GENERAL ANNUAL CHECKS
(1) Review past maintenance records to find repair patterns. These records may point to
certain components that should be closely inspected during performance of preventive
maintenance.
(2) Review operator records concerning electrical load readings; compare with
equipment ratings. Operator records regarding operating temperatures and any
documented abnormal circumstances associated with the system should also be
reviewed.
(3) Inspect Secondary Electrical Distribution Equipment:
(a) Inspect to ensure that warning signs exist. Replace as required.
(b) Inspect enclosures for damage, unauthorized openings, and corrosion of metallic objects.
Repair and paint as required.
(c) Inspect air passages and remove any blockage.
(d) Inspect, investigate, and solve conditions for unusual odors.
(e) As equipment is operated and tested, listen, investigate, and solve conditions for
unusual noises.
(f) Inspect electrical connections for degradation and tightness. Repair as required.
(g) Inspect electrical insulation for discoloration and degradation. Repair as required.
(h) Inspect equipment grounding components such as conductors and connections. Repair as
required.
(i) Inspect insulators for damage. Replace as required.
(j) Inspect liquid immersed equipment for leaks and damage.
(k) Inspect indicating lights for correct illumination.
(4) Remove debris, dirt, and other foreign objects from all components, housings,
cabinets, panels, etc.
(5) Torque all electrical connections to design value..
(6) Verify operation of space heaters and control thermostat. Check thermostat set point
for proper setting.
(7) Verify the grounding of the equipment and associated neutral where applicable.
(8) Conduct infrared test on all main current carrying equipment for hot spots that may
indicate overload conditions or loose connections.
(9) Using calibrated test instruments, calibrate ammeters, voltmeters, etc. Verify
continuity of metering selector switch contacts with ohmmeter.
Comprehensive Electrical SystemMaintenance Checklists http://www.tvss.net/pm/el-chk.htm
1 of 6 1/25/2014 9:00 PM
COMPREHENSIVE ELECTRICAL SYSTEM CHECKLI ST
Secondary Distribution System
Annual
Inspect to ensure that warning signs exist. Replace as required.
Inspect enclosures for damage, unauthorized openings, and corrosion of metallic
objects.
Inspect air passages and remove any blockage.
Inspect, investigate, and solve conditions for unusual odors.
As equipment is operated and tested, listen, investigate, and solve conditions for
unusual noises.
Inspect electrical connections for degradation and tightness.
Inspect electrical insulation for discoloration and degradation.
Inspect equipment grounding components such as conductors and connections.
Inspect insulators for damage.
Inspect liquid immersed equipment for leaks and damage.
Inspect indicating lights for correct illumination.
Clean equipment.
Tighten electrical connections..
Verify space heater operation
Verify equipment grounding.
Perform infrared test.
Calibrate recording and indicating metering.
Low Voltage Switchgear, Switchboards, and Panelboards
Six Month:
Inspect solid electrical insulation for discoloration and degradation.

Annual:
Review operator records.
Inspect barriers and shutters for physical damage.
Test phase bus insulation
Comprehensive Electrical SystemMaintenance Checklists http://www.tvss.net/pm/el-chk.htm
2 of 6 1/25/2014 9:00 PM
Service circuit breakers.
Inspect drawout contacts for abnormal wear, tension, and discoloration. Correct as
required.
Inspect breakers current carrying components for discoloration that may indicate
overheating. Replace as required.
Inspect, operate, adjust, and lubricate mechanical linkages. Replace components as
required.
Verify interlocks preventing a closed switchgear drawout breaker from being
withdrawn from or connected to the switchgear bus.
Inspect and dress current carrying contacts on air circuit breakers in accordance
with manufacturers recommendations.
Test power circuit breakers. Perform test operations to prove correct actuation of
breakers trip and close components, including spring charging motors, trip
solenoids, indicating targets, etc.
Perform contact resistance test.
Perform insulation resistance test on each phase-to-phase and phase-to-ground
using a megohmmeter.
Prove circuit breaker operation by actuation of each associated protective device.
Prove circuit breaker operation by actuation of each breakers manual control switch
or handle.
Test molded-case circuit breakers. Perform overcurrent test on critical load
breakers to prove correct actuation of breakers trip and close components.
Perform contact resistance test on critical load breakers.
Prove circuit breaker operation by actuation of each breaker manual control switch
or handle.
Verify equipment alarms.
Protective device calibration .
Perform harmonics analysis
Measure and record neutral currents.
Transformers
Annual:
Inspect forced cooling system equipment for damage, etc
Operate system by simulating high temperature at controlling devices.
Verify transformer alarms.
Motor Control Center
Comprehensive Electrical SystemMaintenance Checklists http://www.tvss.net/pm/el-chk.htm
3 of 6 1/25/2014 9:00 PM
Annual:
Inspect main contacts and auxiliary contacts on contactors.
Inspect pushbuttons, indicating lights, selector switches, etc.
Inspect indicating lamps for burned out bulbs or improper illumination.
Test phase bus insulation
Inspect drawout contacts for abnormal wear, tension, and discoloration. Correct as
required.
Inspect units current carrying components for discoloration that may indicate
overheating.
Inspect, operate, adjust, and lubricate mechanical linkages.
Verify mechanical interlocks. yr Inspect and dress current carrying contacts on
switches and contactors in accordance with manufacturers recommendations.
Motor Starter
Annual:
Manually operate switches and circuit breakers to verify correct operation.
Operate starter unit using all manual and automatic control devices to ensure
correct operation.
Verify correct interlocking action with other associated equipment.
Verify correct indicating light operation.
Verify equipment alarms
Automatic Transfer Switches
Annual:
Inspect, operate, adjust, and lubricate mechanical linkages.
Verify operation of mechanical interlocks.
Inspect and dress current carrying contacts in accordance with manufacturers
recommendations.
Test automatic transfer switches Perform insulation resistance test on each phase-
to-phase and phase-to-ground using a megohmmeter.
Perform contact resistance test.
Prove correct operation of the transfer switches by manually initiating transfers in
both directions.
Simulate the automatic conditions requiring automatic transfer switches to transfer
in both directions
Comprehensive Electrical SystemMaintenance Checklists http://www.tvss.net/pm/el-chk.htm
4 of 6 1/25/2014 9:00 PM
Verify starting generators where applicable.
Verify correct indicating light operation.
Verify equipment alarms
Safety Switches
Annual:
Inspect, operate, adjust, and lubricate mechanical linkages. Replace components as
required.
Verify operation of mechanical interlocks.
Inspect and dress current carrying contacts in accordance with manufacturers
recommendations.
Test safety switches Perform insulation resistance test on each phase-to-phase and
phase-to-ground using a megohmmeter of each critical load switch.
Perform contact resistance test on each critical load switch.
Secondary Distribution Feeders
Annual:
Perform cable inspection
Every 3 years:
Perform cable insulation test
Every 5 years:
Perform busway insulation test

PHONE: (678) 546-6780 FAX: (678) 546-6782
Technical Support
tech@tvss.net
Stedi-Power, I nc.
5044 B U Bowman Drive,
Suite 102
Buford GA 30518
General Inquiries
help@tvss.net



Comprehensive Electrical SystemMaintenance Checklists http://www.tvss.net/pm/el-chk.htm
5 of 6 1/25/2014 9:00 PM
Stedi-Power, I nc
5044 B U Bowman Drive #102
Buford, Georgia 30518
PHONE: (678) 546-6780
Last Updated: 07 J un 2004
1997-2004 Stedi-Power, I nc.
All trademarks are the property of their respective owners
All other rights reserved.
Comprehensive Electrical SystemMaintenance Checklists http://www.tvss.net/pm/el-chk.htm
6 of 6 1/25/2014 9:00 PM

Potrebbero piacerti anche