant ABEIL
'.1.3 Ai% H"a#"%
T|e A|r |ea|er W||| oe arrarged as ||e |as| |ea| recovery sec||or doWrs|rear ol ||e
ecoror|zer. T|e A|r |ea|er W||| oe recupera||ve |ype W||| l|ue gas l|oW|rg |rs|de ||e |uoes ard
||e corous||or a|r l|oW|rg over ||e |uoes. T|e a|r |ea|er W||| oe arrarged W||| ||e |uoes |r ||e
ver||ca| d|rec||or. T|e |uoes excep| ||ose requ|red lor s|ay|rg purposes Wou|d oe exparded
|r|o ||e |uoe s|ee|s or oo|| erds.
T|e a|r |ea|er arrargerer| W||| prov|de lor adequa|e access lor rep|ac|rg ||e |uoes.
Cors|der|rg ||e ||g| ro|s|ure |r ||e l|ue gases, su||ao|e precau||ors s|ou|d oe |a|er |o
prever| ||e |uoe corros|or a| ||e a|r |r|e| s|de ol ||e a|r |ea|er. ll ||e a|r |ea|er |s des|gred
W||| rore ||ar a s|rg|e pass |r ||e a|rs|de su||ao|e gu|de vares W||| oe |rcorpora|ed |r ||e
correc||rg duc||rg |o prever| s|ra||l|ca||or. T|e loW Terpera|ure oar| ol ||e A|r-pre|ea|er
W||| oe des|gred |o prever| corros|or ard ||e co|d erd ra|er|a| ol ||e a|r |ea|er |uoes W||| oe
Cor|er 3|ee|.
'.1.4 S**# B*5i!= S8s#"-
T|e oo||er W||| oe prov|ded W||| a corp|e|e sys|er ol soo| o|oWers |o ellec||ve|y d|s|odge
depos||s lror ||e |ea| |rarsler areas. T|e soo| o|oWers W||| oe ro|or opera|ed W||| s|ear,
|a|er lror ||e ou||e| ol 3uper|ea|er l|rs| s|age, as ||e c|ear|rg red|ur.
'.1.' F)" Fi%i!= S8s#"-
T|e oo||er W||| oe des|gred lor l|r|rg 100 o|orass. T|e |ayou| ol ||e lue| leed|rg sys|ers
W||| oe suc| ||a| eac| sys|er |s access|o|e ard ra|r|a|rao|e. A|| leeders ard d|s|r|ou|ors W|||
|ave |rdeperder| dr|ve arrargerer|.
+) ,ue ,eeding "yste%
T||s poWer p|ar| W||| oe |av|rg a separa|e lue| |ard||rg sys|er. T|e lue| leed|rg
sys|er |rc|udes rac| ard p|r|or |so|a||or ga|es, lue| s|orage s||os W||| a capac||y ol
a||eas| lor o0 r|ru|es ol |Cb requ|rerer|s. T|e excess lue| |r ||e s|a| corveyor W|||
oe re|urred |o ||e s|orage yard ||roug| ||e re|urr corveyor. T|e lue| |rpu| |o ||e
oo||er W||| oe regu|a|ed oy ||e leed|rg sys|er.
10 MW Biomass Based Power Plant ABEIL
T|e lue| leed|rg sys|er |r add|||or |o ||e s|orage s||o W||| cors|s| ol |r|e| c|u|es,
leeders, leed c|u|es ard ||e d|s|r|ou|or.
T|e lue| d|s|r|ou|or W||| oe preura||c W||| prov|s|or |o d|s|r|ou|e ||e lue| ur|lorr|y
across ||e lurrace. T|e d|s|r|ou|or W||| |ave prov|s|or lor or|oad adjus|rer| ol ||e
||roW ol ||e lue|. T|e d|s|r|ou|or par|s lac|rg ||e rad|a||or lror ||e lurrace W||| oe ol
Al3l 310 |ype s|a|r|ess s|ee|. T|e ruroer ol leeder ard d|s|r|ou|or W||| oe dec|ded
oased or ||e d|s|r|ou|or capac||y ard ||e W|d|| ol ||e lurrace.
.) ,iring "yste%
T|e l|r|rg sys|er W||| cors|s| ol a spreader s|o|er W||| cor||ruous as| d|sc|arge
|rave|||rg gra|e W||| var|ao|e speed dr|ve. T|e dr|ve sys|er W||| |ave over|oad
pro|ec||or.
'.1.< D%a+# S8s#"-
T|e dral| sys|er lor ||e oo||er W||| oe su||ao|e lor produc|rg a oa|arced dral| W||| suo-
a|rosp|er|c pressure cord|||ors |r ||e lurrace.
T|e oo||er W||| |ave ore (1) x 100 capac||y lrduced 0ral| lars, 0re (1) x 100 capac||y
lorced 0ral| lars ard ore (1) x 100 capac||y lo| 3ecordary A|r lars ra||rg up ||e
corp|e|e dral| sys|er lor ||e oo||er.
+) ,orced Draft ,an
T|e lorced dral| lar W||| oe a cors|ar| speed, |or|zor|a|, rad|a|, oac|Ward curved
o|ades, dr|ve ro|or W||| su||ao|e s|ar|er. T|e lar l|oW cor|ro| W||| oe W||| |r|e| gu|de
vares ||roug| servorec|ar|sr |rcorpora||rg su||ao|e ||r|ages ard poWer cy||rder
|oused su||ao|y |o prever| se|||erer| ol dus| or ||r|s.
.) 8nduced Draft ,an
T|e lrduced dral| lar W||| oe |or|zor|a|, rad|a|, W||| oac|Ward curved o|ades. T|e lar
l|oW cor|ro| W||| oe W||| |r|e| gu|de vares | |r|e| darper ||roug| servorec|ar|sr
|rcorpora||rg su||ao|e ||r|ages ard poWer cy||rder. l0v|darper opera||rg ||r|s|dr|ves
s|ou|d oe |oused su||ao|y |o avo|d se|||erer| ol dus| or ||r|s. T|e lar W||| oe dr|ver
oy a ro|or dr|ve W||| a su||ao|e s|ar|er. T|e lar speed W||| ro| exceed 1000 bl|. T|e
10 MW Biomass Based Power Plant ABEIL
lar W||| oe supp||ed corp|e|e W||| ro|or, corror oase p|a|e lor ro|or ard lar,
coup||rg, e|c.
T|e lar s|al| W||| oe ol s|rp|y suppor|ed des|gr ard ||e r|r|rur |||c|ress ol ||e
p|a|es used |r ||e cors|ruc||or ol ||e lar W||| oe 8 rr. T|e |rpe||er W||| oe |ard laced
|o avo|d eros|or ol ||e |rpe||er o|ades. T|e lar des|gr |erpera|ure W||| oe 200C.
0) "econdary 5ir ,an
T|e 3ecordary a|r lar W||| oe cors|ar| speed, |or|zor|a|, rad|a|, oac|Ward curved ard
e|ec|r|c ro|or dr|ver. T|e lar l|oW cor|ro| W||| oe W||| |r|e| gu|de vares W||| preura||c
cy||rder lor opera||or lror cor|ro| roor. T|e lar W||| oe d|rec| dr|ver, W||| speed ro|
exceed|rg 1440 bl| ard W||| oe corp|e|e W||| ro|or, corror oase p|a|e lor lar ard
ro|or, coup||rg, e|c. T|e lar s|al| W||| oe ol s|rp|y suppor|ed des|gr ard ||e
r|r|rur |||c|ress ol p|a|e used |r ||e lar W||| oe o rr. T||s lar W||| |ard|e |o| a|r
ard W||| |a|e suc||or lror ||e a|r |ea|er ou||e| duc|.
'.1.; D)c#i!= S8s#"-
A|| duc|s W||| oe rec|argu|ar |r cross sec||or ard W||| oe ol We|ded cors|ruc||or, proper|y
s||llered. A|| ||e a|r duc|s W||| oe laor|ca|ed lror s|ee| p|a|es ol r|r|rur 5 rr |||c|, ard a||
l|ue duc|s W||| oe ol r|r|rur o rr |||c|. T|e duc| p|a|e ra|er|a| W||| corlorr |o l3 20o2.
Caroor s|ee| p|a|es W||| ro| oe used lor duc||rg sys|er |l ||e opera||rg |erpera|ure ol l|ue gas
exceeds 425C. T|e duc| corrers W||| oe s|||c| We|ded |r|erra||y ard lu|| We|ded or ||e
ou|s|de.
A|| duc|s W||| oe su||ao|y s||llered ard re|rlorced or ||e ou|s|de ard des|gred |o W|||s|ard ||e
pressures ercour|ered. 0uc|s W||| oe s|zed cors|der|rg a rax|rur ve|oc||y ol 18 r|sec lor
|o| a|r ard l|ue gases ard 12 r|sec lor co|d a|r. T|e duc| des|gr cors|dera||or W||| |rc|ude ||e
opera||rg |r|erra| pressure, red|ur |erpera|ure, dead |oads, as| |oads, ||ve |oads, se|sr|c
|oads, expars|or jo|r| reac||or e|c.
0arpers, |r ||e duc||rg sys|er, W||| oe prov|ded as requ|red, lor ||e proper opera||or ol ||e
oo||er. A|| darpers W||| oe ol ||e `|ouver' or ou||erl|y |ype W||| ||e recessary lrares, s|al|s,
o|ades, oear|rgs, ||r|ages, sea|s e|c.
A|| lars W||| oe prov|ded W||| |so|a||or darpers a| ||e d|sc|arge erds lor or||re ra|r|erarce.
10 MW Biomass Based Power Plant ABEIL
'.1.7 C?"-ica D*si!= S8s#"-
T|e oo||er W||| oe prov|ded W||| a |r|-sod|ur p|osp|a|e oased ||g| pressure (ll) dos|rg
sys|er ard a |ydraz|re ard arror|a oased loW lressure (ll) dos|rg sys|er. T|e ll
dos|rg sys|er W||| cor||ruous|y add ||e c|er|ca|s |o ||e oo||er Wa|er ard |o ra|r|a|r ||e
p|osp|a|e reserve ard |o |rcrease ||e oo||er Wa|er pl.
T|e ll dos|rg |s dore |o ||e leed Wa|er prelerao|y |r ||e deaera|or s|orage |ar| |o scaverge
||e |races ol oxyger ard |o |rcrease ||e leed Wa|er pl.
'.1.1 E"c#%* S#a#ic P%"ci/i#a#*%
T|e oo||er W||| oe equ|pped W||| ar F|ec|ro 3|a||c lrec|p||a|or, W||c| W||| rerove ||e dus| ard
as| par||c|es lror ||e l|ue gas, oelore ||e l0 lar cou|d |ard|e ||. T|e ell|c|ercy ol ||e
prec|p||a|or W||| oe 98 ard ||e dus| corcer|ra||or a| ||e ou||e| ol ||e F3l W||| oe 115
rg|Nr
3
.
'.1.10 C?i-!"8
T|e re|rlorced corcre|e c||rrey W||| oe cors|ruc|ed |o ex|aus| ||e l|ue gas |o ||e
a|rosp|ere. T|e s|ze ard |e|g|| ol ||e c||rrey W||| oe |o su|| ||e gas l|oW ard ||e |oca|
po||u||or cor|ro| rorrs.
'.1.11 F)" Ha!.i!= S8s#"-
lue| lror ||e yard W||| oe rec|a|red ||roug| dozers | lror| erd |oaders ard W||| oe led or |o
||e grourd corveyor (8C1). T|e corveyor 8C1 W||| d|sc|arge ||e lue| or |o ||e corveyor 8C2
||a| suosequer||y W||| de||ver ||e lue| or |o ||e s|a| corveyor 3C1. lror 3C1, ||e lue| W||| oe
led |o ||e oo||er. T|e excess lue| W||| la|| or |o ||e corveyor 8C3 ard |a|er |o ||e yard.
'.1.12 As? Ha!.i!= S8s#"-
T|e as| |ard||rg sys|er |s prov|ded lor ||e as| co||ec|ed lror ||e lo||oW|rg reg|or.
Trave|||rg gra|e |opper
l|erur c|aroer
A|r |ea|er |opper
F3l |oppers
10 MW Biomass Based Power Plant ABEIL
T|e as| co||ec|ed |r ||e p|erur c|aroer |s ex|rac|ed oy ro|ary va|ves ard corveyed |o a s||o
oy preura||c corveyor sys|er.
T|e as| co||ec|ed lror ||e a|r |ea|er ard F3l |oppers W||| oe |rarspor|ed |o As| 3||o oy
ro|ary va|ves ard preura||c corveyor.
'.2 TURBO3GENERATOR SYSTEM
'.2.1 S#"a- T)%>i!"
T|e proposed poWer p|ar| W||| oe W||| ore 11 |w |uroogerera|or. T|e |uro|re W||| oe a o|eed
cur corders|rg |ype ard rurr|rg a| a ||g| speed. T|e gerera|or speed W||| oe 1500 rpr.
lerce, ||e |uro|re W||| oe coup|ed W||| ||e gerera|or ||roug| a reduc||or gear ur||.
3|ear |s adr|||ed |r|o ||e |uro|re ||roug| ar erergercy s|op va|ve ac|ua|ed oy |ydrau||c
cy||rders. T|e |uro|re speed |s cor|ro||ed oy ar e|ec|ror|c goverr|rg sys|er. T|e |uro|re
ex|aus| pressure W||| oe 0.1 a|a.
T|e |uro|re W||| oe prelerao|y s|rg|e cy||rder, s|rg|e ex|aus|, o|eed corders|rg |ype. A|| cas|rg
W||| oe |or|zor|a||y sp||| ard ||e des|gr W||| oe suc| as |o perr|| exar|ra||or ol ||e o|ad|rg
W|||ou| d|s|uro|rg s|al| a||grrer| or caus|rg darage |o ||e o|ades.
T|e des|gr ol ||e cas|rg ard ||e suppor|s W||| oe suc| as |o perr|| lree ||erra| expars|or |r
a|| d|rec||ors. T|e o|ad|rg W||| oe des|gred |o W|||s|ard a|| v|ora||ors, ||erra| s|oc|s, ard
o||er |oad|rg ||a| ray oe exper|erced dur|rg serv|ce ard sys|er d|s|uroarces. T|e o|ades
W||| oe rac||red lror lorged oars or d|e lorged ard ||e ra|er|a|s used W||| oe c|ror|ur
s|ee|s cors|s|er| W||| prover exper|erce ard s|ardards.
T|e g|ards W||| prelerao|y ol |aoyr|r|| |ype ard sea|ed W||| ||. A vacuur sys|er requ|red oy
||e des|gr W||| oe prov|ded. A|| p|p|rg ard corporer|s ol s|al| sea| ard vacuur sys|er W|||
oe s|zed lor 300 percer| ol ||e ca|cu|a|ed |ea|age. 3|ear |eav|rg ||e g|ards W||| oe
cordersed |r sea| s|ear corderser. l| W||| oe poss|o|e |o |rspec| ard rep|ace ||e erd sea|s
W|||ou| oper|rg ||e cas|rg ard W|||ou| darag|rg ||e ||erra| |rsu|a||or.
+) &earings
T|e Turo|re W||| oe prov|ded W||| ||oera||y ra|ed |ydrodyrar|c rad|a| ard ||rus|
oear|rgs. T|e rad|a| oear|rgs W||| oe sp||| lor ease ol assero|y, ard ol ||e s|eeve or
10 MW Biomass Based Power Plant ABEIL
pad |ype, W||| s|ee| s|e|| oac|ed, oaoo|||ed rep|aceao|e pads. T|ese oear|rgs W||| oe
equ|pped W||| ar||-ro|a||or p|rs ard W||| oe pos|||ve|y secured |r ||e ax|a| d|rec||or.
T|e ||rus| oear|rgs W||| oe ol ||e s|ee| oac|ed oaoo|||ed ru|||p|e segrer| |ype,
des|gred lor equa| ||rus| capac||y |r oo|| d|rec||ors.
A ||oera| l|oW ol |uoe o|| urder pressure W||| oe supp||ed |o a|| ||e oear|rgs lor
|uor|ca||or ard coo||rg.
.) Lubrication and contro oi syste%
A pressure |uor|ca||or ard cor|ro| o|| sys|er W||| oe lurr|s|ed lor ||e |uroo gerera|or
ur|| |o supp|y o|| a| ||e requ|red pressure |o ||e s|ear |uro|re, gearoox, gerera|or ard
goverr|rg sys|er. 0|| |r ||e reservo|r W||| oe ra|r|a|red a| ar appropr|a|e
|erpera|ure W|er ||e T0 se| |s |d|e oy prov|d|rg su||ao|e e|ec|r|c |ea|ers ard
|erpera|ure cor|ro|s.
T|e o|| sys|er W||| |rc|ude ||e lo||oW|rg.
|a|r o|| purp prelerao|y dr|ver oy ||e |uro|re s|al|.
A 100 capac||y AC ro|or dr|ver aux|||ary o|| purp arrarged |o cu| |r
au|ora||ca||y |l ||e o|| pressure la||s |o a prese| va|ue. T||s purp W||| a|so ree|
||e requ|rerer|s dur|rg ||e s|ar| up ard s|u|doWr.
A 0.C. ro|or dr|ver erergercy o|| purp ol sull|c|er| capac||y |o prov|de
adequa|e |uor|ca||or |r ||e ever| ol a la||ure ol ||e ur|| AC ro|or dr|ver purp.
T||s purp a|so W||| cu| |r au|ora||ca||y a| a pre se| va|ue ol ||e o|| pressure.
TWo 100 du|y o|| l|||ers arrarged |r suc| a Way oy rears ol |rarsler va|ves
||a| || |s poss|o|e |o c|ear ore o|| l|||er W|||e ||e o||er |s |r serv|ce W|||
cor||ruous l|oW.
0up|ex 100 capac||y o|| coo|ers W||| c|argeover va|ves.
Ar accuru|a|or |o ra|r|a|r sull|c|er| o|| pressure, dur|rg servo cor|ro|
|rars|er|s ard W|||e s|ardoy purp acce|era|es lror |d||rg |o lu|| speed.
0|| s|orage ard se||||rg |ar| W||| adequa|e reservo|r capac||y, dup||ca|e
s|ra|rers, |eve| |rd|ca|ors W||| l|oa| sW||c|es ard a|arr cor|ac|s, ver| ard o||
r|s| e||r|ra|ors.
l|oW ard |erpera|ure |rd|ca||or lor ou||e| o|| lror oear|rgs ard oear|rg re|a|
|erpera|ure |rd|ca||or lor a|| oear|rgs.
Cer|r|luga| o|| pur|l|er.
0) 9i cooers
T|e o|| coo|ers W||| oe Wa|er-coo|ed W||| a dup||ca|e arrargerer| ard c|argeover
va|ves. T|e coo|ers W||| oe ol s|e|| ard |uoe |ype.
10 MW Biomass Based Power Plant ABEIL
T|e coo|ers W||| oe cors|ruc|ed |r accordarce W||| TF|A c|ass C. T|e prov|ded
surlace area W||| oe adequa|e |o coo| ||e o|| W||| lr|e| coo||rg Wa|er |erpera|ure a| 35
C ever W||| 20 ol ||e |uoes p|ugged.
4) ,iters
lu|| l|oW o|| l|||ers W||| oe used doWrs|rear ol ||e coo|ers ard W||| oe p|ped |r a
para||e| arrargerer| W||| a cor||ruous l|oW |rarsler va|ve. l|||ra||or W||| oe 10
r|crors ror|ra|. l|||er car|r|dges W||| oe des|gred lor r|r|rur pressure drop ard
su||ao|e lor rax|rur d|sc|arge pressure ol ||e o|| purps.
6) 9i reservoir
T|e |r|er|or ol o|| reservo|rs W||| oe desca|ed ard rus| prooled W||| a perrarer|
coa||rg. beservo|rs W||| |op rour|ed equ|prer| W||| |ave sull|c|er| r|g|d||y. A||
oper|rgs lor p|p|rg W||| oe rade dus| ard Wa|erprool.
:) 9i purifier
A cer|r|luga| |ype o|| pur|l|er W||| oe prov|ded lor ||e rerova| ol Wa|er, sed|rer|s ard
o||er ox|da||or produc|s. T|e pur|l|er W||| oe a separa|e corp|e|e pac|age.
;) "tea% !urbine $overning "yste%
T|e |uro|re goverr|rg sys|er W||| oe e|ec|ro-|ydrau||c or e|ec|ror|c des|gred lor ||g|
accuracy, speedy ard sers|||ve resporse. T|e e|ec|r|ca||e|ec|ror|c ard |ydrau||c
corporer| ol ||e cor|ro| sys|er W||| oe se|ec|ed or ||e oas|s ol re||ao||||y over a W|de
rarge ol opera||rg cord|||ors.
A|| corporer|s used W||| oe We|| prover |o assure overa|| sys|er re||ao||||y ard W||| oe
des|gred lor easy ard qu|c| rep|acerer| W|er recessary. T|e goverror W||| ersure
cor|ro||ed acce|era||or ol ||e |uroo gerera|or ard W||| prever| overspeed W|||ou|
|r|pp|rg ||e ur|| urder ary opera||rg cord|||ors |rc|ud|rg ||e ever| ol rax|rur |oad
rejec||or.
T|e goverror W||| a|so ersure ||a| ||e ur|| does ro| |r|p |r ||e ever| ol sudder
lrequercy l|uc|ua||or |r ||e gr|d ard a|so sudder gr|d la||ure | |oad ||roug| oll.
10 MW Biomass Based Power Plant ABEIL
T|e goverror W||| |ave ||rear droop c|arac|er|s||cs W||| a su||ao|e rarge lor s|ao|e
opera||or ard W||| |ave prov|s|or lor adjus||rg ||e droop |r l|re s|eps.
T|e goverr|rg sys|er W||| |ave ||e lo||oW|rg |rpor|ar| lurc||ors.
3peed cor|ro|
0verspeed cor|ro|
load cor|ro| ard speeder gear.
3|ear pressure cor|ro|
|as|er |r|p lor loW 3|ear lressure, loW vacuur, l|g| v|ora||or,
eccer|r|c||y, over speed, 0|llerer||a| Fxpars|or e|c.
<) Condenser
T|e corderser W||| oe ol ror-cor|ac| surlace |ype corderser des|gred as per ||e
requ|rerer|s ol lea| Fxc|arge lrs|||u|e 3|ardards lor 3|ear 3urlace Cordersers
ard A3|F 3ec||or vlll d|v|s|or 1. Corderser s|e|| s|a|| oe cy||rdr|ca| rade ol s|ee|
p|a|e ard |uoes s|a|| oe 19 rr 0.0. ard 18 8w0 adr|ra||y orass. lea| |rarsler
surlace s|a|| |ave 10 rarg|r lor |uoe p|ugg|rg over ard aoove lou||rg lac|or.
T|e corderser W||| oe s|zed |o corderse ||e rax|rur quar|||y ol ex|aus| s|ear (|.e.
W|er ||e ex|rac||or |s r|r|rur) W||| ||e |r|e| coo||rg Wa|er |erpera|ure a| 32C up|o
a rax|rur ol 40C. (W||| par| |oad opera||or).
T|e corderser des|gr ard supp|y W||| oe corp|e|e W||| ||e rec|, expars|or jo|r|,
corders|rg c|aroer ard |uoes, |uoe s|ee|s, |o| We||, Wa|er ooxes, Wa|er s|de, va|ve,
a|r rerova| sys|er ard accessor|es, rup|ure d|sc, Tel|or padded s||d|rg suppor|,
oo||ed ard ||rged Wa|er oox cover a| lror| ard oac|.
T|e corderser rec| W||| oe su||ao|y des|gred |o reduce ||e |r|e| s|ear ve|oc||y |o
ersure |oW-pressure drop ard |o pro|ec| ||e |uoes lror |rp|rgerer| ol s|ear.
T|e corderser W||| oe adequa|e|y des|gred lor ||e ex|erra| pressure, s||llerers ard
orac|rg W|erever requ|red Wou|d oe prov|ded.
10 MW Biomass Based Power Plant ABEIL
T|e |uoes W||| oe prov|ded W||| suppor|s |o e||r|ra|e ary ser|ous |uoe v|ora||or
proo|ers ard sagg|rg. T|e |uoes W||| oe exparded |r|o ||e |uoe s|ee|s a| oo|| ||e
erds ard l|ared.
T|e corderser rec| W||| oe correc|ed |o ||e |uro|re ex|aus| |ood W||| a proper|y
des|gred s|a|r|ess s|ee| expars|or oe||oW W||c| a||oWs lree expars|or ol ||e
corderser ur|| W|||ou| exer||rg urdue ||rus| or ||e |uro|re ex|aus| |ood ard
lac||||a|e |rdeperder| suppor||rg ol ||e corderser or ||e lourda||ors W|||ou|
resor||rg |o spr|rgs. |ar|o|es W||| oe prov|ded lor lac||||a||rg |rspec||or ol |uoes oo||
a| s|ear ard Wa|ers|des.
T|e |o| We|| a| ||e corderser oo||or W||| |ave a r|r|rur capac||y ol 2 r|ru|es
s|orage W|||e |ard||rg rax|rur quar|||y ol ex|aus| s|ear.
T|e |o| We|| W||| oe prov|ded W||| |eve| gauges ard correc||ors lor cordersa|e
ex|rac||or ard dra|r. A su||ao|y des|gred |eve| cor|ro| sys|er W||| oe prov|ded, W|||
prov|s|or lor a|arr |r|pp|rg e|c.
T|e corderser W||| oe ol d|v|ded Wa|er oox des|gr, ard ||e Wa|er ooxes W||| prov|de
easy access|o||||y |o ||e |uoes. l| W||| oe poss|o|e |o c|ear ore sec||or ol ||e |uoes W|||
||e corderser |oad su||ao|y reduced. T|e c|rcu|a||rg Wa|er |r|e| ard ou||e|
correc||ors W||| oe ol adequa|e s|ze |o reduce ||e Wa|ers|de pressure drop |o ||e
r|r|rur.
T|e Wa|er ooxes W||| oe coa|ed W||| epoxy res|r, |r|erra||y |o prever| corros|or lror
||e coo||rg Wa|er ard W||| oe prov|ded W||| sacr|l|c|a| arodes.
=) Condenser 5ir Re%ova 7>uip%ent
0re s|ear opera|ed |ogg|rg ejec|or ol s|rg|e s|age W||| oe lurr|s|ed lor ||e |r|||a|
pu|||rg ol ||e vacuur |r ||e sys|er. T|e capac||y W||| oe so as |o reac| 80 - 90
vacuur |r 20 r|ru|es ||re.
logg|rg Fjec|or W||| oe, W|||ou| ary corderser, d|sc|arg|rg |o ||e a|rosp|ere
||roug| a su||ao|y des|gred s||ercer.
10 MW Biomass Based Power Plant ABEIL
2 x 100 s|ear opera|ed ra|r ejec|ors ol |Wo-s|age |W|r e|erer| |ype W||| |r|er ard
al|er cordersers W||| oe prov|ded.
+?) Condensate 7@traction /u%ps
TWo ruroers 100 capac||y cordersa|e ex|rac||or purps |o purp ||e cordersa|e
lror ||e corderser |o| We|| W||| oe prov|ded.
8o|| ||e purps W||| oe dr|ver oy e|ec|r|c ro|ors ard ||e l|oW W||| oe cor|ro||ed oy
d|sc|arge ||ro||||rg.
T|e purps W||| oe ol cer|r|luga|, |or|zor|a|, s|rg|e s|age |ype ard W||| oe supp||ed
corp|e|e W||| a|| va|ves, |r|e| ard d|sc|arge p|p|rg W||| rar|lo|ds.
++) $ear &o@
T|e reduc||or gearoox, |l requ|red, oe|Weer ||e |uro|re ard ||e gerera|or W||| oe ol
prover des|gr prelerao|y ol douo|e |e||ca| arrargerer| W||| serv|ce lac|or ol 1.2
l| W||| oe capao|e ol |rarsr||||rg ||e rax|rur ra||rg ol ||e se| ard oe ao|e |o
W|||s|ard 20 over speed over a per|od ol r|r|rur l|ve r|ru|es. T|e gearoox W|||
a|so oe des|gred lor ||e s|or| c|rcu|| cord|||or ol ||e gerera|or.
A|| oear|rgs ol ||e gearoox W||| oe read||y rereWao|e ard || W||| oe poss|o|e |o |rspec|
||e oear|rgs ard ||e gears read||y W|||ou| d|s|uro|rg ||e s|al| a||grrer|.
l||ur|ra|ed s|g|| g|asses W||| oe prov|ded |o |rspec| ||e |uoe o|| dra|r lror eac|
|rd|v|dua| oear|rg. T|e gearoox des|gr W||| oe as per ||e requ|rerer|s ol A0|A.
'.3 COOLING (ATER SYSTEM
T|e coo||rg Wa|er |s used |r ||e surlace corderser lor corders|rg ||e s|ear, |uro|re
aux|||ar|es lor coo||rg, oo||er aux|||ar|es |||e leed purp, l0 lar e|c., lor oear|rg ard g|ard
coo||rg.
T|e coo||rg Wa|er al|er coo||rg ||e equ|prer| W||| oe coo|ed, so ||a| ||e sare Wa|er car oe
reused aga|r. lor |||s purpose, a We| coo||rg |oWer ol |rduced dral| |ype W||| oe used. T|e
coo||rg red|ur |r ||e corderser W||| oe raW Wa|er. T|e coo||rg Wa|er |erpera|ure r|se |r ||e
10 MW Biomass Based Power Plant ABEIL
sys|ers W||| oe ||r||ed |o 10 0eg C. T|e |o| re|urr Wa|er W||| oe d|s|r|ou|ed ur|lorr|y over ||e
ce||s ol ||e coo||rg |oWer.
T|e raW Wa|er lror ||e Cara|| 8oreWe||s W||| oe purped |o ||e coo||rg |oWers al|er su||ao|e
|rea|rer|, W||c| W||| coo| ||e coo||rg Wa|er. lor |||s purpose, |Wo ros (2 x 100) purps ol
100 capac||y eac| W||| oe prov|ded. T|e raW Wa|er W||| oe s|ored |r a raW Wa|er reservo|r.
T|e Wa|er W||| oe purped |o ||e coo||rg |oWer lore oay. T|e Wa|er lror ||e lore oay W||| ||er
l|oW |o ||e suc||or ol ||e coo||rg Wa|er purps. T|e coo||rg Wa|er purps W||| |ave ||e |ead |o
ree| ||e pressure drop |r ||e er||re c|rcu||. T|e coo||rg Wa|er W||| a|so oe |a|er |o ||e
|uroogerera|or, oo||er area e|c., ||roug| p|pes ol adequa|e s|ze.
lso|a||or va|ves ol |ype ga|e | ou||erl|y W||| oe prov|ded a| d|llerer| |oca||ors, lor easy
ra|r|erarce. 3|r||ar|y su||ao|e expars|or jo|r|s W||| oe prov|ded |r ||e p|p|rg, |o lac||||a|e
d|srar|||rg ard a|so |o |a|e care ol ||e r|sa||grrer|s | ||erra| expars|or ol ||e p|pes.
T|e Wa|er |r ||e coo||rg |oWer oas|r |s prore lor a|gae groW||. ll a|gae groW |r ||e coo||rg
|oWer Wa|er, || W||| allec| ||e equ|prer|, W||c| are coo|ed oy ||e coo||rg Wa|er. To prever| ||e
groW|| ol a|gae c||or|re W||| oe dosed |r ||e Wa|er a| appropr|a|e quar|||y. To ra|r|a|r ||e sa||
corcer|ra||or |r coo||rg Wa|er |o accep|ao|e ||r||s, o|oW doWr W||| oe g|ver per|od|ca||y.
'.4 CHLORINATION SYSTEM
T|e C||or|ra||or sys|er W||| |ave |Wo vacuur leed c||or|ra|ors, W||| ore as s|ardoy. Fac|
c||or|ra|or W||| oe correc|ed |rdeperder||y |o |rd|v|dua| evapora|ors, W||c| |r |urr oe
correc|ed |o |Wo c||or|re cor|a|rers. T|e Wa|er lor ||e C||or|ra||or sys|er W||| oe supp||ed
lror ||e aux|||ary coo||rg |oWer purp d|sc|arge |eader. T|e capac||y ol c||or|ra|ors W||| oe
oase or a rax|rur dos|rg ra|e ol l|ve ppr or ||e |o|a| ra|e ol ra|r ard aux|||ary coo||rg
Wa|er sys|ers.
'.' CONDENSATE (ATER SYSTEM
T|e cordersa|e lror ||e surlace corderser W||| oe co||ec|ed |r ||e |o|We||. T|e cordersa|e
W||| oe purped |o a cordersa|e |ar| oy |Wo cordersa|e ex|rac||or purps (CFl). 0re ol ||e
purps W||| oe Wor||rg ard o||er serv|rg as s|ard oy.
T|e d|sso|ved gases |||e oxyger e|c., preser| |r ||e cordersa|e, W|er |ea|ed |o ||e
sa|ura||or |erpera|ure, W||| d|ssoc|a|e lror ||e cordersa|e ard W||| oe ver|ed ou|. Traces ol
10 MW Biomass Based Power Plant ABEIL
oxyger W||| oe reroved oy dos|rg |ydraz|re so|u||or. T|e ra|e up Wa|er lor ||e sys|er W|||
oe 0| Wa|er. T|e deaera|or W||| |ave a s|orage |ar| W||| capac||y equ|va|er| |o 20 r|ru|es
|Cb requ|rerer|s ol ||e oo||ers.
T|e leed Wa|er lror ||e deaera|or s|orage |ar| W||| oe purped |o ||e ecoror|zer oy ore leed
Wa|er purp W||| ore 100 s|ard oy, eac| ol capac||y 40 r
3
||r.
'.< P%"ss)%" %".)ci!= a!. D"s)/"%?"a#i!= s#a#i*!s.
0re No. lb03 W||| rarua| oy pass W||| oe prov|ded lor supp|y ol |oW-pressure s|ear-|o-
s|ear Je| A|r Fjec|or ard Turo|re g|ards. 0re No. 3epara|e lb03 W||| rarua| oy pass W|||
oe prov|ded lor supp|y ol s|ar| up s|ear ard pegg|rg s|ear |o deaera|or. legg|rg s|ear W|||
oe au|ora||ca||y cu| |r W|er pressure ol ex|rac||or s|ear lror |uro|re drops oe|oW requ|red
pressure.
'.; DM (ATER PLANT
T|e 0| Wa|er, W||c| W||| oe used as ||e ra|e up Wa|er, W||| oe produced |r ||e 0| l|ar|. T|e
capac||y ol ||e p|ar| proposed |s 8 r
3
||r. T|e 0| p|ar| W||| cors|s| ol sard l|||ers, ac||va|ed
caroor l|||ers, ar|or ard ca||or exc|argers, degasser ard r|xed oed exc|argers. TWo raW
Wa|er purps W||| purp ||e raW Wa|er. T|e regerera||or ol ||e 0| p|ar| W||| oe 8 |rs|day. T|e
0| Wa|er lror |||s p|ar| W||| oe s|ored |r a 3|orage |ar| ol adequa|e capac||y. T|e ac|ds ard
a||a|| requ|red lor ||e regerera||or W||| oe sull|c|er||y prov|ded |r ||e p|ar|. T|e ell|uer| lror
||e 0| p|ar| W||| oe reu|ra||zed |r a reu|ra||za||or p||. T|e ou||e| Wa|er lror ||e reu|ra||za||or
p|| W||| |ave a pl ol 7.0.
'.7 SERVICE (ATER AND POTABLE (ATER
T|e serv|ce Wa|er |s requ|red lor gerera| Was|, garder|rg, |o||e|s e|c., ard ||e po|ao|e Wa|er
requ|red lor ||e poWer p|ar| W||| oe |a|er lror ||e ou||e| ol ||e ac||va|ed caroor l|||er |r ||e 0|
p|ar|.
'.1 CRANES AND HOISTS
Crares, |o|s|s ard rorora||s W||| oe prov|ded |r ||e lo||oW|rg areas ol poWer p|ar| lor
ra|r|erarce purposes.
10 MW Biomass Based Power Plant ABEIL
lard opera|ed over|ead |rave|||rg crare |r ||e |uroo-a||erra|or ou||d|rg. |orora||s W||| |o|s|s
lor |ard||rg oo||er leed Wa|er purps |oca|ed urder ||e deaera|or s|ruc|ure, |orora||s W|||
|o|s|s lor |ard||rg |rpe||ers ard ro|ors ol l0 lars. |orora||s W||| |o|s|s lor |ard||rg
|rpe||ers ard ro|ors ol l0|3A lars. |orora||s W||| |o|s|s lor |ard||rg corderser
corporer|s.
T|e T0 ou||d|rg Wou|d oe prov|ded W||| a |ard opera|ed over|ead |rave|||rg crare ol 15 | 5
|ores capac||y ard aoou| 1or|s spar lor ra|r|erarce ol a|| equ|prer| |r ||e T0 ou||d|rg. T|e
capac||y Wou|d oe adequa|e |o |ard|e a|| equ|prer| | corporer| |r ||e T0 ou||d|rg |rc|ud|rg
||e gerera|or s|a|or W||c| |s ||e |eav|es| equ|prer| |o oe |ard|ed. T|e aux|||ary |oo| Wou|d
|ard|e ||e sra||er corporer|s |r ||e T0 ou||d|rg suc| as |uoe o|| coo|ers, ejec|ors, g|ard
s|ear corderser ard ejec|or corderser. T||s crare W||| oe |ard opera|ed.
'.10 COMPRESSED AIR SYSTEM
lrs|rurer| a|r |s requ|red lor var|ous preura||ca||y opera|ed cor|ro| va|ves |r ||e oo||er ard
T0 sys|ers. T|e a|r |s requ|red |o oe supp||ed a| a pressure ol 5 |o o Kg|cr
2
(g) a| ||e var|ous
corsurp||or po|r|s. lrs|rurer| a|r lror ||e a|r corpressors W||| oe dr|ed oy |ea||ess a|r dr|er
ra||rg use ol ||e |o| a|r lror corpressor lor regerera||or ol ||e dr|er red|ur (des|ccar|).
3erv|ce a|r |s requ|red lor c|ear|rg ol var|ous areas ol ||e p|ar|. Accord|rg|y, ||e serv|ce a|r
correc||ors are proposed |o oe prov|ded |r ||e 8o||er area, T0 ou||d|rg, Wor|s|op, 0| l|ar|
e|c.
Cors|der|rg ||e quar|||y ol a|r requ|red lor ||e poWer p|ar|, |Wo (2) a|r corpressors W||| oe
requ|red. T|ese corpressors W||| supp|y ||e |rs|rurer| a|r ard ||e requ|red serv|ce a|r.
Corpressors W||| oe ol ror-|uor|ca|ed |ype.
'.11 AIR3CONDITIONING AND VENTILATION SYSTEM
T|e lo||oW|rg areas |r ||e poWer p|ar| W||| oe a|r-cord|||ored.
- T|e ra|r cor|ro| roor |ous|rg ||e cor|ro| pare|s ol oo||er ard T0, sW||c|yard cor|ro|
pare|s ard aux|||ary pare| roor |ous|rg ||e assoc|a|ed sys|er cao|re|s.
- lrs|rurer| ra|r|erarce roor
10 MW Biomass Based Power Plant ABEIL
T|e aoove areas W||| oe a|r-cord|||ored us|rg W|rdoW |ype|sp||| |ype a|r cord|||orers. T|e
capac||y ol ||e a|r cord|||or|rg ur||s W||| oe dec|ded oased or ||e area ol ||e roor ard |ea|
|oad d|ss|pa|ed |r ||e roor.
T|e lo||oW|rg rec|ar|ca| ver|||a||or sys|ers are proposed |o oe prov|ded lor var|ous
ou||d|rgs|roors |r ||e poWer p|ar|.
- TWo (2) ax|a| |ype poWer rool ver|||a||or ol adequa|e capac||y eac| lor ||e T0
ou||d|rg.
- TWo (2) cer|r|luga| |ype supp|y a|r lars ol adequa|e capac||y lor ||e sW||c| gear roor,
oa||ery roor e|c.,
- 3u||ao|e ruroer ol prope||er |ype ex|aus| lars |r ||e Wa|er purp |ouse, 0| l|ar|,
l|||ra||or p|ar|, Wor|s|op ard s|ores.
'.12 FIRE PROTECTION SYSTEM
T|e lo||oW|rg sys|ers ol l|re pro|ec||or are proposed |o oe prov|ded lor ||e poWer p|ar|.
- lydrar| sys|er lor ||e er||re p|ar|.
- l|g| ve|oc||y Wa|er spray (lvw3) sys|er lor |rarslorrers ard |uoe o|| |ar|s.
- Caroor d|ox|de l|ood|rg sys|er lor ||e gerera|or ol ||e s|ear |uro|re.
- lor|ao|e l|re ex||rgu|s|ers.
T|e l|re pro|ec||or W||| oas|ca||y corp|y W||| ||e Tar|ll Adv|sory Corr|||ee (TAC)
requ|rerer|s, erao||rg reoa|e |r ||e |rsurarce prer|ur ra|e.
'.12.1 R"s"%$" S#*%a="
beserve s|orage ol 350 r
3
W||| oe prov|ded |r ||e raW Wa|er s|orage |ar| W||| a su||ao|e
par||||or |o ca|er |o ||e Wa|er requ|rerer|s ol ||e l|re pro|ec||or sys|er. lr v|eW ol ||e aoove,
purp |ouse e|eva||or W||| a|so oe su||ao|y |oWered a| ||e |oca||or ol ||e l|re Wa|er purps as
corpared |o ||e l|oor e|eva||or a| ||e |oca||or ol ||e raW Wa|er purps.
'.12.2 H8.%a!# S8s#"-
T|e |ydrar| sys|er W||| corpr|se ||e lo||oW|rg.
- 0re ro|or dr|ver ard ore d|ese| erg|re dr|ver l|reWa|er purp. T|ese purps W||| |a|e
||e suc||or lror ||e Wa|er s|orage |ar|. As per TAC regu|a||ors, ||e aoove |ydrar|
purp capac||y W||| oe adequa|e |o ca|er |o ||e |o|a| ruroer ol lydrar|s prov|ded |r
||e p|ar|.
10 MW Biomass Based Power Plant ABEIL
- TWo ro|or dr|ver joc|ey purps (ore Wor||rg ard ore s|ard oy) eac| ol 10 cur.||r
capac||y W||| oe prov|ded |o |eep oo|| ||e |ydrar| ard lvw3 sys|er ra|rs
pressur|zed. T|ese purps W||| a|so |a|e suc||or lror ||e raW Wa|er |ar|.
- Fx|erra| l|re |ydrar|s |r a|| areas ol ||e poWer p|ar| |rc|ud|rg oo||ers, T0, 0| l|ar|,
cor|ro| ou||d|rg, sW||c| yard, car|eer, s|ores, ard Wor|s|op ard adr|r|s|ra||or
ou||d|rgs.
- lr|erra| l|re |ydrar|s |r a|| s|or|ed ou||d|rgs ard s|ruc|ures suc| as 8o||er p|a|lorrs,
T0 ou||d|rg, car|eer ard adr|r|s|ra||or ou||d|rg.
'.12.3 Hi=? V"*ci#8 (a#"% S/%a8 S8s#"-
T|e lvw3 sys|er |s proposed |o oe prov|ded lor ||e |rarslorrers ard ||e s|ear |uro|re |uoe
o|| |ar|. wa|er supp|y |o ||e lvw3 sys|er W||| oe prov|ded oy ore ro|or dr|ver purp. 3|rce
||e parare|ers lor ||e lvw3 sys|er W||| oe |der||ca| |o ||a| ol ||e |ydrar| sys|er, ||e d|ese|
erg|re dr|ver purp descr|oed |r ||e |ydrar| sys|er, car serve as a corror s|ardoy lor oo||
lvw3 sys|er ard |ydrar| sys|er.
T|e lvw3 sys|er W||| cors|s| ol a ruroer ol ||g| ve|oc||y Wa|er projec|ors rour|ed or a
p|pe re|Wor| arourd eac| |rarslorrer ard s|ear |uro|re |uoe o|| |ar|. wa|er supp|y |o eac|
p|pe re|Wor| lror ||e lvw3 sys|er ra|rs W||| oe ||roug| a de|uge va|ve. T|e lvw3
sys|er lor ||e |rarslorrers W||| oe ol au|ora||c |ype. lr case ol l|re, quar|zo|d ou|o sersors
rour|ed arourd ||e |rarslorrers W||| au|ora||ca||y ac|ua|e ||e de|uge va|ve or ||e spray
Wa|er ||re. T|e lvw3 sys|er lor ||e |uro|re |uoe o|| |ar| W||| oe rarua||y ac|ua|ed. 3ro|e
ard |ea| de|ec|ors W||| oe used s|ra|eg|ca||y.
'.12.4 P*%#a>" Fi%" EB#i!=)is?"%s
l| |s proposed |o prov|de ar adequa|e ruroer ol Wa|||co|urr rour|ed |ype por|ao|e l|re
ex||rgu|s|ers |r var|ous areas ol ||e p|ar| |rc|ud|rg ||e cor|ro| roor, adr|r|s|ra||or ou||d|rg,
car|eer, s|ores, Wor|s|op, purp |ouse, e|c., T|ese por|ao|e l|re ex||rgu|s|ers Wou|d
oas|ca||y oe ol caroor d|ox|de ard dry poWer |ype.
'.12 TECHNICAL DATA FOR MA2OR MECHANICAL EHUIPMENT
'.12.1 B*i"%
Nuroer ol oo||ers . 0re (1)
|Cb capac||y |p| . 50
lea| gerera||or |p| . 50
3|ear pressure a| 3l ou||e| Kg| cr
2
(g) . o7
10 MW Biomass Based Power Plant ABEIL
3|ear |erp. a| 3l ou||e|
0
C . 485 +|- 5
leed Wa|er |r|e| |erp.
0
C . 105
8o||er ell|c|ercy or rus|ard or co||or s|a||s 0Cv . 78.5
0as |erpera|ure a| ||e ou||e| ol Al
0
C . 150
'.12.2 T)%>*="!"%a#*%
+) "tea% !urbine
loWer ra|ed |w . 11000
lr|e| s|ear pressure Kg| cr
2
(g) . o4
lr|e| s|ear |erpera|ure
0
C . 480
Fx|aus| s|ear pressure a|a . 0.1
8|eed s|ear pressure Kg| cr
2
(g) . 2.5
A||erra|or speed rpr . 1500
.) "urface Condenser
Type . 3urlace, d|v|ded wa|er oox
3|ear l|oW |p| . 30.5
3|ear pressure a|a . 0.1
Coo||rg Wa|er l|oW |p| . 2100
Tuoe ra|er|a|
0
C . 32
0u||e| coo||rg Wa|er |erpera|ure
0
C . 40
0) Condensate 7@traction /u%p
Type . Cer|r|luga|
Capac||y r
3
||r . 35
3uc||or pressure a|a . 0.1
0|sc|arge pressure Kg|cr
2
(g) . o.0
Nuroer ol purps . 2
4) Cooing -ater "yste%
Coo||rg ToWer.
Type . lrduced dral|
Nuroer ol coo||rg |oWers . 0re (1)
Capac||y r
3
||r . 2200
Coo||rg Wa|er supp|y |erpera|ure
0
C . 32
Coo||rg Wa|er re|urr |erpera|ure
0
C . 42
Coo||rg Wa|er re|urr pressure Kg| cr
2
. 0.5
Fvapora||or |oss ard o|oW doWr . 2.5
No. ol ce||s . TWo (2)
0es|gr We| ou|o |erpera|ure
0
C . 27
6) &oier ,eed /u%ps
10 MW Biomass Based Power Plant ABEIL
Nuroer ol purps . TWo (2)
Capac||y r
3
||r . 40
lead |lC . 1000
Type . |u|||s|age Cer|r|luga|
0r|ve . F|ec|r|c ro|or
:) Deaerator
Type . 3pray cur |ray
Capac||y |p| . 40
0u||e| Wa|er |erpera|ure
0
C . 105
0pera||rg pressure Kg|cr
2
(g) . 1.0
0es|gr pressure Kg|cr
2
(g) . 3.0
3|ear |r|e| pressure Kg|cr
2
(g) . 1.5
0xyger cor|er| |r ||e ou||e| Wa|er ppr . 0.007
;) D* -ater /ant
Capac||y r
3
||r . 8
begerera||or |rs|day . 8
<) D* -ater "pecification
lardress . N||
C||or|de . N||
3|||ca as 3|02, rax. ppr . <0.02
lror as le, rax. ppr . <0.01
Corduc||v||y a| 20 0eg.C rax, . 0.5 r|cros|erers|cr
pl . 9.0 |o 9.4
0| Wa|er p|ar| W||| oe corp|e|e W||| ac||va|ed caroor l|||er, ar|or, ca||or exc|argers
degassers, purps, r|xed oed exc|argers, ac|d|a||a|| |ar| ard purps, raW Wa|er purps e|c.,
10 MW Biomass Based Power Plant ABEIL
< DESCRIPTION OF ELECTRICAL AND I 4 C SYSTEMS
<.0 GENERATOR
T|e gerera|or W||| oe ra|ed 11 |w, 11 |v, 50 lz, 3 pl, ard 0.8 pl. T|e ra|ed speed W||| oe
1500 rpr. T|e gerera|or W|rd|rg W||| |ave c|ass l |rsu|a||or. T|e W|rd|rg W||| oe s|ar
correc|ed. T|e s|ar po|r| W||| oe ear||ed ||roug| a res|s|or |o ||r|| ||e lau|| currer| |o lu|| |oad
currer|. T|e gerera|or W||| oe a|r-coo|ed W||| ar a|r -Wa|er |ea| exc|arger. T|e gerera|ors W|||
|ave orus||ess exc||a||or sys|er.
A|| ||e s|x |err|ra|s ol ||e |uroo gerera|or W|rd|rg W||| oe oroug|| ou| lor ex|erra| correc||ors.
T|ese correc||ors W||| oe |a|er |o ||e l|g||r|rg Arres|or (lA) vT oy su||ao|y ra|ed ous oars.
T|e lAvT W||| |ouse recessary currer| |rarslorrers, vo||age |rarslorrers, ||g||r|rg arres|or
gerera|or reu|ra| grourd|rg res|s|or, e|c. lur||er correc||ors |o ||e gerera|or c|rcu|| orea|er
|r ||e 11 |v sW||c|gear W||| oe oy rears ol su||ao|y ra|ed 11 |v cao|es.
A|| s|x |err|ra|s ol ||e s|ear |uro|re-gerera|or W||| oe oroug|| ou| ol ||e |uro|re pedes|a| Wa||,
||roug| sea|-oll ous||rgs. T|e correc||ors oe|Weer gerera|or |err|ra|s ard sea|-oll ous||rg
W||| oe oy oper ousoars. 0u|s|de ||e T0 pedes|a| a s|or| rur ol segrega|ed p|ase ousduc| W|||
oe prov|ded or ||e p|ase s|de ol ||e gerera|or |o |ouse ||e currer| |rarslorrers ard g|ve
|ap-oll correc||ors |o lA & lT cuo|c|e. T||s p|ase s|de ous duc| W||| oe |err|ra|ed W||| a
cao|e |err|ra||or oox lor lur||er correc||or oy 11 |v cao|es up|o ||e 11 |v sW||c|gear.
3|r||ar|y, a s|or| rur ol segrega|ed p|ase ous duc| W||| oe prov|ded or ||e reu|ra| s|de |o
|ouse ||e currer| |rarslorrers. T|e reu|ra| lorra||or ard ||e d|scorrec||rg ||r| W||| oe
prov|ded |r ar adap|or oox al|er ||e currer| |rarslorrers. A s|or| s|rg|e-p|ase ous duc| W||| oe
prov|ded oe|Weer ||e adap|er oox ard ||e N0b cuo|c|e.
T|e gerera|or s|a|| oe ol c|osed c|rcu|| a|r-coo|ed |ype |oused |r ar ll55 (CACw) erc|osure
ard dr|ver oy s|ear |uro|re ||roug| a speed reducer. T|e recessary coup||rg ard coup||rg
oo||s s|a|| a|so lorr par| ol ||e supp|y.
+) "tator
T|e s|a|or lrare s|a|| oe a s|rg|e p|ece cors|s||rg ol a cy||rdr|ca| cas|rg ol We|ded p|a|e
cors|ruc||or, re|rlorced |r|erra||y |r ||e rad|a| ard ax|a| d|rec||or oy s|a||orary Weo p|a|es
10 MW Biomass Based Power Plant ABEIL
ra||rg ||e er||re lrare perlec||y r|g|d. T|e s|a|or W|rd|rg s|a|| oe ol ||e douo|e |ayer |ap |ype
W||| C|ass 'l' |rsu|a||or.
.) Rotor
a) T|e gerera|or ro|or s|a|| oe lorged lror a s|rg|e p|ece |rgo| ol spec|a| a||oy s|ee|
carelu||y |ea| |rea|ed |o oo|a|r exce||er| rec|ar|ca| ard ragre||c proper||es ard a
corpre|ers|ve ser|es ol u||rasor|c exar|ra||ors or ||e ro|or oody s|a|| oe dore |o
ersure ||a| aoso|u|e|y ro |radr|ss|o|e |r|erra| delec|s are preser| ard ||a| ||e ra|er|a|
ree|s ||e qua|||y s|ardards.
o) T|e des|gr ard cors|ruc||or ol ||e ro|or s|a|| oe |r accordarce W||| ||e oes| roderr
prac||ce ard s|a|| oe lu||y descr|oed |r ||e oller.
c) T|e |rsu|a||or oe|Weer |urrs ol l|e|d W|rd|rg s|a|| oe cors|s|er| c|ass l |rsu|a||or.
d) T|e l|e|d po|es s|a|| oe prov|ded W||| adequa|e darper W|rd|rgs |o ersure s|ao||||y urder
lau|| cord|||ors ard |o ree| [(I2C) 2|} va|ue ol 20.
0) 7arth !er%ina
TWo Nos. or rore Far|| |err|ra|s s|a|| oe prov|ded. T|e ear|| |err|ra|s s|a|| oe des|gred |o
|err|ra|e 0a|var|zed |ror corduc|ors. T|e s|ze s|a|| oe as spec|l|ed |r lFC 34-1.
4) "peed Reguation
T|e rorer| ol |rer||a ol ||e a||erra|or |oge||er W||| ||a| ol ||e |uro|re s|a|| oe sull|c|er| |o
ersure s|ao||||y ard ||e speed regu|a||or spec|l|ed |r ||e sec||or- cover|rg |uro|re lor lu|| |oad.
6) "haft
a) T|e gerera|or s|al| s|a|| oe rade ol oes| qua|||y lorged a||oy s|ee|, proper|y |rea|ed. T|e
s|al| s|a|| oe ol arp|e s|ze |o opera|e a| a|| speeds, |rc|ud|rg rax|rur over speed
W|||ou| v|ora||or or d|s|or||or ard s|a|| oe ao|e |o W|||s|ard s|or| c|rcu|| ard o||er
s|resses W|||ou| darage. To prever| ||e l|oW ol |arrlu| s|al| currer|s darag|rg ||e
oear|rgs, su||ao|e s|al| ear||||rg s|a|| oe prov|ded.
o) A corp|e|e se| ol |es| repor|s cover|rg re|a||urg|ca| s|rerg||, crys|a||ograp||c ard
u||rasor|c ard ooroscop|c |es|s perlorred |r eac| s|al| dur|rg var|ous s|ages ol ||s
rarulac|ur|rg s|a|| oe lurr|s|ed as a|so ||e corp|e|e spec|l|ca||ors ol ||e s|al| lorg|rg
ra|er|a| ard ||s des|gr parare|ers suc| as s|resses ard cr|||ca| speed.
10 MW Biomass Based Power Plant ABEIL
c) T|e gerera|or s|al| s|a|| |ave a su||ao|y s|aped l|arge lor coup||rg |o ||e
|uro|re|gearoox s|al|. T|e coup||rg s|a|| oe lorged |r|egra| W||| ||e s|al| ard ||e s|al|
coup||rg s|a|| corp|y W||| ||e requ|rerer|s ol lFC lor s|al| coup||rg. A|| coup||rg oo||s,
ru| ard ru| guards lor coup||rg s|a|| oe lurr|s|ed oy ||e verdor. T|e a||grrer| ||r|| lor
||e s|al| s|a|| oe as per ||e |a|es| NF|A|0lN s|ardards.
:) "pace Heaters
3u||ao|y ra|ed |ea|ers s|a|| oe |rs|a||ed W||||r ||e erc|osure ol ||e gerera|or. loca||or ard
||e rax|rur |erpera|ure ol ||e |ea|ers s|a|| oe suc| ||a| ro darage car oe caused |o ary
|rsu|a||or. lea|ers s|a|| oe su||ao|e lor opera||or or a s|rg|e-p|ase 230 v AC supp||es.
A su||ao|e ||erros|a| cor|ro||ed sW||c| s|a|| oe rour|ed or or adjacer| |o ||e s|a|or lrare lor
||e sW||c||rg oll ||e |ea|ers.
;) 7@citation "yste%
a) A orus||ess exc||er s|a|| oe used ard || s|a|| oe rour|ed or ||e ou| ooard erd ol ||e
gerera|or lrare. A s|a||c vo||age regu|a|or s|a|| oe |rc|uded |o cor|ro| ||e vo||age ol ||e
syrc|rorous gerera|or oy vary|rg ||e currer| supp||ed |o ||e l|e|d. 0e|a||s ol ||e
equ|prer| s|a|| oe lurr|s|ed a|org W||| ||e o|d.
o) A se|l-exc||ed s|a||c exc||a||or sys|er s|a|| oe prov|ded. A ||g| speed, lu||y |rop|ca||sed,
pr|r|ed c|rcu||, draWou| |ype, au|ora||c d|g||a||ara|og vo||age regu|a|or s|a|| oe prov|ded.
l| s|ou|d oe corp|e|e W||| recessary sers|rg lT's, cao|e er|r|es, cas| res|r |ype currer|
|rarslorrer, adjus||rg r|eos|a|s, au|o|rarua| ard or|oll se|ec|or sW||c|es. T|e lo||oW|rg
re|ers ol c|ass ore accuracy ol s|ze ro| |ess ||ar 144 x 144 rr s|a|| oe prov|ded |r ||e
exc||a||or cuo|c|e ard a|so |r ||e ur|| cor|ro| pare|.
Fxc||er l|e|d Currer|
0erera|or l|e|d Currer|
0erera|or l|e|d vo||age
0erera|or Terr|ra| vo||age
c) T|e exc||a||or sys|er s|a|| oe prov|ded W||| ||e lo||oW|rg lea|ures.
0erera|or vo||age cor|ro|
Fxc||a||or currer| cor|ro|
Fxc||a||or ou||dup dur|rg s|ar|up ard l|e|ds suppress|or s|u|doWr.
10 MW Biomass Based Power Plant ABEIL
l|r||er lor ||e urder exc||ed rarge ard de|ayed ||r||er lor overexc||ed rarge.
lea|ure lor para||e| opera||or ol ||e gerera|or W||| ||e gr|d sys|er |rcorpora||rg
poWer lac|or cor|ro| rode ard lea|ure lor |s|ard|rg opera||or dur|rg sudder gr|d
la||ure.
d) T|e sys|er ollered s|a|| |ave ||e lo||oW|rg lac|||||es.
|arua| rode ol opera||or
Au|o rode ol opera||or
lo||oW or rode |o |ave sroo|| |rarsler lror ore rode ol opera||or |o ||e o||er.
Au|o||arua| c|argeover lac||||y s|a|| oe prov|ded. lor rarua| rode vo||age |oWer|ra|se
p|s|o| gr|p |ype | spr|rg re|urr |ype sW||c| s|a|| oe prov|ded. lo||oW|rg r|r|rur a|arrs
s|a|| oe |rarsr|||ed |o ||e ur|| cor|ro| des|. T|e exc||a||or sys|er s|a|| |ave d|ode
pro|ec||or re|ays |o de|ec| la||ure ol ||e bo|a||rg 0|odes.
Avb lau||
Avb au|ora||c c|argeover |o rarua|
0|ode la||ure
<) 5ccessory 7>uip%ent
a) Terr|ra| ooxes s|a|| oe prov|ded |o erc|ose ||e |eads ard currer| |rarslorrer. T|e
|err|ra| ooxes s|a|| oe adequa|e|y des|gred |o accorroda|e |err|ra||or ol 8us
duc||s|rg|e core 11 |v XllF cao|e per p|ase ard ||s |err|ra||or |||s. T|e gerera|or s|a||
oe prov|ded W||| var|ous bT0's (|erpera|ure sersors) |rs|a||ed var|ous |r ||e s|a|or
W|rd|rg W||| |eads, oroug|| ou| |o a separa|e |err|ra| oox.
T|ese bT0's s|a|| oe |oo|ed up|o ||e |erpera|ure scarrer |r ||e cor|ro| pare|.
Necessary v|ora||or |rarsducer, d|sp|acerer| |rarsducers W||| |rarsr|||ers s|a|| oe
prov|ded W||c| s|a|| oe |oo|ed up |o ||e cor|ro| pare| |r ||e cor|ro| roor.
o) Adequa|e|y ra|ed reu|ra| grourd|rg res|s|or | reu|ra| grourd|rg |rarslorrer s|a|| oe
supp||ed, ||e res|s|or s|a|| oe s|a|r|ess s|ee| edge Wourd |ype rour|ed |r s||e|ded sale
erc|osure. A currer| |rarslorrer s|a|| oe prov|ded lor grourd lau|| currer| reasurerer|s
lor pro|ec||or. T|e ra||rg ol ||e res|s|or s|a|| oe lurr|s|ed.
c) Necessary surge capac||ors ard ||g||r|rg arres|ors s|a|| oe prov|ded lor gerera|or
pro|ec||or. T|e surge capac||ors s|a|| corlorr |o ||e |a|es| l3 2834 ard s|a|| oe ra|ed
10 MW Biomass Based Power Plant ABEIL
0.25 ||cro larad. T|e capac||ors s|a|| oe su||ao|e lor |rdoor rour||rg ard s|a|| oe
prov|ded W||| ou|||-|r d|sc|arge res|s|or.
<.1 SURGE PROTECTION EHUIPMENT
T|e surge pro|ec||or equ|prer| Wou|d corpr|se ||g||r|rg arres|ors W||| su||ao|e d|sc|arge
c|arac|er|s||cs |o su|| ||e gerera|or |rsu|a||or |eve| |r para||e| W||| su||ao|y ra|ed capac||or lor
sroo||er|rg ||e ra|e ol r|se ol |rpu|se vo||age. T|e ||g||r|rg arres|ors W||| oe |oca|ed as c|ose
as poss|o|e |o ||e gerera|or |err|ra|s.
<.2 PO(ER EVACUATION
T|e poWer gerera|ed lror ||e proposed poWer p|ar| W||| oe evacua|ed a| 132 |v ||roug| 1
No. 100 capac||y |rarslorrer.
T|e gerera|or |s ear||ed ||roug| a res|s|or |o ||r|| ||e ear|| lau|| currer| |o accep|ao|e ||r||s
so ||a| gerera|or core |s ro| daraged. lerce |||s sys|er W||| oe ol ror-ellec||ve|y ear||ed
|ype.
<.3 11 KV S(ITCHGEAR
T|e poWer gerera|ed lror ||e gerera|or W||| oe led |o ar |rdoor re|a| c|ad 11 |v sW||c|gear
||roug| su||ao|y ra|ed cao|es.
T|e 11 |v sW||c|er W||| corpr|se ol draW ou| |ype c|rcu|| orea|ers |oused |r |rdoor, re|a| c|ad
cuo|c|es. T|e ca|cu|a|ed lau|| |eve| ol ||e 11 |v gerera|or ous |s 500 |vA. T|e c|rcu|| orea|er
proposed |s 750 |vA|40 |A lor ||e gerera|or ous. T|e orea|ers W||| oe ol e|||er 3lo or
vacuur |ype.
<.4 PO(ER TRANSFORMERS
8ased or a rax|rur es||ra|ed |oad ol aoou| 12.5 |vA |o oe evacua|ed a| 132 |v, ore No.
12.5 |vA, 11 |v|132 |v, rd11, Z = 8 |rarslorrers W||| oe prov|ded lor |r|ercorrec||or W|||
||e gr|d. T|e |rarslorrer W||| oe 0NAN coo|ed. l| W||| oe prov|ded W||| 0lTC or ||e lv s|de
|av|rg 10 rarge |r s|eps ol 1.25. T|e lv reu|ra| W||| oe so||d|y ear||ed. T|e lv s|de
W||| oe prov|ded W||| ous||rgs ard lv s|de W||| cao|e oox.
10 MW Biomass Based Power Plant ABEIL
<.' 132 AV S(ITCHYARD
T|e 132 |v sW||c|yard s|a|| cors|s| ol s|rg|e ousoar arrargerer|, W||| ore |rcorer lror
|rarslorrer ard ore ou|go|rg leeder lor correc||rg ||e 132 |v ||re lror A3F8. T|e lau||
|eve| a| ||e 132 |v ous Wor|s ou| |o 750 |vA. loWever, as ||e r|r|rur ava||ao|e c|rcu||
orea|er ra||rg a| 132|v |s o30 A, 3lo c|rcu|| orea|ers su||ao|e lor 2o.3 |A orea||rg capac||y
W||| oe prov|ded. T|e |so|a|ors W||| oe |or|zor|a| cer|er orea| |ype W||| ro|or opera|ed c|os|rg
rec|ar|sr. T|e currer| ard po|er||a| |rarslorrers W||| oe ol o|| l|||ed |ype.
T|e sW||c|yard W||| oe ol ou|door |ype W||| ga|var|zed s|ee| |a|||ce s|ruc|ures.
T|e s|a||or aux|||ary sW||c|gear W||| leed ||e lo||oW|rg sW||c|gear | |CCs | 0|s|r|ou||or ooards.
8o||er |CC
Coo||rg ToWer |CC
T0 |CC
As| |ard||rg sys|er 08
0| l|ar| 08
3W||c|yard 08
l|g|||rg 08
Crare 08
Adr|r|s|ra|or 8u||d|rg | 0ues| louse
lue| lard||rg 3ys|er.
loads ol ||e poWer p|ar| aux|||ar|es ard o||er s|a||or |oads W||| oe led d|rec||y lror ||e s|a||or
aux|||ary sW||c|gear.
T|e ra|r ore-||re d|agrar lor ||e poWer p|ar|, erc|osed |rd|ca|es ||e aux|||ary poWer
d|s|r|ou||or. T|e var|ous aux|||ar|es ol ||e poWer p|ar| Wou|d oe supp||ed a| ||e lo||oW|rg
ror|ra| vo||ages deperd|rg upor ||e|r ra||rgs ard lurc||ors.
415 v, 3 p|ase, 3 W|re ellec||ve|y grourded AC supp|y lor ro|ors.
240 v, 1 p|ase, AC supp|y lor ||g|||rg, space |ea||rg ol ro|ors ard pare|s, s|rg|e p|ase
ro|ors, e|c.
230 v, 1 p|ase grourded AC supp|y lor AC cor|ro| c|rcu||s.
110 v, urgrourded 0C supp|y lor cor|ro| ard |rd|ca||or.
<.< 41' V SYSTEM
T|e 415v 3 p|ase, 3 W|re poWer lor ||e 415 v aux|||ar|es Wou|d oe oo|a|red lror ||e aux|||ary
|rarslorrer. T|e 415 v sW||c|gear Wou|d oe ol re|a| erc|osed des|gr W||| syrre|r|ca| s|or|
c|rcu|| ra||rg ol 50 |A.
10 MW Biomass Based Power Plant ABEIL
A|| ||e poWer ard ro|or cor|ro| cer|ers Wou|d oe corpar|rer|a||zed ard Wou|d oe ol douo|e
lror| execu||or ard lu||y draW-ou| des|gr W||| a|| ||e c|rcu|| corporer|s rour|ed or a
W|||draWa| s|ee| re|a| c|ass|s. T|e c|rcu|| orea|ers Wou|d oe a|r orea| |ype. |o|or s|ar||rg
Wou|d oe d|rec| or-||re. |o|ors ra|ed aoove 125 |w W||| oe cor|ro||ed oy a|r orea|, e|ec|ro-
ragre||c |ype cor|ac|ors prov|ded W||| aro|er| |erpera|ure corpersa|ed, ||re |agged, |ard
rese| |ype ||erra| over|oad re|ays, |av|rg adjus|ao|e se|||rgs ard oac|ed up oy lbC luses
lor pro|ec||or aga|rs| s|or| c|rcu||s. T|e sW||c|gear Wou|d oe |oca|ed |r ||e cor|ro| ou||d|rg.
<.; STATION AUIILIARY TRANSFORMER
T|e aux|||ary |rarslorrer Wou|d oe 1 ro. 1.5 |vA 11 | 0.433 |v 0yr11 corror lor a|| ur||s. l|
W||| supp|y poWer |o ||e 415 v aux|||ar|es ol ||e poWer p|ar| 3T0, Cw|ACw sys|er, Wa|er
|rea|rer| p|ar|, ||g|||rg, oa||ery c|argers, e|c. T|e reu|ra| ol ||e |rarslorrer Wou|d oe so||d|y
ear||ed. T|e aux|||ary |rarslorrer Wou|d oe 0NAN |ype ard Wou|d oe prov|ded W||| 5 oll
c|rcu|| |aps |r s|eps ol 2.5 or ||e lv s|de.
<.7 CONTROL 4 PROTECTION SYSTEM
<.7.1 G"!"%a#*%
T|e lo||oW|rg pro|ec||ors are proposed |o oe prov|ded lor ||e gerera|ors.
0|llerer||a| pro|ec||or
3|a|or ear|| lau|| pro|ec||or
loss ol l|e|d pro|ec||or
Nega||ve p|ase sequerce currer| pro|ec||or
lrpedarce or vo||age res|ra|red overcorrec| oac|-up pro|ec||or
bo|or ear|| lau|| pro|ec||or
beverse poWer pro|ec||or
0ver vo||age pro|ec||or
loW lorWard poWer pro|ec||or (lor s|ear |uro|re gerera||or or|y)
urder vo||age pro|ec||or
0ver|oad a|arr
<.7.2 Ca/aci#8 11 AV 6 41' V S#a#i*! A)Biia%8 T%a!s+*%-"%
T|e lo||oW|rg pro|ec||ors are proposed lor ||e s|a||or aux|||ary |rarslorrer.
3-po|e ||g| se| overcorrec| pro|ec||or or l.T. s|de.
0-po|e l.0.|.T overcorrec| oac|-up pro|ec||or or l.T. s|de
3|rg|e po|e |rs|ar|areous overcorrec| ear|| lau|| pro|ec||or
10 MW Biomass Based Power Plant ABEIL
<.7.3 12.' MVA@ 11 6 132 AV T%a!s+*%-"%
T|e lo||oW|rg pro|ec||ors are proposed lor ||e aoove |rarslorrer.
0|llerer||a| pro|ec||or
0|rec||ora| oac|-up p|ase overcorrec| pro|ec||or or lv ard lv s|de
bFl pro|ec||or
0verl|ux|rg pro|ec||or
8uc||o|z, o|| ard W|rd|rg |erpera|ure pro|ec||or
<.7.4 132 AV Li!"s
0|s|arce pro|ec||or Wou|d oe prov|ded a| ||e gerera||rg s|a||or s|de.
<.7.' 132 AV B)s>a%s
l|g| |rpedarce, c|rcu|a||rg currer| |ype re|ay sc|ere W||| ra|r ard c|ec| lea|ures Wou|d oe
prov|ded lor ||e 132 |v ousoars.
<.1 EMERGENCY PO(ER SYSTEM
TWo Nos. d|ese| gerera|or se|s, 500 |va eac|, 415 v, 50 lz W||| oe prov|ded |o ra|e ava||ao|e
erergercy poWer supp|y |o ||e s|a||or |r case ol o|ac|-ou|. T|e d|ese| gerera|or se| W||| oe
correc|ed |o ||e 415 v sW||c|gear as s|oWr |r 3l0.
<.10 DIRECT CURRENT SUPPLY SYSTEM
T|e 0|rec| Currer| 3ys|er (0C) |s ||e ros| re||ao|e source ol supp|y |r ||e poWer s|a||or ard
W||| oe used lor ||e cor|ro| ard pro|ec||or ol ||e poWer p|ar| equ|prer|.
T|e 0C sys|er W||| oe used lor ||e lo||oW|rg.
F|ec|r|ca| cor|ro| ol equ|prer| ard |rd|ca||ors or ||e cor|ro| pare|.
loWer supp|y |o ||e esser||a| aux|||ar|es ol ||e poWer p|ar| ard |uro|res |r case ol AC
poWer la||ure.
loWer supp|y |o ||e lo||oW|rg serv|ces |r case ol |o|a| AC poWer la||ure.
Corrur|ca||or sys|er
0C ||g|||rg ol s|ra|eg|c areas lor sale persorre| roverer|.
T|e oa||ery s|z|rg W||| oe dore |o ca|er |o ||e lo||oW|rg |ype ol |oads.
|orer|ary |oad lor 1 r|ru|e
Frergercy |oad lor 2 |ours
10 MW Biomass Based Power Plant ABEIL
Cor||ruous |oad lor 10 |ours
urder rorra| cord|||ors, ||e oa||ery W||| oe or l|oa| c|arger. T|e l|oa| c|arger |s correc|ed |o
a d|s|r|ou||or ooard ard ree|s ||e requ|rerer|s ol 0C |oad. lr case ol add|||ora| derard ol
|oad or AC supp|y la||ure, ||e oa||ery W||| ree| ||e requ|rerer|s ol 0C |oads.
T|e ooos| c|arger W||| oe des|gred |o c|arger ||e lu||y d|sc|arged oa||ery |r 12 |ours oelore
pu|||rg || oac| or l|oa| c|arge.
A se| ol |Wo 110v oa||ery o|ar|s (100 s|ardoy) ol su||ao|e capac||y W||| |Wo l|oa| ard ooos|
c|argers ard a d|rec| currer| sW||c| ooard W||| ree| ||e 0C |oad ol poWer p|ar|. T|e oa||er|es
Wou|d oe ol s|a||orary |ead ac|d |ype, corp|e|e W||| rac|s, porce|a|r |rsu|a|ors, |r|erce|| ard
|r|er|or correc|ors. T|e c|argers Wou|d oe ol s|||cor rec||l|er |ype W||| au|ora||c vo||age
cor|ro| ard |oad ||r|||rg lea|ures.
<.11 UNINTERRUPTED PO(ER SUPPLY 9UPS: SYSTEM
0re oa||ery oar| ol su||ao|e capac||y W||| assoc|a|ed |Wo 100 l|oa| ard ooos| c|argers ard
|rver|ors Wou|d oe prov|ded |o der|ve ur|r|errup|ed 230 v AC poWer supp|y ||roug| su||ao|y
ra|ed |rver|ors. T|e oa||er|es W||| oe s|zed |o ca|er |o ||e |oads lor 30 r|ru|es. T||s poWer
supp|y W||| oe used |o leed esser||a| serv|ces suc| as cor|ro|, |rs|rurer|a||or, ard
arrurc|a||or e|c. requ|r|rg ul3 poWer. T|e |ype ol oa||er|es ard c|argers lor ||e ul3
sys|er Wou|d oe s|r||ar |o ||a| descr|oed aoove lor ||e 0C sys|er.
<.12 LIGHTING
T|e poWer s|a||or ||g|||rg sys|er Wou|d corpr|se ||e lo||oW|rg.
+) Aor%a .4? B 5C Lighting "yste%
T|e ||g|||rg c|rcu|| |r ||e rorra| 240 v AC ||g|||rg sys|er Wou|d oe led ||roug| 415|433 vo||s,
3 p|ase, 4 2W|re ||g|||rg |rarslorrers correc|ed |o a 415 v d|s|r|ou||or sys|er.
l|g|||rg |rarslorrers |r eac| area |r ||e poWer s|a||or Wou|d oe led lror a corver|er| 415 v
sW||c|gear||CC |oca|ed rearoy. Aoou| 20 ol ||e ||g|||rg l|x|ures W||| oe correc|ed |o rece|ve
erergercy AC supp|y. 0ur|rg la||ure ol rorra| AC supp|y, ||ese l|x|ures W||| oe led lror
erergercy AC supp|y der|ved lror ||e 00 se|.
10 MW Biomass Based Power Plant ABEIL
.) Direct Current 7%ergency Lighting
0|rec| currer| erergercy ||g||s Wou|d oe prov|ded a| s|ra|eg|c po|r|s |r ||e poWer s|a||or, v|z.,
rear er|rarces, s|a|rcases, ||e ra|r cor|ro| roor, e|c. T|ese Wou|d oe led lror ||e s|a||or
110 v 0C sys|ers ard Wou|d oe oll W|er ||e rorra| AC poWer supp|y |s ava||ao|e. T|ese
Wou|d oe au|ora||ca||y sW||c|ed or W|er ||e rorra| AC supp|y la||s.
T|e proposed |||ur|ra||or |eve|s lor var|ous areas are g|ver oe|oW.
Area |||ur|ra||or leve|
Cor|ro| roor 500 |ux.
3W||c|gear | |CC roors 200 - 250 |ux
loWer |ouse 200 |ux.
0u||y|rg areas 50 |ux.
Trarslorrer yard & sW||c|yard 10 - 20 |ux.
8o||er Area 50 |ux
A|r|0as corpressors |ouse, 0| p|ar| 200 |ux
wor|s|op 300 |ux
Car|eer 150 |ux.
3|ores 100 - 150 |ux.
lar||rg area ard cyc|e s|ard 70 |ux.
8a||ery roor 150 |ux.
Cao|e vau||s 100 |ux.
Adr|r|s|ra||or ou||d|rg ard oll|ce roors 350 |ux.
boads 10 |ux.
<.13 CABLING
A|| cao|es Wou|d oe se|ec|ed |o carry ||e |oad currer| urder s||e cord|||ors, W||| perr|ss|o|e
vo||age drop. lr add|||or, ||g| vo||age cao|es Wou|d oe s|zed |o W|||s|ard ||e s|or| c|rcu||
currer|.
T|e lo||oW|rg |ype ol cao|es Wou|d oe used.
lor 11 |v gerera|or sys|er. 11 |v urear||ed grade, s|rg|e | ru|||-core, s|rarded a|ur|rur
corduc|or, cross ||r|ed po|ye||y|ere |rsu|a|ed, screered, A|ur|rur W|re | ga|var|zed s|ee|
W|re arrored ard overa|| lvC s|ea||ed cao|es corlorr|rg |o l3 7098 lar| ll.
lor red|ur vo||age ard |oW vo||age poWer cao|es. oo0 | 1100 v grade, s|rarded a|ur|rur
corduc|or, lb lvC|lvC |rsu|a|ed, co|or coded.
lvC s|ea||ed ard A|ur|rur W|re|ga|var|zed s|ee| W|re arrored overa|| lvC s|ea||ed
cao|es corlorr|rg |o l3-1554.
10 MW Biomass Based Power Plant ABEIL
Cor|ro|, pro|ec||or, s|gra||rg ard superv|sory cao|es Wou|d oe ol o50|1100 v grade, arrea|ed
||g| corduc||v||y s|rarded copper corduc|or, lvC | e|as|orer |rsu|a|ed ard overa||
lvC|e|as|orer s|ea||ed. 3|gra||rg ard superv|sory cao|es Wou|d oe |W|s|ed pa|rs ard
screered W|erever requ|red.
T|e |rrer ard ou|er s|ea||s ol a|| ||e aoove cao|es Wou|d |ave l|re re|ardar| capao|||||es.
Cao|es Wou|d oe |a|d |r s|ee| |adder |ype cao|e |rays, su||ao|y suppor|ed |r ||e cor|ro| ou||d|rg,
3T0 ou||d|rg, o||er aux|||ary ou||d|rgs. lr ou|door areas, cao|es Wou|d oe |a|d |r rac|s|ou|||-up
|rerc|es or Wou|d oe our|ed d|rec||y urdergrourd deperd|rg or ||e erv|rorrer|.
<.14 LIGHTNING PROTECTION SYSTEM
A ||g||r|rg pro|ec||or sys|er Wou|d oe prov|ded as per l3 2309 ard lrd|ar F|ec|r|c||y bu|es.
T|e pro|ec||ors Wou|d cors|s| ol rool corduc|ors, a|r |err|ra|s ard doWrcorers ard Wou|d oe
prov|ded lor |a|| s|ruc|ures suc| as ||e 3T0 ou||d|rg.
<.1' FIRE ALARM SYSTEM
A l|re a|arr sys|er Wou|d oe |rs|a||ed |o prov|de v|sua| ard aud|o|e a|arr |r ||e poWer s|a||or
lor l|re de|ec||or a| ||e |rc|p|er| s|age. T||s sys|er Wou|d corpr|se rarua| ca|| po|r|s |oca|ed
a| s|ra|eg|c |oca||ors |r areas W||c| are rorra||y rarred, ard au|ora||c sro|e ard |ea|
de|ec|ors |oca|ed a| |rpor|ar| po|r|s suc| as ||e cao|e vau||, ||e cor|ro| roor, sW||c|gear
roor e|c., |o de|ec| l|re a| ar ear|y s|age, ard prov|de v|sua| ard aud|o|e a|arr.
<.1< FIRE CONTAINMENT
3|ra|eg|c areas |r ||e p|ar| Wou|d oe separa|ed oy adequa|e|y ra|ed l|reWa||s. A|| oper|rgs lor
sW||c|gears ard cao|e er|ry Wou|d oe sea|ed oy l|reprool sea|s |o prever| spread ol l|re lror
ore area |o aro||er.
<.1; COMMUNICATION SYSTEM
lr v|eW ol ||e ||g| ro|se |eve| |r poWer p|ar|s, puo||c address sys|er |s ro| recorrerded.
lor ellec||ve corrur|ca||or |r ||e p|ar|, au|ora||c d|a| |ype |e|ep|ores Wou|d oe se| up,
|av|rg ||e lo||oW|rg lea|ures.
10 MW Biomass Based Power Plant ABEIL
<.1;.1 I!#"%3c*--)!ica#i*! T""/?*!"s
T||s sys|er Wou|d corpr|se a |e|ep|ore exc|arge ard ar adequa|e ruroer ol d|a| |ype |ard
se| s|a||ors |oca|ed |r sourdprool cao|rs W||| su||ao|e l|as||rg |rd|ca||or or |op ol || |o
|rd|ca|e |rcor|rg ca||.
T|e |ardse|s |r ||e cor|ro| roor Wou|d oe prov|ded W||| pr|or||y serv|ce lac||||y |o erao|e ||er
|o |ave |rred|a|e access |o ary ol ||e |ardse|s ever |l ||e |ardse|s are a|ready ergaged. A
pr|va|e au|ora||c exc|arge lor corrur|ca||or W||| ou|s|de par||es Wou|d a|so oe prov|ded.
<.1;.2 (aAi"3#aAi" S"#s
wa|||e-|a|||e se|s Wou|d oe prov|ded lor |ey persorre|. T||s Wou|d, |oWever requ|re spec|a|
perr|ss|or lror ||e s|a|u|ory au||or|||es.
<.17 SAFETY EARTHING SYSTEM
A 3ale|y ear||||rg sys|er cors|s||rg ol a our|ed r||d s|ee| corduc|or ear||||rg gr|d Wou|d oe
prov|ded lor ||e poWer p|ar| |rarslorrer yard, sW||c|yard ard o||er ou||y|rg areas. T|ese
Wou|d oe correc|ed |o ||e ear|| gr|ds |r var|ous ou||d|rgs. T|e our|ed ear||||rg gr|d Wou|d oe
lur||er correc|ed |o ear||||rg gr|d Wou|d oe lur||er correc|ed |o ear||||rg e|ec|rodes our|ed
urder grourd ard |oca|ed a| represer|a||ve po|r|s.
T|e ear|| e|ec|rodes W||| oe 40 rr d|are|er ard 3000 rr |org 0.l rods ard ||e ra|r ear||
corduc|ors W||| oe 75 rr x 12 rr l|a|s. T|e ear|| corduc|ors W|er our|ed W||| oe ol r||d
s|ee| ard ga|var|zed W|erever exposed |o a|rosp|ere.
<.11 INSTRUMENTATION AND CONTROL
<.11.1 G"!"%a
T|e |rs|rurer|a||or & cor|ro| (l&C) sys|er proposed |o oe prov|ded lor ||e poWer p|ar| Wou|d
lac||||a|e cer|ra||zed au|ora|ed ard sale cor|ro| ol ||e poWer p|ar| corpr|s|rg ol ||e 8o||ers,
T0 ard ||e|r aux|||ar|es, cordersa|e sys|er ard ||e coo||rg Wa|er equ|prer|. T|e l&C
sys|er Wou|d oe des|gred |o ersure rax|rur ell|c|ercy, re||ao||||y, sale|y ard ava||ao||||y so
||a| op||rur p|ar| cor|ro| cou|d oe ac||eved W||| r|r|rur s|all.
T|e l&C sys|er oas|ca||y corpr|se ol ||e lo||oW|rg.
10 MW Biomass Based Power Plant ABEIL
lurc||ora||y d|s|r|ou|ed r|croprocessor oased l&C sys|er
lard W|red arrurc|a||or sys|er
Ara|y||ca| lrs|rurer|s
Cor|ro| des|s, pare|s ard sys|er cao|re|s
loWer supp|y sys|ers
loca| |rs|rurer|s
<.11.2 Dis#%i>)#". I!s#%)-"!#a#i*! 4 C*!#%* S8s#"- 9DCS:
T|e lurc||ora||y d|s|r|ou|ed r|croprocessor oased l&C sys|er W||| |ave a ||erarc||ca||y
d|s|r|ou|ed s|ruc|ure ard W||| |r|egra|e ||e var|ous p|ar| lurc||ors|sys|ers suc| as
reasurerer|s sys|er, c|osed |oop cor|ro| sys|er, oper |oop cor|ro| sys|er, sequerce ol
ever|s record, da|a oase sys|er, lau|| ror||or|rg d|agros|s, rar rac||re |r|erlace e|c.,
T|e aoove l & C sys|er W||| |ave corp|e|e redurdarcy a| processor |eve| ard corrur|ca||or
|eve|. A| ||e sersor |eve|, |r|p|e redurdarcy W||| oe prov|ded lor a|| cr|||ca| c|osed ard oper
|oops ard s|rg|e sersors W||| oe prov|ded lor a|| o||er oper ard c|osed |oops. lor cr|||ca|
ara|og cor|ro|s, lreud|ar se|ec||or lror ||ree reasurerer|s W||| oe adop|ed W|||e lor cr|||ca|
oper |oops |r|p|e sersors W||| |Wo ou| ol ||ree |og|c W||| oe prov|ded. Cors|der|rg ||e ||g|
re||ao||||y ol preser||y ava||ao|e processors, ro lur||er redurdarcy oy Way ol |ard-W|red oac|
up sys|ers |s proposed lor oper |oops.
+) !he DC" sha incude the foo(ing %ain subsyste%
a) Cor|ro| ard 0a|a Acqu|s|||or 3uosys|er lor ror||or|rg ard cor|ro| ol process
parare|ers |||e l|oW, |erpera|ure, pressure, |eve|, poWer, currer|, vo||age, ara|y||ca|
ard s|a|us.
T|e sys|er s|a|| a|so p|a|lorr ||e p|ar| superv|sory lurc||ors |||e perlorrarce
ca|cu|a||ors, u|||||y d|sp|ay, opera|or gu|darce ressage d|sp|ays, |ogs, ||s|or|ca|
s|orage ard re|r|eva| e|c., as spec|l|ed |r ||e suosequer| c|ap|ers.
o) 3equerce & |r|er|oc|, sale|y suo-sys|er lor ror||or|rg ard execu||rg sequerce
opera||or, p|ar| s|u|doWr, |r|er|oc|s ard p|ar| s|ar|-up.
c) 0pera|or | Frg|reer |r|erlace suo-sys|er lor opera|or gu|darce ressage d|sp|ays
ard rero|e cor|ro|, lor |ur|rg, corl|gur|rg, prograrr|rg ard ra|r|a|r|rg ||e sys|er.
d) bedurdar| Corrur|ca||or suo-sys|er lor |r|ercorrec||rg a|| ||e suo-sys|er.
e) T|e c|osed |oop suo-sys|er lor cor||ruous ac||or or va|ves or o||er rec|ar|ca|
dev|ces W||c| a||er ||e p|ar| opera||rg cord|||or |o or|rg ||e p|ar| parare|ers |o
s|ao|e cord|||or.
10 MW Biomass Based Power Plant ABEIL
l) T|e oper |oop suo-sys|er lor opera||or or var|ous |r|er re|a|ed dr|ves ol p|ar| sale|y,
au|ora||ca||y ard sequer||a||y W||| ||e |r|er|oc| ard pro|ec||or lurc||ors oe|rg
ava||ao|e a|| ||e ||re urder a|| cord|||ors ol opera||or |o avo|d ra|-opera||or ard |o
|rcrease ||e p|ar| ava||ao||||y.
T|e sys|er s|a|| corrur|ca|e W||| ||e |erpera|ure scarrers, o||er sys|er us|rg llC |r
ser|a| corrur|ca||or rode us|rg |008u3 pro|oco| rode lor ror||or|rg||r|er|oc||rg
purpose.
lurc||ora|||y ol ||ese suosys|ers descr|oed |r ||e correspord|rg c|ap|ers ol ||e
spec|l|ca||or.
lrograrrao|e log|c Cor|ro||ers (llC) or o||er spec|a| cor|ro| dev|ces s|a|| oe |rcorpora|ed
|r ||e suosys|ers.
T|ese cor|ro||ers s|a|| oe lu|| |rlorra||ora||y corpa||o|e W||| ||e 0C3 ard s|a|| a||oW ar
|rlorra||or exc|arge ||roug| a ru|ua| 0C3|llC 0a|a l|g|Way ard correspord|rg ga|eWays.
T|e ||s| ol a|arrs s|a|| oe sull|c|er| lor prov|d|rg sale p|ar| opera||or.
.) DC" $enera Characteristics
a) lrocess Cor|ro||er l|re C|arac|er|s||cs.
T|e Word `process cor|ro||er l||e' reler |o ary coro|ra||or ol r|croprocessor
assoc|a|ed rerory, da|a acqu|s|||or ard ou|pu| dev|ces W||c| car oe corl|gured |o
perlorr a se| ol cor|ro| ard|or |og|c lurc||or, da|a acqu|s|||or, ca|cu|a||or ard
corp|ex ara|og & d|scre|e s|ra|eg|es.
|ears s|a|| oe prov|ded |o ersure ||e |oss ol poWer supp|y ol ary cor|ro||er l||e does
ro| resu|| |r |oss ol rerory requ|r|rg rarua| recorl|gura||or, W|||ou| error, dur|rg a
poWer ou|age.
o) T|e r|r|rur des|gr lea|ures s|a|| |rc|ude ou| ro| ||r||ed |o ||e lo||oW|rg.
bedurdarcy s|a|| oe prov|ded |o ||e process|rg cor|ro||er ur||, poWer supp|y, l|0s lor
cr|||ca| s|gra|s ard corrur|ca||or rodu|es.
bedurdarcy s|a|| a|so oe prov|ded lor ||e da|a ||g|Way correc||ors ard ser|a|
|r|erlaces.
10 MW Biomass Based Power Plant ABEIL
loWer supp|y used lor |r|erroga||or W||| l|e|d dev|ces s|a|| a|so oe redurdar|.
A|| |rpu| ard ou|pu| rodu|es s|a|| oe s|or| c|rcu|| prool.
T|e sys|er s|a|| oe arrarged so ||a| ||e la||ure ol ary ror||or|rg dev|ce or cor|ro|
corporer|s or spur|ous |r|erred|a|e grourd|rg |r ||e s|gra| pa|| s|a|| ro| oper ||e s|gra|
|oop ror cause ||e |oss or ra|lurc||or ol s|gra| |o o||er dev|ces us|rg ||e sare s|gra| ard
urre|a|ed cor|ro| |oops.
Necessary grourd|rg lac|||||es s|a|| oe ava||ao|e W||| ||e sys|er, |o |a|e care ol ||e ear||||rg
re|a|ed proo|ers.
T|e des|gr ol ||e cor|ro| sys|er ard ||e re|a|ed equ|prer| s|a|| ad|ere |o ||e pr|rc|p|e ol
la||-sale opera||or a| a|| sys|er |eve|s. la||-sale opera||or s|gr|l|es ||a| ||e |oss ol s|gra|, |oss
ol exc||a||or or la||ure ol ary corporer| s|a|| ro| cause a |azardous cord|||or ard a| ||e
sare ||re occurrerce ol la|se |r|ps.
upor res|ora||or ol poWer, ||e sys|er W||| |r|||a||ze ||se|l |o ||e es|ao||s|ed corl|gura||or ard
opera||or. T|e cor|rac|or s|a|| prov|de de|a||ed exp|ara||or or sys|er lea|ures prov|ded lor
poWer la||ure recovery.
ll a |rarsr|||er la||s lor ar ara|og |rpu| va|ue exceed|rg prese| ||r||s, rears s|a|| oe prov|ded
|o crea|e ar a|arr ard |r|||a|e appropr|a|e pro|ec||or ac||or, suc| as |rarsler |o rarua| or ary
o||er pro|ec||ve ac||or. l| s|a|| oe poss|o|e |o ass|gr ||g| or |oW ||r||s |o eac| ara|og |rpu|,
s|ou|d a |rarsr|||er exceed e|||er ||r|| || s|a|| oe poss|o|e, ||roug| corl|gura||or, |o |rarsler
||e allec|ed pro|ec||ors ol ||e sys|er |o rarua|.
T|e sys|er s|a|| oe ao|e |o W|||s|ard ||e e|ec|r|ca| ro|se ard surge as ercour|ered |r ac|ua|
serv|ce cord|||ors.
0e|a||ed rars|a|||rg cao|re|s s|a|| oe prov|ded or as requ|red oas|s lor |err|ra||or ol a||
ara|og ard d|g||a| |rpu|s |o ||e sys|er ard a|| ara|og ard d|g||a| ou|pu|s lror ||e sys|er.
A r|r|rur ol 20 spare |err|ra|s ard a r|r|rur ol 20 add|||ora| rodu|es s|a|| prov|ded
|r excess ol ||e |o|a| requ|rerer| ol ||e sys|er des|gr.
10 MW Biomass Based Power Plant ABEIL
T|e sys|er s|a|| |rc|ude se|l-surve|||arce ard ror||or|rg lac|||||es, d|agros||c lea|ures, |oo|s
e|c., so ||a| a la||ure | ra|lurc||or s|a|| oe d|agrosed au|ora||ca||y, ard g|v|rg ||e de|a||s |o
||e opera|or s|a||ors.
- C|osed |oop cor|ro| execu||or s|a|| oe dore W||||r 250 rsec.
- 3equerce cor|ro|||r|er|oc|s scar ||re s|a|| oe W||||r 100 rsec.
- A|| ||e oper |oop s|a|| oe scarred a| ||e ra|e ol |ess ||ar 1 sec.
- 0C3 ard llC sarp||rg ||re s|a|| oe adjus|ed al|er se|ec||or ol ||e 0C3 ard llC
|ypes.
- lrov|s|or s|a|| oe |rc|uded |o produce a c|ear |ex|, |ard copy record ol ||e de|a||ed
corl|gura||or ol eac| l||e.
<.11.3 A!!)!cia#i*! S8s#"-
A|| aororra| opera||rg cord|||ors |ead|rg |o ur|| s|u|doWr W||| oe s|ru||areous|y arrurc|a|ed
or ||e d|s|r|ou|ed r|croprocessor oased cor|ro| sys|er as We|| as or ||e corver||ora| a|arr
lasc|a ur||s rour|ed or ||e cor|ro| pare|.
Add|||ora||y, group cor|ro| lurc||or (|.e. re|a|ed |o ||e suo-sys|er as a W|o|e or ||e ra|r
equ|prer|) ard |rd|v|dua| equ|prer| la||ure W||| oe arrurc|a|ed or ||e a|arr lasc|a |r ||e
cor|ro| pare|. A|| |rd|v|dua| or suos|d|ary cor|ro| lurc||or la||ure W||| oe arrurc|a|ed or ||e
0C3.
lor sale|y ard pro|ec||or |og|c's, cor|ac|s W||| oe |a|er or|y lror pr|rary sers|rg dev|ces,
W|erever leas|o|e. A|arr cor|ac|s W||| oe der|ved lror ||e reasurerer| s|gra| us|rg ||r||
va|ue ror||ors.
<.11.4 C*!#%* ."sA a!. /a!"
T|e ra|r cor|ro| roor |r ||e cor|ro| ou||d|rg W||| |ouse ||e recessary cor|ro| des|s ard
pare|s. T|e var|ous l&C sys|er cao|re|s W||| oe |oused |r ||e aux|||ary cor|ro| roor adjacer|
|o ||e ra|r cor|ro| roor. T|e prograrrers corso|e, corpu|er cao|re|s, d|sc cao|re|s,
pr|r|er's e|c., W||| oe |oca|ed |r ||e corpu|er roor.
T|e cor|ro| des|s W||| |rcorpora|e CbTs W||| assoc|a|ed |eyooard, |||ur|ra|ed pus| ou||or lor
purps, darpers, va|ves, T0 cor|ro| dev|ces e|c., au|o rarua| s|a||ors, cor|ro| sW||c|es, pus|
ou||ors ard syrc|ror|z|rg equ|prer| lor ||e oo||er ard T0. T|e cor|ro| pare|s W||| oe ol
s|rp|ex lree s|ard|rg |ype ard W||| |ouse |rd|ca|ors | recorders lor a|| cor|ro||ed parare|ers
10 MW Biomass Based Power Plant ABEIL
ard cer|a|r |rpor|ar| ror-cor|ro||ed parare|ers, arrurc|a||or W|rdoWs lor a|| |r|p cord|||ors
ard cr|||ca| process cord|||ors ard arre|ers lor a|| |arge capac||y ro|ors.
+) 9perator "tations
T|e opera|or ra|r |r|erlace |o ||e cor|ro| sys|er s|a|| oe ||roug| opera|or s|a||ors
cors|s||rg ol co|or CbT's rouse||rac|oa|| ard |eyooards. lr add|||or cer|a|r sol|Ware-
ass|gred ard |ard-W|red recorders s|a|| oe |rs|a||ed |l requ|red. T|e opera|or s|a||or
s|a|| oe su||ao|e lor lrdus|r|a| 0u|y.
Nor-d|s| oased |ar-rac||re |r|erlace |s prelerred.
.) Capabiities
Capao|||||es ol a r|r|rur 100 process grap||c d|sp|ays W||| oe prov|ded. T||s l|gure
does ro| |rc|ude de|a|| d|sp|ay, group d|sp|ay, |rerd d|sp|ay, a|arr ||s| ard
ra|r|erarce d|sp|ays.
0) DC" High(ay Co%%unication Re>uire%ents
A redurdar| re|Wor| corrur|ca||or ||r| (da|a ||g|Way) s|a|| oe prov|ded. T|e da|a
||g|Way s|a|| prov|de ||e rears oy W||c| process l|0, raragerer| |rlorra||or ard
cor|ro| |rlorra||or |s access|o|e |o ||e opera|or |r|erlace ard |o a|| o||er cor|ro| l||es
ard o||er ||g|Way dev|ces. lr ||e ever| ol la||ure or ore ||r|, corrur|ca||or s|a||
cor||rue W|||ou| d|s|uroarce |o or-go|rg opera||or.
<.11.' P*5"% S)//8
T|e corp|e|e l&C sys|er Wou|d oas|ca||y oe des|gred |o opera|e or 110 v AC supp|y W||c|
Wou|d oe prov|ded lror ||e ur|r|errup|ed poWer supp|y (ul3) sys|er |rcorpora||rg recessary
oa||er|es, c|argers, |rver|ers e|c., Cer|a|r o||er vo||ages requ|red lor ||e sys|er, e.g. 24 v 0C
poWer supp|y requ|red lor cor|ac| |r|erroga||or, 48 v 0C requ|red lor cer|a|r e|ec|ror|cs cards,
e|c., W||| oe der|ved lror ||e 110v AC poWer supp|y rade ava||ao|e lror ul3 sys|er.
<.11.< L*ca I!s#%)-"!#s
lr add|||or |o ||e aoove, a|| recessary |oca| |rs|rurer|s suc| as pressure, |erpera|ure ard
|eve| gauges, pressure, |erpera|ure, |eve| ard l|oW sW||c|es e|c., W||| oe prov|ded |r ||e poWer
p|ar| |o erao|e ||e |oca| opera|or |o superv|se ard ror||or ||e equ|prer| opera||or.
10 MW Biomass Based Power Plant ABEIL
+) !e%perature 8nstru%ents
A|| |erpera|ure e|erer|s s|a|| oe prov|ded W||| ||erroWe||s laor|ca|ed ou| ol oar
s|oc| ol r|r|rur 33 304 ra|er|a|. Ary p|pe ||res |ess ||ar 4' ror|ra| oore s|a|| oe
|rcreased |oca||y |o 4' s|ze |o |rs|a|| ||erro We||s.
loca| |erpera|ure gauge s|a|| oe gerera||y rercury |r s|ee| l|||ed |ype, Wea||erprool,
W||| 150 rr d|a d|a| gauge s|ze, W||| s|a||erprool g|ass. l|||ed |ype W||| cap|||ary
|uo|rg s|a|| oe r|r|rur ol 33 304 W||| s|a|r|ess s|ee| l|ex|o|e arror|rg. T|e gauges
s|a|| |ave accuracy ol 1 l30.
0up|ex |ype ||errocoup|es or bT0 s|a|| oe used W|erever requ|red.
Adequa|e des|gr care |as |o oe |a|er |o ersure ||erra| corduc||v||y oe|Weer
||erroWe|| ard |erpera|ure reasur|rg e|erer|.
T|errocoup|es s|a|| oe as per AN3l |C 9o.1 ard s|a|| oe ol 14 Aw0 ragres|ur
ox|de |rsu|a|ed grourded |ype. lor |erpera|ure aoove 800 dec. ||e s|ea|| s|a||
rade ol lrcore| o00. lor |erpera|ures aoove 800 dec. ||e s|ea|| s|a|| oe rade ol
33 31o. T|e ||errocoup|es s|a|| oe se|ec|ed as lo||oWs.
a) Copper - Cors|ar|ar (l3A-TlF T) lor rarges . - 200 |o 200C
o) C|rore| - Cors|ar|ar (l3A-TlF F) lor rarges . - 200 |o o00C
c) C|rore| - A|ure| (l3A - TlF K) lor rarges .- o00 |o 1200C
bT0 s|a|| oe ||ree W|re |ype W||| p|a||rur e|erer| W||| 100 o|rs res|s|arce a| 0
dec. ca||ora|ed as per 0lN 437o0.
TW|r e|erer| sersors, |l used, s|a|| |ave |Wo separa|e cordu|| er|r|es.
.) /ressure 8nstru%ents
lressure gauges s|a|| |ave ar accuracy ol 1 ol l30. T|ese s|a|| oe Wea||er
prool W||| d|a| s|ze ol r|r|rur 150 rr ard s|a|| |ave lea|ures |||e screWed oeze|s,
ex|erra||y adjus|ao|e zero, over rarge pro|ec||or ard o|oWou| d|scs.
lressure gauge sers|rg e|erer| s|a|| oe r|r|rur ol 33 31o ard rov|rg par|s ol 33
304. lor |rpor|ar| app||ca||ors, 250 rr d|a| s|ze s|a|| oe used. T|e g|ass s|a|| oe
10 MW Biomass Based Power Plant ABEIL
s|a||er prool. 8|dder s|a|| prov|de sruooer | s|p|or a|org W||| ||e pressure gauges
W|erever requ|red.
lressure |rarsr|||ers - srar| |ype W||| a r|r|rur |urrdoWr ra||o ol 1.30 W||| |oca|
|rd|ca|or s|a|| oe e|ec|ror|c capac||arce |ype or p|ezoe|ec|r|c res|s|arce |ype W|||
r|r|rur ol 33 31o e|erer| ra|er|a| ard W||| a over rarge pro|ec||or ol r|r|rur
130 ol rarge.
0|rec| rour|ed pressure sW||c| s|a|| |ave e|erer| d|ap|ragr or oe|oW ol r|r|rur
ol 33 31o ra|er|a| W||| ' NlTl correc||or.
0) Leve 8nstru%ents
A|| gauge g|asses s|a|| oe s|ee| arrored rel|ex or |rarsparer| |ype W||| oody ard
cover ra|er|a|s ol caroor s|ee| as a r|r|rur ard |erpered |rpor|ed ooros|||ca|e
g|ass.
0|llerer||a| pressure |rarsr|||er s|a|| oe used lor |eve| reasurerer|.
leve| sW||c|es s|a|| gerera||y oe ex|erra| oa|| l|oa| |ype W||| l|arged |ead.
lor rero|e |eve| |rd|ca||or ol drur, a separa|e |eve| |rarsr|||er s|a|| oe erp|oyed
W||c| W||| oe correc|ed |o a d|g||a| |rd|ca|or W||| lF0 ard oarograp| d|sp|ay.
4) ,o( 8nstru%ents
l|oW reasurerer| s|a|| oe W||| l|oW rozz|es lor |a|r s|ear l|oW ard |||r p|a|e
square edge corcer|r|c or|l|ce p|a|e rour|ed oe|Weer a pa|r ol We|d rec| l|arges ol
r|r|rur 300 pourds AN3l ra||rg W||| l|arge |aps lor o||er reasurerer|s. T|e
ra|er|a| ol ||e or|l|ce p|a|es s|a|| oe 33 31o.
|e|er rurs s|a|| |ave sull|c|er| s|ra|g|| ||re as per 83-1042.
0l |ype l|oW |rarsr|||er s|a|| rorra||y oe e|ec|ror|c capac||arce | p|ezo - res|s||ve
|ype ard srar| |ype W||| a |urrdoWr ra||o ol r|r|rur 1.30
10 MW Biomass Based Power Plant ABEIL
6) Contro Baves
- Cor|ro| va|ves s|a|| rorra||y oe 0|ooe |ype. 0||er |ypes |||e ou||erl|y va|ves,
oa|| va|ves, arg|e va|ves, 3 Way va|ves, e|c., s|a|| oe se|ec|ed as per serv|ce.
- ||r|rur oody ard l|arge ra||rg ol cor|ro| va|ves s|a|| oe as per p|p|rg c|ass.
- 8ody ra|er|a|, as a r|r|rur, s|a|| oe as per p|p|rg spec|l|ca||ors.
- va|ve sea| |ea|age s|a|| oe as per AN3l 8 15.104.
- lea|age ol s|u| doWr va|ves s|a|| oe C|ass vl, as a r|r|rur ard |ea|age
lor cor|ro| va|ves s|a|| oe C|ass lv.
- va|ve pos|||orers W|erever used s|a|| oe s|de rour|ed lorce oa|arce
preura||c |ype.
- lor e|ec|ror|c |rs|rurer|a||or, l|l corver|er s|a|| oe used a|org W|||
preura||c pos|||orers.
- 3e|l ac|ua||rg regu|a|ors lor l|oW, pressure ard |erpera|ure s|a|| oe used
W|ere |oads are cors|ar| ard s|a|| oe ol prec|s|or cor|ro|s.
T|e poWer cy||rders s|a|| oe douo|e ac||rg p|s|or rodu|a||rg |ype, |rurr|or rour|ed,
W||| ||rear car c|arac|er|s||cs ard prov|s|or lor reversa| ac||or. T|e p|s|or rod s|a||
oe |ard c|rore p|a|ed ||g| s|rerg|| s|ee|. T|e dr|v|rg equ|prer| s|a|| oe |r `3TA
luT' rode or a|r la||ure. T|e poWer cy||rders s|a|| oe supp||ed W||| pos|||orers, ||r||
sW||c|es ard pos|||or |rarsr|||ers.
10 MW Biomass Based Power Plant ABEIL
; ENVIRONMENTAL IMPACT AND POLLUTION CONTROL
T|e |ype ol po||u||or, W||c| allec|s ||e erv|rorrer|, erara||rg lror ||e poWer p|ar| car oe c|ass|l|ed
as lo||oWs.
A|r po||u||or
wa|er po||u||or
T|erra| po||u||or
No|se po||u||or
;.1 THE POLLUTANTS GENERATED FROM THE PO(ER PLANT ARE
0us| ard par||cu|a|e ra||er |r ||e l|ue gas
l|y as| lror ||e |oppers
lurrace oo||or as|
Fll|uer| lror Wa|er |rea|rer| p|ar|
3eWage lror ||e p|ar|
CONTROL METHODS FOR AIR POLLUTION
;.2.1 D)s# a!. /a%#ic)a#" -a##"%s
T|e po||u||or cor|ro| rorrs s||pu|a|es a rax|rur dus| corcer|ra||or ol 115rg||N.cu.r|. T|e
proposed poWer p|ar| W||| |ave ar F|ec|ros|a||c lrec|p||a|or (F3l), W||c| W||| separa|e ||e
dus| lror ||e l|ue gas ard |as ar ell|c|ercy ol 98. T|e dus| corcer|ra||or |s ||e l|ue gas
|eav|rg ||e F3l W||| oe rax|rur 115 rg|Nr
3
.
T|e dus| corcer|ra||or |eve| |r ||e c||rrey W||| oe per|od|ca||y ror||ored. Correc||ve s|eps W|||
oe |a|er, |l ||e corcer|ra||or |s ro| as per ||e accep|ao|e ||r||s.
;.2.2 S)/?)%3.i3*Bi." a!. Ni#%*="!3.i3*Bi."
T|e ra|r lue| |r ||e proposed p|ar| |s 8|o |ass, W||c| does ro| |ave s|gr|l|car| 3u|p|ur |r ||.
lerce, ||e 3u|p|ur d|ox|de W||| ro| oe produced. loWever, ||e s|ac| |e|g|| W||| oe as per ||e
|oca| po||u||or cor|ro| ooard s||pu|a||ors. T|e r||roger-d|-ox|des are ro| produced |r l|r|rg.
;.2.3 F8 As? a!. B*##*- As?
T|e as| co||ec|ed lror ||e oo||or ol lurrace (oed as|) ard ||e as| co||ec|ed |r ||e a|r |ea|er
|oppers ard F3l |oppers are |a|er |o ar as| s||o ||roug| a ser|es ol corveyors. T|e as|
lror ||e s||o W||| oe d|sposed oll |o larrers, W|o car use ||e as| as rarure lor ||e crops.
10 MW Biomass Based Power Plant ABEIL
CONTROL METHODS FOR (ATER POLLUTION
+) 7ffuents fro% -ater !reat%ent /ant
T|e Wa|er dra|red lror ||e Wa|er |rea|rer| p|ar| W||| |ave |o oe |rea|ed so ||a| ||e Wa|er |e|
ou| |s reu|ra| (pl 7.0). To ac||eve |||s ||e Wa|er dra|red lror ||e Wa|er |rea|rer| p|ar| |s
purped |o a reu|ra||za||or p||. T|e reu|ra||za||or p|| W||| |ave ac|d res|s|ar| or|c| ||r|rg.
0eperd|rg or ||e qua|||y ol Wa|er co||ec|ed |r ||e p||, e|||er ar a||a||re red|ur or ac|d|c
red|ur W||| oe purped |r|o ||e p|| |o reu|ra||ze ||e Wa|er.
.) &oier &o(do(n
lr order |o ra|r|a|r ||e so||d corcer|ra||or |r ||e oo||er leed Wa|er, |Wo |ypes ol o|oW doWr
are erp|oyed |r ||e oo||er. 0re |ype |s cor||ruous o|oW doWr ard ||e o||er |r|err|||er| o|oW
doWr.
T|e o|oW doWr Wa|er W||| oe a| a |erpera|ure ol 100
0
C. T|e quar|||y ol o|oW doWr W||| oe
arourd 1.5 |p|. T||s Wa|er car oe |a|er |o ||e ell|uer| pords, W|ere || W||| ge| coo|ed ra|ura||y.
0) "e(age fro% the /o(er /ant &uidings
T|e seWage lror ||e var|ous poWer p|ar| ou||d|rgs W||| oe |a|er |o a corror sep||c |ar|
||roug| |rerc|es. T|e seWage lror ||e sep||c |ar| W||| oe d|sposed oll ||roug| corcre|e
|rerc|es. As ||e seWage |s |a|er |r |rerc|es ||e so|| W||| ro| ge| cor|ar|ra|ed.
;.3 CONTROL METHODS FOR THERMAL POLLUTION
T|e Wa|er used |r ||e surlace corderser |o corderse ||e s|ear W||| oe coo|ed |r a coo||rg
|oWer ol e|||er |rduced or lorced dral| |ype. T|e Wa|er |e| ou| lror ||e coo||rg |oWer W||| |ave
a |erpera|ure very c|ose |o ||e aro|er|.
CONTROL METHODS FOR NOISE POLLUTION
T|e rajor source ol ro|se po||u||or |r ||e poWer p|ar| poWer p|ar| |s lror ||e lo||oW|rg.
bo|a||rg equ|prer|s |||e l0, l0 ard 3A lars
- leed purps
- 8o||er ard super|ea|er sale|y va|ves
- 3|ar| up ver|
- 3|ear |uro|re
;.4.1 DG S"#s
10 MW Biomass Based Power Plant ABEIL
As per 03lA s|ardards, ||e sourd |eve| lror ||e ro|a||rg equ|prer|s s|a|| oe 85 |o 90 d8A.
T|e ro|a||rg equ|prer|s W||| oe des|gred |o ac||eve |||s.
T|e s|ar| up ver|, sale|y va|ve ou||e|s ard ||e 00 se|s W||| oe prov|ded W||| s||ercers |o
reduce ||e ro|se |eve| |o ||e accep|ao|e ||r||s.
T|e poWer |ouse ou||d|rg W||| oe cors|ruc|ed su||ao|y |o |eep ||e ro|se |eve| W||||r ||e
accep|ao|e ||r||s.
lroro|ers are aWare ol ||e|r soc|a| oo||ga||ors ard W||| oe es|ao||s||rg ar ell|uer| |rea|rer|
p|ar| |o |rea| ||s ||qu|d ell|uer|s.
T|e lo||u||or Cor|ro| 8oard rorrs lor a|r, Wa|er ard sourd |s g|ver oe|oW.
T*"%a!c" Li-i#s +*% Disc?a%=" *+ T%a." E++)"!#s
C?a%ac#"%is#ics
T*"%a!c" Li-i#s +*% .isc?a%=" *+ T%a."
E++)"!#s
I!a!. S)%+ac" (a#"% O! a!. +*% I%%i=a#i*!
3usperded so||ds (rg||||.) 100 200
0|sso|ved so||ds-lrorgar|c (rg||||.) 2100 2100
ll va|ue 5.5-9.0 5.5-9.0
Terpera|ure (
0
C) 40 a| ||e po|r| ol
d|sc|arge
45 a| ||e po|r| ol
d|sc|arge
0|| ard grease (rg||||.) 10 10
8|oc|er|ca| 0xyger 0erard (800) lor
5 days a| 20
0
C
30 100
C|er|ca| 0xyger 0erard (C00)
(rg||||.)
250
C||or|de (as Cl) (rg||||.) 1000 o00
3u|p|a|es (30
4
) (rg||||.) 1000 1000

10 MW Biomass Based Power Plant ABEIL
A->i"!# Ai% H)ai#8 S#a!.a%.s
C?a%ac#"%is#ics
C*!c"!#%a#i*! 9-=6-
3
:
SPM S*
2
CO NO
I
lrdus|r|a| ard r|xed use 500 120 5000 120
bes|der||a| & bura| 200 80 2000 80
3ers|||ve 100 30 1000 30
E-issi*! S#a!.a%.s +*% B*i"%s
Ca/aci#8 *+ B*i"%s 9#*!s6?: Pa%#ic)a#" E-issi*! Li-i#s 9-=6N-
3
:
less ||ar 2 1o00
2 |o 15 1200
|ore ||ar 15 150
T||s requ|rerer| |s app||cao|e lor oo||ers us|rg ary |ype ol so||d lue|. lr ||e case ol |rdus|r|es
W|ere par||cu|a|e er|ss|or cor|ro| are adop|ed |o ||e ||r||s prescr|oed, ||e s|ac| |e|g|| car
oe re|axed |o l = 74
p
0.27
, W|ere
p
= lar||cu|a|e er|ss|or |r Tors per |our.
P"%-issi>" N*is" L"$"s
EB/*s)%" D)%a#i*! /"% Da8 S*)!. L"$" .B 9A:
8 90
o 92
4 95
3 97
2 100
1 102
10 MW Biomass Based Power Plant ABEIL
7. PO(ER PLANT LAYOUT
7.1 CRITERIA FOR THE PO(ER PLANT LAYOUT
T|e gerera| cr||er|a lor ||e poWer p|ar| |ayou| are as lo||oWs.
a. T|e ra|r s|ear p|p|rg |o ||e |uroogerera|or s|a|| oe as s|or| as poss|o|e. T||s |s |o
avo|d excess|ve pressure ard |erpera|ure drop |r ||e s|ear ||re, W||c| Wou|d allec|
||e |uro|re perlorrarce. A|so, ||e ra|er|a| used W||| oe a||oy s|ee|, W||c| |s very
cos||y.
o. T|e |erg|| ol ||e lT cao|es lror ||e T0 |a|| |o ||e sW||c|yard s|a|| oe r|r|rur.
c. T|e |erg|| ol ||e s|a| corveyor lror ||e s|orage area |o ||e oo||er e|c. |as |o oe
r|r|rur. T||s |s |o reduce ||e aux|||ary poWer corsurp||or ard ||e cos| ol ||e
equ|prer|.
d. lue| s|orage yard s|a|| oe lar aWay lror ||e equ|prer| so ||a| ||ere W||| ro| oe ary
dus| ru|sarce.
e. T|e sW||c|yard, as| |ard||rg area ard lue| s|orage |ard||rg area |as |o oe
access|o|e oy roads.
7.2 BOILER LAYOUT
T|e |ayou| lor ||e oo||er 1 x50 |p| W||| oe or ||e eas|err s|de ol ||e l|ar|. T|e leed|rg sys|er
lor lue| W||| oe |oca|ed |r ||e oo||er lror|. T|e opera||rg l|oor lor ||e oo||er W||| oe corcre|e ard
a| a e|eva||or ol 5 ||s. lror ||e grourd |eve|. T|e oo||er W||| oe prov|ded W||| 800 rr W|d||
l|oors, W|erever requ|red.
T|e oo||er W||| oe |op suppor|ed. T|e ecoror|zer ard ||e a|r |ea|ers W||| oe |oca|ed jus| al|er
||e oo||er oar| ore over ||e o||er. T|e a|r |ea|er W||| cors|s| ol |Wo o|oc|s. 3u||ao|e space W|||
oe prov|ded ard prov|s|or rade lor c|ear|rg ol ||e a|r |ea|er |uoes. T|e oo||er leed Wa|er
purps W||| oe |oca|ed oe|oW ||e deaera|or s|orage |ar|, a| ||e grourd l|oor ol T0 ou||d|rg.
T|e leed Wa|er cor|ro| s|a||or W||| oe |oca|ed |r ||e oo||er opera||rg l|oor. T|e c||rrey |e|g||
W||| oe dec|ded oased or ||e |oca| po||u||or cor|ro| rorrs.
7.3 TG BUILDING LAYOUT
T|e T0 ou||d|rg W||| oe |oca|ed adjacer| |o ||e oo||er area. T|e T0 ou||d|rg W||| oe s|zed |o
accorroda|e ||e 11 |w |uroogerera|or ard ||s aux|||ar|es. T|e |uro|re W||| oe |oca|ed a| ar
e|eva||or ol o ||s. lror grourd |eve|. T|e ou||d|rg W||| oe s|ee| s|ruc|ure W||| regu|ar rool W|||
s|de c|add|rg. T|e l|oors W||| oe rade lror pre cas| s|aos, W||c| g|ves oe||er appeararce ard
10 MW Biomass Based Power Plant ABEIL
||e |rs|a||a||or ||re W||| oe |ess. T|e corderser W||| oe |oca|ed jus| oe|oW ||e T0 a| grourd
|eve|. T|e corderser ex|rac||or purps ard ||e evacua||or sys|er W||| a|so oe |oca|ed a| ||e
grourd l|oor. T|e T0 ou||d|rg W||| oe prov|ded W||| a Crare lor ||l||rg ||e |uro|re par|s lor
ra|r|erarce.
7.4 ELECTRICAL AND CONTROL ROOMS
8o|| ||e e|ec|r|ca| ard cor|ro| roors W||| oe |oca|ed |r ||e T0 ou||d|rg. T|e oa||ery c|arger
roor ard oll|ce W||| a|so oe |oca|ed a| |||s l|oor a| e|eva||or o ||s. T|e |oca||or ol ||e cor|ro|
roor W||| oe suc| ||a| ||e oo||er ard ||e |uro|re W||| oe c|ear|y v|s|o|e lror ||e cor|ro| roor.
7.' FUEL STORAGE AREA
loWer p|ar| s|a|| |ave a p|arred lue| s|orage yard |o s|ore ||e lue| quar|||y
7.< ASH HANDLING SYSTEM
T|e as| |ard||rg sys|er cors|s|s ol scrapper corveyor, oe|| corveyors ard screW corveyor.
T|e as| lror ||e |rave|||rg gra|e |opper, p|erur c|aroer, a|r |ea|er |opper ard ||e F3l
|oppers W||| oe co||ec|ed ard corveyed |o a ra|r as| s||o W||c| W||| oe |oca|ed c|ose |o ||e
c||rrey.
7.; S(ITCH YARD
T|e o|orass poWer p|ar| s|a|| |ave a We|| p|arred poWer evacua||or sW||c|yard ol 132 |v.
10 MW Biomass Based Power Plant ABEIL
1. PRO2ECT SCHEDULE AND IMPLEMENTATION
1.0 PRO2ECT IMPLEMENTATION
1.1 PRO2ECT SCHEDULE
T|e sc|edu|e lor ||e |rp|erer|a||or ol ||e o|orass poWer projec| ol Arr|| 8|o Frergy ard
lrdus|r|es l|d Jag| boad |r |ayorg C|rc|e ol |ar|gaor d|s|r|c| |r Assar W||| a capac||y ol 11
|w |s erc|osed. T|e projec| sc|edu|e |rd|ca|es ||e var|ous ac||v|||es, W||c| |rc|udes
Frg|reer|rg, 0e|a||ed Frg|reer|rg, lrocurerer|, Frec||or ard Corr|ss|or|rg ol ||e projec|.
T|e projec| reeds 18 ror||s lror ||e da|e ol l|rarc|a| c|osure ard p|acerer| ol orders lor
cr|||ca| ||ers |||e, 8o||er ard Turo|re.
1.2 PRO2ECT MANAGEMENT
Frg|reer|rg |aragerer| sys|er, |s a lurc||ora| s|ra|egy deve|oped |o ree| ||e |as|s ol ||e
erg|reer|rg d|v|s|or |eep|rg |r v|eW ||e overa|| projec| ard ||e corpary's oojec||ves.
l| |s a se| ol p|arred ard We||-del|red sys|ers ard procedures lor eac| ac||v||y ard suo-
ac||v||y lor erg|reer|rg |as|s |o corp|e|e ||e projec| lror leas|o||||y, corcep|ua| des|gr,
de|a||ed erg|reer|rg up|o corr|ss|or|rg ard opera||or ol ||e p|ar|. T|e lo||oW|rg rajor
cors|||uer|s ol ||e Frg|reer|rg raragerer| sys|ers are oe|rg used lor ||e execu||or ol |||s
projec|.
0|v|s|or ol bespors|o||||y & Au||or||y, W||c| del|res ||e ro|e ard respors|o|||||es aga|rs| ||e
|as|s |der||l|ed lor ||e erg|reer|rg serv|ces, projec| erg|reer|rg ard ua|||y Assurarce &
lrspec||or serv|ces |r var|ous d|sc|p||res suc| as C|v||, |ec|ar|ca|, F|ec|r|ca|, Cor|ro|s ard
lrs|rurer|a||or.
Frg|reer|rg ard |or||or|rg 3ys|er covers |der||l|ca||or ol var|ous Frg|reer|rg ac||v|||es ard
suo-ac||v|||es oo|| pre-aWard ard pos|-aWard ol ||e ra|r p|ar| equ|prer| lor |||s projec|.
T|e ror||or|rg ol ||e progress repor|s ard |oo| a|ead p|arr|rg |s rade or ||e oas|s ol
3c|edu|ed da|es aga|rs| ||e ac|ua| da|e ol corp|e||or ol ||e ac||v|||es or ar||c|pa|ed da|es |o
corp|e|e ||e ac||v|||es lor every ror||.
10 MW Biomass Based Power Plant ABEIL
verdor 0raW|rg Cor|ro| 3ys|er prov|des ||e s|a|us repor||rg ard ror||or|rg lor verdor
suor|||ed draW|rgs, W||c| g|ve ||e c|ue |o |der||ly ||e verdor draW|rgs, la|||rg |r d|llerer|
approva| ca|egor|es, draW|rgs W||c| are over due lor suor|ss|or oy ||e verdor, draW|rgs
W||c| are perd|rg lor |rarsr|||a| ol ||e correr|s | d|s|r|ou||or e|c. T||s |s very |rpor|ar| lror
||e po|r| ol verdor progress ror||or|rg.
0raW|rg Cor|ro| lrocedure e|aoora|es |oW |o cor|ro| draW|rgs rece|ved lror ||e verdor or
deve|oped |r-|ouse. T|e sys|er |der||l|es |oW ||e draW|rgs are |o oe processed ard W|o |as
||e au||or||y |o approve ||ese draW|rgs | docurer|s ard |rarsr|||a| ol ||e draW|rgs |o ||e s||e
oll|ce corcerred, projec| corsu||ar| ard |o ||e verdor.
1.2.1 S8s#"- +*% F"". BacA
T||s projec| |as go| a group ol l|e|d erg|reers, W||c| W||| perlorr ||e erg|reer|rg |as|s a| s||e
oll|ce ard suppor| ||e erg|reer|rg group corcerred a| ||e lead oll|ce. T|e erg|reer|rg
group |s ||e loca| po|r| lor a|| erg|reer|rg |ssues ard ||e l|e|d proo|ers per|a|r|rg |o
erg|reer|rg. T|ey a|so rece|ve draW|rgs ard docurer|s ard d|s|r|ou|e arorgs| ||e var|ous
depar|rer|s ol ||e projec|, prov|de ary c|ar|l|ca||or or rod|l|ca||or ol ary ra|ure ard g|ve ||e
leed oac| dur|rg cors|ruc||or ard corr|ss|or|rg s|age ol ||e projec|. T|ey are a|so
respors|o|e |o gerera|e projec| draW|rgs ard da|a |o A3-8u||| |rlorra||or.
1.2.2 C*-/)#"% Ai.". D"si=!
T|e use ol Corpu|er A|ded 0es|gr (CA0) lor deve|oprer| ol erg|reer|rg des|gr ard
draW|rgs |s oe|rg erp|as|zed oy ||e corpary. lreser||y a|ros| a|| ||e erg|reer|rg |as|s are
perlorred us|rg CA0 W||| ||e sol|Ware progrars a|ready ava||ao|e ard deve|oped W||||r ||e
corpary.
1.2.3 Ass)%a!c" *+ E!=i!""%i!= H)ai#8
w||| ||e use ol s|ardard|zed docurer|, rode| |ec|r|ca| spec|l|ca||or, des|gr gu|de||res ard
c|ec|||s|, ||e requ|red erg|reer|rg qua|||y |s poss|o|e |o ac||eve.
Cos| Cor|ro|. lr order |o |ave cor|ro| or ||e overa|| cos| ol ||e projec|, ||e projec| |s sp||| |r|o
ro. ol pac|ages ard ||e cos| |s Wor|ed or ||e oas|s ol ||e pr|ce da|a oo|a|red lror var|ous
verdors, as We|| as or ||e oas|s ol ||e |rerds ol ||e cos| var|a||ors |r ||e preser| day rar|e|.
10 MW Biomass Based Power Plant ABEIL
T|re Cor|ro|. T||s |s ac||eved dur|rg projec| p|arr|rg ard ror||or|rg sys|er. |or||or|rg |s
dore a| every p|ace - beg|ora| oll|ce, Corsu||ar|'s oll|ce ard ||e 3||e oll|ce.
1.3 CONSTRUCTION MANAGEMENT
1.3.1 P*5"% Pa!# a!. Facii#i"s
3||e ac||v|||es ol projec| group s|a|| oe carr|ed ou| as per Corsu||ar|s, Cors|ruc||or
|aragerer| |arua| adv|ce prescr|o|rg sys|ers ard procedures, ||e|r scope ol
respors|o|||||es, |r|er-re|a||ors||ps as ou|||red |r ||e var|ous c|ap|ers.
0rgar|za||or |as|s ard lrareWor| lor cors|ruc||or raragerer| |as oeer orgar|zed |r lour
d|s||rc| |ead|rgs rare|y.
a) Cors|ruc||or |aragerer| Tas|s.
o) Cors|ruc||or |aragerer| 0rgar|za||or.
c) lurc||ora| 8ourdar|es & 3cope ol wor|.
d) Cors|ruc||or |aragerer| lr|erlace.
T|e Cors|ruc||or |aragerer| Tas|s cover ||e lo||oW|rg. -
|) lrlras|ruc|ure deve|oprer|
||) Cors|ruc||or execu||or superv|s|or
||) 3ale|y ard secur||y
|v) l|arr|rg, 3c|edu||rg, bev|eW|rg ard Cor|ro|.
v) l|e|d qua|||y surve|||arce
v|) 3||e cor|rac||rg
v||) |a|er|a| |aragerer|
v|||) Cos| cor|ro|
|x) l|a|sor W||| ex|erra| agerc|es
x) lersorre| adr|r|s|ra||or ard We|lare
x|) l|rarce ard Accour|.
1.4 CONSTRUCTION MANAGEMENT ORGANISATION
Cors|ruc||or 0rgar|za||or a| projec| s||e |s |eaded oy a projec| rarager, a ser|or execu||ve
lror ||e p|ar| ass|s|ed oy a corsu||ar| erg|reer lror ||e corsu||ar| s|de. T|e projec|
rarager |s ass|s|ed |r carry|rg ou| s||e lurc||ors oy lurc||ora| |eads v|z.
lead ol projec| cors|ruc||or, p|arr|rg, sc|edu||rg ard projec| co-ord|ra||or.
lead ol lersorre| |aragerer|, W||c| |rc|udes l|rarce ard accour|s.
10 MW Biomass Based Power Plant ABEIL
T|e cors|ruc||or, erec||or ard corr|ss|or|rg |s carr|ed ou| oy ||e cor|rac|ors W||| ||e
|ec|r|ca| superv|s|or lror ||e Corsu||ar| | Cus|orer Frg|reers |r assoc|a||or W||| ||e
represer|a||ves ol equ|prer| rarulac|urer |o ||e sa||slac||or ol ||e p|ar| erg|reers. T|e |oo|s
ard p|ar|s lor cors|ruc||or are oroug|| oy ||e cor|rac|or.
T|e lurc||ora| oourdar|es ard scope ol Wor| cover ||e lo||oW|rg areas. -
|) Cors|ruc||or p|arr|rg ard sc|edu||rg,
||) C|v|| cors|ruc||or
|||) Fqu|prer| erec||or
|v) 3||e cor|rac| group, W||c| prov|des cer|ra||zed serv|ces a| s||e lor aWard|rg Wor|
cor|rac|s.
v) |a|er|a| raragerer| lurc||ors cover ac||v|||es ol ra|er|a| p|arr|rg, procurerer|,
s|orage |ssue e|c.
v|) 3||e serv|ce |s a cer|ra||zed serv|ce group W||c| prov|des ard ra|r|a|rs a|| corror
cors|ruc||or lac|||||es, |oo|s, p|ar|s ard cors|ruc||or u|||||y serv|ces.
v||) lersorre| ard Adr|r|s|ra||or group a| s||e |s gu|ded oy ||e lb0 d|v|s|or a| lead
quar|ers ard || |s respors|o|e lor rar poWer p|arr|rg, recru||rer| e|c.
v|||) l|rarce & Accour|s.
1.' INFRASTRUCTURAL FACILITIES 4 CIVIL SYSTEM
T|e ex|s||rg o|orass poWer p|ar| |as We|| deve|oped |rlras|ruc|ure lac|||||es ard c|v|| lor
s|ruc|ures |||e oll|ce ou||d|rg, poWer p|ar| ou||d|rgs ard o||er s|orage yards e|c. 3epara|e
|rlras|ruc|ure lac||||y |s ro| requ|red lor |||s poWer p|ar|.
1.< HUALITY ASSURANCE 4 INSPECTION
T|e procedure lor ||e ua|||y Assurarce ard lrspec||or |s evo|ved oy ||e corsu||ar| |r co-
ord|ra||or W||| ||e poWer p|ar| erg|reers. lr order |o ersure ||g| re||ao||||y ard oe||er
perlorrarce, qua|||y assurarce progrars |ave oeer deve|oped lor a|| pac|ages. lor |||s
purpose, o|d docurer|s lor a|| cor|rac| pac|ages s||pu|a|e ||a| ||e o|dders |ave |o suor||
||e|r oWr qua|||y assurarce progrars lor rarulac|ur|rg ard l|e|d ac||v|||es.
T?"8 i!c)." i."!#i+ica#i*! *+
a) ua|||y orgar|za||or.
o) 0ocurer|a||or cor|ro|.
c) lrocedure lor purc|ase ol ra|er|a|s, par|s, corporer|s ard se|ec||or ol
suocor|rac|ors, serv|ces |rc|ud|rg verdor ara|ys|s, source |rspec||or, raW ra|er|a|
|rspec||or e|c.
d) Cor|ro| ard |es||rg ol ca||ora||or, |es||rg ol reasur|rg ard |es||rg equ|prer|.
e) lard||rg, s|orage ard de||very.
l) |a|r|erarce ol records |o ree| a|| ||e cor|rac|ua| requ|rerer|s.
10 MW Biomass Based Power Plant ABEIL
A|| ||e cor|rac|ors are requ|red |o deve|op suc| A progrars al|er ||e rev|eW ol a|| |ec|r|ca|
spec|l|ca||or ard cor|rac| requ|rerer|s. T|e A progrars ol ||e verdors are |a|er |r|o
cors|dera||or dur|rg o|d eva|ua||or oy ||e corsu||ar|s. A| ||e ||re ol l|ra||za||or ol ||e
agreerer| W||| ||e successlu| verdors, a de|a||ed qua|||y p|ar se|||rg ard ||e qua|||y prac||ces
ard procedures, re|evar| s|ardards ard accep|arce |eve| lor a|| ||e corporer|s ol a|| ||e
equ|prer| W||| oe ru|ua||y d|scussed ard agreed |o.
lur||er, corsu||ar| | c||er| W||resses |es|s | |rspec||or e|c as per ||e cus|orer |o|d po|r|s
(Cll) |o oe se|ec|ed oy ||e corsu||ar| |r qua|||y p|ars, oeyord W||c| ||e Wor| W||| progress
or|y W||| ||e corser| ol ||e corsu||ar|. Apar| lror |||s, ||e qua|||y surve|||arce ol ||e sys|er
ard procedures ol ||e cor|rac|or's qua|||y cor|ro| orgar|za||or W||| oe carr|ed ou| lor ror||or|rg
||e |rp|erer|a||or s|a|us.
lr add|||or, ||e corsu||ar| | cus|orer W||| carry ou| qua|||y aud||s or ||e sys|ers ard
processes lor ||e areas ol rarulac|ure ard l|e|d ac||v|||es |o de|err|re ||e ellec||veress ol
|rp|erer|a||or ard |o ersure corlorrarce |o code, cor|rac| ard procedure requ|rerer|s.
Cor|ro| ol qua|||y |r ||e l|e|d r|g|| lror ||e s|age ol ra|er|a| rece|p| |||| l|ra| corr|ss|or|rg W|||
oe ellec|ed oy ||e l|e|d qua|||y cor|ro| group. T||s group W||| oe |rdeperder| ol ac|ua|
execu||or sc|edu|es ard cos|s ard W||| lurc||or urder |ec|r|ca| gu|darce lror ||e
corsu||ar|'s A group.
1.; MAN PO(ER TRAINING 4 PLACEMENT
T|e ex|s||rg poWer p|ar| |s |av|rg proper 0rgar|za||or s|ruc|ure. T|e ex|s||rg o|orass poWer
p|ar| |as We|| |ra|red |ec|r|c|ars ard o||er |aoors. T||s reW p|ar| reeds sore rore
|ec|r|c|ars ard |aoors lor ||s opera||or ard ra|r|erarce.
10 MW Biomass Based Power Plant ABEIL
10 MW Biomass Based Power Plant ABEIL
10 MW Biomass Based Power Plant ABEIL
10. OPERATION AND MAINTENANCE
T|e proposed 0rgar|za||or s|ruc|ure lor ||e opera||or ard ra|r|erarce (0&|) ol ||e poWer p|ar| |s
preser|ed |r ||e ex||o||. lr order |o ersure a ||g| |eve| ol perlorrarce ol ||e poWer p|ar|, || |s
proposed |o |rduc| exper|erced 0&| erg|reers lror ||e very oeg|rr|rg ol ||e projec|.
10.1 BASIC STRUCTURE OF THE O4M TEAM
T|e oas|c s|ruc|ure ard ||e oroad lurc||ora| area W||||r ||e 0&| orgar|za||or Wou|d oe as
lo||oWs.
T|e l|ar| |arager Wou|d |ave ||e pr|rary respors|o||||y lor ||e 0&| ol ||e poWer p|ar|. T|e
orgar|za||or W||| corpr|se ol lour oroad lurc||ora| areas v|z. 0pera||or, ra|r|erarce,
|ec|r|ca| ard adr|r|s|ra||or. T|e oas|c du||es covered urder eac| ol ||ese lurc||ora| areas
Wou|d oe as lo||oWs.
10.1.1 O/"%a#i*!
0pera||or ol ra|r gerera||rg equ|prer|, lue| |ard||rg sys|ers, Wa|er sys|ers |rc|ud|rg
Wa|er |rea|rer| p|ar|, sW||c| yard ard o||er aux|||ary p|ar|.
Fxcep| lor ||e loWer 3|a||or 3uper|r|erder| a|| o||er opera||rg persorre| Wou|d Wor| or
||ree s||l| oas|s.
3||l| persorre| rarpoWer p|arr|rg lor |ey areas |as oeer gerera||y dore or 3+1
corcep|, |o |a|e |r|o accour| |eave |a|er oy s||l| persorre|.
T|e day |o day opera||or ol ||e poWer p|ar| W||| oe cor|ro||ed oy ||e |arager W|o W||| oe
ass|s|ed oy ||e Cor|ro| roor opera|ors ard s||l| erg|reers.
10.1.2 Mai!#"!a!c"
|a|r|erarce ol rec|ar|ca| ard e|ec|r|ca| p|ar|, cor|ro| sys|ers, ou||d|rgs, roads,
dra|rages ard seWage sys|ers e|c.,
0pera||or ol ||e p|ar| Wor|s|op, p|arr|rg ard sc|edu||rg ra|r|erarce Wor|s ard
dec|d|rg ||e requ|rerer| ol spare par|s.
T|e l|ar| |arager W||| oe ass|s|ed oy depar|rer|a| erg|reers, W|o |a|e care ol ||e
ra|r|erarce aspec|s ol a|| rec|ar|ca|, e|ec|r|ca| ard l&C requ|rerer|s.
Tra|red |ec|r|c|ars W||| oe erp|oyed |o ass|s| ||e ra|r|erarce group |r day |o day
ra|r|erarce ol ||e p|ar|
10 MW Biomass Based Power Plant ABEIL
10 MW Biomass Based Power Plant ABEIL
10.1.3 A.-i!is#%a#i*!
T|e ra|r respors|o|||||es ol |||s depar|rer| W||| oe as lo||oWs.
lurc|ase
l|ar| 3ecur||y
l|a|sor W||| |oca| |aoor oll|cers
3|ores raragerer|
l|rarce & Accour|s
|ed|ca| 3erv|ces
3ecre|ar|a| & C|er|ca|
Trarspor| serv|ces
lb0 ard Tra|r|rg
10.2 FACILITIES TO BE EITENDED TO THE EMPLOYEES
T|e ruroer ol erp|oyees requ|red lor ||e proposed poWer p|ar| W||| oe arourd 40. T|e
persorre| requ|red lor adr|r|s|ra||or ard l|rarce & accour|s a|so W||| oe prov|ded. T|e
lo||oW|rg lac|||||es W||| oe prov|ded |r ||e poWer p|ar|.
Adr|r|s|ra||or ou||d|rg ard |ec|r|ca| oll|ce
Cors|ruc||or oll|ces ard s|ores
T|re ard secur||y oll|ces
l|rs| a|d ard l|re l|g|||rg s|a||or
Car|eer ard We|lare cer|er
To||e|s ard c|arge roors
Car par|s ard cyc|e|scoo|er s|ards.
10.3 STATION OPERATION PHILOSOPHY
T|e poWer gerera|ed lror |||s p|ar| |s expor|ed |o A3F8 0r|d. Necessary sol|Ware ard
|ardWare lea|ures are requ|red lor ellec||ve opera||or ard ra|r|erarce raragerer| sys|er.
3ol|Ware sys|er rarages ard prov|des ||e |rlorra||or reeded |o rarage da||y opera||ors,
|rprove |aoor produc||v||y, reduce ra|r|erarce cos|s, ard ror||or prever||ve ard pred|c||ve
ra|r|erarce progrars.
T|roug| rore ellec||ve sc|edu|ed ard prever||ve ra|r|erarce, ||e cos|s assoc|a|ed W|||
erergercy orea|doWrs car oe grea||y reduced. T||s |rc|udes sav|rgs lror reduced payro||
over||re, leWer delec||ve produc|s ard reduced doWr ||re |osses lror d|srup|ed produc||or
sc|edu|es.
10 MW Biomass Based Power Plant ABEIL
10 MW Biomass Based Power Plant ABEIL
10.4 STATION MAINTENANCE PHILOSOPHY
T|e oased poWer p|ar| ra|r|erarce p|||osop|y |s oased or ||e lo||oW|rg aspec|s.
10.4.1 O%.i!a%8 Mai!#"!a!c"
0rd|rary |a|r|erarce, W||c| covers rou||re c|ec||rg ard r|ror ard reluro|s|rer| ac||v|||es
|o oe perlorred accord|rg |o opera||rg rarua|s or corporer| | equ|prer| |r opera||rg
cord|||ors.
10.4.2 E-"%="!c8 Mai!#"!a!c"
Frergercy |a|r|erarce, W||c| |s a correc||ve ra|r|erarce |o oe perlorred W|er a
s|gr|l|car| la||ure occurs. To r|r|r|ze lorced ou|ages dura||or, ar ellec||ve Frergercy
|a|r|erarce rus| oe suppor|ed oy.
A proper s|oc| ol spare par|s.
lerrarer| ror||or|rg ard d|agros||c sys|ers lor ra|r corporer|s.
10.4.3 Mai!#"!a!c" Pa! a!. Sc?".)". -ai!#"!a!c"
3c|edu|ed ra|r|erarce |s carr|ed ou| accord|rg |o ra|r|erarce p|ar, W||c| s|ou|d oe
d|scussed ard op||r|zed accord|rg |o ||e reeds ol ||e cus|orer|c||er|.
T|e ra|r|erarce p|ar |s oased or sc|edu|ed ou|ages lor ||e lo||oW|rg corporer|s.
8o||er
3|ear Turo|re
A||erra|or
3W||c|yard equ|prer|
10.' MAINTENANCE MANAGEMENT SYSTEM
T|e ra|r|erarce ol |||s p|ar| W||| oe carr|ed ou| as per ||e aoove p|||osop|y. T||s sys|er
a|rs a| rax|r|z|rg ||e ava||ao||||y ol ||e p|ar|, W|||e ersur|rg r|r|rur ra|r|erarce cos| ard
sale|y ol ||e p|ar| ard persorre|.
|ee||rgs are corvered oy var|ous depar|rer|a| leads |o acce|era|e ||e dec|s|or ra||rg
process ard |o |ay doWr ||e pr|or|||es ard gu|de||res lor ra|r|erarce Wor| |o oe |a|er up.
10 MW Biomass Based Power Plant ABEIL
10.< SPARE PARTS MANAGEMENT SYSTEM
T|e pr|rary oojec||ve ol spare par| raragerer| sys|er W||| oe |o ersure ||re|y ava||ao||||y ol
proper spare par|s lor ell|c|er| ra|r|erarce ol ||e p|ar| W|||ou| excess|ve ou||d-up ol ror-
rov|rg ard s|oW rov|rg |rver|ory.
T|e spare par|s raragerer| sys|er lor |||s projec| W||| cover ||e lo||oW|rg areas.
lroper cod|l|ca||or ol a|| spares ard corsurao|es.
3pare par|s |rder||rg ard procurerer| po||cy.
0rder|rg ol cr|||ca| rarda|ory ard recorrerded spares.
Jud|c|ous l|xa||or ol |rver|ory |eve|s ard order|rg |eve|s lor spare par|s oased or
exper|erce.
0eve|oprer| ol rore ||ar ore source ol rarulac|urer| supp||er w|erever prac||cao|e.
10.; AVAILABILITY OF O 4 M MANUALS
A|| cor|rac|s |rc|ude prov|s|or ol a| |eas| o se|s ol de|a||ed 0 & | rarua|s, W||c| W||| oe
d|s|r|ou|ed |o a|| depar|rer|s corcerred We|| |r advarce lror ||e corr|ss|or|rg da|e ol ||e
poWer p|ar| |o avo|d proo|ers |r prepara||or ol corr|ss|or|rg docurer|s as We|| as proper
|rs|a||a||or ard corr|ss|or|rg procedures ol var|ous equ|prer|.
10.7 SPECIAL TOOLS AND TACKLES
A|| cor|rac|s W||| |rc|ude ||e prov|s|or lor supp|y ol ore se| ol a|| |ypes ol spec|a| |oo|s ard
|ac||es, W||c| are requ|red lor |rs|a||a||or, corr|ss|or|rg ard proper ra|r|erarce ol p|ar|
ard equ|prer|.
10.1 OPERATION REHUIREMENTS
w||| ||e corp|e||or ol ||e oll|c|a| |ydrau||c |es| ol ||e oo||er, ||e pre-corr|ss|or|rg ard
corr|ss|or|rg ac||v|||es s|ar|. lre-corr|ss|or|rg c|ec|s ol ||e |rd|v|dua| equ|prer| W||| |ead
|o sale corr|ss|or|rg ol ||e equ|prer|. lrs|a||a||or procedure ard corr|ss|or|rg procedure
as s||pu|a|ed |r ||e 0 & | rarua|s supp||ed oy ||e var|ous equ|prer| supp||ers s|a|| oe
carelu||y lo||oWed. w|erever poss|o|e, || |s adv|sao|e |o |eep ||e verdor's represer|a||ve a|
s||e lor corr|ss|or|rg ||e aux|||ary equ|prer| ol ||e poWer p|ar|.
loWever, ||e oo||er, |uroo-a||erra|or ard o||er cr|||ca| equ|prer| |ave |o oe corr|ss|ored oy
||e supp||er ||se|l, as ||e perlorrarce guarar||es ||e W||| ||er.
10 MW Biomass Based Power Plant ABEIL
Cor|ro|s ard lrs|rurer|a||or sys|er a|org W||| a|arr ard |r|p |r|er|oc|s s|ou|d oe pu| |r|o
opera||or |o saleguard ||e equ|prer| as We|| as ||e opera||rg persorre|.
10.10 CHECKLISTS AND PROTOCOL
A de|a||ed c|ec|||s| lor ||e var|ous equ|prer|, supp|erer|ed W||| ||e c|ec|||s| suor|||ed oy
||e supp||er s|a|| oe draWr ard |ogged lor lu|ure relererce. T||s W||| a|so lorr par| ol ||e
p|ar|'s oase ||s|ory | da|ur.
w|erever ar equ|prer| |r corr|ss|ored, ||e |rpor|ar| parare|ers ol ||a| par||cu|ar
equ|prer| s|ou|d oe ooserved lor a per|od ol e|g|| |ours ard ||e read|rgs s|a|| oe |ogged as
per ||e |og s|ee|s. T|ese ac||v|||es s|a|| oe perlorred |r ||e preserce ol ||e cus|orer |
corsu||ar| ard a pro|oco| s|a|| oe s|gred.
10.11 ORGANISATION LEVELS 4 GRADING OF POSITIONS
Fvery pos|||or |r ar orgar|za||or |s graded W||||r ||ese dec|s|or-|a||rg oards oased or a
s|or| descr|p||or rer||ored oe|oW. T|ese grad|rg |eve|s rarge lror A 8ard (urs||||ed |aoor)
|o F- 8ard (Top |aragerer|). T|e del|r|||ors lor ||e c|ass|l|ca||or ol d|llerer| pos|||ors are
as lo||oWs.
A-8ard 8as|c e|erer|ary dec|s|ors W|ere ||e op||ors ard a||erra||ves are ||r||ed.
lrlorra||or requ|red oy ||e Wor|er |s ||r||ed, s|rp|e, ard easy |o urders|ard.
l| ra|r|y requ|res urs||||ed |aoor ard |ra|r|rg requ|rerer|s are r|r|rur.
8 8ard 0pera||ora| dec|s|ors |r a |og|ca| sequerce ol e|erer|s Fxper|erce ard
prac||ce |s esser||a| lor |a||rg dec|s|ors |r |||s oard. Tra|r|rg rorra||y |a|es
a leW ror||s.
C 8ard lrocess dec|s|ors |r a sys|era||c sequerce ol opera||ora| ac||v|||es.
lroo|ers |ave |o oe d|agrosed ard ||e oes| so|u||or lorr a rarge ol
a||erra||ves reeds |oo oe se|ec|ed ard |rp|erer|ed. A oroad spec|rur ol
|r|ers|ve lorra| educa||or, as We|| as exper|erce, |s requ|red lor ||ese joos.
0 8ard lr|erpre|a||ve dec|s|ors oy r|dd|e |aragerer|.
F 8ard 3|ra|eg|c dec|s|ors oy 3er|or |aragerer|.
10 MW Biomass Based Power Plant ABEIL
. STATUTORY CLEARANCES REHUIRED
T|e lo||oW|rg are ||e s|a|u|ory c|eararces requ|red lor ||e proposed poWer p|ar| ol A8Fll a| Jag|
boad |r |ayorg C|rc|e ol |ar|gaor d|s|r|c| |r Assar. 0e|a||s ol Approva|s are g|ver |r ||e ro||l|ca||or,
W||c| |s erc|osed.
11.1 A//%*$a +%*- AEDA
A8Fll s|a|| l||e ar app||ca||or W||| AF0A lor sarc||or ol projec| as per ||e 0overrrer| ol
Assar ro||l|ca||or ol poWer projec|s. A8Fll, W||| a|so reed |o er|er ar agreerer| W||| AF0A
as lac||||a|or.
11.2 Ta%i++ FiBa#i*! +%*- AERC
A8Fll l|d,s|ou|d l||e ar all|dav|| W||| AFbC lor oo|a|r|rg ||e |ar|ll.
11.3 P*5"% P)%c?as" A=%""-"!# 5i#? ASEB
Al|er oo|a|r|rg ||e approva| lror AF0A, ard A3F8, A8Fll,reed |o er|er loWer lurc|ase
agreerer| W||| A3F8.
11.4 A//%*$a +*% Pa%a" O/"%a#i*!
Approva| ol ||e 0overrrer| ol Assar ||roug| A3F8 lor para||e| opera||or ol gerera||rg se|
W||| A3F80r|d, s|a|| oe soug||. 3c|ere |as |o oe approved oy A3F8 lrspec|ora|e.
11.' P*)#i*! C*!#%* B*a%.
lr|||a||y corser| |o es|ao||s| |o oe oo|a|red lror ||e Assar 3|a|e lo||u||or Cor|ro| 8oard lor
||e a|r po||u||or, Wa|er po||u||or ard ro|se po||u||or. T|e source ol po||u||or ard ||e cor|ro|
re||ods proposed are d|scussed |r ||e c|ap|er, `Frv|rorrer|a| lrpac| ard lo||u||or Cor|ro|'.
0r corr|ss|or|rg, corser| |o opera|e reed |o oe oo|a|red lror lo||u||or Cor|ro| 8oard.
11.< T?" La!. Us" Ca%i+ica#i*! C"a%a!c" F%*- G*$#. *+ Assa-
Approva| lor ||e |ayou| ard ou||d|rgs ol ||e poWer p|ar| |s requ|red lror ||e ToWr l|arr|rg
0epar|rer| ol 0ov|. ol Assar.
10 MW Biomass Based Power Plant ABEIL
11.; A//%*$a +*% #?" E"c#%ica I!s#aa#i*!
T|e e|ec|r|ca| |rs|a||a||ors |||e |rarslorrers, sW||c| yard equ|prer| e|c., s|a|| oe approved oy
||e C||el F|ec|r|ca| lrspec|or, lor ||e sale|y lea|ures, |oca||or e|c.
11.7 B*i"% a!. P%"ss)%" Pa%# C*-/*!"!#s
T|e approva| lror ||e C||el lrspec|or ol 8o||ers, Assar |s requ|red lor ||e |rs|a||a||or ard
opera||or ol ||e oo||ers, s|ear ard Wa|er p|p|rg.
11.1 G%*)!. (a#"% B*a%.
T|e ra|e up Wa|er lor ||e poWer p|ar| |s proposed |o oe purped lror ||e rearoy |a|e ard
ooreWe|| ava||ao|e |r ||e s||e. C|eararce lror ||e Cer|ra| 0rourd wa|er 8oard |s requ|red lor
us|rg ||e grourd Wa|er.
11. 11 I%%i=a#i*! D"/a%#-"!#
l| |s oe||er |o |ave ||e perr|ss|or lror lrr|ga||or depar|rer| lor draWa| ol Wa|er lror ||e
cara|s.
11.12 I!+*%-a#i*! #* MNES
||r|s|ry ol Nor Corver||ora| Frergy 3ources, (|NF3) ex|erds ||e cap||a| suos|dy. lroro|er
reed |o app|y |o |NF3 ||roug| AF0A, al|er oo|a|r|rg ||e |oar sarc||ored lror l|rarc|a|
lrs|||u||or. |NF3 reeds ||e lo||oW|rg docurer|s erc|osed |o ||e|r app||ca||or ard c|ec| ||s|.
a. 0e|a||ed lrojec| bepor|
o. lrojec| Approva| lror AF0A
c. loWer lurc|ase Agreerer| W||| A3F8
d. Corser| |o Fs|ao||s| lror Assar 3|a|e lo||u||or Cor|ro| 8oard.
e. 3arc||or le||er lror l|rarc|a| lrs|||u||or
l. Appra|sa| bepor| lror l|rarc|a| lrs|||u||or
|NF3 g|ves ||e pr|rc|pa| approva| |r|||a||y, ard sarc||ors ||e Cap||a| suos|dy al|er
corr|ss|or|rg. |NF3 |s ye| |o |ssue adr|r|s|ra||ve approva|.
11.13 D)#8 EB"-/#i*!&
0ov| ol lrd|a |ad |ssued ||e ro||l|ca||or, exerp||rg ||e Fxc|se 0u|y ard Cus|or 0u|y lor
se|||rg up ||ese p|ar|s. 0ov| ol lrd|a No||l|ca||or |s a|ready g|ver |r C|ap|er 1. lroro|er
s|ou|d |a|e advar|age ol |||s. 3upp||ers ol ||e equ|prer| are reed |o oe |a|er, 0u|y
Fxerp||or Cer||l|ca|es lror |NF3.
10 MW Biomass Based Power Plant ABEIL
12. COST ESTIMATES
12.1 GENERAL
A8Fll |s p|arr|rg |o |rs|a|| 11 |w 8|orass oased loWer l|ar| a| Jag| boad, |ayorg C|rc|e,
|ar|gaor 0|s|r|c|. As |||s p|ar| |s s||ua|ed |r Assar, |rarspor|a||or c|arges, erec||or ard
corr|ss|or|rg c|arges are rore corpared |o ||e o||er par|s ol lrd|a. Fver 0ov|. ol lr|a
g|ves ||e spec|a| |rcer||ves lor ||e Nor|| Fas|err 3|a|es.
T||s c|ap|er dea|s W||| ||e es||ra|es ol ||e |o|a| cos| ol ||e poWer projec|. T|e es||ra|e |s
a|so oased or ||e oudge|ary ollers rece|ved lror ||e var|ous rarulac|urers lor ||e rajor
equ|prer| ard |r |ouse cos| da|a corp||ed lor poWer p|ar|s. Cor||rgercy prov|s|or |as oeer
rade, ou| ro| ||e esca|a||or, as ||e projec| |s expec|ed |o oe |rp|erer|ed W||||r s|or| per|od.
||r|s|ry ol l|rarce, 0ov| ol lrd|a, |ad |ssued ||e ro||l|ca||or No. 33|2005 - Cer|ra| Fxc|se
da|ed 8
||
3ep| 2005, exerp||rg ||e cus|or du|y ard exc|se du|y lor ||e p|a| ard rac||rery
requ|red lor o|orass oased poWer p|ar|s. lerce, ||e projec| cos| |s exc|us|ve ol ||ese du||es.
T||s c|ap|er dea|s W||| ||e es||ra|es ol ||e |o|a| cos| ol ||e poWer projec|. T|e es||ra|e |s
a|so oased or ||e oudge|ary ollers rece|ved lror ||e var|ous rarulac|urers lor ||e rajor
equ|prer| ard |r |ouse cos| da|a corp||ed lor poWer p|ar|s. Cor||rgercy prov|s|or |as oeer
rade, ou| ro| ||e esca|a||or, as ||e projec| |s expec|ed |o oe |rp|erer|ed W||||r s|or| per|od.
T|e cos| ol ||e poWer p|ar| g|ver |r |||s c|ap|er, covers a|| ||e cos|s assoc|a|ed W||| ||e
cors|ruc||or ol ||e p|ar|, ard |rc|udes ||e c|v|| cors|ruc||or cos|, cos| ol equ|prer| lor poWer
gerera||or, cos| ol aux|||ar|es ard u||||||es. T|e |o|a| cos| |s arr|ved a| oy add|rg |o |||s cos|,
||e pre opera||ve experses |rc|us|ve ol projec| des|gr ard erg|reer|rg, s|ar| up ard |ra|r|rg
experses, |r|eres| dur|rg cors|ruc||or ard ||e rarg|r rorey lor Wor||rg cap||a|.
Tao|e 12.1 |o 12.4 g|ves ||e de|a||s ol ||e projec| Wor|s cos| es||ra|e |rc|ud|rg C|v||,
|ec|ar|ca| ard F|ec|r|ca| cos|. Tao|e 12.5 |o 12.9 g|ves ||e de|a||s ol ||e es||ra|e ol ||e
projec| cos| W||c| |rc|udes ||e cor||rgercy, preopera||ve experses |rc|ud|rg ||e l0C ard
Wor||rg cap||a| rarg|r. T|e |ao|e a|so g|ves ||e draW| ol ||e |err |oar dur|rg ||e projec|
cors|ruc||or per|od ard ||e ca|cu|a||or ol ||e l0C |s oased or ||a|. l| |s presured ||a| ||e
10 MW Biomass Based Power Plant ABEIL
|err |oar d|sourserer| |s propor||ora| |o ||e arour| ol ||e equ||y |rves|ed. Tao|e 12.10 g|ves
||e corso||da|ed de|a||s ol ||e |o|a| cos| ol ||e projec|.
12.2 LAND AND SITE DEVELOPMENT
T||s corpary |s p|arr|rg |o procure ||e |ard W||| ||e |e|p lror beverue 0ll|c|a|s ol |or|gaor
0|s|r|c|. T|e proposed s||e |s jus| oe||rd 132 |v 3uos|a||or ol Jag| boad , |ayorg C|rc|e. .
Ta>" 12.1 J La!. a!. si#" D"$"*/-"!#
(bs. la||s)
Pa%#ic)a%s A-*)!#
Cos| ol lard |o oe acqu|red 45.0
Cos| ol |eve||rg ard deve|oprer| 10.0
Cos| ol |ay|rg ol roads
lr|erra| roads lor ||e lac|ory 5.0
Approac| road correc||rg ||e |a|r boad 5.0
lr|erra| roads lor ||e ToWrs||p 5.0
Cos| ol lerc|rg|corpourd Wa|| 15.0
Cos| ol 0a|es 2.0
T*#a 7;.0
12.3 CIVIL AND STRUCTURALS
T|e c|v|| Wor| |rc|udes ||e ear||Wor| ard corcre|e Wor| lor ||e poWer |ouse ou||d|rg,
equ|prer| lourda||ors, |ar|s, coo||rg |oWer oas|r e|c. T|e cos| ol |ay|rg ol |r p|ar| roads,
lerc|rg dra|rs ard seWers |s a|so |rc|uded as par| ol c|v|| cos|. T|e bCC|s|ruc|ura| s|ee| Wor|
lor ||e |uroogerera|or ou||d|rg |s a|so |rc|uded urder ||e |ead|rg ol C|v|| wor|s cos|. No p|||rg
|as oeer erv|saged lor ||e ou||d|rg as We|| as lor equ|prer| lourda||ors ard or|y oper
lourda||ors are cors|dered.
T|e c|v|| Wor| quar||||es ard ||e cos| ol c|v|| are or|y es||ra|es ard W||| |ave |o oe su||ao|y
rod|l|ed ard l|rred up al|er ||e equ|prer| supp|y |s l|ra||zed ard adequa|e da|a regard|rg
||e |oad|rg d|rers|ors ol equ|prer| are ava||ao|e lror ||e rarulac|urers ard supp||ers
dur|rg ||e erg|reer|rg s|age, ard a|so or ||e ac|ua| so|| cord|||ors ercour|ered a| d|llerer|
s|ages ol cors|ruc||or. T|e es||ra|es g|ver |ere are oased or ||e so|| oear|rg capac||y ol 35
Tores|3q. r|r a| 3.5 re|er dep||.
10 MW Biomass Based Power Plant ABEIL
T|e |o|a| cos| ol c|v|| Wor|s |rc|ud|rg equ|prer| lourda||ors, ou||d|rgs, cos| ol |ard
deve|oprer|, roads, ard r|sce||areous lourda||ors e|c |s es||ra|ed a| bs. 317.78 la||s.
Ta>" 12.2 Ci$i (*%As C*s# Es#i-a#"
S.
N*.
D"sc%i/#i*! U!i# H)a!#i#8 Ra#"
Rs.
C*s#
9Rs. LaA?s:
;.0 P*5"% /a!# >)i.i!=
7.1 Fxcava||or r 2015 120 2.42
7.2 8ac|l||||rg W||| approved ear|| r 1495 108 1.o1
7.3 lCC r 195 45o0 8.89
7.4 bCC grade |20 |rc|ud|rg lorrWor| r 371 o000 22.23
7.5 be|rlorcerer| 3|ee| T 3o 48000 17.47
7.o 8r|c| Wor| r 520 2400 12.48
7.7 w|rdoWs, doors e|c. r 2o0 21o0 5.o2
7.8 l|as|er|rg r 13351 108 14.42
7.9 l|oor|rg r 1729 o00 10.37
7.10 la|r||rg r 8o71 84 7.28
7.11 3|ruc|ura| 3|ee| T 87 43200 37.o3
7.12 0ra||rg r 104 1800 1.87
7.13 l|uro|rg l3 1.50
7.14 lrecas| bCC bool 3|aos, 125 rr |||c| l3 1.50
7.15 wea||er|rg Course l3 1.50
7.1o la|se ce|||rg l3 1.00
8.0
F*)!.a#i*! +*% >*i"%s@ #)%>*="!"%a#*%@
#%a!s+*%-"%s 4 *#?"% "C)i/-"!# 0
8.1 Fxcava||or r 2925 120 3.51
8.2 8ac|l||||rg W||| approved ear|| r 2470 108 2.o7
8.3 lCC r 135 45o0 o.17
8.4 bCC grade |25 |rc|ud|rg lorrWor| r 527 o000 31.59
8.5 be|rlorcerer| 3|ee| T o0 48000 28.70
8.o ||ce||areous (Froedrer|s, lourda||ors e|c.) l3 2.20
9.0
C**i!= #*5"% >asi!@ %a5 5a#"% #a!A@ /)-/s
a!. -isc"a!"*)s +*)!.a#i*!s 0
9.1 Fxcava||or r 1300 120 1.5o
9.2 8ac|l||||rg W||| approved ear|| r 1040 108 1.12
10 MW Biomass Based Power Plant ABEIL
9.3 lCC r 91 45o0 4.15
9.4 bCC grade |20 |rc|ud|rg lorrWor| r 455 o000 27.30
9.5 be|rlorcerer| T 35 48000 1o.85
10.0 RCC C?i-!"8 a!. +*)!.a#i*!
10.1 Fxcava||or r 1950 120 2.34
10.2 8ac|l||||rg W||| approved ear|| r 15o0 108 1.o8
10.3 lCC r 137 45o0 o.22
10.4 bCC grade |20 |rc|ud|rg lorrWor| r o44 o000 38.o1
10.5 be|rlorcerer| T 59 48000 28.08
10.o Froedrer|s, l|arges, |adders & p|a|lorrs T 20 50400 9.83
10.7 belrac|ory ||r|rg r|||ooard e|c. l3 o.00
11.0 3W||c| ard C|v|| lourda||or
12.0 Terporary s|ores, oll|ce ou||d|rg, garage, e|c. l3 4.20
13.0
||sc. c|v|| Wor|s lor corveyor suppor|s, duc||rg
suppor|s, lue| |ard||rg sys|er e|c. l3 1o.80
14.0
lac|ory ou||d|rgs lor aux|||ary serv|ces |||e Wa|er
supp|y, |aoora|ary, Wor|s|op l3 14.00
15.0 Adr|r|s|ra||ve ou||d|rgs & gues| |ouse l3 25.20
1o.0
||sc. ror-lac|ory ou||d|rgs |||e car|eer, ||re
oll|ce, c|arge roor l3 11.20
17.0 0arage | lar||rg l3 2.80
18.0 Arc|||ec| lees l3 35.00
TOTAL 4;'.'7
12.4 MECHANICAL AND ELECTRICAL (ORKS
T|e projec| cos| es||ra|e |rc|udes ||e cos| ol a|| o||er aux|||ary sys|ers ol ||e poWer p|ar|,
|||e ||e coo||rg Wa|er sys|er cors|s||rg ol coo||rg |oWer, ard ||e purps, 0| Wa|er sys|er,
corpressed a|r sys|er. AC ard ver|||a||or sys|er, l|re l|g|||rg e|c. 3|ear p|p|rg, ||g|
pressure ard |oW pressure, leed Wa|er p|p|rg, coo||rg Wa|er p|p|rg ard a|| o||er p|p|rg ol ||e
poWer p|ar|.
T|e 132 |v |rarsr|ss|or ||res lor evacua||rg poWer are a|so cors|dered |r ||e e|ec|r|ca|
es||ra|es. T|e cos| ol ||e gerera|or |rarslorrer lor s|epp|rg up ||e gerera|ed vo||age |o ||e
expor|ao|e vo||age |eve|, ||e d|s|r|ou||or |rarslorrers lor ree||rg ||e poWer requ|rerer| a|
415 |eve| lor poWer p|ar|, ||e poWer cor|ro| cer|er lor leed|rg poWer |o ||e p|ar|, ||e cao|es
10 MW Biomass Based Power Plant ABEIL
ard ous duc|s, corp|e|e ear||||rg ol ||e p|ar| ard ||g|||rg are |rc|uded |r ||e Wor|s cos|
es||ra|e.
Cos| |oWards ||e p|ar| erec||or, |es||rg ard corr|ss|or|rg |ave oeer |rc|uded |r ||e
equ|prer| cos| |rd|ca|ed. A|so ||e cos| es||ra|es g|ver |r ||e repor| are |rc|us|ve ol ||e |axes
ard du||es, lre|g|| ard |rsurarce.
T|e cos| ol ||e |Wo years spares |s es||ra|ed |o oe |Wo percer| ol ||e rec|ar|ca| ard
e|ec|r|ca| equ|prer| cos| W||c| |s |rc|uded |r ||e cos| ol ||e equ|prer| |rc|uded |r ||e Wor|s
cos| es||ra|e.
T?" #*#a c*s# *+ #?" -"c?a!ica a!. ""c#%ica 5*%As is "B/"c#". #* >" a%*)!.
Rs. 323< LaA?s
Ta>" 12.3 Mac?i!"%8 C*s# i!c).i!= E"c#%icas
(bs. |r la||s)
EC)i/-"!#6 Mac?i!"%8 A-*)!#
3|ear Turo|re & gerera|or
(11 |w o|eed cur corders|rg)
1050.00
8o||er & 80l
8o||er 1200.0
0| p|ar| 30.0
Coo||rg Wa|er sys|er ard p|p|rg o0.0
lue| |ard||rg sys|er 140.0
As| |ard||rg sys|er 45.0
F0T Crare 25.0
3uos|a||or 210
l|ar| e|ec|r|ca|s 50.0
Coo||rg |oWer o0.0
l|re pro|ec||or 25.0
A|r cord|||or|rg & ver|||a||or 40.0
u||||||es |||e Wa|er & corp.a|r 50.0
Frec||or 80.0
Trarsr|ss|or ||res sys|er 121.0
||sce||areous |||e We|g| or|dge, c||ppers e|c., 50.0
T*#a 323<.00
10 MW Biomass Based Power Plant ABEIL
Ta>" 12.4 E"c#%ica C*s# Es#i-a#i*!
S. N* D"sc%i/#i*! H)a!#i#8 A-*)!# i! Lacs
1 11 Kv lare|
1 37.00
2 N0b ard 3urge arres|or
1 5.00
3 33 Kv 3lo 8rea|er
1 8.00
4. 33 Kv cor|ro| & be|ay lare|
1 8.00
5 33 Kv lso|a|or
2 4.50
o. CT
1 1.00
7. lT
1 1.00
8. loWer Trarslorrer - 12.5 |vA
1 80.00
9. Aux|||ary Trarslorrer - 1.25 |vA
1 20.00
10. |CC lare|
1 7.50
11. 110 vo||s 8a||ery se|
1 2.50
12 110 vo||s 8a||ery C|arger
2 10.00
13 0C08
1 1.00
14 ul3
1 1.00
15 Cao|es
1 10.00
1o l|g|||rg ra|er|a|s
1 2.00
17 Far|||rg
1 2.00
18 3|ee| 3|ruc|ure |r |orres
5 3.50
19 Frec||or C|arges
- o.00
T*#a
210.00
12.' CONTINGENCIES
A prov|s|or ol aoou| 5 ol ||e cos|s ol ||e c|v|| ard s|ruc|ura| Wor|, rec|ar|ca| ard e|ec|r|ca|
equ|prer| ard o||er cos|s |as oeer prov|ded |oWards ||e cor||rgerc|es, dur|rg ||e
cors|ruc||or ol projec|. T||s cor||rgercy prov|s|or Wor|s ou| |o bs. 220.92 la||s.
10 MW Biomass Based Power Plant ABEIL
Ta>" 12.' C*!#i!="!ci"s
(bs. |r la||s)
Pa%#ic)a%s C*s# C*!#i!="!c8
P%*$isi*!
A-*)!#
3||e deve|oprer| 87.00 5 4.35
8u||d|rgs 475.58 5 23.78
l|ar| & |ac||rery 323o.00 5 1o1.80
||sc. l|xed asse|s 92.00 10 9.20
lre-0pera||ve Fxperses 435.75 5 21.79
T*#a 220.92
12.< NODAL AGENCYES REHUIREMENT
AF0A |s ||e roda| agercy |o g|ve approva| |o |||s projec|. T|ey W||| a|so ac| as coord|ra|ors
lor |||s projec|. As ||e po||cy |s ro| ye| arrourced, prov|s|or lor roda| agercy lee |s |a|er as
bs. 2.00 |a||s.
12.; MISCELLANEOUS FIIED ASSETS
T|e cos| ol ||sce||areous l|xed asse|s |s es||ra|ed a| bs.92 la||s oased or ||e oudge|ary
es||ra|e rece|ved lror ||e supp||ers. T|e de|a||s are as urder.
Ta>" 12.< Misc"a!"*)s FiB". Ass"#s
Pa%#ic)a%s A-*)!# Rs i! LaA?s
T|e |aoora|ory equ|prer|
30.00
wor|s|op equ|prer|
30.00
ve||c|es
20.00
lurr||ure
5.00
0ll|ce equ|prer|
7.00
T*#a
12.00
12.1 (ORKING CAPITAL MARGIN
T|e Wor||rg cap||a| s|a|| ree| ||e requ|rerer|s ol raW ra|er|a| cos|s ard ||e rece|vao|es.
70 W||| oe oar| l|rarce ard ||e 30 W||| oe ||e rarg|r rorey |o oe cap||a||zed. T|e
l|rarc|a| ara|ys|s |a|es |r|o cors|dera||or ar |r|eres| ra|e ol 12.25 lor Wor||rg cap||a|
l|rarced oy oar|. wor||rg cap||a| requ|rerer| |r l|rs| year |s bs. 424.09 la||s. T|e |o|a|
10 MW Biomass Based Power Plant ABEIL
requ|rerer| ol rarg|r rorey lor Wor||rg cap||a| |s es||ra|ed a| Rs. 10<.02 LaA?s or ||e
oas|s ol raW ra|er|a| lor 180 days ard ||e deo|ors lor o0 days |r l|rs| year. 0r ||e aoove
oas|s, ||e |o|a| Wor||rg cap||a| |oar requ|rerer| lor ||e l|rs| opera||or year |s es||ra|ed a| bs
318.07 la||s. lr |||rd year Wor||rg cap||a| requ|rerer| |rcreases |o bs.57o.50 |a||s ard ||e
requ|rerer| ol Wor||rg cap||a| rarg|r rorey |rcreases |o bs. 148.49 la||s.
Ta>" 12.; (*%Ai!= Ca/i#a
(bs. |r la||s)
Pa%#ic)a%s 6 Y"a%s 1
s#
8"a% 2
!.
8"a% 3
%.
8"a% 4
#?
8"a% '
#?
8"a%
C)%%"!# Ass"#s H*.i!= "$" i! -*!#?s
baW-|a|er|a| o ror||s 125.53 147.77 171.23 17o.3o 181.o5
3|ores o ror||s 7.50 7.88 8.27 8.o8 9.12
3urdry 0eo|ors 2 ror||s 291.0o 242.o2 397.01 408.92 421.19
T*#a C)%%"!# Ass"#s 424.09 498.2o 57o.50 593.9o o11.9o
less. |arg|r |orey (25) 10o.02 124.57 144.13 148.49 152.99
8ar| l|rarce bequ|red 318.07 373.70 432.38 445.47 458.97
12.1 INTEREST DURING CONSTRUCTION 9IDC:
T|e |r|eres| dur|rg cors|ruc||or per|od |s cap||a||zed |o ca|cu|a|e ||e projec| cos|. T|e l0C |s
ca|cu|a|ed cors|der|rg ||e p|as|rg ol ||e cap||a| experd||ure g|ver oe|oW.
12.1.1 P?asi!= *+ Ca/i#a EB/"!.i#)%"
T|e projec| cors|ruc||or per|od |s 18 ror||s lror ||e da|e ol order|rg ||e ra|r equ|prer|.
T|e lo||oW|rg g|ves ||e p|as|rg ol ||e cap||a| experd||ure or quar|er|y oas|s lror ||e da|e ol
order|rg ol ||e oo||er ard ||e |uroo gerera|or, W||c| cor|r|ou|es ||e rajor experd||ure.
lr|eres| or |oar lor ||e cors|ruc||or per|od |s |a|er as 12.25. lr|eres| dur|rg cors|ruc||or |s
rourded oll |o bs.412.00 la||s.
Ta>" 12.7 P?asi!= *+ Ca/i#a EB/"!.i#)%" 4 IDC
(bs. |r la||s)
H)a%#"% Ca/i#a
EB/"!.i#)%"
EC)i#8 T"%- L*a! I!#"%"s# #i #?" .a#"
*+ C*-/"#i*!
1 1421.48 355.37 10oo.11 171.90
2 947.o5 23o.91 710.73 9o.o1
10 MW Biomass Based Power Plant ABEIL
H)a%#"% Ca/i#a
EB/"!.i#)%"
EC)i#8 T"%- L*a! I!#"%"s# #i #?" .a#"
*+ C*-/"#i*!
3 710.74 177.o8 533.0o o3.97
4 710.74 177.o8 533.0o 47.97
5 473.82 118.45 355.37 21.32
o 473.82 118.45 355.37 10.oo
T*#a 4;37.2; 1174.'; 3''3.70 412.43
l| |s assured ||a|, equ||y W||| oe 30 ol ||e projec| cos|, |.e. bs1421|a||s
w|||e ca|cu|a||rg ||e l0C, || |s cors|dered ||a| ||e draW| ol |org |err |oar lror l|rarc|a|
lrs|||u||or W||| correrce s|ru||areous|y W||| ||e or|rg|rg |r ||e equ||y.
12.10 PRE OPERATIVE EIPENSES
lre-0pera||ve Fxperses are es||ra|ed or ||e oas|s ol experd||ure |rcurred dur|rg ||e
|rp|erer|a||or ol ||e projec|. T||s |s |rc|us|ve ol ||e arour| |o oe pa|d |o AF0A, lror| erd
lee, ard ||e lees |o oe pa|d |o oo|a|r ||e s|a|u|ory approva|s |rc|ud|rg ||e reg|s|ra||or ol
corpary. 0e|a||ed erg|reer|rg ard corsu||arcy c|arges are ro| |rc|uded |r ||e pre||r|rary
experses. lrp|erer|a||or per|od |s arourd 18 ror||s. T|e de|a||s ol pre opera||ve experses
are as urder.
Ta>" 12.1 P%" O/"%a#i$" EB/"!s"s
(bs. |r la||s)
Pa%#ic)a%s A-*)!#
Noda| Agercy's lee 2.00
Trave|||rg 10.00
lreda App||ca||or lee 0.00
lror| erd lee 0.00
Corpary lrcorpora||or C|arges 8.00
0epos||s 0.00
Tr|a| rur Fxperses 3.75
lr|eres| dur|rg ||e cors|ruc||or per|od 412.00
To|a| lre-0pera||ve Fxperses 435.75
lbF0A does ro| |a|e ||e reg|s|ra||or lee, ard lror| erd lee lor ||e projec|s |rp|erer|ed |r Nor||
Fas|err s|a|es. lerce |||s arour| |s ro| cors|dered.
10 MW Biomass Based Power Plant ABEIL
12.11 D"#ai". E!=i!""%i!= F""
A prov|s|or ol bs. 70.00 la||s |as oeer rade |oWards ||e lees lor de|a||ed Frg|reer|rg.
12.12 TOTAL PRO2ECT COST
lrojec| Cos| . bs. 4738.27 la||s
l| |s assured ||a| 30 ol ||e aoove |o|a| projec| cos|, |.e. bs.1421la||s W||| oe re| lror
equ||y. T|e |oar corporer| ol ||e projec| cos| Wor|s ou| |o bs. 3317la||s.
Ta>" 12.10 S)--a%8 *+ P%*,"c# C*s# Es#i-a#"
(bs. |r la||s)
Pa%#ic)a%s A-*)!#
lard & 3||e 0eve|oprer| 87.00
8u||d|rgs 475.58
l|ar| & |ac||rery 323o.00
||ce. Asse|s 92.00
0e|a||ed Frg|reer|rg 70.00
Cor||rgerc|es .22092
lre||r|rary Fxperses 15.00
lre-0pera||ve Fxperses(|rc|.l0C) 435.75
|arg|r |orey lor wor||rg Cap||a| 10o.02
T*#a 4;37.2;
10 MW Biomass Based Power Plant ABEIL
13. FINANCIAL ANALYSIS
13.1 GENERAL
l|rarc|a| Ara|ys|s carr|ed ou| W||| ||e assurp||or ol l|rarce lror lbF0A. lbF0A g|ves ||e
spec|a| |r|eres| ra|e reduc||or ol 1 lror ||e regu|ar s|a|es o|orass oased poWer p|ar|
|r|eres| ra|e ard ||ey dor'| c|arge reg|s|ra||or lee ard lror| erd lee.. Assurp||ors lor
l|rarc|a| ara|ys|s |s g|ver oe|oW.
A. 0eo| equ||y ra||o |s 70.30
8. lr|eres| ra|e 12.25
C. bepayrer| per|od ol 9 years |rc|ud|rg 2 years rora|or|ur
0. lrojec| corp|e||or per|od - 18 ror||s
F. bepayrer| ol |oar |r 28 quar|er|y |rs|a||rer|s
l. 8|orass(r|ce |us|) lr|ce. bs. 1500.00 per |orre |r l|rs| year ard |rcreases oy 5 per
arrur
13.1.1 T||s sec||or ol ||e repor| g|ves ||e l|rarc|a| ara|ys|s ol ||e poWer projec| us|rg r|ce |us| as
lue| ard ||e proposed |ar|ll ca|cu|a||ors(oased or ||e 'Cos| Fs||ra|es'urder sec||or 12) lor
sa|e ol poWer |o ||e gr|d.
13.2 MODE OF FINANCING
13.2.1 T|e |o|a| projec| cos| W||| ||e |r|eres| dur|rg cors|ruc||or ard Wor||rg cap||a| rarg|r |s
es||ra|ed |o oe bs. 4738 la||s as g|ver |r 'Cos| Fs||ra|e'. 3|rce ||e projec| lu|l|||s ||e
rorrs ol rereWao|e erergy o|orass oased projec|s, || |s expec|ed ||a| ||e projec| W||| ge| ||e
e||g|o||||y ol 70 ol ||e projec| cos| as |org |err |oar.
13.2.2 T||r|y percer| (30) ol ||e |o|a| projec| cos| |.e. bs. 1421 la||s W||| oe oroug|| |r as ||e
equ||y lor ||e projec| oy ||e |aragerer| ol ||e poWer p|ar|. T|e oa|arce ol bs. 3317 la||s
W||| oe roo|||zed as |org |err |oar lror l|rarc|a| lrs|||u||ors.
13.2.3 l| |s assured ||a| |||s |oar arour| W||| oe repa|d |r 3ever (7) years |r 28 equa| |rs|a||rer|s
ard ||ere W||| oe ar |r|||a| rora|or|ur ol |Wo (2) years or ||e |oar repayrer|. Ar |r|eres| ra|e
ol 12 |s cors|dered or ||e |err |oar, ard || |s assured ||a| ||e |r|eres| payrer| ard ||e
|oar repayrer| W||| oe quar|er|y.
13.2.4 T||s loWer l|ar| W||| oe |oca|ed a| Jag| boad, |or|gaor 0|s|r|c|.
10 MW Biomass Based Power Plant ABEIL
13.2.' T|e projec| erv|sages ro lore|gr exc|arge ou| l|oW, s|rce a|| ||e equ|prer| are assured |o
oe ooug|| lror |rd|gerous supp||ers ard lore|gr exc|arge |l ary W||| oe orgar|zed oy ||e
supp||ers ol ||e equ|prer|.
13.3 PLANT OPERATION
A8Fll |s p|arr|rg |o opera|e ||e p|ar| lor rear|y 330 days. lrs|a||ed capac||y |s 11 |w. T|e |r
|ouse corsurp||or lor poWer p|ar| W||| oe arourd 1 |w. l| |s es||ra|ed ||a|, |||s p|ar| W||| oe
|r a pos|||or |o expor| arourd 10 |w |o ||e gr|d. T|e p|ar| |oad lac|or |s |a|er as 90
13.4 Ra5 Ma#"%ia R"C)i%"-"!# a!. c*s#&
0r ar average o|orass requ|rerer| |s arourd 1.25 |orres per gerera||or ol 1 |w|. l|ar|
W||| oe opera||rg lor rear|y 330 days, |.e. 7884 |ours, |rc|ud|rg arrua| ra|r|erarce.. T|e
capac||y u||||za||or assured |s 90 lror ||e l|rs| year ||se|l. T||s assurp||or |s ra|r|y lor
l|rarc|a| ara|ys|s. T|e pr|ce ol r|ce |us| |s |a|er as bs.1500 per |or as per currer| ra|e W|||
ar esca|a||or ol 5 per arrur.
13.' SALABLE ELECTRICITY
13.'.1 T|e 0ross gerera||or ol poWer |r ||e reW poWer p|ar| W||| oe 11000 |w. 0u| ol |||s, arourd
10 ol poWer W||| oe corsured |r ||e poWer p|ar|, |.e.1000 |w. T|e oa|arce poWer ol 10000
|w car oe supp||ed |o ||e gr|d.
T||s expor|ao|e poWer W||| a p|ar| capac||y u||||za||or ol 90 W||| oe supp||ed |o ||e A3F8
gr|d. T||s W||| Wor| ou| |o (7884x10000)|W|r |.e.78.84 r||||or ur||s per arrur.
13.'.2 T|e poWer gerera|ed |s proposed |o oe so|d |o ||e A3F8 a| preser|, as A3F8 |s d|rec|ed oy
0ov|. ol Assar.
13.'.3 UNIT CAP PRICE OF ELECTRICITY
T|e ||r|s|ry ol Nor-Corver||ora| Frergy 3ources, |ave recorrerded a pr|ce ol bs. 2.25 per
|w|, lor ||e oase year 94-95. T|ey |ave a|so recorrerded ar esca|a||or ol 5 or ||e ur||
pr|ce every year. w|||e, rary 3F8s |ave ro| ye| lu||y |rp|erer|ed ||ese recorrerda||ors,
0ov|. ol bajas||ar |ad |ssued ||e ro||l|ca||or |rd|ca||rg ||e oase pr|ce ol bs.3.52 lor ||e year
2004-05.
3|rce A3F8 |s |av|rg a del|c|| ol 221 |u al|er ||e cor|rac|ua| purc|ases |r 200o-07, || |as |o ra|e up
||e del|c|| oy purc|as|rg poWer lror loWer Traders a| a ||g| ra|e ol bs.3.57(avg) as |rd|ca|ed urder
10 MW Biomass Based Power Plant ABEIL
c|ause 2.7 ear||er.we are assur|rg ||a|, Assar 3|a|e F|ec|r|c||y begu|a|ory Corr|ss|or W||| g|ve ||e
ca/ %a#" ol sa|e ol o|orass oased poWer ol a| |eas| bs.3.50 per ur|| up|o a ||r|| ol 200 r||||or ur||s |r
||e year 2007-08 |o ra|e up ||e del|c|| ol poWer.
13.< OPERATION AND MAINTENANCE COST
T|e repa|rs ard ra|r|erarce cos| lor |||s projec| |as oeer assured as bs.o1.5o la||s |r
l|rs| year W||| esca|a||or ol 5 per arrur. T|e sa|ar|es ard Wages ol ||e opera||or ard
ra|r|erarce persorre| ol ||e poWer gerera||or p|ar| |s separa|e|y cors|dered (beler |ao|e
erc|osed |o ||e sec||or or |arpoWer ard Tra|r|rg) ard ||e sare |ave oeer Wor|ed ou| as
bs.o8.3o la||s, |rc|ud|rg a prov|s|or lor cor|rac| |aoor serv|ce c|arges.
Ta>" 13.1 P%ic" "scaa#i*!s
EB/"!s"s A-*)!# Escaa#i*! /"% 8"a%
bepa|rs ard |a|r|erarce o1.5o 5
3a|ar|es ard wages o8.3o 5
Corsurao|es 15.00 5
13.; ADMINISTRATION@ OVERHEADS AND SELLING EIPENSES
T|e Cos| |rc|uded urder |||s |ead |s bs. 75.28 la||s |rc|ud|rg bs. 25.00 la||s lor |rsurarce.
T||s a|so |rc|udes ||e gerera| adr|r|s|ra||ve experses.
Ta>" 13.2 A.-i!is#%a#i*!@ O$"%?"a.s a!. S"i!= EB/"!s"s
EB/"!s"s A-*)!# Escaa#i*! /"% 8"a%
|arager|a| ard Adr|r|s|ra||ve sa|ar|es 45.28 10
3e|||rg ard 0||er Fxperses 5.00 0
lrsurarce 25.00 0
8o|| 0pera||or & |a|r|erarce ard Adr|r|s|ra||or 0ver|eads|lrsurarce are cors|dered urder
0&| Fxperses |r ||e ca|cu|a||ors lor gerera||or cos|.
13.1 TAIES ON GENERATION AND SALES
No experse urder |||s |ead |s cors|dered s|rce |||s |s ro| app||cao|e.
13.10 ESCALATION PROVISION FOR VARIOUS COSTS AND EIPENSES
10 MW Biomass Based Power Plant ABEIL
Ar esca|a||or ol 5 or ||e sa|ar|es ard Wages, 5 or ||e adr|r|s|ra||ve experses ard 5
or ||e cos| ol u||||||es |s cors|dered |r ||e l|rarc|a| ara|ys|s. Ar esca|a||or ol 5 |s cors|dered
or ||e cos| ol lue| |r ||e l|rarc|a| ara|ys|s.
13.11 DEPRECIATION
A s|ra|g|| ||re deprec|a||or ra|e ol 3.o lor ||e p|ar| ard rac||rery as prov|ded |r ||e 0aze||e
lor a ||le spar ol 25 years |s cors|dered |r ||e l|rarc|a| ara|ys|s. T|e deprec|a||or oased or
||e aoove ra|es Wor|s ou| |o bs.170.57 la||s lor a lu|| year.
13.12 CAPITAL SPARES
1 ol gross l|xed asse|s arour||rg |o bs.bs.47.38 |acs |s |a|er as cap||a| spares
per arrur.
13.12 GENERATION COST a!. PROPOSED TARIFF
T|e arrexed sc|edu|e g|ves ||e es||ra|e ol cos| ol produc||or ol e|ec|r|c||y, lor |er (10) years
opera||or lror p|ar| corr|ss|or|rg ard ||e proposed |ar|ll lor sa|e ol poWer |o ||e gr|d al|er
cors|der|rg a 14 b0l. l|ar| capac||y u||||za||or ol 90 |as oeer cors|dered lror l|rs| year
orWards |r ||e ara|ys|s..