Saipem BU Drilling

The complete Oil & Gas Service Provider


November 2013
Saipem BU Drilling November 2013


2
Contents
BU Drilling

Saipem Drilling Strategies
Highlights: Major Offshore and Onshore Drilling Projects
Capabilities
Certifications
Safety records
Leverage of local content
Drilling assets



Saipem BU Drilling November 2013


3
Enhance investments in fleet rejuvenation Offshore
Saipem Drilling Strategy
Onshore
Saipem 12000 delivered April 2010
Scarabeo 9 delivered August 2011 Scarabeo 8 delivered April 2012
Perro Negro 8 delivered Sept. 2010
Deepwater
SSDUs
Jack Ups
5824 Heliportable Rig
Ecuador
5804 HH 300 Cile


5946/ 5947 3000 HP
Winterized Rigs Kazakhstan
- Deepwater focused
- HSE oriented
- New Technologies
- Increased Efficiency
Deepwater
DrillShip

- Fast Moving Rig
- HSE oriented
- New Technologies
Fleet rejuvenation to increase quality and competitiveness:
5962 2000 HP
Saudi Arabia
5964 1500 HP
Saudi Arabia
Perro Negro 7
Delivered April 2008
Saipem BU Drilling November 2013


4
SAIPEM 12000
Ultra Deep Water Drillship
Total Angola
5 years project in Angola
5946- 5947
Caspian Sea
Kashagan Experimental Project
6 years
Scarabeo 5
Ultra Deep Water Semisub
Statoil North Sea
3 years project
Norway
Scarabeo 9 Ultra Deep Water
VI Generation Semisub
Repsol/Eni 5 years project
Central America/Worldwide
Scarabeo 8 Ultra Deep Water
VI Generation Semisub
Eni Norge 5 years project
Norway
Highlights: Major Offshore and Onshore Drilling Projects
Scarabeo 7
Deepwater Semisub
Eni 6 years project
Angola/Far East
Perro Negro 7
W.D.: 375 ft
3 years project
Saudi Arabia
Saipem BU Drilling November 2013


5
Capabilities
Saipem
Capabilities
Harsh
environment
Frontiers
areas
Challenging
projects
Difficult
conditions
Saipem BU Drilling November 2013


6
Certifications
Saipem BU Drilling November 2013


7
Safety records
Saipem Leadership in Health and Safety (LIHS)
Saipem Leadership in Health & Safety has been
strategically developed from a corporate level to
disseminate through the entire organization.
The program was initiated from the very top, with
Saipems CEO and Managing Director playing the
role of
catalysts for the project, as they personally
recognized the need for a cultural change.

This is done in three distinct phases.

Phase 1 Delivery of Leadership in Health &
Safety workshop to all management levels.
Phase 2 - Senior Managers cascading the key
Leadership in Health & Safety messages to the
entire workforce through high influential events.
Phase 3 - Delivery of the Five Stars Intervention
training tool throughout the organization.


Saipem BU Drilling November 2013


8
Around 92% of operating personnel in the Onshore Drilling comes from the countries of
operations. Strong development of local content
Leverage of local content
Saipem Onshore drilling operating personnel by nationality
Nr of Saipem Personnel (Saipem consolidation criteria): 44,297
Nr of Nationalities: 127
< 4,0%
each
Saipem BU Drilling November 2013


9

Ultra Deep Water Drillship Units
DP ultra deepwater drillship
Built by Samsung Heavy
Ind. - Koje shipyard,
Korea,
Delivered in 2000
Suitable to operate in
US GOM, South Atlantic,
West Africa and UK
sector of North Sea
(during summer).
Operational Mode
Drilling activities (exploration-appraisal-development)
Early production and extensive well production/testing
Crude oil storage and offloading
Well completion activities
water depth 10.000 ft
drill depth 30.000 ft
drawworks 2 X 4.200 HP
variable deck load 20.000 tonnes
DP DP class 3
mud pumps 4 Wirth TPK 2200 7500 PSI
top drive
2xHydralift HPS 750
2E
Rated capacity:750 t
BOP Shaffer
18
3
/
4
- 15.000
guidelines
risers ABB VETCO GRAY
Accommodation 172 people
Technical specifications
DP ultra deepwater drillship
Built by Samsung
Heavy Ind. - Koje
shipyard - Korea
Delivered in 2010
Offshore Angola
water depth 12.000 ft
drill depth 35.000 ft
drawworks 2 X 5.750 HP
variable deck load 20.000 tonnes
DP DP class 3
mud pumps
4 NOV 14 P-220
triplex
7500 PSI
top drive 2xNOV HPS 1000 Rated capacity: 1000 t
BOP Shaffer
18
3
/
4
- 15.000
guidelines
risers NOV
Accommodation 200 people
Technical specifications
Operational Mode
Drilling activities (exploration-appraisal-development)
Well completion activities

Saipem 12000
Saipem 10000
Saipem BU Drilling November 2013


10
DP ultra deepwater 6th gen.
semisub.
Design: Frigstad
Delivered August 2011
Catamaran type with two
pontoons and four
stabilizing columns
supporting the upper hull,
dual ram derrick rig


water depth 12.000 ft
drill depth 35.000 ft
drawwork RAM RIG
variable deck load
drill
7.900 tonnes
DP
DP class 3
mud pumps 4 Bomco 2200 2200 HP
top drive
2 Aker Maritime
Hydraulics
DDM
1000 HYRR
BOP Shaffer 18

-
- 15.000
DERRICK
Aker Maritime
hydraulic dual ram rig
118 ft high
accommodation 200
Technical specifications
Scarabeo 9
DP ultra deepwater 6th gen.
semisub.
Bare deck design: Moss
Maritime
Delivered April 2012
Catamaran type with two
pontoons and six
stabilizing columns
supporting the upper
hull; dual derrick rig

water depth 10.000 ft
drill depth 35.000 ft
main drawwork 4000 HP
aux drawwork 4600 HP
DP DP class 3
mud pumps
4 NOV 14P-220
Triplex mud pumps
2200 HP
top drive
NOV HPS-03 1000
NOV HPS-04 500
Rated capacity:1000 t
Rated capacity:500 t
BOP CAMERON TL 18

-
- 15.000
DERRICK WEI double derrick 170 ft high
accommodation 140
Technical specifications
Scarabeo 8
Ultra Deep Water Semisubmersible Units
Saipem BU Drilling November 2013


11
Anchored Semisubmersible Units
Ultra deepwater 5th gen. semisub.
Converted by Tuzla
shipyard, Turkey completed
in 1999
Highly versatile drilling unit,
compliant with the most
severe environmental
regulations (zero pollution
and zero discharge rig).

Operational Mode
Exploration and production drilling

water depth 5.000 ft
drill depth 25.000 ft
drawwork 3.000 HP
variable deck load drill 3.500 tonnes
Mooring System
Automatic
thruster assisted
8 leg moored
mud pumps
3 Wirth TPK
2000 triplex
pumps
1 emsco F 1000
2000 HP

1000 HP
top drive
Hydralift HPS
650E
Rated capacity 650 tons (m)
driven by GE 752
BOP Shaffer
18
3
/
4
- 15.000
Guidelines/guidelineless with
Vetco HD-H4 Bop conn.
accommodation 150 people
Technical specifications
Scarabeo 7
Deepwater 3rd gen. semisub.
Built by Rauma Repola -
Pori shipyard, Finland
completed in 1984
Six column stabilized
semisubmersible.
In keeping with the highest
environmental regulation,
Scarabeo 6 is a zero
pollution and zero
discharge rig; HP HT fitted.
Scarabeo 6
water depth 2.500* ft
drill depth 25.000 ft
drawwork 3.000 HP
variable deck load drill 3.200 tonnes
Mooring system
8x76 mm (3)
DNV 4 chains,
2x1,554 m
mud pumps
3 Oilwell A- 1,700
PT Maritime
hydraulics
1700 HP
top drive DDM-650 rated capacity 650 tons
BOP Cameron
18
3
/
4
- 15.000 psi H2S
service
accommodation 110 people

Operational Mode
Exploration and production drilling
Note: to be upgraded for 1.100 meters water depth
Technical specifications
Saipem BU Drilling November 2013


12
Deep Water Semisubmersible Unit
DP Ultra deepwater 4th gen. semisub
Built by Fincantieri - genoa shipyard,
Italy completed in 1990
Column stabilized semisubmersible rig;
dynamic assisted mooring and class 3;
fully compliant with Norwegian
regulations.
Operational Mode
Exploration and production drilling in harsh environment

drill depth 25.000 ft
drawwork 3000 HP
variable deck load 4.500 tonnes
DP
Dynam. Assist
moor.
DP class 3
up to 3.000 ft

Up to 6.200 ft
mud pumps 3 emsco FB-1600 1600 HP
top drive Varco TDS-4
650 API T, electric with PH
85 pipe handler
BOP Cameron
18
3
/
4
- 15.000
Guideline/guidelineless with
Vetco HD-H4 Bop
accommodation 100 people
In accordance with
Norwegian regolations

Technical specifications
Scarabeo 5
Saipem BU Drilling November 2013


13
Mid water Semisubmersible Units

column stabilized,
triangular, built by
Blohm Voss shipyards
in Hamburg, Germany;
completed in 1975
water depth 1.500 ft
drill depth 25.000 ft
drawwork 3.000 HP
variable deck load 2.700 t
top drive Maritime DDM 500 500 t
BOP Vetco H4
18
3
/
4
- 10,000psi bottom
connector
accommodation 110 people
Technical specifications
water depth 1.500 ft
drill depth 25.000 ft
drawwork 3.000 HP
variable deck load 2.700 t
top drive Varco TDS 3 500 t
BOP Vetco H4
18
3
/
4
- 10,000psi bottom
connector
accommodation 110 people
Technical specifications

column stabilized,
triangular, built by
Blohm Voss shipyards
in Hamburg, Germany;
completed in 1975
Scarabeo 4 Scarabeo 3
Saipem BU Drilling November 2013


14
Last generation Jack Up Units
Cantilever 350 ft w.d. independent legs
Design: GUSTO, Class CJ46-X100-D.
Moss Maritime
Built at Labroy Shipyard - Indonesia
Delivered in September 2010
Self elevating, triangular, mobile
drilling unit


water depth 350 ft
drill depth 30.000 ft
variable deck load 3.500 tonnes
cantilever extension 70 ft
cantilever ext. long. 20/20 ft
BOP 15.000 PSI
drawwork 3.000 HP
no. 3 mud pumps 2.200 HP/each
HP mud system 7.500 PSI

Technical specifications
(NOV Drilling Package)

Cantilever 375 ft w.d. independent legs
Design: Baker Marine, Pacific Class 375
Built by Jurong Shipyard, Singapore
Delivered in April 2008
Self elevating, triangular, mobile
drilling unit
water depth 375 ft
drill depth 30.000 ft
variable deck load 3.750 tonnes
cantilever extension 70 ft
cantilever ext. long. 15/15 ft
BOP 15.000 PSI
drawwork 3.000 HP
no. 3 mud pumps 2.200 HP/each
HP mud system 7.500 PSI

Perro Negro 8 Perro Negro 7
Cantilever 350 ft w.d. independent legs
Design: GUSTO, Class CJ46-X100_D.
Moss Maritime
Built at Labroy Shipyard - Indonesia
Delivered in September 2009
Self elevating, triangular, mobile
drilling unit
Perro Negro 6
water depth 350 ft
drill depth 30.000 ft
variable deck load 3.500 tonnes
cantilever extension 70 ft
cantilever ext. long. 20/20 ft
BOP 15.000 PSI
drawwork 3.000 HP
no. 3 mud pumps 2.200 HP/each
HP mud system 7.500 PSI

Technical specifications
(NOV Drilling Package)

Technical specifications
(NOV Drilling Package)

Saipem BU Drilling November 2013


15
Conventional Drilling and Workover Jack Up Units
Perro Negro 4
water depth 150 ft
cantilever
capacity
35 ft
longitudinal
skid
7.5/7.5 ft
activity workover
Perro Negro 5
water depth 245 ft
cantilever
capacity
40 ft
longitudinal
skid
12/12 ft
activity drilling
Perro Negro 3
water depth 300 ft
cantilever
capacity
40 ft
longitudinal
skid
10/10 ft
activity drilling
Perro Negro 2
water depth 300 ft
cantilever
capacity
45 ft
longitudinal
skid
12/12 ft
activity drilling
Saipem BU Drilling November 2013


16
Assisted Drilling Unit
Tender Assisted Self Erecting Rig
Design Saipem
Delivered June 2008
Tender Assisted Self Erecting Rig
Barge Crane (100 ton) used to install
the drilling package plus Service
Crane (30 ton)


Max transverse skidding distance 10 ft
Max longitudinal skidding distance 40 ft
Max stroke of longitudinal skidding 3 ft
Max stroke of transverse skidding distance 3 ft
Drawwork 1.500 HP
Top Drive 400 ton
Technical specifications
TAD
Saipem BU Drilling November 2013


17
Onshore Rig Tipology: Super Heavy and Heavy
Technical specifications
drawwork 3.000 Hp
Mud pumps
3x1.600
7500
Hp
PSI
rotary table 37 1/2
mast
2.000.000 lbs
with 16 lines
travelling block 750 t
set back capacity 1.500.000 lbs
power 5.750 hp
top drive installed
BOP 10.000-15.000 PSI
Technical specifications
drawwork 2.000 Hp
Mud pumps 3x1.600 Hp
rotary table 27 1/2
mast
1.000.000 lbs
with 12 lines
travelling block 500 t
set back capacity 600.000 lbs
power 5.124 hp
top drive installed
BOP 5.000-10.000 PSI
Super heavy
Heavy
Saipem BU Drilling November 2013


18
Onshore Rig Tipology: Medium and Light
drawwork 1.500 Hp
mud pumps 2x1.000+1x600 Hp
rotary table 20 1/2
mast
Telescopic
Hydr. For r.3 DP
trip velocity 1
m
/
s

power 2.145 Hp
top drive
Hydraulic,
Torque 26
BOP 5.000-10.000 PSI
drawwork 1.000 Hp or lighter
Mud pumps 2x1.000 Hp
rotary table 27 1/2
mast
800.000 lbs
with 12 lines
travelling block 350 t
set back capacity 450.000 lbs
power 3.450 hp
top drive Installed
BOP 5.000-10.000 PSI
Technical specifications
Medium
Light
Technical specifications
Saipem BU Drilling November 2013


19
Onshore Rig Tipology Light Hydraulic
Technical specifications

max hook capacity 182 t
mud pumps 2x1.000 + 1x600 Hp
rotary table 24 1/2
mast
Telescopic
Hydr. For r.3 DP
trip velocity 1
m
/
s

power 3.754 Hp
top drive
Hydraulic,
Torque 26000 lb/ft
BOP 5.000 psi

Potrebbero piacerti anche