Specialist Services to the Oil & Gas and Petrochemical Industries
Established 1999 in Kuala Lumpur, Malaysia
pdmsmodeling
offshorelivingquarters
engineeringservices
as-built surveying
Catalogues, Specifications, Intelligent P&IDs and Pipe Spooling
Specialising in Architectural & Interior Design Works
Structural, Piping, Mechanical and E&I Services Design
pl ant desi gn
engi neer s sdn bhd
www.pdengineers.biz
p
r
o
j
e
c
t
s
s
e
l
e
c
t
d
c l i ent s i nc l ude:
maj or pr oj ec t s:
2004 Malaysia
As-built Laser Scan survey and 3D PDMS modelling of Bintulu Stabiliser Plant 1 & 2
for MMC Oil & Gas Engineering & Shell Sarawak Berhad
2004 Indonesia
As-built Laser Scan survey and 3D PDMS modelling of Central Gathering Station I in Duri, Riau, Sumatra
for Caltex Pacific Indonesia
2003/2004 Malaysia/Vietnam
As-built Laser Scan survey and 3D PDMS modelling of riser tie-ins & Deck extension plus flow line/manifold modifications.
for Talisman Malaysia Limited
2003 Malaysia
As-built Laser Scan survey and 3D PDMS modelling of Pulai A offshore process platform.
for MMC Oil & Gas Engineering & Petronas Carigali Sdn Bhd
2002 Singapore
As-built Laser Scan survey, 3D modelling & verification with PDMS model of combined cycle power station.
for Alstom Power Sdn Bhd & Senoko Power Station Ltd
www.pdengineers.biz
Gas Manifold Extention
for
TALISMAN ENERGY
BS-A PLATFORM
Malaysia
pr oj ec t c ase st udy
www.pdengineers.biz
Project background:
Talisman Energy BS-A Platform
Location about 200km offshore Kota Baru(Malaysia
Vietnam Joint Development Area)
Better then expected production
Additional flow lines needed to be installed and existing
Gas manifolds needed to be extended.
pl ant desi gn
engi neer s sdn bhd
www.pdengineers.biz
Client requirements:
No shutdown during installation of deck extension and
pipe spools
Installation window small
No work barge/boat available for any rework
Especially the deck extension had to fit. No room for any
mismatch.
pl ant desi gn
engi neer s sdn bhd
www.pdengineers.biz
Scope of Work:
3D Laser Scan Survey and 3D Modelling of effected
areas (Manifolds, Wellheads, Water Injection, Drain
Vessel & Structure)
pl ant desi gn
engi neer s sdn bhd
Deliverables:
Registered Point Cloud
Semi Intelligent PDMS Model
Clash Report (New design verified against existing
conditions)
www.pdengineers.biz
Coordination:
Provide appointed Design Consultant with 3D As-Built
PDMS Model. (Engineering PDMS Model was available)
Verify and resolve any clashes between 3D As-Built
PDMS Model and Design consultants new design.
Dimensional verification of Fabricated (Tag welded)
Deck extension by appointed Fabricator.
Dimensional verification of Fabricated critical pipe
spools
pl ant desi gn
engi neer s sdn bhd
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Planning and Logistics
Kuala Lumpur Kota BaruAirport (1 hour flight)
Kota BaruHelibase BS-A Platform (1 Hour Helicopter flight)
Depart 06.00 KL Arrive on the Platform 12.00 noon
Did it work out?
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Well no.
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
2 Days later we arrived
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Manifold Area
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Wellhead Area
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Drain Vessel Water Injection Area
www.pdengineers.biz
c
a
s
e

s
t
u
d
y
Wor k f l ow
laser scanning at site
registering survey data on
platform
point cloud processing in
home office
3D model in cyclone
import to PDMS
www.pdengineers.biz
c
a
s
e

s
t
u
d
y
pl ant desi gn
engi neer s sdn bhd
Malaysia
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Drain Vessel Area
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Manifold Area
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Manifold Area
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Manifold Area
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Turn around time for the Survey and Modeling:
3D Laser Scan Survey - 5 days (3 days of scanning, about 60 scans)
3D Modeling in Cyclone - 3 weeks
Transfer to PDMS and Labelling of objects 3 days
Clash Check 2 days (35 clashes/misalignments)
Completed within 6 weeks as per Schedule
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Survey at the fabrication yard
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Turn around time for Dimensional Verification of
Fabricated Deck extention and Pipe Spools:
Initial Dimensional Survey of Deck extension - 1 day survey
(25mm offset was measured against existing conditions)
Resurvey of Deck extension after 25mm correction 1 day
Dimensional Survey of critical pipe spools 1 day
Completed inclusive of Resurvey within 1 week
www.pdengineers.biz
pl ant desi gn
engi neer s sdn bhd
Installation of Deck extention:
Perfect fit
Installation of Pipe spools:
Installation of the pipe spools is ongoing