This document contains a bill of quantities for civil works for the Mkushi Substation project. It includes 17 items in the preliminary and general works section covering contractual requirements, site establishment, and health and safety compliance. The civil works are broken into 5 sections covering bulk earthworks and landscaping (6 items), access and terrace roads (10 items), base foundations (6 items), stormwater drainage (5 items), and fencing (4 items). The quantities and rates for each item are to be completed to calculate the total cost for the civil works.
This document contains a bill of quantities for civil works for the Mkushi Substation project. It includes 17 items in the preliminary and general works section covering contractual requirements, site establishment, and health and safety compliance. The civil works are broken into 5 sections covering bulk earthworks and landscaping (6 items), access and terrace roads (10 items), base foundations (6 items), stormwater drainage (5 items), and fencing (4 items). The quantities and rates for each item are to be completed to calculate the total cost for the civil works.
This document contains a bill of quantities for civil works for the Mkushi Substation project. It includes 17 items in the preliminary and general works section covering contractual requirements, site establishment, and health and safety compliance. The civil works are broken into 5 sections covering bulk earthworks and landscaping (6 items), access and terrace roads (10 items), base foundations (6 items), stormwater drainage (5 items), and fencing (4 items). The quantities and rates for each item are to be completed to calculate the total cost for the civil works.
SECTION NO 1 SANS 1200A PRELIMINARY AND GENERAL (Applicable to the whole of the Works) SANS1200A.8.3 FIXED CHARGE ITEMS 1 SANS 1200A.8.3.1 Contractual requirements. SUM 1 SANS 1200A.8.3.2 Establishment of Facilities on the Site 2 SANS 1200A.8.3.2.2j Plant. SUM 1 3 Allow the sum of $ for hiring of SUM 1 standby generator, including transporting to site, working on site, diesel fuel and removing from site at contract completion. 4 SANS 1200A.8.3.3 Other fixed charge obligations. SUM 1 5 SANS 1200A.8.3.3 Allow the sum of $ for purchase SUM 1 and delivery to site, of sundry site equipment. 6 SANS 1200A.8.3.3 Allow the sum of $ for the SUM 1 fabrication, delivery and erection in the required position on site, of ALL labelling, informational and safety signage, etc., complete, all as instructed by the ABB Project Manager 7 SABS 1200A.8.3.4 Removal of site establishment. SUM 1 Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200A.8.4 TIME RELATED ITEMS SABS 1200A.8.4.2.1 Facilities for Engineer & Contractor: 8 SABS 1200A.8.4.2.1a Furnished offices. Office accommodation for personnel shall MTHS 8 be able to accommodate SIX (6) persons comfortably and shall have separate boardroom, kitchenette and toilet facilities. This sum is to include for all loose furniture and fittings, electric lighting, power outlets. drawing rack, 2 no. office desks and 4 no. office chairs. overall size of 3m wide x 6m long 9 SABS 1200A.8.4.2.2a Workshop, Lab and Storage sheds. MTHS 8 10 SABS 1200A.8.4.2.2e Ablution and latrine facilities (chemical portable MTHS 8 toilets to be well maintained / serviced for the entire duration of the contract). 11 SABS 1200A.8.4.2.2f Tools and equipment. MTHS 8 12 SABS 1200A.8.4.2.2g Water supplies 2500 L Tank MTHS 8 available from beginning of contract and for entire duration of the contract). 13 SABS 1200A.8.4.2.2i Access to the site. MTHS 8 14 The Contractor is to note that all Security MTHS 8 and Access Control requirements must be in accordance with and conform to 'National Keypoint Standards.' 15 SABS 1200A.8.4.2.2j Plant. MTHS 8 16 SABS 1200A.8.4.3 Supervision for duration of construction. MTHS 8 Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 17 SABS 1200A.8.4.4 Company and head office overhead costs MTHS 8 for duration of construction. 18 SABS 1200A.8.4.5 The Contractor is to take cognizance of the MTHS 8 Environmental Management Programme Act, a copy of which is attached hereto and forms part of the contract documents. The Contractor is to allow a lump-sum price which he deems sufficient to enable him to meet any costs he will encounter in the application of the various clauses in the Environmental Management Programme, for the entire duration of the contract. 24 SABS 1200A.8.4.5 The Contractor is to allow for compliance MTHS 8 with ALL CURRENT ABB Health and Safety requirements, procedures and legislation (OHSACT), which includes the employment of registered safety officer/s, as well as the procurement and use on site, of ALL necessary PPE wear.
TOTAL - carried forward to FINAL SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS Notes (As Applicable to the ENTIRE measured Bills of Quantities, namely Section No. 2, Bill No.'s 1 to 15 inclusive, Sections 3 to 10 inclusive) : 1. 'Section No. 2 : Civil Works' have been measured according to the SABS 1200 System for Measuring Civil Works as published by the SABS. All quantities are provisional and subject to remeasurement during the project. 2. For pricing purposes all items are to be read in conjunction with the tender drawings. No additional compensation will be made for any information shown on the drawings but not mentioned in the Bills of Quantities - the drawings take precedence over the Bills of Quantities 3. All 'Imported Material' for earthworks will be obtained either from a commercial source, as selected by the contractor and shall be regarded as freehaul. 4. All surplus excavated material is to be disposed of at a registered, designated dumping site, as selected by the Contractor, which cost is to include for all sundry charges, royalties, etc. 5. All cut and fill materials will be regarded as freehaul, ie. haulage, loading and offloading of material shall be included in the rates submitted by the Contractor - NO additional compensation whatsoever shall be entertained, or additional monies paid in this regard.
Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SECTION 2 : BILL NO. 1 BULK EARTHWORKS, LANDSCAPING, ETC. SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site Preparation: 1 SABS 1200D.8.3.1.1 Clear and strip 150mm site, including in confined m 2 3,410 areas and remove SABS 1200D.8.3.2 Bulk excavation: 2 SABS 1200D.8.3.2a Cut for reduced levels in terracing, stockpile m 3 324 to be used in fill 3 SABS 1200D.8.3.2b Extra over for: SABS 1200D.8.3.2b.1 Intermediate excavation. m 3 97 4 SABS 1200D.8.3.2b.2 Hard rock excavation, including blasting and m 3 65 breaking down of all rock material to rocks / stones of manageable size SABS 1200D.8.3.4a Importing materials from Commercial sources and placing in: 5 Imported suitable G7 / G8 earth fill material m 3 486 to form terrace, including compacting in 150mm thick layers to a minimum of 95% Mod. AASHTO maximum density @ +/- 2% Optimum Moisture Content (OMC), including tieing / benching into existing in-situ material / embankment / terrace. TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION 2 : BILL NO. 2 CIVIL WORKS ACCESS AND TERRACE ROADS THE FOLLOWING IN 5M WIDE CONCRETE SABS 1200D. EARTHWORKS ( TERRACE ROAD) 1 Cut for reduced levels in road, and cart away m3 131 to a location located by contractor SABS 1200MF. BASE SABS 1200MF.8.3.3 Construct base with material from commercial sources: 2 SABS 1200MF.8.3.3b Imported suitable G5 earth fill material m 3 131 to form road, including compacting in 150mm thick layers to a minimum of 95% Mod. AASHTO maximum density @ +/- 2% Optimum Moisture Content (OMC), including tieing / benching into existing in-situ material / embankment / road SABS 1200G. REINFORCED CONCRETE 3 SABS 1200G.8.4.2 Blinding layer in 15MPa/ 19mm concrete: 50mm Minimum thick. m 3 13 4 SABS 1200G.8.4.3 Strength concrete, 25MPa/19mm with m 3 53 SABS 1200G.8.2 FORMWORK 5 SABS 1200G.8.2.2 Smooth formwork to : Sides of roads m 2 21 6 SABS 1200G.8.2.4 Special off-form : Form rounded edge to 3mm radius along m 106 exposed top edge of concrete road. 7 SABS 1200G.8.3 REINFORCEMENT 8 SABS 1200G.8.3.2 Mesh Reinforcement : High tensile welded mesh reference 311 to m 2 265 road. 9 SABS 1200G.8.4.4a Wood floated finish to falls or slope, m 2 265 including to confined areas. Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 10 SABS 1200G.8.5 JOINTS 12mm Thick expansion joint not exceeding m 11 300mm high or wide consisting of joint filler, raking out of joint filler 15mm deep on exposed surfaces and fill with polysulphide sealant and bond breaker. SABS 1200LC. CABLE DUCTS SABS 1200LC.8.2.2 Excavation in all materials for trenches, backfill and compact to a minimum of 93% Mod. AASHTO maximum density, including disposing of surplus and unsuitable material off site: 11 SABS 1200LC.8.2.2a For set of 2 no. x 160mm diameter uPVC m3 1 pipes, not exceeding 1m deep. SABS 1200LC.8.2.5 Supply, lay, joint, bed and prove duct with nominal 2mm diameter draw wires, including blocking off ends: 12 Set of 2 no. x 160mm diameter Class 16 m 5 uPVC pipes laid according to Engineer's requirements. SABS 1200LC.8.2.6 Imported bedding material, where ordered: 13 SABS 1200MM.8.2.5 Additional item Construct V-Drain with Stone-Pitching m 62 Depth 600mm , 600mm top, 450mm bottom SABS 1200D. EARTHWORKS ( ACCESS ROADS ) 500m Assumed SABS 1200D.8.3.1 Site Preparation: 14 SABS 1200D.8.3.1.2 Remove topsoil to a nominal depth of 100mm, m 2 1000 and compact insitu to 93% 15 Cut for reduced levels in road, and cart away m3 1125 to a location located by contractor SABS 1200D.8.3.4a Importing materials from Commercial sources and placing in: 16 Imported suitable G5 earth fill material m3 1375 to form road, including compacting in 150mm thick layers to a minimum of 95% Mod. AASHTO maximum density @ +/- 2% Optimum Moisture Content (OMC), including tieing / benching into existing in-situ material / embankment / road Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 3 BASE FOUNDATIONS THE FOLLOWING IN BASE FOUNDATIONS SABS 1200D. EARTHWORKS SABS 1200D.8.3.3 Restricted Excavation: 1 SABS 1200D.8.3.3a Excavate for bases in all materials and m3 277 dispose to a site provided by the Contractor (excludes over-excavation) 2 Extra over excavation in soft material for m3 28 battering trench sides / shoring for depths greater than 1,0m SABS 1200D.8.3.3b Extra over for: 3 SABS 1200D.8.3.3b.1 Intermediate excavation. m3 31 4 SABS 1200D.8.3.3b.2 Hard rock excavation. m3 1 5 SABS 1200D.8.3.3b.3 Boulder excavation Class A. m3 1 SABS 1200D.8.3.9 Backfilling: 6 Backfilling in restricted areas around base, m3 115 stub column and to battered slopes, with excavated material including mechanical modification including mechanical modification and compacting to 95% Mod. AASHTO maximum density Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.4 PARTICULAR ITEMS SABS 1200DB.8.3.4b Temporary Works : Control Water Inflow from low water table, during excavations: 7 SABS 1200DB.8.3.4b.1 Provide equipment. SUM 1 8 SABS 1200DB.8.3.4b.2 Operate and maintain. Days 1 9 SABS 1200DB.8.3.4b.3 Remove equipment Sum 1 SABS 1200G. CONCRETE (STRUCTURAL) SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.1 Rough: 10 Sides of base, stub columns. m2 162 SABS 1200G.8.2.2 Smooth: 11 Sides of base, stub columns. m2 241 SABS 1200G.8.2.4 Special off-form: 12 Form 25 x 25mm chamfer along top edge m 505 of exposed stub column. SABS 1200G.8.2.5 Narrow widths: 13 Not exceeding 300mm high or wide m 25 (Provisional). SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.1 Steel reinforcement bars: 14 All diameter bars (Provisional). t 9604 SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/ 19mm concrete: 15 50mm Minimum thick. m3 15 Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200G.8.4.3 Strength concrete, 30MPa/19mm with 'Pro-Struct 539' integral waterproofer added at the rate of 1,5 litres per 50kg cement in: 16 Bases and stub columns. m3 159 SABS 1200G.8.4.4 Unformed surface finishes: 17 SABS 1200G.8.4.4a Wood floated finish to top surface of bases, m2 100 including working in confined areas. SABS 1200G.8.7 GROUTING SABS 1200G.8.7a Under bases: 16 Non-shrink, non-metallic, free-flowing m3 5 35MPa grouting under base plates SABS 1200G.8.8 HOLDING DOWN BOLTS AND MISCELLANEOUS 17 Provide and install Grade 4.8 M20 x 460mm No 620 long galvanized mild steel bolt with 75mm length threaded at exposed end and fitted with suitable nut and washer, and with 70 x 70 x 12mm thick anchor plate welded on at other end, bolt cast 350mm deep into concrete stub column base in exact position 18 Provide and install Grade 4.8 M24 x 460mm No 96 long galvanized mild steel bolt with 75mm length threaded at exposed end and fitted with suitable nut and washer, and with 80 x 80 x 14mm thick anchor plate welded on at other end, bolt cast 350mm deep into concrete stub column base in exact position Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 19 Provide and install Grade 4.8 M36 x 460mm No 96 long galvanized mild steel bolt with 75mm length threaded at exposed end and fitted with suitable nut and washer, and with 350 x 120 x 16mm thick anchor plate welded on at other end, bolt cast 350mm deep into concrete stub column base in exact position TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 4 DRAINAGE THE FOLLOWING IN SUBSOIL DRAINS SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.2a Excavate in all materials for trenches and use for backfill, compact and dispose of surplus material: 1 Depth not exceeding 1m deep (sub-soil m 3 51 drains) SABS 1200DB.8.3.2b Extra over pipe trench excavations for: 3 SABS 1200DB.8.3.2b.1 Intermediate excavation m 3 5 SABS 1200LB. BEDDING (PIPES) SABS 1200LB.8.2.1 Provision of bedding from excavations: 4 SABS 1200LB.8.2.1b Selected fill material (Blanket) (pipe trench) m 3 7 Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200LB.8.2.2 Provision of bedding from commercial sources: 5 Selected G5 granular material (Cradle) m 3 15 stabilized with 3% (by volume) Ordinary Portland Cement, including mechanical modification and compacting to 95% Mod. AASHTO maximum density (sub-soil drain). 6 Selected stone material with aggregate size m 3 15 50 to 75mm nominal diameter (Blanket) SABS 1200LD. CONCRETE PIPE SABS 1200LD.8.2.1 Supply, handle and lay Class 50D spigot and socket concrete pipes complete with rubber ring joints on Class B bedding: Supply, handle and lay Class 50D Intelocking joints concrete pipes complete on Class B bedding: 7 450mm Diameter pipe. m 47 SABS 1200LD.8.2.1 Supply, handle and lay uPVC slotted, flexible sewer and waste piping, including joints, fittings, etc. (refer drawing 0.54/390 sheet 12B): 8 160mm Diameter pipe. m 34 9 Extra over 160mm diameter uPVC slotted No 2 pipe for stopped end. Manholes: Brick manhole size 940 x 940mm internally, as detailed on complete with concrete slab over, step irons, concrete benching and base, excavations, backfilling, carting away of surplus excavated material, etc., SABS 558 Type 4 medium duty manhole cover and frame : 10 Manhole with inlets for 2 no. x 160mm uPVC pipes No 3 and 1 no. x 450mm concrete pipes (elsewhere measured), depth to invert exceeding 1m and not exceeding 1,5m deep. Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 THE FOLLOWING IN CONCRETE HEADWALL SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site preparation: 11 SABS 1200D.8.3.1.1 Clear and strip site in confined areas. m 2 3 12 SABS 1200D.8.3.1.2 Remove topsoil to a nominal depth of 150mm, m 2 3 stockpile and maintain. 13 SABS 1200D.8.3.1.2a Rip excavated surface to a nominal depth of m 2 3 150mm and compact to a minimum of 90% Mod. AASHTO maximum density. SABS 1200D.8.3.2 Bulk excavation: 14 SABS 1200D.8.3.2a Excavate for reduced levels in all materials, m 3 0.5 to form recess for 'stilling basin' and dispose. SABS 1200D.8.3.2b Extra over for : 15 SABS 1200D.8.3.2b.1 Intermediate excavation. m 3 0.2 SABS 1200D.8.3.3 Restricted excavation: 16 SABS 1200D.8.3.3a Excavate for reduced levels to form recess m 3 0.3 for headwall and drainage outlet, including for footing at front of apron slab, and dispose to a site provided by the Contractor. Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200D.8.3.3b Extra over for : 17 SABS 1200D.8.3.3b.1 Intermediate excavation. m 3 0.1 SABS 1200D.8.3.9 Backfilling: 18 Backfilling in restricted areas behind concrete m 3 0.1 headwalls, etc., with material from commercial sources, in layers of 150mm thick, compacted to a minimum of 90% Mod. AASHTO maximum density. SABS 1200D.8.3.15 Supply and lay weedkiller: 19 Supply and lay approved weedkiller in strict m2 3 accordance with the Manufacturer's instructions. SABS 1200G. CONCRETE (STRUCTURAL) SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.1 Rough formwork to : 20 Sides of walls. m2 4 SABS 1200G.8.2.2 Smooth formwork to : 21 Sides of walls m2 4.04 SABS 1200G.8.2.4 Special off-form : 22 Form rounded edge to 3mm radius along m 1 exposed top edge of concrete wall. SABS 1200G.8.2.5 Narrow widths : 23 Not exceeding 300mm high or wide. m 1 24 Not exceeding 300mm high or wide, to m 2 approximately 30 degree batter or slope. SABS 1200G.8.2.6 Box out holes / form voids : Balance c/f 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f 0.00 SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.2 Mesh Reinforcement : 25 High tensile welded mesh reference 311 m 2 4.04 to apron slab and walls. SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/ 19mm concrete: 26 50mm Minimum thick. m 3 0.2 SABS 1200G.8.4.3 Strength concrete 25MPa/19mm in : 27 Apron slab, walls, splitter blocks and m 3 3 thickening for footing, etc. SABS 1200G.8.4.4 Unformed surface finish : 28 SABS 1200G.8.4.4a Wood floated finish to falls or slope, m 2 1 including to confined areas. TOTAL - carried forward to section SUMMARY R 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 5 TRANSFORMER PLINTHS THE FOLLOWING IN TRANSFORMER SABS 1200D. EARTHWORKS SABS 1200D.8.3.3 Restricted excavation in all materials and dispose to a site provided by the Contractor: 1 SABS 1200D.8.3.3a Strip footings. m 3 7 2 SABS 1200D.8.3.3a Cable trenches. m 3 0.3 3 SABS 1200D.8.3.3a Sumps. m 3 0.5 SABS 1200D.8.3.3b Extra over for: 4 SABS 1200D.8.3.3b.1 Intermediate excavation. m 3 0.75 SABS 1200D.8.3.4 Importation of materials from commercial sources: 5 SABS 1200D.8.3.4a Selected fill material compacted in 150mm m 3 4.50 thick layers under surface beds, slabs, etc., stabilized with 3% (by volume) Ordinary Portland Cement, including mechanical modification and compacting to 95% Mod. AASHTO maximum density SABS 1200D.8.3.9 Backfilling: 6 Backfilling in restricted areas to strip m 3 footings (elsewhere measured) with selected fill material from commercial sources in 150mm thick layers, compacted to a minimum of 93% Mod. AASHTO maximum density. Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200G. CONCRETE [STRUCTURAL] SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.1 Rough formwork to: 7 Trench walls. m 2 12 SABS 1200G.8.2.2 Smooth formwork to: 8 Plinths and platforms. m 2 8 SABS 1200G.8.2.4 Sump walls. 7.74 10 Form 25 x 25mm chamfer along exposed m 20 top edges of concrete. SABS 1200G.8.2.5 Narrow widths: 11 Not exceeding 300mm high or wide. m 3 SABS 1200G.8.2.6 Box out holes / Form voids: 12 Form 500 x 500 x 450mm deep pocket in No 1 top surface of concrete surface bed for removeable fence post (elsewhere measured). 13 Form hole 300mm diameter through 100 No 1 to 150mm concrete wall for precast concrete pipe (elsewhere measured). SABS 1200G.8.3 REINFORCEMENT 14 Type reference 245 to plinth and surface m 2 38 beds. SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/19mm concrete: 15 50mm Minimum thick. m 3 2 Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200G.8.4.3 Strength concrete 25MPa/19mm in: 16 Surface beds. m3 3.80 17 Bottom and sides of trenches sumps m3 0.23 18 Transformer plinth m3 7 19 Benching to sump. m3 0.01 SABS 1200G.8.4.4 Unformed surface finishes: 21 SABS 1200G.8.4.4a Wood floated finish, including in confined m2 74 areas. SABS 1200G.8.5 JOINTS 22 'Construction joint' through 600mm thick m 6 concrete including dowels, saw-cut, bond-breaker, silicone sealant, etc., complete, all as detailed on drawing 0.54/390 sheet 38a1. Sundries: 23 Junction box foundation complete No 1 including all excavations, backfilling, concrete, holding down bolts, etc. 24 Plug box foundation complete as per detail No 1 including all excavations, backfilling, concrete, holding down bolts, etc. Screeds: 25 Cement mortar 1:3 screed average 30mm m2 38 thick, to falls. Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200H. FLOORING, COMPLETE AND INSTALLED WITH FRAMES 26 Oil separation Sump, including all No 1 backfilling, concrete, brickwork, covers, drainpipes, etc., complete. BRICKWORK Face brickwork of face bricks (14MPa nominal compressive strength delivered to site) and add for taking delivery, laying, bedding and pointing, storage, waste and profit: 27 Face brick Bundwall 230mm wide with m2 23 maximum height 500mm high with roller course on top of wall, including facing and pointing both sides. 28 Straight joint through bund wall 230mm No 1 wide x 375mm high. Slot 450x450mm through 230mm wide No 1 brick bundwall TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 6 YARDWORKS THE FOLLOWING IN YARDWORKS SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site preparation: 1 Soil poisening to be sprayed over terraces m 2 2953 2 SABS 1200D.8.3.4a Supply and spread 26,5mm nominal diameter m2 2953 yardstone from commercial sources, in 100mm thick layer and lightly compact to set levels. SABS 1200MK. KERBING AND CHANNELING SABS 1200MK.8.2.1 Precast concrete barrier kerb to SABS 927 complete with 15MPa/19mm in-situ concrete haunching at joints, both sides: 3 Kerbs laid straight (edge of terrace). m 234 TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS SECTION 2 - BILL NO. 7 CABLE TRENCHES, DUCTS, JUNCTIONS THE FOLLOWING IN CABLE TRENCHES, DUCTS & JUNCTIONS Construct complete unit as specified and including excavation in all material, working space, risk of collapse, regular dewatering, concrete, formwork, reinforcement, imported backfill and disposal. Cable trenches and junctions complete with concrete covers must be fitted, marked for positions and placed next to trenches for later installation by others. 1 Single trench (600mm wide) m 35 2 Single trench (900mm wide) m 32 Double trench (1500mm wide) m 13 SUNDRIES 3 Cast in-situ concrete cover, size 300mm No 117 wide x 740mm long x 100mm thick overall, including smooth formwork to sides and soffit, all necessary reinforcement and 'vastrap' pattern to top surface of concrete cover, all in accordance with Drawing 4 Cast in-situ concrete cover, size 300mm No 150 wide x 1040mm long x 100mm thick overall, including smooth formwork to sides and soffit, all necessary reinforcement and 'vastrap' pattern to top surface of concrete cover, all in accordance with Drawing TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO.8 LIGHT MASTS AND FOUNDATIONS SABS 1200D. EARTHWORKS SABS 1200D.8.3.3 Restricted Excavation: 1 SABS 1200D.8.3.3a Excavate for bases in all materials and m3 4 dispose to a site provided by the Contractor (excludes over-excavation) SABS 1200D.8.3.3b Extra over for: 2 SABS 1200D.8.3.3b.1 Intermediate excavation. m3 1 SABS 1200D.8.3.9 Backfilling: 3 Backfilling in restricted areas around base, m3 1 stub column and to battered slopes, with selected fill material from commercial sources in 150mm thick layers, including mechanical modification and compacting to 95% Mod. AASHTO maximum density. Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200G. CONCRETE (STRUCTURAL) SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.2 Smooth: 4 Sides of bases, stub columns. m2 11 SABS 1200G.8.2.4 Special off-form: 5 Form 20 x 20mm chamfer along top edge m 6 of exposed stub column. SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.1 Mild steel reinforcement bars: 6 10mm Diameter. kg 13 SABS 1200G.8.3.1 High Tensile steel reinforcement bars: 7 16mm Diameter. kg 28 SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/19mm concrete: 8 50mm Minimum thick. m3 1 SABS 1200G.8.4.3 Strength concrete, 30MPa/19mm with 'Pro-Struct 539' integral waterproofer added at the rate of 1,5 litres per 50kg cement in: 9 Bases and stub columns. m3 4 Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200G.8.4.4 Unformed surface finishes: 10 SABS 1200G.8.4.4a Wood floated finish to top surface of bases, m2 4 including working in confined areas. SABS 1200G.8.7 GROUTING SABS 1200G.8.7a Under bases: 11 Non-shrink, non-metallic, free-flowing m3 1 35MPa grouting under base plates SABS 1200G.8.8 HOLDING DOWN BOLTS AND MISCELLANEOUS 12 Provide and install Grade 4.8 M24 x 1000mm kg 33 long galvanised mild steel bolt with 120mm length threaded at exposed end and fitted with suitable nut and washer, and with 120 x 120 x 14mm thick anchor plate welded on at other end, bolt cast into concrete stub column base in exact position Cable sleeves: 13 50mm Diameter x 700mm long uPVC No 4 sleeve cast in exact position in concrete stub column. One layer of 250 micron 'Plastall Gundle USB Green' waterproof sheeting sealed at laps with 'Gunplas Pressure Sensitive Tape': 14 Under blinding. m2 4 TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCEDESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 9 SECURITY FENCING Note : All galvanized bolts to include for re-threading 1 Supply, deliver and install new 2.3m high m 229 fence with 3 wires of fabric, height of 300mm on supporting arms facing outwards from site at 45 degree angle 3 5m Wide double gate No 1 4 Pedestrian gate 0.6 x 1.8m high No 1 TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 10 WATER SUPPLY PIPING, INCLUDING (PROVISIONAL) SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.2a Excavate in all materials for trenches and use for backfill, compact and dispose of surplus material: 1 Depth not exceeding 1m deep m3 4 SABS 1200DB.8.3.2b Extra over pipe excavation for: 2 SABS 1200DB.8.3.2b.1 Intermediate excavation. m3 0.42 SABS 1200LB. BEDDING (PIPES) SABS 1200LB.8.2.2 Provision of bedding from commercial sources: 3 SABS 1200LB.8.2.2.1a Selected granular material (Cradle). m3 1 4 SABS 1200LB.8.2.2.1b Selected fill material (Blanket). m3 3 Balance c/f $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SABS 1200L. MEDIUM PRESSURE PIPELINES SABS 1200L.8.2.1 Supply, handle and lay Type IV, Class 6 HDPE water supply piping, including joints, fittings, etc.: 5 25mm Diameter pipe. m 25 6 50mm Diameter pipe. m 15 SABS 1200L.8.2.2 Extra over 8.2.1 for the supplying, laying and bedding of specials, complete with couplings: 7 25mm Bend No 8 8 25mm Tee piece No 4 9 50mm Bend No 3 10 50mm Tee piece No 2 SABS 1200L.8.2.3 Extra over 8.2.1 for supplying, fixing and bedding of valves: 11 25mm Diameter isolating valve. No 2 12 50mm Diameter isolating valve. No 2 THE FOLLOWING IN 2500 LITRE WATER STORAGE TANK PLACED ON 6m STAND WATER TANK 2500 Litre Polyethylene, barrel type, water No 1 storage tank , securely mounted in final position with copper straps and U-shaped holding down bolts Provide a 6m high steel water tank support stand No. 1 stand which is able to hold a 2500 litre polyethylene tank TOTAL - carried forward to section SUMMARY $ 0.00 Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 11 SEWERS, INCLUDING SEPTIC TANK SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.2a Excavate in all materials for trenches and use for backfill, compact and dispose of surplus material: 1 Depth not exceeding 1m deep m3 5 SABS 1200DB.8.3.2b Extra over pipe excavation for: 2 SABS 1200DB.8.3.2b.1 Intermediate excavation. m3 1 SABS 1200LB. BEDDING (PIPES) SABS 1200LB.8.2.2 Provision of bedding from commercial sources: 3 SABS 1200LB.8.2.2.1a Selected granular material. m3 2 4 SABS 1200LB.8.2.2.1b Selected fill material (Blanket). m3 3 SABS 1200LD. SEWERS SABS 1200LD. SEWERS SABS 1200LD.8.2.1 Supply, handle and lay uPVC slotted, flexible sewer and waste piping, including joints, fittings, etc.: 5 110mm Diameter pipe. m 18 6 Extra over 110mm diameter uPVC slotted No 3 pipe for 45 degree bend. 7 Extra over 110mm diameter uPVC slotted No 2 pipe for rodding eye, cast in and including mass concrete haunching / anchor block. Balance c/f $ Mkushi Substation PAY REFERENCE DESCRIPTION UNIT QTY RATE Balance b/f $ Sundries: SABS 1200LD.8.2.13 Septic tank complete with covers and frames, etc.: 8 Septic tank chamber, size1.5m No 1 long x 1.5m wide x 2m deep overall, inlets for 2 no. x 110mm diameter and outlet for 1 no. x 50mm diameter uPVC pipes (pipes elsewhere measured), including 500 litre , pumping chamber / chlorinator, blower, all associated electrical supply, excavations, bedding with selected imported material, backfilling and compacting with selected excavated material, carting away of surplus excavated material, etc., complete Manholes: SABS 1200LD.8.2.3 Brick manhole size 940 x 940mm internally, complete with concrete slab over, step irons, concrete benching and base, excavations, backfilling, carting away of surplus excavated material, etc., SABS 558 Type 4 medium duty manhole cover and frame: 9 Manhole with inlets for 2 no. x 110mm No 2 diameter uPVC pipes (pipes elsewhere measured), depth to invert not exceeding 1m. TOTAL - carried forward to section SUMMARY $ Mkushi Substation AMOUNT 0.00 Mkushi Substation AMOUNT 0.00 0.00 Mkushi Substation SECTION NO 2 CIVIL WORKS SECTION SUMMARY Bill No. Description Page No. Amount 1 Bulk Earthworks, Landscaping, etc. 4 0.00 2 Access and Terrace Roads 7 0.00 3 Base Foundations to 132kV Yard 4 0.00 4 Drainage 6 0.00 5 Transformer Plinths (In No. 2) 2 0.00 6 Yardworks 2 0.00 7 Cable Trenches, Ducts, Junctions and Ramps 4 0.00 8 Light Masts and Foundations 4 0.00 9 Security Fencing and Walling, including Security Lighting 1 0.00 10 Water Supply Piping, including Storage Tank 4 0.00 11 Sewers, including Septic Tank 2 0.00 TOTAL - carried forward to FINAL SUMMARY $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT SECTION NO 3 BUILDING WORKS SECTION 3 : BILL NO. 1 CONTROL BUILDING (33 KV YARD) EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site EXCAVATION, FILLING, ETC. Excavation in earth not exceeding 2m deep: 1 Reduced levels under floors m3 100 2 Trenches m3 106 Extra over trench and hole excavations in earth for excavation in: 3 Soft rock m3 21 4 Hard rock m3 2 Extra over all excavations for carting away to a disposal site complying with environmental regulations: 5 Surplus material from excavations and/or stock piles on site to m3 144 spoil area located by the contractor Risk of collapse of excavations: 6 Sides of trench and hole excavations not exceeding 1,5m deep m2 209 Keeping excavations free of water: 7 Keeping excavations free of water Item 1 Earth filling obtained from the excavations: 8 Under floors, steps, pavings, etc and well compacted in layers m3 80 not exceeding 150mm thick 9 Backfilling to trenches, holes, etc., and compacted in layers m3 60 not exceeding 150mm thick to 95% Mod AASHTO density Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 Earth filling obtained from commercial sources: 10 Filling with approved material supplied and carted onto site m3 20 by the Contractor, under floors and well compacted in layers not exceeding 150mm thick Soil insecticide: 11 Under floors, etc., including forming and poisoning shallow m2 165 furrows against foundation walls etc, filling in furrows and ramming. 12 To bottoms and sides of trenches, etc. m2 310 SECTION 3 : BILL NO.1 CONCRETE, FORMWORK AND REINFORCEMENT SUPPLEMENTARY PREAMBLES Cost of tests The costs of making, storing and testing of concrete test cubes as required under clause 7 "Tests" of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the architect. The testing shall be undertaken by an independent firm or institution nominated by the contractor to the approval of the architect. (Test cubes are measured separately) UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES 10MPa/19mm concrete: 13 Blinding to ground beams and m3 6 Columns m3 17 Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 REINFORCED CONCRETE 25MPa/19mm concrete: 14 Ramps m3 2 15 Raft slabs (ground beams elsewhere measured) m3 33 16 Ground beams to raft slabs m3 12 Columns m3 18 TEST BLOCKS 17 Making and testing 150 x 150 x 150mm concrete strength test No 3 cube (Provisional) ROUGH FORMWORK (DEGREE OF ACCURACY II) Rough formwork to sides and soffits: Beams m2 49 Columns m2 22 SMOOTH FORMWORK (DEGREE OF ACCURACY II) Smooth formwork to sides: 18 Column m2 96 19 Ring beam m2 49 REINFORCEMENT Reinforcement to structural concrete work: 20 All diameter bars t 4 Fabric reinforcement: 21 Type 395 fabric reinforcement in concrete surface beds, slabs, m2 165 etc. Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO.1 MASONRY ( Brickwork ) SUPPLEMENTARY PREAMBLES BRICKWORK Sizes in descriptions Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick Pointing Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc FOUNDATIONS (PROVISIONAL) Brickwork of NFP bricks in class II mortar: 22 450mm solid brick wall m2 30 23 300mm Solid brick wall m2 20 SUPERSTRUCTURE Brickwork of NFP bricks in class II mortar: 24 150mm brick walls m2 327 BRICKWORK SUNDRIES Foam filler to firewall: 25 Seal joint between top of one brick wall and roof tiles with m 67 approved foam filler to prevent the escape of hydrogen gasses. Joint forming material in movement joints: 26 10mm Bitumen impregnated fibre board built in vertically m2 3 between brick skins Brickwork reinforcement: 27 150mm Wide reinforcement built in horizontally m 934 Prestressed fabricated lintels: 28 150 x 150mm Lintels in lengths not exceeding 3m m 38 Galvanised hoop iron cramps, ties, etc.: 29 30 x 1,6mm Roof tie 1,5m long with one end fixed to timber No 40 and other end built into brickwork SECTION 3 : BILL NO.1 WATERPROOFING Mkushi Substation DESCRIPTION UNIT QTY AMOUNT DAMP-PROOFING OF WALLS AND FLOORS One layer of 375 micron "Plastall Gundle Brikgrip DPC" embossed damp proof course: 30 In walls m2 67 One layer of 250 micron "Plastall Gundle USB Green" waterproof sheeting sealed at laps with "Gunplas Pressure Sensitive Tape": 31 Under surface beds m2 165 Two coats Cemcrete Permastop waterproof slurry: 32 On internal brick walls m2 56 JOINT SEALANTS, ETC. Cold poured polyurethane sealing compound (15% movement) including bond breaker, primer, etc.: 33 10 x 15mm In expansion joints in floors including raking out m 15 expansion joint filler as necessary Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 1 ROOF COVERINGS, ETC. IBR Sheeting 0.6mm Thick IBR Polythene Roof Sheeting to include head and side wall flashing, closures, washers and screws. To be fixed and laid strictly in accordance with the manufacturer's specifications. Sheeting to be painted per clients required colour 34 Roof covering with not exceeding 50 degrees pitch m2 170 35 231 x 154mm fascia flashing. m 40 36 Ridge m 20 ROOF INSULATION "Sol-Thermo Loft International Roofmate H/D 250-40mm" insulation with aluminium foil to underside and plastic to top : 37 Insulation laid taut over rafters (at approximately 600mm m2 170 centres) and fixed concurrent with tiling battens, purlins, etc SECTION 3 : BILL NO. 1 CARPENTRY AND JOINERY SUPPLEMENTARY PREAMBLES Particle board: Particle board shall comply with the following specifications: a) SABS 1300 Particle board: exterior and flooring type b) SABS 1301 Particle board: interior type Joinery: Descriptions of frames shall be deemed to include frames, transomes, mullions, rails, etc Descriptions of hardwood joinery shall be deemed to include pelleting of bolt holes Fixing Items described as "nailed" shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete EAVES, VERGES, ETC "Everite FC77" pressed fibre-cement : 38 15 x 80 x 200mm Barge board fixed upside down m 31 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 KEY CABINET 39 Glazed timber framed and backed, key cabinet size 1400mm No 1 wide x 1000mm high x 100mm deep mounted to plastered brick wall, with top of cabinet fixed at 2m above finished floor level, including all ironmongery, etc., complete (refer drawing 0.54 / 1150 Sheet 31, rev. 3) SECTION 3 : BILL NO.1 CEILINGS, PARTITIONS AND ACCESS FLOORING CEILINGS, ETC. NAILED UP CEILINGS "Isotherm" polyester insulation : 40 50mm Insulation closely fitted and laid on top of brandering m2 14 between roof timbers etc 6,4mm Gypsum plasterboard with H-type pressed steel jointing strips : 41 Ceilings in 1200mm sheets including 38 x 38mm sawn m2 14 softwood brandering at 400mm centres 42 Extra over ceiling for 610 x 610mm trap door of 50 x 76mm No 2 wrought softwood rebated framing with one 38 x 38mm sawn softwood cross brander covered with ceiling board and fitted flush in opening 43 Extra over ceiling for 400 x 600mm opening for extract air No 1 diffuser (elsewhere measured), including 12 x 50mm timber bead all round fixed to 38 x 38mm framed framing Moulded cornices 44 75mm Gypsum coved cornice m 21 Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 SUSPENDED CEILINGS Proprietary suspended ceilings Note: Electrical light fittings, diffusers, panels, etc generally are "lay in" units of the same dimensions as the suspension grid described and allowance must be made accordingly for their support inclusive of any flexibility insetting out that may be required (ceiling panels have not been deducted and pricing is to take cognizance thereof) 12.5mm "Donn Cyprex" BPB Gypsum Rhinoboard with white porcelain vinyl finish, 600 x 600mm lay-in suspended grid system, including main and cross tees, necessary hangers, grids, etc.: 45 Ceilings suspended not exceeding 1m below timber purlins m2 165 at 600mm centres Cornices to suspended ceilings : 46 "Donn SM25" recessed wall angle plugged m 164 ACCESS FLOORING Supply and install access floor system to system approval. Panels to be 600 x 600mm snap-on stringer system capable of supporting a design load of 7,2KN/m2. The panels are to be covered with high pressure 3,2mm laminate: Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 1 IRONMONGERY SUPPLEMENTARY PREAMBLES Finishes to ironmongery Where applicable finishes to ironmongery are indicated by suffixes in accordance with the following list: BS Satin bronze lacquered CH Chromium plated SC Satin chromium plated SE Silver enamelled GE Grey enamelled AS Anodised silver AB Anodised bronze PB Polished brass PL Polished and lacquered PT Epoxy coated SD Sanded HINGES, BOLTS, ETC. DOOR CLOSERS "Yale": 47 Standard duty overhead door closer No 3 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 1 STRUCTURAL STEELWORK The Tenderer is to allow in the pricing of structural steelwork for all steelwork to be erected plumb and to include for ALL necessary steel packing pieces to achieve same. Steelwork to be hot dipped galvanized Grade 300W, as per the standard specification, complete with all the necessary cleats, brackets, gussets, packs, shop fasteners baseplates and the like, including cleaning of steelwork, shop priming and loading ready for dispatch to site and preparation of shop detail drawings: The following is applicable in respect of roof trusses: Trusses are at maximum 4000mm centres Roof covering is IBR roof sheeting. ROOFS, ETC . 48 Roof construction to double pitched roof No. 8 approximately 15m x 2.06m high overall at 4m centers, including top and bottom chords, permanent bracing, bolts, gussets and 38 x 38mm battens fixed over underlay (underlay elsewhere) SECTION 3 : BILL NO. 1 METALWORK SUPPLEMENTARY PREAMBLES Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 49 PRESSED STEEL DOOR AND FRAME Door and frame manufactured from 2mm thick pre-galvanised No 2 mild steel sheet, 1490mm wide x 2800mm high overall including all ironmongery 50 Door and frame manufactured from 2mm thick pre-galvanised No 7 mild steel sheet, 1090mm wide x 2090mm high overall including all ironmongery 51 Door and frame manufactured from 2mm thick pre-galvanised No 2 mild steel sheet, 900mm wide x 2090mm high overall including all ironmongery STEEL WINDOWS Steel windows with top hung opening sections and brown anodised finish, all as per AAAMSA specifications and: all glazing to be done according to the National Building Regulations - Part N: 52 Window W1 size 1200 x 1500mm high with 4mm clear float No 3 glass 53 Window WF size 900 x 3700mm high with 4mm clear float No 3 glass 54 Window V size 600 x 900mm high with 4mm obscure glass No 2 Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 1 PLASTERING 55 SCREEDS Screeds on concrete 1:4 Cement plaster screeds steel trowelled on concrete : 56 25mm Thick on floors and landings m2 263 INTERNAL PLASTER Cement plaster 1:5 wood floated on brickwork : 57 On walls m2 631 DIVIDING STRIPS, ETC. 58 50 x 3mm Flat section brass dividing strips between different m 3 floor finishes EXTERNAL PLASTER Cement plaster 1:5 wood floated on brickwork : 59 On walls m2 230 COVER STRIPS, ETC. 60 50 x 50 x 3mm Angle section cast into floor of cable trench to m 10 split cables. Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 1 TILING SUPPLEMENTARY PREAMBLES Descriptions Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding FLOOR TILING 61 Smooth Floating Finish m2 165 SECTION 3 : BILL NO. 1 PLUMBING AND DRAINAGE (PROVISIONAL) SUPPLEMENTARY PREAMBLES uPVC pipes and fittings: Soil, waste and vent pipes and fittings shall be solvent weld jointed uPVC pressure pipes and fittings: Pipes for water supply shall be of the class stated Pipes of 40mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings Pipes of 50mm diameter and greater shall have sockets and spigots with push in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints Copper pipes: Pipes shall be hard drawn and half-hard pipes of the class stated. Class 0 (thin walled hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), class 2 (half-hard) and class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper waste, vent and anti-syphon pipes, capillary solder fittings and compression fittings shall be "Cobra Watertech" type. Capillary solder fittings shall comply with ISO 2016. Only compression fittings shall be used in walls or in ground Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 DRAINAGE PIPING, ETC. Rigid PVC drainage pipes: 62 100mm Pipe (No excavation) m 5 63 100mm Pipes laid in and including trenches not exceeding m 10 1m deep Extra over rigid uPVC pipes for fittings: 64 100 mm Bend No 2 65 100 mm Bend with cleaning eye No 1 66 Extra over rigid PVC waste pipes for fittings: 67 100 mm Pan connector No 2 68 50 mm Bend with cleaning eye No 2 69 100 mm Bend with cleaning eye No 2 70 50 mm Junction with cleaning eye No 1 Sundries: 71 Testing drainage pipe system Item 1 WATER SUPPLIES Megapipe: HDPE (high density polyethylene) Type 6 SABS : 72 25mm Pipes laid in and including trenches not exceeding 1m m 64 deep, including all fittings, etc. 73 75mm Pipes laid in and including trenches not exceeding 1m m 4 deep, including all fittings, etc. Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 Pipe encasing : 74 Encase pipe in concrete including all necessary formwork m3 0.5 Sundries : 75 100mm PVC cleaning eye, including 300 mm x 300 mm cast No 1 iron cover and frame, laid in ground 76 Splay cut end to 38 mm PVC pipe No 1 77 Splay cut end to 50 mm PVC pipe No 1 78 Test water supply pipe system Item 1 GULLEYS, ETC. Precast concrete : 79 100 mm Gulley not exceeding 1,0 m deep to invert, fitted with a No 2 galvanised cast iron hinged grating, frame and P-trap, etc., complete SANITARY FITTINGS "Vaal" : 80 White vitreous china close coupled WC suite, complete with No 1 P-trap, 9 litre low level cistern and flushpipe and "Hart Celmac A" double flap heavy duty white plastic seat 455 x 290mm White vitreous china wash hand basin with 81 one taphole configuration, complete with waste, grid, plug and No 2 chain supported on a full universal floor mounted pedestal and "Cobra Stella" basin mixer TRAPS, ETC. 82 40 mm rubber P-trap No 2 "Cobra" or other approved type : TAPS, ETC. Copper : 83 15 mm Service pipe 380mm girth with two brass cap nuts No 2 Chromium-plated : 84 "Cobra" (232/350) 15 mm angle regulating valve No 1 85 15 mm "Star" No 136 stopcock No 1 86 "Cobra" No 136 22 mm compression type underwall stoptap No 1 87 15 mm "Star" No 166/041 sink mixer and swivel outlet No 1 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 Brass : 88 50 mm Gate valve No 1 Cobra" type : FIRE SERVICE No 1 Approved Type : 89 9 kg Dry chemical fire extinguisher including 100mm x 450mm x 25mm polished hardwood back board with chamfered edges, fixed to brickwork No 3 SLEEVES PVC pipes : Pipes 160 mm diameter exceeding 4,5 m and not exceeding 90 5 m long, once bent using a long radius bend and laid below surface bed with both ends sealed with fill, on completion of No 1 cabling Pipes 160 mm diameter exceeding 8 m and not exceeding 8,5 m long, once bent using a long radius bend and laid below 91 surface bed with both ends sealed with fill, on completion of No 1 cabling SECTION 3 : BILL NO. 1 ELECTRICAL WORK BUDGETARY ALLOWANCE Provide the budgetary amount of $ 10 000 (Ten Thousand Dollars) for the Electrical Installation complete. 92 Item 1 10,000.00 Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 1 MECHANICAL WORK MECHANICAL WORK BUDGETARY ALLOWANCE Provide the budgetary amount of $ 5000 ( Five Thousand Dollars) for the Air Conditioning / Mechanical 93 Ventilation Installation complete. Item 1 5,000.00 SECTION 3 : BILL NO. 1 PAINTWORK PAINTWORK, ETC., TO NEW WORK ON FLOATED PLASTER One coat alkali resistant primer and two coats "Dulux Wash 'n Wear" acrylic emulsion paint: On internal walls 94 On external walls m2 433 95 ON SMOOTH CONCRETE m2 230 One coat alkali resistant primer and two coats "Plascon Wall 'n All" paint: On concrete 96 ON PLASTERBOARD m2 17 One coat sealer and two coats "Dulux Wash 'n Wear" acrylic emulsion paint: On ceilings and cornices 97 ON FIBRE-CEMENT m2 347 One coat primer and two coats "Plascon Wall 'n All" acrylic paint: On fascias and barge boards 98 m2 15 Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY AMOUNT Balance b/f $ 0.00 ON METAL Spot priming defects in pre primed surfaces with zinc chromate primer and applying one undercoat and two coats "Dulux Silthane Silk" polyurethane enamel (colour Fawn) paint on steel: On doors and frames 99 One coat calcium plumbate primer, one undercoat and two m2 28 0.00 coats "Plascon Wall 'n All" alkyd enamel paint on galvanised steel: TOTAL - carried forward to FINAL SUMMARY $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT SECTION NO 3 BUILDING WORKS SECTION 3 : BILL NO. 2 GUARD HOUSE (33kV YARD) EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES Carting away of excavated material Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site EXCAVATION, FILLING, ETC. Excavation in earth not exceeding 2m deep: 1 Trenches m3 6 Extra over trench and hole excavations in earth for excavation in: 2 Soft rock m3 2 3 Hard rock m3 1 Extra over all excavations for carting away to a disposal site complying with environmental regulations: 4 Surplus material from excavations and/or stock piles on site to m3 spoil area located by the contractor Earth filling obtained from the excavations: 5 Under floors, steps, pavings, etc and well compacted in layers m3 2 not exceeding 150mm thick Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 Earth filling obtained from commercial sources: 6 Filling with approved material supplied and carted onto site by the Contractor, under floors and well compacted in layers m3 5 not exceeding 150mm thick Soil insecticide: 7 Under floors, etc., including forming and poisoning shallow m2 15 furrows against foundation walls etc, filling in furrows and ramming. 8 To bottoms and sides of trenches, etc. m2 50 SECTION 3 : BILL NO. 2 CONCRETE, FORMWORK AND REINFORCEMENT SUPPLEMENTARY PREAMBLES Cost of tests The costs of making, storing and testing of concrete test cubes as required under clause 7 "Tests" of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the architect. The testing shall be undertaken by an independent firm or institution nominated by the contractor to the approval of the architect. (Test cubes are measured separately) UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES 10MPa/19mm concrete: 9 Blinding to strip footings m3 1 REINFORCED CONCRETE 25MPa/19mm concrete: 10 Strip footings m3 3 Balance c/f 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f 0.00 REINFORCEMENT Fabric reinforcement: 11 Type 395 fabric reinforcement in concrete surface beds, slabs, m2 15 etc. SECTION3 : BILL NO. 2 MASONRY SUPPLEMENTARY PREAMBLES BRICKWORK Sizes in descriptions Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick Pointing Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc FOUNDATIONS (PROVISIONAL) Brickwork of NFX bricks in class II mortar: 12 Half brick walls m2 1 13 One brick wall. m2 4 Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SUPERSTRUCTURE Brickwork of NFX bricks in class II mortar: 14 Half brick walls m2 12 15 One brick walls m2 50 BRICKWORK SUNDRIES Brickwork reinforcement: 16 75mm Wide reinforcement built in horizontally m 26 17 150mm Wide reinforcement built in horizontally m 110 Prestressed fabricated lintels: 18 100 x 70mm Lintels in lengths not exceeding 3m m 3 Galvanised hoop iron cramps, ties, etc.: 19 30 x 1,6mm Roof tie 1,5m long with one end fixed to timber No 6 and other end built into brickwork SECTION 3 : BILL NO.2 WATERPROOFING DAMP-PROOFING OF WALLS AND FLOORS One layer of 375 micron "Plastall Gundle Brikgrip DPC" embossed damp proof course: 20 In walls m2 4 One layer of 250 micron "Plastall Gundle USB Green" waterproof sheeting sealed at laps with "Gunplas Pressure Sensitive Tape": 21 Under surface beds m2 15 SECTION 3: BILL NO. 2 ROOF COVERINGS, ETC. IBR Sheeting 0.6mm Thick IBR Polythene Roof Sheeting to include head and side wall flashing, closures, washers and screws. To be fixed and laid strictly in accordance with the manufacturer's specifications. Sheeting to be painted per clients required colour 22 Roof covering with not exceeding 50 degrees pitch m2 20 Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 2 CARPENTRY AND JOINERY DOORS, ETC. Wrought meranti doors hung to timber frames (elsewhere measured): 23 44mm Framed ledged and braced batten door 813 x 2032mm No 2 high of 44 x 150mm top rail and stiles, 16 x 110mm middle ledge and braces and 22 x 220mm bottom ledge filled in one side with 19mm V-jointed one side boarding and covered on other side with 6mm plywood with sapele veneer let into and including rebates all round Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 2 IRONMONGERY SUPPLEMENTARY PREAMBLES LOCKS "Union" : 24 Oval double cylinder upright lock stainless steel with chrome No 2 cylinder L-2241-78SS/2x13PL with brass Protea handle for cylinder lock CB612-13-PL Weatherstrips : 25 Weatherguard sealing strip fixed to bottom of 813 mm wide No 1 single door Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO.2 STEELWORK SUPPLEMENTARY PREAMBLES Descriptions Descriptions of bolts shall be deemed to include nuts and washers Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete Metalwork described as" holed for bolt(s)" shall be deemed to exclude the bolts unless otherwise described PRESSED ROOF TRUSSES ROOFS, ETC. The following is applicable in respect of roof trusses: Trusses are at maximum 3000mm centres Trusses: 26 Roof construction to double pitched roof No. 3 approximately 4.15 x 2.06m high overall at 4m centers, including top and bottom chords, permanent bracing, bolts, gussets and 38 x 38mm battens fixed over underlay (underlay elsewhere) PRESSED STEEL DOOR FRAME 1,6mm Rebated frames suitable for half walls 27 Frame for door 813 x 2032mm high No 2 SUNDRY GALVANIZED STEELWORK STEEL WINDOWS Steel windows with top hung opening sections and brown anodised finish, all as per AAAMSA specifications and: all glazing to be done according to the National Building Regulations - Part N: Window V size 600 x 900mm high with 4mm obscure glass No 1 Window W1 size 1200 x 1500mm high with 4mm clear float No 3 glass Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 2 PLASTERING SCREEDS Screeds on concrete 1:4 Cement plaster screeds steel trowelled on concrete : 28 25mm Thick on floors and landings m2 15 INTERNAL PLASTER Cement plaster 1:5 wood floated on brickwork : 29 On walls m2 58 EXTERNAL PLASTER Scratch woodfloat plaster bonded to wall with chickenmesh tightly spanned and fixed to wall: 30 30mm Thick on walls m2 50 DIVIDING STRIPS, ETC. 31 50 x 3mm Flat section brass dividing strips between different m 1 floor finishes Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 2 TILING SUPPLEMENTARY PREAMBLES Descriptions Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding FLOOR Smooth Float Floor 32 On floors and landings to falls m2 15 Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 DRAINAGE PIPING, ETC. Rigid PVC drainage pipes: 33 100mm Pipe (No excavation) m 1 34 100mm Pipes laid in and including trenches not exceeding m 3 1m deep Extra over rigid uPVC pipes for fittings: 35 100 mm Bend No 3 36 100 mm Bend with cleaning eye No 1 Rigid PVC waste pipes: 37 50 mm Pipe m 4 38 100 mm Pipe m 5 Sundries: 39 Testing drainage pipe system Item 1 WATER SUPPLIES Megapipe: HDPE (high density polyethylene) Type 6 SABS : 40 25mm Pipes laid in and including trenches not exceeding 1m m 8 deep, including all fittings, etc. 41 50mm Pipes laid in and including trenches not exceeding 1m m 3 deep, including all fittings, etc. Sundries : 42 100mm PVC cleaning eye, including 300 mm x 300 mm cast No 1 iron cover and frame, laid in ground 43 Test water supply pipe system Item 1 SANITARY FITTINGS "Vaal" : 44 White vitreous china close coupled WC suite, complete with No 1 P-trap, 9 litre low level cistern and flushpipe and "Hart Celmac A" double flap heavy duty white plastic seat Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 45 32mm x 38 mm "Cobra" (350) CP bottle trap No 1 TAPS, ETC. Copper : 46 15 mm Service pipe 380 mm girth with two brass cap nuts No 1 Chromium-plated : 47 "Cobra" (232/350) 15 mm angle regulating valve No 1 Cobra" type : 48 50mm No 128 Stopcock No 1 FIRE SERVICE Approved Type : 49 9 kg Dry chemical fire extinguisher including 100mm x 450mm No 1 x 25mm polished hardwood back board with chamfered edges, fixed to brickwork Balance c/f $ 0.00 Mkushi Substation DESCRIPTION UNIT QTY RATE AMOUNT Balance b/f $ 0.00 SECTION 3 : BILL NO. 2 PAINTWORK PAINTWORK, ETC., TO NEW WORK ON INTERNAL PLASTER One coat alkali resistant primer and two coats "Dulux Wash 'n Wear" acrylic emulsion paint: 50 On internal walls m2 58 ON EXTERNAL PLASTER On external walls m2 50 ON FIBRE-CEMENT One coat primer and two coats "Plascon Wall 'n All" acrylic paint: 51 On fascias and barge boards m2 16 ON METAL Spot priming defects in pre primed surfaces with zinc chromate primer and apply one undercoat and two finishing coats "Dulux Silthane Silk" polyurethane enamel (colour Fawn) paint on steel: 52 On security gates (both side measured flat) m2 3 On door frames m2 3 ON WOOD Two coats polyurethane varnish: 53 On doors m2 7 One coat wood primer and two coats "Plascon Velvaglo" paint: 54 On skirtings not exceeding 300mm girth, painted before fixing m 23 in position TOTAL - carried forward to FINAL SUMMARY $ 0.00 Mkushi Substation DESCRIPTION UNIT RATE AMOUNT SECTION NO 3 BUILDING WORKS - EXTERNAL WORKS SECTION 3 : BILL NO. 3 PAVING SURROUNDING CONTROL BUILDINGS PRECAST CONCRETE 1 80mm Thick 25MPa precast concrete interlocking block paving m2 188 0.00 of 220 x 97mm grey paving blocks in herringbone pattern in accordance with SABS Spec.1058 and laid to falls on sand layer (elsewhere) with joints filled with sand and vibrated, including all straight cutting. 2 Extra for edge blocks m 19 0.00 TOTAL - carried forward to FINAL SUMMARY $ 0.00 Mkushi Substation SECTION NO 3 BUIDING WORK SECTION SUMMARY Bill No. Description Page No. Amount 1 Control Building 0.00 2 Guard House 0.00 3 Parking and Paving Surrounding Control Building 0.00 TOTAL - carried forward to FINAL SUMMARY R 0.00 Mkushi Substation FINAL SUMMARY Section Description Amount 1 Preliminary and General 0.00 2 Civil Works 0.00 3 Building Works 0.00 Sub-Total 0.00 Value Added Tax (18%) 0.00 TOTAL TENDER PRICE (Including VAT) 0.00 Pulinda Substation PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 1 SANS 1200A PRELIMINARY AND GENERAL (Applicable to the whole of the Works) SANS1200A.8.3 FIXED CHARGE ITEMS 1 SANS 1200A.8.3.1 Contractual requirements. SUM 1 SANS 1200A.8.3.2 Establishment of Facilities on the Site 2 SANS 1200A.8.3.2.2j Plant. SUM 1 3 Allow the sum of $ 2 000 for hiring of SUM 1 standby generator, including transporting to site, working on site, diesel fuel and removing from site at contract completion. 4 SANS 1200A.8.3.3 Other fixed charge obligations. SUM 1 5 SANS 1200A.8.3.3 Allow the sum of $ for purchase SUM 1 and delivery to site, of sundry site equipment. 6 SANS 1200A.8.3.3 Allow the sum of $ for the SUM 1 fabrication, delivery and erection in the required position on site, of ALL labelling, informational and safety signage, etc., complete, all as instructed by the ABB Project Manager 7 SANS 1200A.8.3.3 Allow the sum of $ for purchase, SUM 1 delivery and erection in suitable position on site, of portable weather station 8 SABS 1200A.8.3.4 Removal of site establishment. SUM 1 Balance c/f Balance b/f Pulinda Substation 9 SABS 1200A.8.4 TIME RELATED ITEMS SABS 1200A.8.4.1 Contractual requirements. MTHS 8 SABS 1200A.8.4.2 Operation and Maintenance of Facilities on 8 Site, for Duration of Construction (unless otherwise stated) SABS 1200A.8.4.2.1 Facilities for Engineer & Contractor: 10 SABS 1200A.8.4.2.1a Furnished offices. Office accommodation for personnel shall MTHS 8 be able to accommodate SIX (6) persons comfortably and shall have separate boardroom, kitchenette and toilet facilities. This sum is to include for all loose furniture and fittings, electric lighting, power outlets. drawing rack, 2 no. office desks and 4 no. office chairs. overall size of 3m wide x 6m long 11 SABS 1200A.8.4.2.1c Name boards. MTHS 8 12 SABS 1200A.8.4.2.1d Survey assistants and materials. MTHS 8 13 SABS 1200A.8.4.2.2a Workshop, Lab and Storage sheds. MTHS 8 14 SABS 1200A.8.4.2.2e Ablution and latrine facilities (chemical portable MTHS 8 toilets to be well maintained / serviced for the entire duration of the contract). 15 SABS 1200A.8.4.2.2f Tools and equipment. MTHS 8 16 SABS 1200A.8.4.2.2g Water supplies 2500 L Tank MTHS 8 available from beginning of contract and for entire duration of the contract). 17 SABS 1200A.8.4.2.2i Access to the site. MTHS 8 18 The Contractor is to note that all Security MTHS 8 and Access Control requirements must be in accordance with and conform to 'National Keypoint Standards.' 19 SABS 1200A.8.4.2.2j Plant. MTHS 8 20 SABS 1200A.8.4.3 Supervision for duration of construction. MTHS 8 Balance c/f Balance b/f 21 SABS 1200A.8.4.4 Company and head office overhead costs MTHS 8 Pulinda Substation for duration of construction. 22 SABS 1200A.8.4.5 Other time related obligations. MTHS 8 23 SABS 1200A.8.4.5 The Contractor is to take cognizance of the MTHS 8 Environmental Management Programme Act, a copy of which is attached hereto and forms part of the contract documents. The Contractor is to allow a lump-sum price which he deems sufficient to enable him to meet any costs he will encounter in the application of the various clauses in the Environmental Management Programme, for the entire duration of the contract. 24 SABS 1200A.8.4.5 The Contractor is to allow for compliance MTHS 8 with ALL CURRENT ABB Health and Safety requirements, procedures and legislation (OHSACT), which includes the employment of registered safety officer/s, as well as the procurement and use on site, of ALL necessary PPE wear. 25 SABS 1200A.8.4.5 Provision for 24 hour site security, comprising MTHS 8 2 armed night-duty and 2 armed day-duty guards. TOTAL - carried forward to FINAL SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS Notes (As Applicable to the ENTIRE measured Bills of Quantities, namely Section No. 2, Bill No.'s 1 to 15 inclusive, Sections 3 to 10 inclusive) : 1. 'Section No. 2 : Civil Works' have been measured according to the SABS 1200 System for Measuring Civil Works as published by the SABS. All quantities are provisional and subject to remeasurement during the project. 2. For pricing purposes all items are to be read in conjunction with the tender drawings. No additional compensation will be made for any information shown on the drawings but not mentioned in the Bills of Pulinda Substation Quantities - the drawings take precedence over the Bills of Quantities 3. All 'Imported Material' for earthworks will be obtained either from a commercial source, as selected by the contractor and shall be regarded as freehaul. 4. All surplus excavated material is to be disposed of at a registered, designated dumping site, as selected by the Contractor, which cost is to include for all sundry charges, royalties, etc. 5. All cut and fill materials will be regarded as freehaul, ie. haulage, loading and offloading of material shall be included in the rates submitted by the Contractor - NO additional compensation whatsoever shall be entertained, or additional monies paid in this regard.
Balance c/f Balance b/f SECTION 2 : BILL NO. 1 BULK EARTHWORKS, LANDSCAPING, ETC. SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site Preparation: 1 SABS 1200D.8.3.1.1 Clear and strip 100mm site, including in confined m 2 2,911 areas to . 2 SABS 1200D.8.3.1.2 Remove topsoil to a nominal depth of 100mm, m 3 291 stockpile and maintain. and compact to a minimum of 90% Pulinda Substation Mod. AASHTO maximum density, including working in confined areas. SABS 1200D.8.3.2 Bulk excavation: Supplementary Notes (Pertaining ONLY to Bulk Excavations) : 1. Freehaul distance, in the case of Bulk m 3 291 Excavations to form the required terrace levels, is to be regarded as NOT more than 3000m from the place of excavation. 2. Limited Overhaul, in the case of Bulk Excavations to form the required terrace levels, is to be regarded as between 3000m and 8000m from the place of excavation. 4 SABS 1200D.8.3.2a Cut to spoil for reduced levels in terracing, m 3 500 not exceeding 2m deep from existing natural ground level, and dispose to a site provided by the Contractor 5 SABS 1200D.8.3.2b Extra over for: SABS 1200D.8.3.2b.1 Intermediate excavation. m 3 240 SABS 1200D.8.3.2b.2 Hard rock excavation, including blasting and m 3 131 breaking down of all rock material to rocks / 6 stones of manageable size Balance c/f Balance b/f 7 SABS 1200D.8.3.4a Importing materials from Commercial sources and placing in: Imported suitable earth fill material to form m 3 150 150mm (average) thick wearing course, compacted to a minimum of 93% Mod. AASHTO maximum density @ +/- 2% 8 Optimum Moisture Content (OMC), including tieing / benching into existing in-situ material / embankment / terrace. 9 Imported suitable G7 / G8 earth fill material m 3 150 to form terrace, including compacting in 150mm thick layers to a minimum of 95% Pulinda Substation Mod. AASHTO maximum density @ +/- 2% Optimum Moisture Content (OMC), including tieing / benching into existing in-situ material / embankment / terrace. SABS 1200D.8.3.6 Overhaul: 10 SABS 1200D.8.3.6a Limited overhaul, exceeding 3000m but not m 3 15 exceeding 8000m from place of excavation. 11 SABS 1200D.8.3.6b Long overhaul, exceeding 8000m from place m 3 .km 2 of excavation. SABS 1200D.8.3.14 Testing and taking of samples: 12 Modified AASHTO density test (Provisional). No 3 13 Dynamic cone Penetrometer testing No 4 TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION 2 : BILL NO. 2 CIVIL WORKS ACCESS AND TERRACE ROADS THE FOLLOWING IN 5M WIDE CONCRETE SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site Preparation: 1 SABS 1200D.8.3.1.2 Remove topsoil to a nominal depth of 100mm, m 2 205 stockpile and maintain. SABS 1200D.8.3.14 Testing and taking of samples: 2 Modified AASHTO density test (Provisional). No 2 3 Dynamic cone Penetrometer testing No 1 (Provisional). SABS 1200DM. EARTHWORKS [ROADS, SUBGRADE] Pulinda Substation SABS 1200DM.8.3.3 Treatment of Road Bed: 4 SABS 1200DM.8.3.3a.1 Roadbed preparation and compaction of m 3 21 material to a depth of 100mm and minimum of 90% Mod. AASHTO maximum density. SABS 1200DM.8.3.5 Construct the selected layer 1 course, with material from commercial sources : 5 Selected G7 material supplied by the m 3 21 contractor in one 150mm layer and spread, level, water and compact to not less than 93% of the modified AASHTO maximum density and trim to grades. Balance c/f Balance b/f SABS 1200DM.8.3.7 Cut to spoil or stockpile from: 6 SABS 1200DM.8.3.7a Soft excavation for reduced levels, including m 3 21 working in confined areas. SABS 1200ME. SUBBASE SABS 1200ME.8.3.3 Construct the sub-base course / shoulders with material from commercial sources: 7 150mm Thick subbase course constructed m 3 31 using G7 material imported from commercial sources, stabilized with OPC (5% by volume) (stabilization and cement measured elsewhere) compacted to a minimum of 98% Mod. AASHTO maximum density. SABS 1200MF. BASE SABS 1200MF.8.3.3 Construct base with material from commercial sources: 8 SABS 1200MF.8.3.3b 150mm Thick base course constructed using m 3 31 G5 material imported from commercial sources and compacted to a minimum of 95% Mod. AASHTO maximum density. 9 SABS 1200G. REINFORCED CONCRETE Pulinda Substation 10 SABS 1200G.8.4.2 Blinding layer in 15MPa/ 19mm concrete: 50mm Minimum thick. m 3 10 11 SABS 1200G.8.4.3 Strength concrete, 25MPa/19mm with m 3 41 SABS 1200G.8.2 FORMWORK 12 SABS 1200G.8.2.2 Smooth formwork to : Sides of walls m 2 41 13 SABS 1200G.8.2.4 Special off-form : Form rounded edge to 3mm radius along m 82 exposed top edge of concrete wall. 14 SABS 1200G.8.2.6 Box out holes / form voids : Box out to form circular hole to suit 160mm No 12 diameter pvc pipes 15 SABS 1200G.8.3 REINFORCEMENT 16 SABS 1200G.8.3.2 Mesh Reinforcement : High tensile welded mesh reference 311 to m 2 205 apron slab and walls. 17 SABS 1200G.8.4.4a Wood floated finish to falls or slope, m 2 205 including to confined areas. Balance c/f Balance b/f 18 SABS 1200G.8.5 JOINTS 12mm Thick expansion joint not exceeding m 41 300mm high or wide consisting of joint filler, raking out of joint filler 15mm deep on exposed surfaces and fill with polysulphide sealant and bond breaker. 19 SABS 1200LC. CABLE DUCTS 20 SABS 1200LC.8.2.2 Excavation in all materials for trenches, backfill and compact to minimum 90% Mod. Pulinda Substation AASHTO maximum density, including disposing of surplus and unsuitable material off site: 21 SABS 1200LC.8.2.2a For set of 3 each 4 x 160mm diameter pipes, m 3 2 exceeding 1m and not exceeding 2m deep. 22 SABS 1200LC.8.2.5 Supply, lay, joint, bed and prove duct with nominal 2mm diameter draw wires, including blocking off ends: For set of 3 each 4 x 160mm diameter pipes, m 15 laid according to Manager's requirement 23 SABS 1200LC.8.2.6 Imported bedding material, where ordered: SABS 1200MM.8.2.5 Additional item 24 Construct V-Drain with concrete as per drawing m 71 Depth 600mm , 600mm top, 450mm bottom 100mm thick concrete Balance c/f Balance b/f 25 Sleeve Pipes , 160mm dia. Pvc no 8 26 SABS 1200MM.8.3 Road Signs : 27 SABS 1200MM.8.3.1 Signs with painted faces and galvanized background, constructed from 1,6mm thick sheet steel: 28 SABS 1200MM.8.3.1a.1 Up to 2m2 m 2 4 SABS 1200MM.8.3.2 Provision and application of Retro reflective material: 29 SABS 1200MM.8.3.2a Engineering grade m 2 4 SABS 1200MM.8.3.3 Sign Supports: 30 SABS 1200MM.8.3.3b Galvanized steel tubing 76mm diameter. kg 22 31 SABS 1200MM.8.3.4 Excavating, backfilling and concreting for m 3 1 sign supports Pulinda Substation SABS 1200D. EARTHWORKS ( ACCESS ROADS ) SABS 1200D.8.3.1 Site Preparation: 18 SABS 1200D.8.3.1.2 Remove topsoil to a nominal depth of 150mm, m 2 2500 stockpile and maintain (Provisional). TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 3 BASE FOUNDATIONS THE FOLLOWING IN BASE FOUNDATIONS SABS 1200D. EARTHWORKS SABS 1200D.8.3.3 Restricted Excavation: 1 SABS 1200D.8.3.3a Excavate for bases in all materials and m3 112 dispose to a site provided by the Contractor (excludes over-excavation) 2 Extra over excavation in soft material for m3 11 battering trench sides / shoring for depths greater than 1,0m SABS 1200D.8.3.3b Extra over for: 3 SABS 1200D.8.3.3b.1 Intermediate excavation. m3 12 4 SABS 1200D.8.3.3b.2 Hard rock excavation. m3 1 5 SABS 1200D.8.3.3b.3 Boulder excavation Class A. m3 1 SABS 1200D.8.3.9 Backfilling: 6 Backfilling in restricted areas around base, m3 26 stub column and to battered slopes, with selected fill material from commercial sources in 150mm thick layers, stabilized with 3% (by volume) Ordinary Portland Cement, including mechanical modification Pulinda Substation and compacting to 95% Mod. AASHTO maximum density SABS 1200D.8.3.14 Testing and taking of samples: 7 Modified AASHTO density test (Provisional). No 5 8 Dynamic cone Penetrometer testing No 5 (Provisional). Balance c/f Balance b/f SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.4 PARTICULAR ITEMS SABS 1200DB.8.3.4b Temporary Works : Control Water Inflow from low water table, during excavations: 9 SABS 1200DB.8.3.4b.1 Provide equipment. SUM 1 10 SABS 1200DB.8.3.4b.2 Operate and maintain. Days 1 11 SABS 1200DB.8.3.4b.3 Remove equipment Sum 1 SABS 1200G. CONCRETE (STRUCTURAL) SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.1 Rough: 12 Sides of base, stub columns. m2 222 SABS 1200G.8.2.2 Smooth: 13 Sides of base, stub columns. m2 25 SABS 1200G.8.2.4 Special off-form: 14 Form 25 x 25mm chamfer along top edge m 202 of exposed stub column. SABS 1200G.8.2.5 Narrow widths: 15 Not exceeding 300mm high or wide m 3 Pulinda Substation (Provisional). SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.1 Steel reinforcement bars: 16 All diameter bars (Provisional). t 4 SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/ 19mm concrete: 17 50mm Minimum thick. m3 6 Balance c/f Balance b/f SABS 1200G.8.4.3 Strength concrete, 30MPa/19mm with 'Pro-Struct 539' integral waterproofer added at the rate of 1,5 litres per 50kg cement in: 19 Bases and stub columns. m3 80 SABS 1200G.8.4.4 Unformed surface finishes: 20 SABS 1200G.8.4.4a Wood floated finish to top surface of bases, m2 72 including working in confined areas. SABS 1200G.8.7 GROUTING SABS 1200G.8.7a Under bases: 21 Non-shrink, non-metallic, free-flowing m3 1 35MPa grouting under base plates SABS 1200G.8.8 HOLDING DOWN BOLTS AND MISCELLANEOUS 22 Provide and install Grade 4.8 M20 x 460mm No 156 long galvanized mild steel bolt with 75mm length threaded at exposed end and fitted with suitable nut and washer, and with 70 x 70 x 12mm thick anchor plate welded on at other end, bolt cast 350mm deep into concrete stub column base in exact position 23 Provide and install Grade 4.8 M20 x 460mm No 156 long galvanized mild steel bolt with 75mm length threaded at exposed end and fitted Pulinda Substation with suitable nut and washer, and with 70 x 70 x 12mm thick anchor plate welded on at other end, bolt cast 350mm deep into concrete stub column base in exact position 24 Provide and install Grade 4.8 M24 x 460mm No 40 long galvanized mild steel bolt with 75mm length threaded at exposed end and fitted with suitable nut and washer, and with 80 x 80 x 14mm thick anchor plate welded on at other end, bolt cast 350mm deep into concrete stub column base in exact position Balance c/f Balance b/f 25 Provide and install Grade 4.8 M36 x 460mm No 48 long galvanized mild steel bolt with 75mm length threaded at exposed end and fitted with suitable nut and washer, and with 350 x 120 x 16mm thick anchor plate welded on at other end, bolt cast 350mm deep into concrete stub column base in exact position SUNDRIES One layer of 250 micron 'Plastall Gundle USB Green' waterproof sheeting sealed at laps with 'Gunplas Pressure Sensitive Tape': 26 Under blinding. m2 10 Pulinda Substation TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 4 DRAINAGE THE FOLLOWING IN SUBSOIL DRAINS SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.2a Excavate in all materials for trenches and use for backfill, compact and dispose of surplus material: 1 Depth not exceeding 1m deep (sub-soil m 3 63 drains) 2 Depth not exceeding 1m deep (pipe trench) m 3 13
3 Depth exceeding 1m and not exceeding 2m m 3 63 deep (sub-soil drains) 4 Depth exceeding 1m and not exceeding 2m m 3 0 deep (pipe trench) SABS 1200DB.8.3.2b Extra over pipe trench excavations for: 5 SABS 1200DB.8.3.2b.1 Intermediate excavation m 3 23 SABS 1200DB.8.3.4 PARTICULAR ITEMS SABS 1200DB.8.3.4b Temporary Works : Control Water Inflow from low water table, during excavations: 7 SABS 1200DB.8.3.4b.1 Provide equipment. SUM 1 8 SABS 1200DB.8.3.4b.2 Operate and maintain. Days 5 Pulinda Substation SABS 1200LB. BEDDING (PIPES) SABS 1200LB.8.2.1 Provision of bedding from excavations: 9 SABS 1200LB.8.2.1b Selected fill material (Blanket) (pipe trench) m 3 17 Balance c/f Balance b/f SABS 1200LB.8.2.2 Provision of bedding from commercial sources: 10 Selected G5 granular material (Cradle) m 3 28 stabilized with 3% (by volume) Ordinary Portland Cement, including mechanical modification and compacting to 95% Mod. AASHTO maximum density (sub-soil drain). 11 Selected stone material with aggregate size m 3 15 50 to 75mm nominal diameter (Blanket) SABS 1200LD. CONCRETE PIPE SABS 1200LD.8.2.1 Supply, handle and lay Class 50D spigot and socket concrete pipes complete with rubber ring joints on Class B bedding: Supply, handle and lay Class 50D Intelocking joints concrete pipes complete on Class B bedding: 13 450mm Diameter pipe. m 27 14 Supply, handle and lay Class 50D Intelocking joints concrete pipes complete on Class B bedding: 15 600mm Diameter pipe. m 44 Pulinda Substation Manholes: Brick manhole size 940 x 940mm internally, as detailed on complete with concrete slab over, step irons, concrete benching and base, excavations, backfilling, carting away of surplus excavated material, etc., SABS 558 Type 4 medium duty manhole cover and frame : 17 Manhole with inlets for 2 no. x 160mm uPVC pipes No 1 and 1 no. x 450mm concrete pipes (elsewhere measured), depth to invert exceeding 1m and not exceeding 1,5m deep. Balance c/f Balance b/f THE FOLLOWING IN CONCRETE HEADWALL SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site preparation: 21 SABS 1200D.8.3.1.1 Clear and strip site in confined areas. m 2 3 22 SABS 1200D.8.3.1.2 Remove topsoil to a nominal depth of 150mm, m 2 3 stockpile and maintain. 23 SABS 1200D.8.3.1.2a Rip excavated surface to a nominal depth of m 2 3 150mm and compact to a minimum of 90% Mod. AASHTO maximum density. SABS 1200D.8.3.2 Bulk excavation: 24 SABS 1200D.8.3.2a Excavate for reduced levels in all materials, m 3 0.5 to form recess for 'stilling basin' and dispose. SABS 1200D.8.3.2b Extra over for : 25 SABS 1200D.8.3.2b.1 Intermediate excavation. m 3 0.2 SABS 1200D.8.3.3 Restricted excavation: 26 SABS 1200D.8.3.3a Excavate for reduced levels to form recess m 3 0.3 for headwall and drainage outlet, including for footing at front of apron slab, and dispose to a site provided by the Contractor. Pulinda Substation Balance c/f Balance b/f SABS 1200D.8.3.3b Extra over for : 27 SABS 1200D.8.3.3b.1 Intermediate excavation. m 3 0.1 SABS 1200D.8.3.9 Backfilling: 28 Backfilling in restricted areas behind concrete m 3 0.1 headwalls, etc., with material from commercial sources, in layers of 150mm thick, compacted to a minimum of 90% Mod. AASHTO maximum density. SABS 1200D.8.3.15 Supply and lay weedkiller: 29 Supply and lay approved weedkiller in strict m2 3 accordance with the Manufacturer's instructions. SABS 1200G. CONCRETE (STRUCTURAL) SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.1 Rough formwork to : 30 Sides of walls. m2 4 SABS 1200G.8.2.2 Smooth formwork to : 31 Sides of walls m2 4.04 SABS 1200G.8.2.4 Special off-form : 32 Form rounded edge to 3mm radius along m 1 exposed top edge of concrete wall. SABS 1200G.8.2.5 Narrow widths : 33 Not exceeding 300mm high or wide. m 1 34 Not exceeding 300mm high or wide, to m 2 approximately 30 degree batter or slope. SABS 1200G.8.2.6 Box out holes / form voids : 35 Box out to form circular hole to suit No 2 300mm diameter precast concrete pipe Pulinda Substation (elsewhere measured) in 200mm thick concrete wall. Balance c/f Balance b/f 36 Box out to form circular hole to suit No 2 450mm diameter precast concrete pipe (elsewhere measured) in 200mm thick concrete wall. SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.2 Mesh Reinforcement : 37 High tensile welded mesh reference 311 m 2 4.04 to apron slab and walls. SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/ 19mm concrete: 38 50mm Minimum thick. m 3 0.2 SABS 1200G.8.4.3 Strength concrete 25MPa/19mm in : 39 Apron slab, walls, splitter blocks and m 3 3 thickening for footing, etc. SABS 1200G.8.4.4 Unformed surface finish : 40 SABS 1200G.8.4.4a Wood floated finish to falls or slope, m 2 1 including to confined areas. Pulinda Substation TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 5 TRANSFORMER PLINTHS THE FOLLOWING IN TRANSFORMER SABS 1200D. EARTHWORKS SABS 1200D.8.3.3 Restricted excavation in all materials and dispose to a site provided by the Contractor: 3 SABS 1200D.8.3.3a Strip footings. m3 15 4 SABS 1200D.8.3.3a Cable trenches. m3 6 5 SABS 1200D.8.3.3a Sumps. m3 1 SABS 1200D.8.3.3b Extra over for: 6 SABS 1200D.8.3.3b.1 Intermediate excavation. m3 2 SABS 1200D.8.3.4 Importation of materials from commercial sources: 10 SABS 1200D.8.3.4a Selected fill material compacted in 150mm m3 15 thick layers under surface beds, slabs, etc., stabilized with 3% (by volume) Ordinary Portland Cement, including mechanical modification and compacting to 95% Mod. AASHTO maximum density SABS 1200D.8.3.9 Backfilling: 11 Backfilling in restricted areas to strip m3 15 footings (elsewhere measured) with selected fill material from commercial sources in 150mm thick layers, compacted to a minimum of 93% Mod. AASHTO maximum density. Pulinda Substation SABS 1200D.8.3.14 Testing and taking of samples: 12 Modified AASHTO density test (Provisional). No 2 13 Dynamic cone Penetrometer testing No 2 (Provisional). Balance c/f Balance b/f SABS 1200G. CONCRETE [STRUCTURAL] SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.1 Rough formwork to: 14 Trench walls. m 3 24 SABS 1200G.8.2.2 Smooth formwork to: 16 Plinths and platforms. m 2 96 18 Trench walls. m 2 3 SABS 1200G.8.2.4 Sump walls. 19 Form 25 x 25mm chamfer along exposed m 48 top edges of concrete. SABS 1200G.8.2.5 Narrow widths: 20 Not exceeding 300mm high or wide. m 98 SABS 1200G.8.2.6 Box out holes / Form voids: 21 Form 500 x 500 x 450mm deep pocket in No 2 top surface of concrete surface bed for removeable fence post (elsewhere measured). 22 Form hole 300mm diameter through 100 No 2 to 150mm concrete wall for precast concrete pipe (elsewhere measured). SABS 1200G.8.3 REINFORCEMENT 27 Type reference 245 to plinth and surface m 2 352 beds. Pulinda Substation SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/19mm concrete: 30 50mm Minimum thick. m 3 1 SABS 1200G.8.4.3 Strength concrete 25MPa/19mm in: Balance c/f Balance b/f 32 Surface beds. m3 1 33 Bottom and sides of trenches sumps m3 20 34 Transformer plinth m3 35 35 Benching to sump. m3 1 SABS 1200G.8.4.3 Strength concrete 30MPa/19mm in: 36 Off-loading platform. m3 34 SABS 1200G.8.4.4 Unformed surface finishes: 37 SABS 1200G.8.4.4a Wood floated finish, including in confined m2 176 areas. SABS 1200G.8.5 JOINTS 40 'Construction joint' through 600mm thick m 32 concrete including dowels, saw-cut, bond-breaker, silicone sealant, etc., complete, all as detailed on drawing 0.54/390 sheet 38a1. Sundries: 41 Junction box foundation complete No 2 including all excavations, backfilling, concrete, holding down bolts, etc. 42 Plug box foundation complete as per detail No 2 including all excavations, backfilling, concrete, holding down bolts, etc. Screeds: 43 Cement mortar 1:3 screed average 30mm m2 36 thick, to falls. Pulinda Substation Balance c/f Balance b/f SABS 1200H. FLOORING, COMPLETE AND INSTALLED WITH FRAMES 49 Oil separation Sump, including all excavations, No 2 backfilling, concrete, brickwork, covers, drainpipes, etc., complete. BRICKWORK Face brickwork of face bricks (14MPa nominal compressive strength delivered to site) and add for taking delivery, laying, bedding and pointing, storage, waste and profit: 50 Face brick Bundwall 230mm wide with m2 24 maximum height 500mm high with roller course on top of wall, including facing and pointing both sides. 51 Straight joint through bund wall 230mm No 2 wide x 375mm high. Balance c/f Balance b/f 52 Slot 450x450mm through 230mm wide No 2 brick bundwall 53 Leave or form hole through 230mm brick No 2 bund wall for 300mm concrete pipe (elsewhere measured) Pulinda Substation SABS 1200LC. CABLE DUCTS SABS 1200LC.8.2.2 Excavation in all materials for trenches, backfill and compact to a minimum of 93% Mod. AASHTO maximum density, including disposing of surplus and unsuitable material off site: 54 SABS 1200LC.8.2.2a For set of 2 no. x 160mm diameter uPVC m3 1 pipes, not exceeding 1m deep. SABS 1200LC.8.2.5 Supply, lay, joint, bed and prove duct with nominal 2mm diameter draw wires, including blocking off ends: 55 Set of 2 no. x 160mm diameter Class 16 m 10 uPVC pipes laid according to Engineer's requirements. SABS 1200LC.8.2.6 Imported bedding material, where ordered: THE FOLLOWING IN STAINLESS STEEL FIRE BARRIER AROUND TRANSFORMER PLINTH SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site preparation: 56 SABS 1200D.8.3.1a Trim, pre-wet and compact in-situ material m 2 8 excavated material to 100% Mod. AASHTO maximum density, including working in confined areas. SABS 1200D.8.3.3 Restricted Excavation: 57 SABS 1200D.8.3.3a Excavate for bases in all materials and m 3 10 dispose to a registered spoil site, provided by the Contractor Balance c/f Balance b/f 58 Excavate for bases in all materials and m3 3 stockpile / set aside for later re-use (includes over-excavation under bases) 59 Extra over excavation in soft material for m3 2 battering trench sides / shoring for depths greater than 1,0m (Provisional) Pulinda Substation SABS 1200D.8.3.3b Extra over for: 60 SABS 1200D.8.3.3b.1 Intermediate excavation. m3 2 61 SABS 1200D.8.3.3b.2 Hard rock excavation. m3 1 SABS 1200D.8.3.9 Backfilling: 62 Backfilling to excavations, to receive concrete m3 8 bases (elsewhere measured), using selected previously stockpiled / set aside material, compacted in 150mm thick layers, stabilized with 15% (by volume) Ordinary Portland Cement, including mechanical modification and compacting to 100% Mod. AASHTO maximum density 63 Backfilling to excavations, to receive concrete m3 1 bases (elsewhere measured), using selected fill material from commercial sources, compacted in 150mm thick layers, stabilized with 3% (by volume) Ordinary Portland Cement, including mechanical modification and compacting to 93% Mod. AASHTO maximum density 64 Backfilling in restricted areas around base, m3 3 stub column and to battered slopes, using selected previously stockpiled / set aside material, compacted in 150mm thick layers, to 100% Mod. AASHTO maximum density. SABS 1200G. CONCRETE (STRUCTURAL) SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.1 Rough: 65 Sides of base, stub columns. m 2 16 SABS 1200G.8.2.2 Smooth: 66 Sides of base, stub columns. m 2 16 Balance c/f Balance b/f SABS 1200G.8.2.4 Special off-form: Pulinda Substation 67 Form 20 x 20mm chamfer along exposed m 19 top edges of concrete stub column, etc. SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.1 Mild steel reinforcement bars: 68 8mm Diameter. kg 20 SABS 1200G.8.3.1 High Tensile steel reinforcement bars: 69 10mm Diameter. kg 0 70 12mm Diameter. kg 25 71 25mm Diameter. kg 0 SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/ 19mm concrete: 72 50mm Minimum thick. m3 0.38 SABS 1200G.8.4.3 Strength concrete 30MPa/19mm in: 73 Bases and stub columns. m3 10 SABS 1200G.8.4.4 Unformed surface finishes: 74 SABS 1200G.8.4.4a Wood floated finish to top surface of bases, m2 30 including working in confined areas. SABS 1200G.8.7 GROUTING SABS 1200G.8.7a Under bases: 75 Non-shrink, non-metallic, free-flowing 35MPa m3 5 grouting under base plates. SABS 1200G.8.7b Holding Down bolts: 76 Non-shrink grouting in holding bolt m3 5 pockets. Balance c/f Balance b/f SABS 1200G.8.8 HOLDING DOWN BOLTS AND MISCELLANEOUS 77 Provide and install Grade 4.8 M24 x 460mm kg 30 Pulinda Substation long galvanized mild steel bolt with 75mm length threaded at exposed end and fitted with suitable nut and washer, and with 80 x 80 x 14mm thick anchor plate welded on at other end, bolt cast 350mm deep into concrete stub column base in exact position (In no. 24) (refer drawing 0.54/4169 rev.6) SABS 1200HB. CLADDING AND SHEETING SABS 1200HB.8.2.2 Stainless steel firewalls: 78 Supply, deliver and install 6m high stainless m 8.350 steel fire wall, including hot-dipped galvanized mild steel support posts, IBR profile sheeting, fixing brackets, purlins, cleats, bolts, etc., complete, including offsets or changes in direction along length (In no. 5 'Module A' type panels, measured along straight length) (foundation bases elsewhere measured) 79 Supply, deliver and install 'Module B' type No 2 stainless steel fire wall at unprotected end of wall, comprising IBR profile sheeting, suitably fixed to stainless steel post (post elsewhere measured) (refer drawing THE FOLLOWING IN FIRE EQUIPMENT KIOSKS SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site preparation: 80 SABS 1200D.8.3.1.2a Rip excavated surface to a nominal m2 2.250 depth of 150mm and compact to a minimum of 93% Mod. AASHTO maximum density. Balance c/f Balance b/f SABS 1200D.8.3.3 Restricted excavation in all materials and dispose to a site provided by the Contractor: Pulinda Substation 81 SABS 1200D.8.3.3a Reduced levels under floors. m3 1.35 SABS 1200G. CONCRETE [STRUCTURAL] SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.4 Special off-form: 82 Form 25 x 25mm chamfer along exposed m 27 top edges of concrete. SABS 1200G.8.2.5 Narrow widths: 83 Not exceeding 300mm high or wide. m 10 SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.2 High tensile welded mesh: 84 Type reference 395 to surface bed. m2 2 SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/19mm concrete: 85 50mm Minimum thick. m3 1.35 SABS 1200G.8.4.3 Strength concrete 25MPa/19mm in: 86 Surface bed. m3 1.35 SABS 1200G.8.4.4 Unformed surface finishes: 87 SABS 1200G.8.4.4a Wood floated finish to top of surface m2 2.250 bed, including in confined areas. Balance c/f Balance b/f SABS 1200G.8.5 JOINTS 88 20mm Thick 'Flexcell' or equal approved m 10 joint filler not exceeding 300mm high, including raking out to a depth of 16mm and fill with 10mm thick layer 'Pressfit' neoprene seal, including bond breaker, BRICKWORK Face brickwork of face bricks (14MPa Pulinda Substation nominal compressive strength) (PC Allowance of R3,800.00 excluding VAT per thousand bricks, supplied and delivered to site) and add for taking delivery, laying, bedding and pointing, storage, waste and profit: 89 Face brick wall 230mm wide, including m2 8 facing and pointing with recessed joints both sides. 90 Face brick lining 110mm wide to top of m 8 220mm brick wall (elsewhere measured), including facing and pointing with recessed joints. BRICKWORK SUNDRIES Brickwork reinforcement: 91 150mm Wide reinforcement built in m 2 horizontally Prestressed fabricated lintels: 92 100 x 70mm Lintels laid side by side, in m2 2 lengths not exceeding 3m Balance c/f Balance b/f Joint sealants: 93 Polysulphide sealing compound including m 2 backing cord, bond breaker, primer, etc. FIRE APPLIANCES 94 50kg Dry chemical fire extinguisher, No 3 mounted on and including wheeled 'carry cart.' Soak away pit: Soak away pit size 2.00 x 2.00m on plan complete including all No 2 necessary excavations, backfilling, stone, carting away of excavated material, etc., executed complete. Pulinda Substation TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 6 YARDWORKS THE FOLLOWING IN YARDWORKS SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site preparation: 1 SABS 1200D.8.3.1.2a Rip in-situ material (terraces) to a nominal m 2 0 depth of 150mm and compact to a minimum of 95% Mod. AASHTO maximum density, including working in confined areas and supplying suitable imported fill material to make up levels (around bases, cable trenches, etc.). Pulinda Substation 2 Soil poisening to be sprayed over terraces m 2 1877 3 SABS 1200D.8.3.4a Supply and spread 26,5mm nominal diameter m2 1877 yardstone from commercial sources, in 100mm thick layer and lightly compact to set levels. SABS 1200MK. KERBING AND CHANNELING SABS 1200MK.8.2.1 Precast concrete barrier kerb to SABS 927 Fig. 5 complete with 15MPa/19mm in-situ concrete haunching at joints, both sides: 5 Kerbs laid straight (edge of terrace). m 41 SABS 1200D. MISCELLANEOUS WORK (EARTHWORKS) SABS 1200D.8.3.3 Extra over all excavations for excavation in: 10 SABS 1200D.8.3.3b.1 Intermediate material. m3 1 TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS SECTION 2 - BILL NO. 7 CABLE TRENCHES, DUCTS, JUNCTIONS SABS 1200P. ELECTRICAL INSTALLATION THE FOLLOWING IN CABLE TRENCHES, DUCTS & JUNCTIONS Construct complete unit as specified and including excavation in all material, working space, risk of collapse, regular dewatering, concrete, formwork, reinforcement, imported backfill and disposal. Cable Pulinda Substation trenches and junctions complete with concrete covers must be fitted, marked for positions and placed next to trenches for later installation by others. 1 Single trench (600mm wide) m 160 3 Single to single (600mm wide) junction No 4 5 Entrance to junction box No 2 Sundries: 6 Single cable (600mm) trench bend No 3 7 Single to single junction No 1 8 One trench entrance to control building, No 2 including manhole, racking, submersible pump, excavation, backfilling, brickwork, Balance c/f Balance b/f THE FOLLOWING IN CABLE TRENCH RAMPS SABS 1200D. EARTHWORKS SABS 1200D.8.3.1 Site preparation: 9 SABS 1200D.8.3.1a Trim, pre-wet and compact in-situ material m2 43 excavated material to 93% Mod. AASHTO maximum density, including working in confined areas. SABS 1200D.8.3.3 Restricted excavation in all materials and dispose to a site provided by the Contractor: 10 SABS 1200D.8.3.3a Reduced levels under ramps. m3 17 SABS 1200D.8.3.3b Extra over for: 11 SABS 1200D.8.3.3b.1 Intermediate excavation. m3 2 SABS 1200D.8.3.4 Importation of materials from commercial sources: Pulinda Substation 12 SABS 1200D.8.3.4a Selected fill material in 150mm layers under m3 108 ramps, compacted to a minimum of 95% Mod. AASHTO maximum density. SABS 1200DM.8.3.7 Cut to spoil or stockpile from: 13 SABS 1200DM.8.3.7a Soft excavation for reduced levels, including m3 108 working in confined areas. SABS 1200G. CONCRETE STRUCTURAL SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.1 Rough formwork to: 14 Sides and ends of ramps. m2 31 Balance c/f Balance b/f SABS 1200G.8.2.4 Special off-form: 15 Form 20 x 20mm chamfer along top edge m 24 of exposed concrete ramp, including to slight falls. SABS 1200G.8.2.5 Narrow widths: 16 Not exceeding 300mm high or wide. m 24 SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.2 High tensile welded mesh: 17 Type reference 245 to ramps. m2 79 SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/19mm concrete: 18 50mm Minimum thick. m3 2 SABS 1200G.8.4.3 Strength concrete, 25MPa/19mm with 'Pro-Struct 539' integral waterproofer added at the rate of 1,5 litres per 50kg cement in: Pulinda Substation 19 Cable trench ramp. m3 23 20 SABS 1200G.8.4.4 Unformed surface finishes: 21 SABS 1200G.8.4.4a Wood floated finish to falls. m2 36 SABS 1200H. STRUCTURAL STEELWORK SABS 1200H.8.3.1 The following in Grade 300W hot-dipped galvanised mild steel, welded and/or bolted together: 22 SABS 1200H.8.3.1.2 50 x 50 x 6mm Galvanised angle section as kg 107 trench cover support, with and including 50 x 3mm thick x 150mm long, split and fanged lugs welded on at 300mm centres along length and cast into concrete. Balance c/f Balance b/f 23 SABS 1200H.8.3.2 Delivery to site: 24 SABS 1200H.8.3.2.1 Delivery of normal loads of steelwork to kg 107 site. 25 SABS 1200H.8.3.3 Off-loading and erection of steel on site: SABS 1200H.8.3.3 Angle sections. kg 107 SUNDRIES 26 Cast in-situ concrete cover, size 300mm No 52 wide x 740mm long x 100mm thick overall, including smooth formwork to sides and soffit, all necessary reinforcement and 'vastrap' pattern to top surface of concrete cover, all in accordance with Drawing Pulinda Substation TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO.8 LIGHT MASTS AND FOUNDATIONS SABS 1200D. EARTHWORKS SABS 1200D.8.3.3 Restricted Excavation: 1 SABS 1200D.8.3.3a Excavate for bases in all materials and m3 4 dispose to a site provided by the Contractor (excludes over-excavation) SABS 1200D.8.3.3b Extra over for: 2 SABS 1200D.8.3.3b.1 Intermediate excavation. m3 1 SABS 1200D.8.3.9 Backfilling: 3 Backfilling in restricted areas around base, m3 1 stub column and to battered slopes, with selected fill material from commercial sources in 150mm thick layers, stabilized 10% (by volume) Ordinary Portland Cement, including mechanical modification and compacting to 95% Mod. AASHTO maximum density. Pulinda Substation Balance c/f Balance b/f SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.4 PARTICULAR ITEMS SABS 1200DB.8.3.4b Temporary Works : Control Water Inflow from low water table, during excavations: 4 SABS 1200DB.8.3.4b.1 Provide equipment. SUM 1 5 SABS 1200DB.8.3.4b.2 Operate and maintain. Days 5 6 SABS 1200DB.8.3.4b.3 Remove equipment. SUM 1 SABS 1200G. CONCRETE (STRUCTURAL) SABS 1200G.8.2 FORMWORK SABS 1200G.8.2.2 Smooth: 7 Sides of bases, stub columns. m2 11 SABS 1200G.8.2.4 Special off-form: 8 Form 20 x 20mm chamfer along top edge m 6 of exposed stub column. SABS 1200G.8.3 REINFORCEMENT SABS 1200G.8.3.1 Mild steel reinforcement bars: 9 10mm Diameter. kg 13 SABS 1200G.8.3.1 High Tensile steel reinforcement bars: 10 16mm Diameter. kg 28 SABS 1200G.8.4 CONCRETE SABS 1200G.8.4.2 Blinding layer in 15MPa/19mm concrete: Pulinda Substation 11 50mm Minimum thick. m3 1 SABS 1200G.8.4.3 Strength concrete, 30MPa/19mm with 'Pro-Struct 539' integral waterproofer added at the rate of 1,5 litres per 50kg cement in: 12 Bases and stub columns. m3 4 Balance c/f Balance b/f SABS 1200G.8.4.4 Unformed surface finishes: 13 SABS 1200G.8.4.4a Wood floated finish to top surface of bases, m2 4 including working in confined areas. SABS 1200G.8.7 GROUTING SABS 1200G.8.7a Under bases: 14 Non-shrink, non-metallic, free-flowing m3 1 35MPa grouting under base plates SABS 1200G.8.8 HOLDING DOWN BOLTS AND MISCELLANEOUS 15 Provide and install Grade 4.8 M24 x 1000mm kg 33 long galvanised mild steel bolt with 120mm length threaded at exposed end and fitted with suitable nut and washer, and with 120 x 120 x 14mm thick anchor plate welded on at other end, bolt cast into concrete stub column base in exact position Cable sleeves: 16 50mm Diameter x 700mm long uPVC No 4 sleeve cast in exact position in concrete stub column. One layer of 250 micron 'Plastall Gundle USB Green' waterproof sheeting sealed at laps with 'Gunplas Pressure Sensitive Tape': 17 Under blinding. m2 4 Pulinda Substation TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 9 SECURITY FENCING Note : All galvanized bolts to include for re-threading 1 Supply, deliver and install new 1.8 m high m 224 wire mesh 'safety fence' 2 Extra over 1.8m high galvanised wire mesh No 4 security with overhang, for 90 degree bend 3 Main automatic 3m x 1.8m gate with motor No 2 Pedestrian gate 0.6 x 1.8m high No 1 TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 Pulinda Substation CIVIL WORKS SECTION 2 : BILL NO. 10 WATER SUPPLY PIPING, INCLUDING (PROVISIONAL) SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.2a Excavate in all materials for trenches and use for backfill, compact and dispose of surplus material: 1 Depth not exceeding 1m deep m3 15 SABS 1200DB.8.3.2b Extra over pipe excavation for: 2 SABS 1200DB.8.3.2b.1 Intermediate excavation. m3 2 SABS 1200DB.8.3.4 PARTICULAR ITEMS SABS 1200DB.8.3.4b Temporary Works : Control Water Inflow from low water table, during excavations: 3 SABS 1200DB.8.3.4b.1 Provide equipment. SUM 1 4 SABS 1200DB.8.3.4b.2 Operate and maintain. Days 5 5 SABS 1200DB.8.3.4b.3 Remove equipment. SUM 1 SABS 1200LB. BEDDING (PIPES) SABS 1200LB.8.2.2 Provision of bedding from commercial sources: 6 SABS 1200LB.8.2.2.1a Selected granular material (Cradle). m3 4 7 SABS 1200LB.8.2.2.1b Selected fill material (Blanket). m3 11 Balance c/f Balance b/f SABS 1200L. MEDIUM PRESSURE PIPELINES SABS 1200L.8.2.1 Supply, handle and lay Type IV, Class 6 HDPE water supply piping, including joints, fittings, etc.: Pulinda Substation 8 25mm Diameter pipe. m 40 9 50mm Diameter pipe. m 10 SABS 1200L.8.2.2 Extra over 8.2.1 for the supplying, laying and bedding of specials, complete with couplings: 10 25mm Bend No 6 11 25mm Tee piece No 8 12 50mm Bend No 4 13 50mm Tee piece No 2 SABS 1200L.8.2.3 Extra over 8.2.1 for supplying, fixing and bedding of valves: 14 25mm Diameter isolating valve. No 6 15 50mm Diameter isolating valve. No 6 Balance c/f Balance b/f SABS 1200LF. ERF CONNECTIONS (WATER) Pulinda Substation SABS 1200LF.8.2.1 Provide Erf connections complete: 16 Provide erf connection for 25mm diameter No 2 HDPE pipe including jointing, all fittings, etc., complete. 17 Provide erf connection for 50mm diameter No 2 HDPE pipe including jointing, all fittings, etc., complete. SABS 1200LF.8.2.6 Supply and install stop taps complete with special fittings: 18 20mm Chrome plated hose bibtap, complete No 3 with 20mm hose union, 1,0m long x 22mm diameter galvanized mild steel standpipe, jointing to Class 6 HDPE pipe (elsewhere measured), etc., complete. SABS 1200LF.8.2.8 Markings or marker posts: 19 1,0m High precast concrete marker pole, No 2 painted yellow, fixed firmly into ground. Balance c/f Balance b/f THE FOLLOWING IN 2500 LITRE WATER STORAGE TANK PLACED ON 6m STAND WATER TANK 20 2500 Litre Polyethylene, barrel type, water No 1 storage tank , securely mounted in final position with copper straps and U-shaped holding down bolts Provide a 6m high steel water tank support stand No. 1 stand which is able to hold a 2500 litre polyethylene tank PUMPS IN-LINE BOOSTER PUMP Pulinda Substation 21 a) Supply and install a booster pump at the No 1 terrace headtank to pump b) Supply and install 50mm non-return valve between pump and headtank. The booster pump must be set at 4 bar, the pump must consist of Lowara stainless steel CM 70/34 and 25l hydro tube and 5 bar kit or other equal approved c) Supply and install suitable chamber with lid for pump (or use approved prefabricated fibre glass as for swimming pools) d) Supply and install 25mm non-return valve at the building. Pipe depth is 1m e) Supply and install 16A Mercury float switch suitably fixed at 500mm from bottom, to inside surface of water storage tank TOTAL - carried forward to section SUMMARY PAY REFERENCE DESCRIPTION UNIT QTY SECTION NO 2 CIVIL WORKS SECTION 2 : BILL NO. 11 SEWERS, INCLUDING SEPTIC TANK SABS 1200DB. EARTHWORKS (PIPE TRENCHES) SABS 1200DB.8.3.2a Excavate in all materials for trenches and use for backfill, compact and dispose of surplus material: 1 Depth not exceeding 1m deep m3 11 Pulinda Substation SABS 1200DB.8.3.2b Extra over pipe excavation for: 2 SABS 1200DB.8.3.2b.1 Intermediate excavation. m3 1 SABS 1200LB. BEDDING (PIPES) SABS 1200LB.8.2.2 Provision of bedding from commercial sources: 3 SABS 1200LB.8.2.2.1a Selected granular material. m3 2 4 SABS 1200LB.8.2.2.1b Selected fill material (Blanket). m3 4 SABS 1200LD. SEWERS SABS 1200LD. SEWERS SABS 1200LD.8.2.1 Supply, handle and lay uPVC slotted, flexible sewer and waste piping, including joints, fittings, etc.: 5 110mm Diameter pipe. m 40 6 Extra over 110mm diameter uPVC slotted No 8 pipe for 45 degree bend. 7 Extra over 110mm diameter uPVC slotted No 5 pipe for rodding eye, cast in and including mass concrete haunching / anchor block. Balance c/f Balance b/f Sundries: SABS 1200LD.8.2.13 Septic tank complete with covers and frames, etc.: 8 Septic tank chamber, size1.5m No 1 long x 1.5m wide x 2m deep overall, inlets for 2 no. x 110mm diameter and outlet for 1 no. x 50mm diameter uPVC pipes (pipes elsewhere measured), including 500 litre , pumping chamber / chlorinator, blower, all associated electrical supply, excavations, bedding with selected imported material, backfilling and compacting with selected excavated material, carting away of surplus excavated material, etc., complete Pulinda Substation Manholes: SABS 1200LD.8.2.3 Brick manhole size 940 x 940mm internally, complete with concrete slab over, step irons, concrete benching and base, excavations, backfilling, carting away of surplus excavated material, etc., SABS 558 Type 4 medium duty manhole cover and frame: 9 Manhole with inlets for 2 no. x 110mm No 1 diameter uPVC pipes (pipes elsewhere measured), depth to invert not exceeding 1m. TOTAL - carried forward to section SUMMARY DESCRIPTION UNIT QTY SECTION NO 3 BUILDING WORKS SECTION 3 : BILL NO. 1 CONTROL BUILDING (33 KV YARD) EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site EXCAVATION, FILLING, ETC. Excavation in earth not exceeding 2m deep: 1 Reduced levels under floors m3 100 2 Trenches m3 106 Extra over trench and hole excavations in earth for excavation in: Pulinda Substation 3 Soft rock m3 21 4 Hard rock m3 0 Extra over all excavations for carting away to a disposal site complying with environmental regulations: 5 Surplus material from excavations and/or stock piles on site to m3 144 spoil area located by the contractor Risk of collapse of excavations: 6 Sides of trench and hole excavations not exceeding 1,5m deep m2 209 Keeping excavations free of water: 7 Keeping excavations free of water Item 1 Earth filling obtained from the excavations: 8 Under floors, steps, pavings, etc and well compacted in layers m3 80 not exceeding 150mm thick 9 Backfilling to trenches, holes, etc., and compacted in layers m3 60 not exceeding 150mm thick to 95% Mod AASHTO density Balance c/f Balance b/f Earth filling obtained from commercial sources: 10 Filling with approved material supplied and carted onto site m3 20 by the Contractor, under floors and well compacted in layers not exceeding 150mm thick Surface preparation: 11 Trim and level off surface of ground (excavated or filled under m2 165 this Contract) to receive concrete surface beds or filling, including excavating or filling, ripping and scarifying as necessary and compacting the whole area for a depth of 150mm to a density of at least 95% Mod . AASHTO maximum density (includes part areas to falls) Tests: 12 Modified AASHTO Density test on earth filling No 1 Soil insecticide: 13 Under floors, etc., including forming and poisoning shallow m2 165 Pulinda Substation furrows against foundation walls etc, filling in furrows and ramming. 14 To bottoms and sides of trenches, etc. m2 310 SECTION 3 : BILL NO.1 CONCRETE, FORMWORK AND REINFORCEMENT SUPPLEMENTARY PREAMBLES Cost of tests The costs of making, storing and testing of concrete test cubes as required under clause 7 "Tests" of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the architect. The testing shall be undertaken by an independent firm or institution nominated by the contractor to the approval of the architect. (Test cubes are measured separately) UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES 10MPa/19mm concrete: 15 Blinding to ground beams and m3 6 Columns m3 17 Balance c/f Balance b/f REINFORCED CONCRETE 25MPa/19mm concrete: 16 Ramps m3 2 17 Raft slabs (ground beams elsewhere measured) m3 33 18 Ground beams to raft slabs m3 12 Columns m3 18 TEST BLOCKS 19 Making and testing 150 x 150 x 150mm concrete strength test No 3 cube (Provisional) Pulinda Substation ROUGH FORMWORK (DEGREE OF ACCURACY II) Rough formwork to sides and soffits: Beams m2 49 Columns m2 22 SMOOTH FORMWORK (DEGREE OF ACCURACY II) Smooth formwork to sides: 20 Column m2 96 21 Ring beam m2 49 REINFORCEMENT Reinforcement to structural concrete work: 22 All diameter bars t 4 Fabric reinforcement: 23 Type 395 fabric reinforcement in concrete surface beds, slabs, m2 165 etc. Balance c/f Balance b/f SECTION 3 : BILL NO.1 MASONRY ( Brickwork ) SUPPLEMENTARY PREAMBLES BRICKWORK Sizes in descriptions Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick Pointing Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc Pulinda Substation FOUNDATIONS (PROVISIONAL) Brickwork of NFP bricks in class II mortar: 24 450mm solid brick wall m2 30 25 300mm Solid brick wall m2 20 SUPERSTRUCTURE Brickwork of NFP bricks in class II mortar: 26 150mm brick walls m2 327 BRICKWORK SUNDRIES Foam filler to firewall: 27 Seal joint between top of one brick wall and roof tiles with m 67 approved foam filler to prevent the escape of hydrogen gasses. Joint forming material in movement joints: 28 10mm Bitumen impregnated fibre board built in vertically m2 3 between brick skins Brickwork reinforcement: 29 150mm Wide reinforcement built in horizontally m 934 Prestressed fabricated lintels: 30 150 x 150mm Lintels in lengths not exceeding 3m m 38 Galvanised hoop iron cramps, ties, etc.: 31 30 x 1,6mm Roof tie 1,5m long with one end fixed to timber No 40 and other end built into brickwork SECTION 3 : BILL NO.1 WATERPROOFING DAMP-PROOFING OF WALLS AND FLOORS One layer of 375 micron "Plastall Gundle Brikgrip DPC" embossed damp proof course: 32 In walls m2 67 One layer of 250 micron "Plastall Gundle USB Green" waterproof sheeting sealed at laps with "Gunplas Pressure Sensitive Tape": 33 Under surface beds m2 165 Pulinda Substation Two coats Cemcrete Permastop waterproof slurry: 34 On internal brick walls m2 56 JOINT SEALANTS, ETC. Cold poured polyurethane sealing compound (15% movement) including bond breaker, primer, etc.: 35 10 x 15mm In expansion joints in floors including raking out m 15 expansion joint filler as necessary Balance c/f Balance b/f SECTION 3 : BILL NO. 1 ROOF COVERINGS, ETC. IBR Sheeting 0.6mm Thick IBR Polythene Roof Sheeting to include head and side wall flashing, closures, washers and screws. To be fixed and laid strictly in accordance with the manufacturer's specifications. Sheeting to be painted per clients required colour 36 Roof covering with not exceeding 50 degrees pitch m2 170 37 231 x 154mm fascia flashing. m 40 38 Ridge m 20 ROOF INSULATION "Sol-Thermo Loft International Roofmate H/D 250-40mm" insulation with aluminium foil to underside and plastic to top : 39 Insulation laid taut over rafters (at approximately 600mmm2 170 centres) and fixed concurrent with tiling battens, purlins, etc SECTION 3 : BILL NO. 1 CARPENTRY AND JOINERY SUPPLEMENTARY PREAMBLES Pulinda Substation Particle board: Particle board shall comply with the following specifications: a) SABS 1300 Particle board: exterior and flooring type b) SABS 1301 Particle board: interior type Joinery: Descriptions of frames shall be deemed to include frames, transomes, mullions, rails, etc Descriptions of hardwood joinery shall be deemed to include pelleting of bolt holes Fixing Items described as "nailed" shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete EAVES, VERGES, ETC "Everite FC77" pressed fibre-cement : 40 15 x 80 x 200mm Barge board fixed upside down m 31 Balance c/f Balance b/f KEY CABINET 41 Glazed timber framed and backed, key cabinet size 1400mm No 1 wide x 1000mm high x 100mm deep mounted to plastered brick wall, with top of cabinet fixed at 2m above finished floor level, including all ironmongery, etc., complete (refer drawing 0.54 / 1150 Sheet 31, rev. 3) SECTION 3 : BILL NO.1 CEILINGS, PARTITIONS AND ACCESS FLOORING CEILINGS, ETC. NAILED UP CEILINGS "Isotherm" polyester insulation : 42 50mm Insulation closely fitted and laid on top of brandering m2 14 Pulinda Substation between roof timbers etc 6,4mm Gypsum plasterboard with H-type pressed steel jointing strips : 43 Ceilings in 1200mm sheets including 38 x 38mm sawn m2 14 softwood brandering at 400mm centres 44 Extra over ceiling for 610 x 610mm trap door of 50 x 76mm No 2 wrought softwood rebated framing with one 38 x 38mm sawn softwood cross brander covered with ceiling board and fitted flush in opening 45 Extra over ceiling for 400 x 600mm opening for extract air No 1 diffuser (elsewhere measured), including 12 x 50mm timber bead all round fixed to 38 x 38mm framed framing Moulded cornices 46 75mm Gypsum coved cornice m 21 Balance c/f Balance b/f SUSPENDED CEILINGS Proprietary suspended ceilings Note: Electrical light fittings, diffusers, panels, etc generally are "lay in" units of the same dimensions as the suspension grid described and allowance must be made accordingly for their support inclusive of any flexibility insetting out that may be required (ceiling panels have not been deducted and pricing is to take cognizance thereof) 12.5mm "Donn Cyprex" BPB Gypsum Rhinoboard with white porcelain vinyl finish, 600 x 600mm lay-in suspended grid system, including main and cross tees, necessary hangers, grids, etc.: 47 Ceilings suspended not exceeding 1m below timber purlins m2 165 at 600mm centres Cornices to suspended ceilings : 48 "Donn SM25" recessed wall angle plugged m 164 Pulinda Substation ACCESS FLOORING Supply and install access floor system to system approval. Panels to be 600 x 600mm snap-on stringer system capable of supporting a design load of 7,2KN/m2. The panels are to be covered with high pressure 3,2mm laminate: 49 CONCRETE FLOOR 125mm thick m3 25 50 Extra over for 200 x 600mm purpose made aluminium louvres No 25 in access floor 51 Hole size 600 x 250 mm through access flooring No 3 Balance c/f Balance b/f SECTION 3 : BILL NO. 1 IRONMONGERY SUPPLEMENTARY PREAMBLES Finishes to ironmongery Where applicable finishes to ironmongery are indicated by suffixes in accordance with the following list: BS Satin bronze lacquered CH Chromium plated SC Satin chromium plated SE Silver enamelled GE Grey enamelled AS Anodised silver AB Anodised bronze PB Polished brass PL Polished and lacquered PT Epoxy coated SD Sanded Pulinda Substation HINGES, BOLTS, ETC. DOOR CLOSERS "Yale": 52 Standard duty overhead door closer No 3 Balance c/f Balance b/f SECTION 3 : BILL NO. 1 STRUCTURAL STEELWORK The Tenderer is to allow in the pricing of structural steelwork for all steelwork to be erected plumb and to include for ALL necessary steel packing pieces to achieve same. Steelwork to be hot dipped galvanized Grade 300W, as per the standard specification, complete with all the Pulinda Substation necessary cleats, brackets, gussets, packs, shop fasteners baseplates and the like, including cleaning of steelwork, shop priming and loading ready for dispatch to site and preparation of shop detail drawings: The following is applicable in respect of roof trusses: Trusses are at maximum 4000mm centres Roof covering is IBR roof sheeting. ROOFS, ETC . 53 Roof construction to double pitched roof No. 8 approximately 13.65 x 2.06m high overall at 4m centers, including top and bottom chords, permanent bracing, bolts, gussets and 38 x 38mm battens fixed over underlay (underlay elsewhere) SECTION 3 : BILL NO. 1 METALWORK SUPPLEMENTARY PREAMBLES Balance c/f Balance b/f 54 PRESSED STEEL DOOR AND FRAME Door and frame manufactured from 2mm thick pre-galvanised No 2 mild steel sheet, 1490mm wide x 2800mm high overall including all ironmongery Door and frame manufactured from 2mm thick pre-galvanised No 7 mild steel sheet, 1090mm wide x 2090mm high overall including all ironmongery Door and frame manufactured from 2mm thick pre-galvanised No 2 mild steel sheet, 900mm wide x 2090mm high overall including all ironmongery STEEL WINDOWS 55 Steel windows with top hung opening sections and brown anodised finish, all as per AAAMSA specifications and: all glazing to be done according to the National Building Pulinda Substation Regulations - Part N: 56 Window W1 size 1200 x 1500mm high with 4mm clear float No 3 glass Window WF size 900 x 3700mm high with 4mm clear float No 3 glass Window V size 600 x 900mm high with 4mm obscure glass No 2 Balance c/f Balance b/f SECTION 3 : BILL NO. 1 PLASTERING 57 SCREEDS Screeds on concrete 1:4 Cement plaster screeds steel trowelled on concrete : 58 25mm Thick on floors and landings m2 263 INTERNAL PLASTER Cement plaster 1:5 wood floated on brickwork : 59 On walls m2 631 DIVIDING STRIPS, ETC. 60 50 x 3mm Flat section brass dividing strips between different m 3 floor finishes EXTERNAL PLASTER Cement plaster 1:5 wood floated on brickwork : 61 On walls m2 230 COVER STRIPS, ETC. 62 50 x 50 x 3mm Angle section cast into floor of cable trench to m 10 split cables. Pulinda Substation Balance c/f Balance b/f SECTION 3 : BILL NO. 1 TILING SUPPLEMENTARY PREAMBLES Descriptions Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding FLOOR TILING 63 Smooth Floating Finish m2 165 63 SECTION 3 : BILL NO. 1 PLUMBING AND DRAINAGE (PROVISIONAL) SUPPLEMENTARY PREAMBLES uPVC pipes and fittings: Soil, waste and vent pipes and fittings shall be solvent weld jointed uPVC pressure pipes and fittings: Pipes for water supply shall be of the class stated Pipes of 40mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings Pulinda Substation Pipes of 50mm diameter and greater shall have sockets and spigots with push in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints Copper pipes: Pipes shall be hard drawn and half-hard pipes of the class stated. Class 0 (thin walled hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), class 2 (half-hard) and class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper waste, vent and anti-syphon pipes, capillary solder fittings and compression fittings shall be "Cobra Watertech" type. Capillary solder fittings shall comply with ISO 2016. Only compression fittings shall be used in walls or in ground Balance c/f Balance b/f DRAINAGE PIPING, ETC. Rigid PVC drainage pipes: 64 100mm Pipe (No excavation) m 5 65 100mm Pipes laid in and including trenches not exceeding m 10 1m deep Extra over rigid uPVC pipes for fittings: 66 100 mm Bend No 2 67 100 mm Bend with cleaning eye No 1 68 100 mm Junction No 1 69 100 mm Junction with cleaning eye No 1 70 Rigid PVC waste pipes: 71 38 mm Pipe m 10 72 50 mm Pipe m 7 73 100 mm Pipe m 12 Pulinda Substation 74 Extra over rigid PVC waste pipes for fittings: 75 100 mm Pan connector No 2 76 38 mm Bend with cleaning eye No 3 77 50 mm Bend with cleaning eye No 2 78 100 mm Bend with cleaning eye No 2 79 50 mm Junction with cleaning eye No 1 80 100 mm Junction with cleaning eye No 1 81 100 mm Two-way vent valve No 2 Sundries: 82 Testing drainage pipe system Item 1 WATER SUPPLIES Megapipe: HDPE (high density polyethylene) Type 6 SABS : 83 25mm Pipes laid in and including trenches not exceeding 1m m 3 deep, including all fittings, etc. 84 75mm Pipes laid in and including trenches not exceeding 1m m 5 deep, including all fittings, etc. Balance c/f Balance b/f Pipe encasing : 85 Encase pipe in concrete including all necessary formwork m3 0.5 Sundries : 86 100mm PVC cleaning eye, including 300 mm x 300 mm cast No 1 iron cover and frame, laid in ground 87 Splay cut end to 38 mm PVC pipe No 1 88 Splay cut end to 50 mm PVC pipe No 1 89 Test water supply pipe system Item 1 GULLEYS, ETC. Pulinda Substation Precast concrete : 90 100 mm Gulley not exceeding 1,0 m deep to invert, fitted with a No 2 galvanised cast iron hinged grating, frame and P-trap, etc., complete SANITARY FITTINGS "Vaal" : 91 White vitreous china close coupled WC suite, complete with No 1 P-trap, 9 litre low level cistern and flushpipe and "Hart Celmac A" double flap heavy duty white plastic seat 455 x 290mm White vitreous china wash hand basin with 92 one taphole configuration, complete with waste, grid, plug and No 2 chain supported on a full universal floor mounted pedestal and "Cobra Stella" basin mixer TRAPS, ETC. 93 40 mm rubber P-trap No 2 "Cobra" or other approved type : TAPS, ETC. Copper : 94 15 mm Service pipe 380mm girth with two brass cap nuts No 8 Chromium-plated : 95 "Cobra" (232/350) 15 mm angle regulating valve No 1 96 15 mm "Star" No 138 underwall stopcock No 1 97 15 mm "Star" No 136 stopcock No 1 98 "Cobra" No 136 22 mm compression type underwall stoptap No 1 99 15 mm "Star" No 166/041 sink mixer and swivel outlet No 1 Balance c/f Balance b/f Pulinda Substation Brass : 100 25 mm Gate valve No 1 101 50 mm Gate valve No 1 Cobra" type : 102 12 mm No 507-21 hose bibtap without hose union, outlet No 4 threaded 103 FIRE SERVICE No 1 Approved Type : 104 9 kg Dry chemical fire extinguisher including 100mm x 450mm x 25mm polished hardwood back board with chamfered edges, fixed to brickwork No 3 SLEEVES PVC pipes : Pipes 160 mm diameter exceeding 4,5 m and not exceeding 105 5 m long, once bent using a long radius bend and laid below surface bed with both ends sealed with fill, on completion of No 1 cabling Pipes 160 mm diameter exceeding 8 m and not exceeding 8,5 m long, once bent using a long radius bend and laid below 106 surface bed with both ends sealed with fill, on completion of No 1 cabling SECTION 3 : BILL NO. 1 ELECTRICAL WORK BUDGETARY ALLOWANCE Provide the budgetary amount of $ 15 000 (Fifteen Thousand Dollars) for the Electrical Installation complete. 107 Item 1 Balance c/f Balance b/f SECTION 3 : BILL NO. 1 Pulinda Substation MECHANICAL WORK MECHANICAL WORK BUDGETARY ALLOWANCE Provide the budgetary amount of $ 5000 ( Five Thousand d Dollars) for the Air Conditioning / Mechanical 108 Ventilation Installation complete. Item 1 SECTION 3 : BILL NO. 1 PAINTWORK PAINTWORK, ETC., TO NEW WORK ON FLOATED PLASTER One coat alkali resistant primer and two coats "Dulux Wash 'n Wear" acrylic emulsion paint: On internal walls 109 On external walls m2 433 110 ON SMOOTH CONCRETE m2 230 One coat alkali resistant primer and two coats "Plascon Wall 'n All" paint: On concrete 111 ON PLASTERBOARD m2 17 One coat sealer and two coats "Dulux Wash 'n Wear" acrylic emulsion paint: On ceilings and cornices 112 ON FIBRE-CEMENT m2 347 One coat primer and two coats "Plascon Wall 'n All" acrylic paint: On fascias and barge boards 113 m2 15 Balance c/f Balance b/f Pulinda Substation ON METAL Spot priming defects in pre primed surfaces with zinc chromate primer and applying one undercoat and two coats "Dulux Silthane Silk" polyurethane enamel (colour Fawn) paint on steel: On doors and frames 114 One coat calcium plumbate primer, one undercoat and two m2 28 coats "Plascon Wall 'n All" alkyd enamel paint on galvanised steel: TOTAL - carried forward to FINAL SUMMARY DESCRIPTION UNIT QTY SECTION NO 3 BUILDING WORKS SECTION 3 : BILL NO. 2 GUARD HOUSE (33kV YARD) EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES Carting away of excavated material Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site EXCAVATION, FILLING, ETC. Excavation in earth not exceeding 2m deep: Pulinda Substation 2 Trenches m3 17 Extra over trench and hole excavations in earth for excavation in: 3 Soft rock m3 2 4 Hard rock m3 1 Extra over all excavations for carting away to a disposal site complying with environmental regulations: 5 Surplus material from excavations and/or stock piles on site to m3 17 spoil area located by the contractor Earth filling obtained from the excavations: 8 Under floors, steps, pavings, etc and well compacted in layers m3 5 not exceeding 150mm thick Balance c/f Balance b/f Earth filling obtained from commercial sources: 9 Filling with approved material supplied and carted onto site by the Contractor, under floors and well compacted in layers m3 5 not exceeding 150mm thick Tests: 10 Modified AASHTO Density test on earth filling 1 Soil insecticide: 11 Under floors, etc., including forming and poisoning shallow m2 33 furrows against foundation walls etc, filling in furrows and ramming. 12 To bottoms and sides of trenches, etc. m2 53 SECTION 3 : BILL NO. 2 CONCRETE, FORMWORK AND REINFORCEMENT SUPPLEMENTARY PREAMBLES Pulinda Substation Cost of tests The costs of making, storing and testing of concrete test cubes as required under clause 7 "Tests" of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the architect. The testing shall be undertaken by an independent firm or institution nominated by the contractor to the approval of the architect. (Test cubes are measured separately) UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES 10MPa/19mm concrete: 13 Blinding to strip footings m3 1 REINFORCED CONCRETE 25MPa/19mm concrete: 14 Strip footings m3 6 Balance c/f Balance b/f 15 Surface beds cast on waterproofing m3 4 REINFORCEMENT Fabric reinforcement: 16 Type 395 fabric reinforcement in concrete surface beds, slabs, m2 33 etc. SECTION3 : BILL NO. 2 MASONRY SUPPLEMENTARY PREAMBLES BRICKWORK Sizes in descriptions Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick Pulinda Substation Pointing Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc FOUNDATIONS (PROVISIONAL) Brickwork of NFX bricks in class II mortar: 17 Half brick walls m2 3 18 One brick wall. m2 6 Balance c/f Balance b/f SUPERSTRUCTURE Brickwork of NFX bricks in class II mortar: 19 Half brick walls m2 34 20 One brick walls m2 83 BRICKWORK SUNDRIES Brickwork reinforcement: 21 75mm Wide reinforcement built in horizontally m 140 22 150mm Wide reinforcement built in horizontally m 322 Prestressed fabricated lintels: 23 100 x 70mm Lintels in lengths not exceeding 3m m 8 Galvanised hoop iron cramps, ties, etc.: 24 30 x 1,6mm Roof tie 1,5m long with one end fixed to timber No 7 and other end built into brickwork SECTION 3 : BILL NO.2 WATERPROOFING Pulinda Substation DAMP-PROOFING OF WALLS AND FLOORS One layer of 375 micron "Plastall Gundle Brikgrip DPC" embossed damp proof course: 25 In walls m2 6 One layer of 250 micron "Plastall Gundle USB Green" waterproof sheeting sealed at laps with "Gunplas Pressure Sensitive Tape": 26 Under surface beds m2 33 SECTION 3: BILL NO. 2 ROOF COVERINGS, ETC. IBR Sheeting 0.6mm Thick IBR Polythene Roof Sheeting to include head and side wall flashing, closures, washers and screws. To be fixed and laid strictly in accordance with the manufacturer's specifications. Sheeting to be painted per clients required colour 27 Roof covering with not exceeding 50 degrees pitch m2 25 Balance c/f Balance b/f SECTION 3 : BILL NO. 2 CARPENTRY AND JOINERY DOORS, ETC. Wrought meranti doors hung to timber frames (elsewhere measured): 28 44mm Framed ledged and braced batten door 813 x 2032mm No 3 high of 44 x 150mm top rail and stiles, 16 x 110mm middle ledge and braces and 22 x 220mm bottom ledge filled in one side with 19mm V-jointed one side boarding and covered on other side with 6mm plywood with sapele veneer let into and including rebates all round SHELVING TO SAFE ROOM Pulinda Substation Linvar Storage Systems: 31 Type "Linspace" single entry bay 1000 x 2200 x 500mm deep No 1 plugged to wall, complete with uprights, top and base, and 4 shelves (Order NSBAYSOPK1, Tel: 0800-011-0468) Balance c/f Balance b/f SECTION 3 : BILL NO. 2 IRONMONGERY SUPPLEMENTARY PREAMBLES LOCKS "Union" : 32 Oval double cylinder upright lock stainless steel with chrome No 2 cylinder L-2241-78SS/2x13PL with brass Protea handle for cylinder lock CB612-13-PL Weatherstrips : 33 Weatherguard sealing strip fixed to bottom of 813 mm wide No 2 single door Balance c/f Balance b/f SECTION 3 : BILL NO.2 Pulinda Substation STEELWORK SUPPLEMENTARY PREAMBLES Descriptions Descriptions of bolts shall be deemed to include nuts and washers Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete Metalwork described as" holed for bolt(s)" shall be deemed to exclude the bolts unless otherwise described PRESSED ROOF TRUSSES ROOFS, ETC. The following is applicable in respect of roof trusses: Trusses are at maximum 3000mm centres Trusses: 35 Roof construction to double pitched roof No. 3 approximately 13.65 x 2.06m high overall at 4m centers, including top and bottom chords, permanent bracing, bolts, gussets and 38 x 38mm battens fixed over underlay (underlay elsewhere) PRESSED STEEL DOOR FRAME 1,6mm Rebated frames suitable for half walls 36 Frame for door 813 x 2032mm high No 2 SUNDRY GALVANIZED STEELWORK Balance c/f Balance b/f SECTION 3 : BILL NO. 2 PLASTERING SCREEDS Pulinda Substation Screeds on concrete 1:4 Cement plaster screeds steel trowelled on concrete : 40 25mm Thick on floors and landings m2 30 INTERNAL PLASTER Cement plaster 1:5 wood floated on brickwork : 41 On walls m2 125 EXTERNAL PLASTER Scratch woodfloat plaster bonded to wall with chickenmesh tightly spanned and fixed to wall: 42 30mm Thick on walls m2 77 DIVIDING STRIPS, ETC. 43 50 x 3mm Flat section brass dividing strips between different m 1 floor finishes Balance c/f Balance b/f SECTION 3 : BILL NO. 2 TILING SUPPLEMENTARY PREAMBLES Pulinda Substation Descriptions Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding FLOOR Smooth Float Floor 45 On floors and landings to falls m2 6 Balance c/f Balance b/f DRAINAGE PIPING, ETC. Rigid PVC drainage pipes: 55 100mm Pipe (No excavation) m 1 56 100mm Pipes laid in and including trenches not exceeding m 3 1m deep Extra over rigid uPVC pipes for fittings: 57 100 mm Bend No 3 58 100 mm Bend with cleaning eye No 1 59 100 mm Junction with cleaning eye No 1 Rigid PVC waste pipes: 60 38 mm Pipe m 5 61 50 mm Pipe m 4 62 100 mm Pipe m 5 Extra over rigid PVC waste pipes for fittings: 63 100 mm Pan connector No 3 Pulinda Substation 64 38 mm Bend with cleaning eye No 4 65 50 mm Bend with cleaning eye No 2 66 100 mm Bend with cleaning eye No 1 67 50 mm Junction with cleaning eye No 1 68 100 mm Junction with cleaning eye No 1 69 100 mm Two-way vent valve No 1 Sundries: 71 Testing drainage pipe system Item 1 WATER SUPPLIES Megapipe: HDPE (high density polyethylene) Type 6 SABS : 72 25mm Pipes laid in and including trenches not exceeding 1m m 8 deep, including all fittings, etc. 73 50mm Pipes laid in and including trenches not exceeding 1m m 3 deep, including all fittings, etc. Sundries : 74 100mm PVC cleaning eye, including 300 mm x 300 mm cast No 1 iron cover and frame, laid in ground 75 Test water supply pipe system Item 1 SANITARY FITTINGS "Vaal" : 76 White vitreous china close coupled WC suite, complete with No 1 P-trap, 9 litre low level cistern and flushpipe and "Hart Celmac A" double flap heavy duty white plastic seat Balance c/f Balance b/f 78 32mm x 38 mm "Cobra" (350) CP bottle trap No 1 TAPS, ETC. Pulinda Substation Copper : 79 15 mm Service pipe 380 mm girth with two brass cap nuts No 2 Chromium-plated : 80 "Cobra" (232/350) 15 mm angle regulating valve No 2 Brass : 81 25 mm Gate valve No 1 82 50 mm Gate valve No 1 Cobra" type : 83 50mm No 128 Stopcock No 1 HOLES Leave or form hole for not exceeding 100 mm pipe : 86 One brick wall No 1 FIRE SERVICE Approved Type : 87 9 kg Dry chemical fire extinguisher including 100mm x 450mm No 1 x 25mm polished hardwood back board with chamfered edges, fixed to brickwork SLEEVES uPVC pipes : 89 20mm Diameter uPVC conduit fixed to brickwork m 5 Balance c/f Balance b/f SECTION 3 : BILL NO. 2 PAINTWORK Pulinda Substation PAINTWORK, ETC., TO NEW WORK ON INTERNAL PLASTER One coat alkali resistant primer and two coats "Dulux Wash 'n Wear" acrylic emulsion paint: 91 On internal walls m2 90 ON EXTERNAL PLASTER On external walls m2 77 ON FIBRE-CEMENT One coat primer and two coats "Plascon Wall 'n All" acrylic paint: 92 On fascias and barge boards m2 7 ON METAL Spot priming defects in pre primed surfaces with zinc chromate primer and apply one undercoat and two finishing coats "Dulux Silthane Silk" polyurethane enamel (colour Fawn) paint on steel: 93 On security gates (both side measured flat) m2 2 On door frames m2 5 ON WOOD Two coats polyurethane varnish: 94 On doors m2 5 One coat wood primer and two coats "Plascon Velvaglo" paint: 95 On skirtings not exceeding 300mm girth, painted before fixing m 23 in position TOTAL - carried forward to FINAL SUMMARY DESCRIPTION UNIT SECTION NO 3 BUILDING WORKS - EXTERNAL WORKS SECTION 3 : BILL NO. 3 Pulinda Substation PAVING SURROUNDING CONTROL BUILDINGS PRECAST CONCRETE 1 80mm Thick 25MPa precast concrete interlocking block paving m2 3 of 220 x 97mm grey paving blocks in herringbone pattern in accordance with SABS Spec.1058 and laid to falls on sand layer (elsewhere) with joints filled with sand and vibrated, including all straight cutting. 2 Extra for edge blocks m 3 TOTAL - carried forward to FINAL SUMMARY Pulinda Substation RATE AMOUNT 2,500.00 12,500.00 0.00 500.00 1,250.00 1,875.00 1,563.00 1,500.00 $ 19,188.00 $ 19,188.00 Pulinda Substation 1,000.00 8,000.00 500.00 4,000.00 500.00 4,000.00 0.00 0.00 938.00 7,504.00 400.00 3,200.00 500.00 4,000.00 100.00 800.00 220.00 1,760.00 500.00 4,000.00 Included 0.00 1,000.00 8,000.00 $ 64,452.00 $ 64,452.00 500.00 4,000.00 Pulinda Substation 0.00 0.00 Included 200.00 1,600.00 2,150.00 17,200.00