Sei sulla pagina 1di 4

Muhammad Adam

Address:
1206/B Mumtazabad Colony Multan Pakistan.
Mobile: 00923033779737
Landline: 0092616529269
Email:engr.adam@gmail.com


Career Profile
2G RF professional with 5 years experience of GSM,GPRS, EDGE networks based on ZTE, Nokia (BSS S12/S13/S14,
Flexi BTS, RG10,RG20,RG30 GPRS, EDGE and AMR Enabled Dual Band Network 900/1800, NETACT 4.2/ 5.2) and ZTE
(OMCZXG10, V3 ,V4 BSCs and latest NetNuemen EMS clients ). Extensive Experience in Vendor SWAPs. Excellent
working knowledge of Microsoft Excel.
ACADEMICS

Bachelors in Computer Systems Engineering
2002 to 2006
JOB EXPERIENCE
MARCH 2013- TILL NOW
RF OPTIMIZATION ENGINEER NSN TO ZTE TELENOR SWAP PROJECT.
Regular Optimization Activities
To meet the agreed KPIs on the cluster level .To support the customer in daily tasks of
optimization.
Daily KPIs monitoring (CSSR, DCR ,HOSR etc) and troubleshooting of the worst cells.
Responsible for reducing congestion and drops, improving the Handover, Location Update, CSSR in
the designated area, issuing capacity requests whenever needed.
Routine neighbor audit of BSCs, analysis of per neighbor stats in cells having poor handover
performance and to change handover margins.
Handover Success improvement on cell level by changing Pbgt,
Adjustments of idle mode boundaries by tweaking ACCMIN, C1, C2.
SDCCH dimensiong for reduced SDCCH congestion.
HR/FR Parameters setting for reduced TCH Blocking improving CSSR
RX Acceslevel setting for traffic shifting.
Improving Data KPIs like TBF drops rate , TBF Allocation Success Rate, DL Blocking and UL
Blocking and Throughput.
Interference on band 4 and band 5 reduction by Frequency tuning.
Coordinating with BSS Teams to resolve Issues, such as Handover Failures, Frequency Interference,
and Low Power TRXs.
Analysis of routine Drive Test of area assigned or issue-based DT using TEMS investigation(Data
collection and route analysis) and prepare DT analysis report with recommendations for dropped calls,
bad quality/coverage areas, no-dominance, handover failure issues etc. to improve the performance of
the designated area.
OCT 2012- FEB 2013
RF OPTIMIZATION CONSULTANT MOTOROLA TO NSN SWAP ZAINIRAQ.

To get acceptance of RF KPIs on Cluster level after swap from Zain Iraq team .
Audit of pre and post parameters for swapped sites . Escalation of discrepencies to planning team for
correction.
Inter MSC HO analysis and correction of wrong LACs contributing to HO failures.
Sector swap detection by analysis of pre and post swap traffic .
Escalation of zero PS data cells to operations and care team to rectify.

MUHAMMAD ADAM


Frequency change where required to improve the KPIs.
NeighbourAudit for swapped sites and proposed addition and deletion of neighbours where required.
IASR improvement by RACH,and SLO and MAXRetrans Parameters
TCH Blocking improvement by Accesslevel min, CRO, PT, PBGTHO and BTSLOADTHS parameters.
DCR Improvement by Accessmin, TRXpriority shifting, HO Optimization and Frequency cleaning.
SDR improvement by SDCCH Shifting, BSTXPWRMAX, RxAccessmin, T200 and Frequency Tuning.
Improving TBF Success Rate by BFG and TRP and CDED and CDEF parametres.
Routine neighbor audit of BSCs, analysis of per neighbor stats in cells having poor handover
performance and to change handover margins.
Handover Success improvement on cell level by changing Pbgt, RxAccesslevelmin,NY1, (Power
Budget parameter)
Improving KPIs SDR,CSSR,HOSR by optimizaingPowerControl values in POC table.
Adjustments of idle mode boundaries by tweaking ACCMIN, C1, C2.
HR/FR Parameters setting for reduced TCH Blocking improving CSSR
RX Acceslevel setting for traffic shifting.
Recommendations for newly on-aired sites based on DT performed at the time of commissioning and
analysis of Statistical data.
Making XML from plan edit for implementation in BSC.
Escalation of Faulty Hardware to improve KPIs.
Making daily report of Alarms to float in the team .
Making of BSC report for final acceptance after complete swap.


DATA KPIs Optimization:
Improving throughput by modifying CDED and CDEF values.
Improving TBF drop rate by modifying coding schemes and Frequency cleaning.
Improving TBF Success rate by BFG and CDED CDED and coding schemes.
Improving UL and DL blocking KPIs by increasing dedicated data timeslots and enabling more trx with
data capability and assigning them to EDAP pool.
APRIL2012-SEPTEMBER 2012
RF OPTIMIZATION CONSULTANT MOTOROLA TO NSN SWAP MOBILY MADINAH SAUDI ARABIA.

This project consists on acceptance on cell level for CS and PS KPIs. All sites assigned were got
accepted by the customer.

NOV 2011-APRIL2012
HUAWEI MANAGED SERVICES RF PROJECT.
Regular Optimization Activities
To meet the agreed KPIs on the monthly basis .To support the customer in daily tasks of
optimization.





MUHAMMAD ADAM


JOB EXPERIENCE
AUGUST 2011 OCT 2011
RF OPTIMIZATION CONSULTANT (MOTOROLA TO NSN) VODACOM SRAN SWAP SOUTH AFRICA.
I have completed my assignmentas RF Optimization Consultant Motorola to NSN Vodacom SRAN Swap Project
in South Africa . I leaded the Optimization area for swap sites on daily basis includes BSC KPIs Optimization
according to customer agreed SLA and getting acceptance of Swapped clusters .
NSN SPECIFIC Activities:

NSN Dump processing by using Plan Edit tool for extracting parameters and required info.
Using SONAR for extracting multi vendor stats including NSN, Huawei , Motorola .
Using NetAct to Extract Counter level stats and KPIs reports .
Making specific reports in NETACT used for swapped sites reporting.
TOP level user interface usage for alarms generation and parameter and live time site monitoring.
CM editor usage in NETACT.
Reporting suite for extracting reports.
NetAct Content Browser for making specific reports.
RF Optimization based on Drive Testing
Initiating the drive test of swapped cluster and analysis of logfiles to rectify the Blocking and Drop Call
isuues and generationg report for acceptance.
Analyzing drive tests of cities and submit their reports with appropriate recommendations to resolve the
identified problems.
Carrying out Routine and Issue Based Drive Tests using TEMS Investigation to identify areas having
coverage, quality & connectivity issues.
Network Audits
Carrying out Bi-weekly audit to find BSC, Cell and Adjacencies parameter discrepanciesand Generate
WOs to remove such discrepancies.
MARCH 2010 JULY 2011
TELENOR PAKISTAN (NOKIA SEIMENSNETWOKS)AS
RF PLANNING AND OPTIMIZATION ENGINEER

Special Projects
Trial performed to optimize power control window so as to make sure good RxLev/Rxqual Samples
while ensuring minimum interference.
Restricted overshooting cells coverage areas through parametric adjustment.
Retuned parameters to Push traffic from outer GSM to inner DCS zone in order to Optimize DCS
utilization.
Extremely Remote Sites DCR and CSSR Optimization Project
GSM and DCS Layer Utilization Project
HR/FR Utilization improvement Project for better user perception.
Expansions of basis of TCH call setup blocking.







MUHAMMAD ADAM





JUNE 08 TILL MARCH 2010
CHINA MOBILEPAKISTAN CENTRAL REGION (ZTE)
RF PLANNING AND OPTIMIZATION ENGINEER
Special Projects
T20 city optimization Project to improve the KPIs of top cities according to agreed SLA.
HR/FR utilization project to shift more traffic on FR.
TRX removal project of Low utilization cells to save the capex and improve the Utilization.

JUNE 07 TILL JUNE 2008
(SHANGHAI TELECOM CMPAK PROJECT )
RF OPTIMIZATION ENGINEER

TRAININGS
NSN BSS Dimensioning Training(Duration:3 Days) Nokia Seimens Networks, Pakistan

FINAL YEAR PROJECT

GSM Network Design and Simulation.
TECHNICAL TOOLS
Tools:
1. TEMS Investigation 8.1.1 2. Asset 6.1
3. Optima 4. Net Act
5. MAP INFO 8.0 6. GOOGLE EARTH
7. Auto Cad
9. Plan Edit
11. Actix
8. Ericsson MCOM
10. SONAR
12. OMCR ZTE
13. Minos(ZTE) 14. IBSC ZTE

REFERENCE
Will be furnished on request

Potrebbero piacerti anche