Sei sulla pagina 1di 3

A8-E8FLOOR ROOF

Fcu = 300 kg/cm


2
Fy = 4600 kg/cm
2
Span L = 7.4 m
Depth H = 50 cm
Width B = 20 cm
Max. B.M. M = 10.50 t.m Mue 10.91
Shear force V = 10.40 t.m Vue 12.00
Torsion T = 0.20 t.m
d act. = 45.90 cm
K = M/bd2fcu = 0.09
& = 0.89
z = 40.97 cm
A's required = 0.00 cm
2
no. of bars = 2.00
Dia. of bars = 16
A's provided = 4.02 cm
2
As required = 6.66 cm
2
Fcu = 30 N/mm
2
no. of bars = 4.00 Fy = 460 N/mm
2
Dia. of bars = 16 M = 10.50 t.m
As provided = 8.04 cm
2
TRUE b = 200 mm
d = 459 mm
Vmax = 4.38 = 23
v=V/bd = 1.31 = 2.49
100*Asp/(b*d) = 0.88 0.64 = 0.44
Vc = 0.64 = 237.92
As v = 0.33 Sv = 1.14 1.14
Dia. of ring = 8 mm = 1.13 1.13
spacing of ring = 20 cm TRUE = 16.12
no. of arms = 2 L = 29.49 deflection ok
DESIGN OF BEAM
CHECK DEFLECTION
SHEAR CALCULATION
Sup. con. Effc.
mf1
mf2
L/d act.
L/d lim.
M/bd
2
100*Asp/(b*d)
fs1
deflection ok
CHECK DEFLECTION
Design of square footing F9:
fcu = 30 N/smm fy = 460 N/smm
Ult. column load = 1503 kN Safe bearing capacity = 110 kN/m
2
B reqd
Self weight = 85 kN Overburden height = 0.91 m 3.39
Overburden = 250 kN Area of footing reqd. = 11.52 m
2
Total load = 1838 kN Footing size = 3.50 m A prvd.
Column breadth = 200 mm Area of footing prvd. = 12.25 m
2
TRUE
Column width = 700 mm Footing thickness = 550 mm
Net upward pressure = 123 kN/m
2
Max. cantilever proj. = 1.65 m
As min
Max. B.M. /m width M = 167 kNm Z = 467 mm 640
K = M/bd
2
fcu = 0.023 N/mm
2
As required /m width = 893 mm
2
No of bars
Diameter of bars = 16 mm Spacing of bars = 150 mm 23
As provided/m width = 1340 mm
2
As prvd.
150%
Punch shear = 1067 kN Dist. to critical section = 825 mm
Punch shear stress = 0.29 N/mm
2
Shear force = 101 kN
Allow.shear stress = 0.41 N/mm
2
Shear stress = 0.21 N/mm
2
TRUE
Footing F9: 350 x 350 x 55 16 @ 150 16 @ 150