Key factors to consider while setting up a solar plant
Latest News for Energy Efficiency, Solar, Wind, Biomass Power, Biofuels, Waste to
Energy
EAI is currently looking for dynamic and driven
MBAs/M.Techs as Interns for industry research and analysis.
The following are the
important key factors to be
considered before setting up
a solar captive power plant:
1. Load Supported
They are usually the largest single influence on the size and cost of a PV system. A
PV system designer can minimize a PV systems cost by efficiently using the energy
available. The first step is to estimate the average daily power demand of each load
to be use. It is important to note that one should be thorough, but realistic, when
estimating the load. A 25 percent safety factor can cost a great deal of money.
2. Type of Loads
While estimating the load, it is necessary to calculate for both ac and dc loads.
EAI Renewable Energy
Monthly Digest -
August 2013
Latest Solar Energy
News
Delegation to study
feasibility of Aurangabad's
solar energy projects
Tamil Nadu govt to supply
solar pump sets to
farmers
Thin-film solar tops India
panel performance, BNEF
says
0

13

36

6631



Sections EAI Daily Consulting Reports Promotions 360 Club
About Team
Search...
Setting Up Solar Power Plant in India - Key Factors to Consider- Energy Alternatives India - EAI.in
http://www.eai.in/ref/ae/sol/cs/sup/if/key_factors_to_consider_while_setting_up_a_solar_plant.html[10/6/2013 9:53:06 PM]
3. Hours of Operation
An hour of operation is an important factor. This value helps us determine the exact
consumption of electricity (kWh) of each appliance. Calculating this value will help
the designer in the first level assessment of the size of the solar system that will be
needed to power the site under consideration. More importantly the time of
operation during the day will enable a designer to do a more accurate sizing of the
PV system. For example, a refrigerator runs for 24 hours in a day. Other appliances
like washing machine will run 2 hours a day in the afternoon. So a PV system can
be designed to supplement grid electricity by providing electricity during peak hours.
It is also possible, if the user wishes, to design a complete solar system to provide
electricity throughout the day with battery backup.
4. Days of Autonomy
Autonomy refers to the number of days a battery system will provide a given load
without being recharged by the PV array or another source. General weather
conditions determine the number of no sun days which is a significant variable in
determining the autonomy. Local weather patterns and microclimates must also be
considered. Cross-check weather sources because errors in solar resource
estimates can cause disappointing system performance.
The most important factors in determining an appropriate autonomy for a system
are the size and type of loads that the system services. The general range of
autonomy is as follows.
2-3 days for non-essential uses or systems with a generator back up
5-7 days for critical loads with no other power source
5. Space Available
For setting up 1 kW SPV system without batteries, the required shade free area is
100 sqft.
Knowing the installation site before designing the system is recommended for good
planning of component placement, wire runs, shading, and terrain peculiarities. The
primary requirement in selecting the space is that, it should be shade free. Shading
critically affects a PC arrays performance. Even a small amount of shade on a PV
panel can reduce its performance significantly. For this reason, minimizing shading is
much more important in PV system design. Carefully determining solar access or
shade-free location is fundamental to cost effective PV performance. . When a site
is selected, be sure that the following parameters are met and tasks completed.
Be sure that the array is not shaded from 9 A.M to 3 P.M.
read more
Tamil Nadu to establish
solar power transmission
corridor to evacuate 3,000
MW solar power
Indias ultra-mega solar
plant to sell power at a
record-low rate
News by category
Small Hydro
Pune
Power Trading
Biodiesel
Recycling
Solar CSP
Transportation
Cities
Combined Heat and
Power
Solar Photovoltaic
Related Links
Policies
News and Updates
Companies and Projects
Business Opportunities
Education & Careers
Technology Options
Captive Solar Power in
India
Latest News from EAI
Blog
EAI presents at SolarCon
2013
Setting Up Solar Power Plant in India - Key Factors to Consider- Energy Alternatives India - EAI.in
http://www.eai.in/ref/ae/sol/cs/sup/if/key_factors_to_consider_while_setting_up_a_solar_plant.html[10/6/2013 9:53:06 PM]
Identify the obstacles, if any, that shade the array between 9 A.M and 3 P.M
Make recommendations to eliminate any shading, move the array to avoid
shading, or increase the array size to offset losses due to shading.
Other factors to be considered
Keep it simple - Complexity lowers reliability and increases maintenance cost.
Understand system availability - Achieving 99+ percent availability with any
energy system is expensive.
Know what hardware is available at what cost - Tradeoffs are inevitable. The
more you know about hardware, the better decisions you can make. Shop for
bargains, talk to dealers, ask questions.
Install the system carefully - Make each connection as if it had to last 30 years--
it does. Use the right tools and technique. The system reliability is no higher than
its weakest connection.
Safety first and last - Dont take shortcuts that might endanger life or property.
Comply with local and national building and electrical codes.
Plan periodic maintenance - PV systems have an enviable record for unattended
operation, but no system works forever without some care.
Calculate the life-cycle cost (LCC) to compare PV systems to alternatives LCC
reflects the complete cost of owning and operating any energy system.
Related Links
Solar Power vs Diesel Generator
Types of Solar Cells
Crystalline Silicon c-Si
Thin Film Solar Cells
Major obstacles in the Captive Solar industry
Hottest sectors in the Market that Use Solar Power
Large Industrial Facilities that use Captive Solar Power
Large Commercial Facilities that use Captive Solar Power
Solar Power in the Communication Sector
Solar Power Generation to Pump Water
RENERGY 2013
Conference 3 Days of
Exciting Renewable
Energy Action, With a
Focus on Solar
GE, ENERPARC, CWET,
Vikram Solar J oin as
Sponsors @ RENERGY
2013
Operation and
Maintenance of Solar PV
Projects Workshop,
13th March, New Delhi
Bangalore Solar PV
Installers Training and UL
Certification Mar 13-15,
2013, Conducted by
iAcharya and UL
Free Whitepapers from
EAI
An analysis of
Opportunities in th
Wind Power Value
Chain
PV Savvy -
Knowing the Key
Characteristics of
Solar PV Value
Chain
India Renewable
Energy Advisor -
Highlights of India
Renewable Energ
Industry
Analysis of
Manufacturing
Opportunities in th
Solar PV Value
Chain
Setting Up Solar Power Plant in India - Key Factors to Consider- Energy Alternatives India - EAI.in
http://www.eai.in/ref/ae/sol/cs/sup/if/key_factors_to_consider_while_setting_up_a_solar_plant.html[10/6/2013 9:53:06 PM]
Solar Powered Warning Signals
Solar Powered Lighting
Solar Powered Commercial Refrigerators
Technology Options involved in Captive Solar
Stand Alone PV Systems
Grid connected Captive Solar Plants
Grid connected Captive Solar Plants without battery
Grid connected Captive Solar Plants with battery
Hybrid Technology Involved in Solar Plants
Solar Photovoltaic- Diesel Generator Hybrid System
Solar Photovoltaic- Wind Hybrid System
Technology Option Prevalent In India and Future Trends
Setting up a Captive Solar Plant
Installing a Captive Solar Power Plant
Installing a Hybrid System
Essential Components to Set Up A Captive Plant
Optional Components to Set Up A Captive Plant
Default Components to Set Up A Captive Plant
Key Factors to Consider while setting up a Solar Plant
Solar PV in India Industry Status & Trends
Future Prospects of the Solar Industry
Key Challenges in the Growth of Solar PV Technology in India
Nodal Agencies that Support Renewable Energy Financing in India
IREDA
Power Finance Corporation Limited
Popular Links
100 Cleantech Ideas that
Will Change the World
Wind Power Purchase
through Group Captive
India Solar PV Advisor
India Solar PV Module
Market Report
India Biomass
Gasification Power
Production
Comprehensive Oilgae
Report
Oilgae Digest
Oilgae Report Academic
Edition
Oilgae Guide to Algae-
based Wastewater
Treatment
Comprehensive Guide for
Algae-based CO
2
Capture
Replacing Diesel with
Solar
Comprehensive Castor
Oil Report
Setting Up Solar Power Plant in India - Key Factors to Consider- Energy Alternatives India - EAI.in
http://www.eai.in/ref/ae/sol/cs/sup/if/key_factors_to_consider_while_setting_up_a_solar_plant.html[10/6/2013 9:53:06 PM]
Banks and Institutions that Support Renewable Energy Financing in India
Subscribe to EAI Daily!
Don't Miss It! Get Latest from Energy Alternatives India Delivered in Your Mailbox. Free!
*
Name
*
Email Address
Mobile No.
(Optional)
Company Name
Designation City
About Yourself
Sector of Interest Solar Wind
Biomass and Biofuels
Energy Efficiency
Waste Management
Others
EAI Presentations
Energy Storage, Battery and
Renewable Energy
Wind Energy, Small Hydro Power
- Investment Challenges
Green Electricity from Biomass -
Technology Trends
Cellulosic Ethanol and J atropha
Biofuels in India
Renewable Energy investing in
india - Potential and challenges
Popular Links
India Solar PV Consulting
EAI's Offerings in Solar PV
Module Manufacturing
Meet the renewable energy folks
from world over
Power Plant Carbon
Storage Costs
Biomass Gasification in India
EAI Links
Tag Clouds
climate finance pipeline
campco teri cag wind
turbines
manufacturing solar
panels cerc krishi
mela national solar
mission moser baer ntpc
suzlon energy ethanol reliance
tamilnadu solar pv
power plant suntech coal
policy solar energy india wise
solar inverters suzlon joint
ventures wind energy
potential coal companies azim
premji ujvn
Setting Up Solar Power Plant in India - Key Factors to Consider- Energy Alternatives India - EAI.in
http://www.eai.in/ref/ae/sol/cs/sup/if/key_factors_to_consider_while_setting_up_a_solar_plant.html[10/6/2013 9:53:06 PM]
Copyright - 2012 EAI. All rights reserved.
Scroll to Top
Home Blog About Us Privacy Policy

Potrebbero piacerti anche