Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
)
12
1!
1(
4A
(
1
2*
2!
2)
2A
!
12
1!
2*
22
4, Internal -irports
;or 2** persons
;or !** persons
;or 1*** persons
!
12
1(
1*
2*
2)
(
1!
22
Note: i* 3rovision for wash basins, baths including shower stalls, shall be in accordance with part i/ section #)
$rainage and Sanitation of National 'uilding 1ode of "ndia.
* 4t least one "ndian stle water closet shall be provided in each toilet. 4ssume 50 6 males and 70 6
females in an area.
N2te4 12r :e0era" :.+7a0*e 12r ,ater 4.pp"6 arra0:e/e0t4A
1, (or new construction: Pro&ision shall be made for under ground tan% for the storage
of water, ha&ing capacity at 2** l, per person with ade.uate pumping arrangements to
supply water to upper floors, ;iltered water connection will be allowed only for use
of drin%ing and bathing needs, ;or other purposes i,e, flushing and gardening etc,, the
indi&idual shall be re.uired to ha&e own arrangements of tube well water within the
premises, /hile according sanction to 2ayout Plan, the -uthority shall ma%e a
special mention that pro&ision for space shall be %ept for the construction of under
ground reser&oir of ade.uate capacity along with booster pumping station,
Model Building-Bye-laws
)1
Chapter-5 Structural Safety and Services
2, -rrangements as gi&en in 1 abo&e shall also be pro&ided in >roup 4ousing 'ocieties,
3, The plumbing arrangement in case of new constructions shall be made in a way that
the potable water shall be used for drin%ing, coo%ing 7 bathing only and for rest of
the uses, pro&ision for ground water can be made with dual piping system,
4, 2ow capacity cistern should preferably be pro&ided instead of normal 12, l, capacity,
, .ater 8arvesting: /ater har&esting through storing of water runoff including
rainwater in all new buildings on plots of 1** s. m, and abo&e will be mandatory,
The plans submitted to the local bodies shall indicate the system of storm water
drainage along with points of collection of rain water in surface reser&oirs or in
recharge wells,
!, -ll building ha&ing a minimum discharge of 1*,*** l, and abo&e per day shall
incorporate waste water recycling system, The recycled water should be used for
horticultural purposes,
+, "nstallation of Solar 4ssisted .ater 8eating Sstem in 'uildings:
i, "o new building in the following categories in which there is a system of
installation for supplying hot water shall be built unless the system of the
installation is also ha&ing an au6iliary solar assisted water heating systemC-
a< 4ospitals and "ursing 4ome
b< 4otels, 2odges, and >uest 4ouses, >roup 4ousing with the plot area of
4*** s. m,
c< 4ostels of 'chools, $olleges and Training $entres with more than 1**
'tudents,
d< #arrac%s of armed forces, paramilitary forces and police
e< Indi&idual residential buildings ha&ing more than 1* s. m, plinth area
f< ;unctional #uildings of :ailway 'tations and -ir Ports li%e waiting
rooms, retiring rooms, rest rooms, inspection bungalows and catering units
g< $ommunity $entres, #an.uet 4alls, #arat >hars, 1angal Haryalayas and
buildings for similar use,
Model Building-Bye-laws
)2
Chapter-5 Structural Safety and Services
i< $efinitions
i< K'olar -ssisted /ater 4eating
'ystem
- de&ice to heat water using solar energy
as heat source,
ii< K-u6iliary bac% upL 5lectricity operated or fuel fired
boilersGsystems to heat water coming out
from solar water heating system to meet
continuous re.uirement of hot water,
iii< K"ew #uildingL 'uch buildings of abo&e said categories
for which construction plans ha&e been
submitted to the -uthority for clearance,
i&< K56isting buildingL 'uch buildings, which are licensed to
perform their respecti&e business,
ii< "nstallation of Solar .ater 8eating Sstem
a< New 'uildings: $learance of plan for the construction of new buildings of the
aforesaid categories shall only be gi&en if they ha&e a pro&ision in the building
design itself for an insulated pipeline from the rooftop in the building to &arious
distribution points where hot water is re.uired, The building must ha&e a
pro&ision for continuous water supply to the solar water heating system, The
building should also ha&e open space on the rooftop, which recei&es direct sun
light, The load bearing capacity of the roof should at least be * %g, per s. m,
-ll new buildings of abo&e said categories must complete installation of solar
water heating systems before obtaining necessary license to commence their
business,
b< 9/isting 'uildings: Installation of 'olar -ssisted /ater 4eating 'ystems in the
e6isting building shall be made mandatory at the time of change of use to abo&e
said category pro&ided there is a system or installation for supplying hot water,
iii< 1apacit: The capacity of solar water heating system to be installed on the building
of different categories shall be decided in consultation with the local bodies, The
recommended minimum capacity shall not be less than 2 litres per day for each
bathroom and %itchen subFect to the condition that ma6imum of *I of the total roof
area is pro&ided with the system,
i&< Specifications: Installation of 'olar -ssisted /ater 4eating 'ystems shall
conform to #I' specification I' 12)33, The solar collectors used in the system shall
ha&e the #I' certification mar%,
Model Building-Bye-laws
)3
Chapter-5 Structural Safety and Services
&< 4u/iliar Sstem: /here&er hot water re.uirement is continuous, au6iliary heating
arrangement either with electric elements or oil of ade.uate capacity can be
pro&ided,,
Model Building-Bye-laws
)4