The file has three sheets

1 Info Information of how to use the file


2 Main sheet Data entry and output sheet - yellow fields input fields
3 cal This sheet takes input from Main sheet, calculates and transfer back output to Main sheet
Calculates
Various losses
Total makeup water quantity
Side stream filter capacity
Dimension of CT Basin
DBS
This sheet takes input from Main sheet, calculates and transfer back output to Main sheet
PROCESS DATA
Circulation Flow 500 M3/hr
Suply Temperature 33 C
Return Temperature 43 C
Wet Bulb Temperature 27.8 C
Approach 5.2 C
Range 10 C
Cycles of Conc. 4
1 Evaporation Loss 8 M3/hr
2 Blow Down Loss 3 M3/hr
3 Drift Loss 1 M3/hr
4 Back Wash Loss 10 M3/hr
5 Total Make up 22 M3/hr
6 Side Stream Capacity 15 M3/hr
OUTPUT
INPUT
DATA FROM CT VENDOR
CT footprint
Length 8 mt
Width 4 mt
Sump level to pump centre level 600 mm To avoid sediments ingress in pump
Pump centre level to min level 200 mm
MinL to NL 1312.5 mm
Normal level to max level (over flow level) 300 mm
Free board level to max level 300 mm
ELEVATION
300 mm MaxL
300 mm NL
1313 mm MinL
200 mm Pump CL
600 mm Sump
2713 mm Total Depth
OUTPUT
INPUT
To avoid sediments ingress in pump

By process requirement Circulation Flow 500

By process requirement Suply Temperature 33
By process requirement Return Temperature 43
As per prevailing atm condition Wet Bulb Temperature 27.8
Approach 5.2
Range 10
As per CW treatment COC 4


CT Makeup Reuirement
1 Evaporation Loss 0.00153 * Range * Circulation
Q 500
Range 10
Evaporation loss 7.65
Round Off 8
2 Blow Down Loss Evap Loss / [ COC - 1]
Eavporation loss 8
COC 4
Blow Down Loss 2.7
Round Off 3
3 Drift Loss 0.2% of Circulation rate
Q 500
Drift Loss 1
Round Off 1
4 Side Stream Filter
Side Stream Filter capacity 3% of Circulation rate
Q 500
Side Stream Capacity 15
Round Off 15
Back Wash Loss 2% of Circulation rate
Q 500
Side Stream Capacity 10
Round Off 10
CW MAKE UP FLOW = Evap loss + B/D loss + Drift Loss + Back wash
CW Make up 22
COOLING TOWER & ITS SYSTEM
CT BASIN
M3/hr CT Capacity 110% of circulating flow
Q 500 M3/hr
C 110% 550 M3/hr
C
C Hold up volume above min level in CT Basin
C 5 minutes of circulating water
C
Q 500 M3/hr
5 min of vol 41.7 M3/hr
Round Off 42 M3/hr
42 M3 of volume to be of min level to normal level
CT Foot print
L 8 mt
M3/hr B 4 mt
C Area 32 m2
M3/hr
M3/hr Ht of water storage 1.3125 mt
(min to normal)
WATER LEVEL IN SUMP
M3/hr
Sump to pump centre line 600 mm
M3/hr
M3/hr Pump centre level to min level 200 mm
Min Level to Nor level 1312.5 mm
M3/hr Normal level to max level (over flow level) 300
M3/hr
M3/hr Free board level to max level 300
M3/hr
M3/hr
M3/hr
M3/hr
M3/hr
M3/hr
M3/hr
COOLING TOWER & ITS SYSTEM