24/48V Dual Voltage Power System


NEQ.15238 Alpha Part #0540091
Installation Checklist
1
System Installation
1. Mounting:
Secure the rack to the oor (drawing 0540091-06 for dimensions).
Floor anchors
Anchor washers (Zone 4)
CAUTION!
This procedure must be performed by qualifed personnel. Review the safety instructions provided in
manual 0540091-J0, and the battery manufacturers safety recommendations.
Site Name: Site ID:
Installer: Title: Date:
6. Battery Temperature Probes:
Connect battery temperature probes to mid-string negative battery termination
post on the top and mid-height battery shelves in the battery bay.
7. Battery Rack Battery Disconnect Breakers:
Uncoil the black wire, labelled #2, from the battery bay and connect it to D4
terminal #37 on the Distribution and I/O Interface board 707-548-20 in the Vista
power system.
4. AC Input to rectier shelves:
Use 1" conduit retainers to route AC cables. Secure cables to AC input and chassis ground terminals (cus-
tomer connections drawing #0540091-08).
2. Ground Wiring
Ground the rack to Cell Reference Ground Bar (CRGB) with #6
AWG (13mm
2
) insulated cable, thread forming screws and paint
piercing washers.
Connect battery return bus to CRGB with recommended return
bus ground wire size.
5. Battery Terminations (1/4"5/8"C lugs)
Verify polarity and route battery hot cables through top of cabinet and connect to bus bar.
Verify polarity and route battery return cables through top of cabinet and connect to battery return bus.
Power system
ampacity
Return Bus
Ground Wire Size
< 30A #10
30 100A #6-2
100 400A 0000
400 800A 350 MCM
>800A 750 MCM
Battery Temp Probes
3. Breaker Installation:
Install AM-type mid-trip plug-in breakers:
Tiers 1 and 2 (lower): 48V load distribution, 20 positions
Tier 3 and 4 (upper): 24V load distribution, 24 positions
Allow 1 space between pairs of 100A breakers.
Two-position and three-position breakersuse multi-pole adapter plates to link together the output connec-
tions of the breaker.
Recommended torque values
1/4" 8.8 ft-lbs
3/8" 32.5 ft-lbs
1/2" 73 ft-lbs
Canada: Burnaby, British Columbia Tel: 604 436 5900 Fax: 604 436 1233
United States: Bellingham, Washington Tel: 360 647 2360 Fax: 360 671 4936 Doc#: 0540091-J1 Rev A
Alpha Technologies reserves the right to make changes to the products and information contained in this document without notice.
Copyright 2012 Alpha Technologies. All Rights Reserved. Alpha is a registered trademark of Alpha Technologies.
member of The Alpha Group is a trademark of Alpha Technologies.
Alpha Technologies Ltd. For more information visit www.alpha.ca
member of The Group

2
NEQ.15238 Alpha Part #0540091 Power System Installation Checklist
Commissioning
Controller conguration:
CXC controller LCD verify/ set network IP parameters.
IP address: 10.10.10.201 (factory default)
Subnet mask:255.255.255.0
Logout.
Connect a laptop to the CXC controller with a network crossover cable.
Laptop IP Network settings (Start > Control Panel)
IP address: 10.10.10.202
Subnet mask:255.255.255.0
Turn off Pop-up Blocker.
10.10.10.201 in the web address bar
Login to the CXC controller:
Username: your company name and your initials
Password: 1234
Language selection: English
Set correct date and time (Controller > Date & Time).
Set Battery AH Capacity (Batteries > Congure Batteries).
Count number of battery strings.
Multiply the number of strings by the rated battery capacity.
Submit changes and Accept.
Logout.
8. Load Terminations
Multi-pole adapter plates in use Two-position and three-position breakers include a plate that links to-
gether the output connections of the breaker
GMT Fuses:
SIAD
LMU
Smoke Detector
Hydrogen Sensor
9. Alarm wiring
Installed Veried
K2 and K3
Un-assignable - no input leads connected
K4
Power System Minor
K5
Power System Major
K6
AC Mains Failure
K7
Distribution Fuse/Breaker alarm
K8
Battery on Discharge
System Installation continued