Sei sulla pagina 1di 3

https://excha

nge.dnv.com/s
ervicedocumen
ts/dnv/


DNV Offshore
Standards
2014-05
Go to historical editions


Edition Amended

History

Summary of Changes and
Current Document Status
2013-10


+
DNV-OS-A101
Safety Principles and
Arrangements
2013-10


+
DNV-OS-A201
Winterization for Cold
Climate Operations
(Tentative)
2013-10

New +
DNV-OS-B101 Metallic Materials 2012-10


+
DNV-OS-C101
Design of Offshore Steel
Structures, General
(LRFD Method)
2011-04


+
DNV-OS-C102
Structural Design of
Offshore Ships
2012-10


+
DNV-OS-C103
Structural Design of
Column Stabilised Units
(LRFD Method)
2012-10


+
DNV-OS-C104
Structural Design of Self-
Elevating Units (LRFD
Method)
2012-04


+
DNV-OS-C105
Structural Design of TLPs
(LRFD Method)
2011-04


+
DNV-OS-C106
Structural Design of Deep
Draught Floating Units
(LRFD Method)
2012-04


+
DNV-OS-C201
Structural Design of
Offshore Units (WSD
Method)
2012-10


+
DNV-OS-C301
Stability and Watertight
Integrity
2013-10


+
DNV-OS-C401
Fabrication and Testing of
Offshore Structures
2013-04


+
DNV-OS-C501 Composite Components 2013-11


+
DNV-OS-C502
Offshore Concrete
Structures
2012-09


+
DNV-OS-C503
Concrete LNG Terminal
Structures and
Containment Systems
2010-10


+
DNV-OS-D101
Marine and Machinery
Systems and Equipment
2013-10


+
DNV-OS-D201 Electrical Installations 2013-10


+
DNV-OS-D202
Automation, Safety and
Telecommunication
Systems
2013-10 2014-02

+
DNV-OS-D203
Integrated Software
Dependent Systems
(ISDS)
2012-12


+
DNV-OS-D301 Fire Protection 2013-10


+
DNV-OS-E101 Drilling Plant 2013-10


+
DNV-OS-E201
Oil and Gas Processing
Systems
2013-04


+
DNV-OS-E301 Position Mooring 2013-10


+
DNV-OS-E302 Offshore Mooring Chain 2013-10


+
DNV-OS-E303 Offshore Fibre Ropes 2013-02


+
DNV-OS-E304
Offshore Mooring Steel
Wire Ropes
2013-10


+
DNV-OS-E401 Helicopter Decks 2012-04


+
DNV-OS-E402
Offshore Standard for
Diving Systems
2010-10


+
DNV-OS-E403 Offshore Loading Buoys 2008-10


+
DNV-OS-E406
Design of Free Fall
Lifeboats
2010-04


+
DNV-OS-E407
Underwater Deployment
and Recovery Systems
2012-10

New +
DNV-OS-F101
Submarine Pipeline
Systems
2013-10


+
DNV-OS-F201 Dynamic Risers 2010-10


+
DNV-OS-H101
Marine Operations,
General
2011-10


+
DNV-OS-H102
Marine Operations,
Design and Fabrication
2012-01


+
DNV-OS-H201 Load Transfer Operations 2012-04


+
DNV-OS-H203
Transit and Positioning of
Offshore Units
2012-02


+
DNV-OS-H204
Offshore Installation
Operations (VMO
Standard Part 2-4)
2013-11

New +
DNV-OS-H205
Lifting Operations (VMO
Standard - Part 2-5)
2014-04

New +
DNV-OS-J101
Design of Offshore Wind
Turbine Structures
2014-05

Rev. +
DNV-OS-J103
Design of Floating Wind
Turbine Structures
2013-06

New +
DNV-OS-J201
Offshore Substations for
Wind Farms
2013-11


+
DNV-OS-J301
Wind Turbine Installation
Units
2013-04 2014-02

+

Potrebbero piacerti anche