Patentia, W.B.D
15th December, 2013
% Completed
by 15th
December
% Planned
Completed by
15th December
0.210
0.100
0.500
2.500
1.590
1.100
1.500
5.000
12.500
100%
100%
100%
100%
100%
0%
100%
20%
0.21
0.1
0.5
2.5
1.59
1.1
1.5
5
12.5
1.100
4.200
8.000
5.000
3.167
3.000
5.000
5.000
2.000
3.084
1.413
1.120
1.500
0.500
2.000
2.000
1.000
1.000
2.000
2.916
55.000
100%
20%
100%
40%
0%
0%
20%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
50%
0%
0%
1.1
4.2
8
5
3.167
3
5
5
2
3.084
1.413
1.12
1.5
0.5
2
2
1
0.5
2
2.916
54.50
0.200
0.150
0.500
3.750
0.100
0%
0%
0%
0%
0%
0.2
0.15
0.5
3.75
0.1
Weighted
Average
Blinding
Prepare formwork
Reinforcement
Concrete works
Backfilling
Fabricate discharge pipe
Excavate channel
Revetment
Total
Pump Works
Buy + Install pump
Buy + Install gear drive unit
Buy + Install engine
Support frame
Safety mesh
Fuel tank & transfer system
Install discharge pipe
Install exhaust pipe
Install trash rack
Install safety rail
Testing & training
Total
General Items
Mobilisation/ Demobilisation
Signboard
Temporary works
Contractor's facilities
Consultant's site office
Total
Project Total
0.100
0.250
2.000
2.000
0.250
2.000
2.000
1.700
15.000
0%
0%
0%
0%
0%
0%
0%
0%
0.1
1.2
2
2
0.25
2
0
1.7
13.95
3.000
2.000
2.000
0.360
0.300
0.300
2.000
0.010
0.010
0.010
0.010
10.000
25%
20%
20%
0%
0%
0%
0%
0%
1.5
1
1
0.36
0.3
0.3
1
0.005
1.100
0.010
6.290
0.050
0.050
7.500
100%
100%
20%
100%
100%
5.5
1.1
0.01
6.29
0.05
0.05
7.5
94
December, 2013
% Actual
Completed by
15th December
0.21
0.1
0.5
2.5
1.59
0
1.5
1
7.4
1.1
1
8
2
0
0
1
0
0
0.5
0
13.6
0
0
0
0
0
0
0
0
0
0
0
0
0
0.75
0.4
0.4
1.6
1.1
0.01
0.8
0.05
0.05
2.01
24.6
Item
Access Road & Revetment
Main Structure
Discharge box & pipe supports
Pump works
General Items
Total
100
% Weighted
12.5
55
15
10
7.5
100
% Planned
12.50
54.50
13.95
5.50
7.50
94.0
% Actual
7.40
13.60
0.00
1.55
2.01
24.6
90
80
% Complete
70
60
50
40
Planned
30
Actual
20
10
0
Date
Date
Planned
7/15/2013
0
7/31/2013
7.2
8/15/2013
16.6
8/31/2103
24.1
9/15/2013
28.7
9/30/2013
38.4
10/15/2103
50.7
10/31/2013
64.1
11/15/2013
68.3
31/11/2013
74.4
12/15/2013
94
12/31/2013
1/14/2014
Actual
0
5
11.1
15.1
15.4
16.8
23.60
24.60
24.60
24.60
24.60
Project time
0.0
8.3
16.6
24.9
33.2
41.5
49.8
58.1
66.4
74.7
83.0
91.3
100.0
Amount Paid $
3838950
10000000
8556750
6547500
28943200