Sei sulla pagina 1di 6

RESUME

EZE FABIAN CHINYERE.


4 Faith Close off Chief Amadi Road off Circular Road,
Mgbesilaru New layout Portharcourt Rivers State.
Chifab_eze@yahoo.com
08033385971; 08099897851
Date of Birth: 12
th
May 1966
Nationality: Nigerian
Marital Status: Married

Summary
Has good experience in Building Electrical services project execution, Quality control/Quality assurance
inspection and Facility management. Have good knowledge of SPDC standard constructions specifications,
design and Engineering practice (DEP), PTW systems, Electrical safety rules and standards in Oil and Gas
Industry.

Major Achievements:
-QA/QC inspection of Completion of SPDC main office blocks 4, Portharcourt Industrial area which
involves all the electrical installations(normal and UPS power),pre and post commissioning testing, fire
alarm systems lightning protection
-Rehabilitation of twenty five blocks of houses at shell residence area Port Harcourt
-Revamping of Obigbo Gas plant
-Safe delivery of various electrical projects on schedule and within budget.etc.

Education:
Bachelor Degree in Electrical Engineering (B.ENG). University of Nigeria, Nsukka (1989)
West African School Certificate (WASC). St Theresas College, Nsukka. (1983)
First School Leaving Certificate (FSLC). Community Primary School Nru Nsukka. (1978)

Training/Certificates:
Holder of General inspection-Electrical/Instrumentation -TWI certificate of Competency Grade A
Holder of Helicopter Underwater Escape Training With survival at Sea (HUET)
Holder of Permit to work system certification -
Holder of Electrical Wiring License Federal Ministry of Mines and Power
Holder of HSE certification level 3.
Computer Literate

PROFESSIONAL AFFILIATION
COREN member- R14, 250)
Member, Nigerian Society of Engineers (NSE)-12699



1


EMPLOYEMENT HISTORY:

1. Provast Ltd.
Position-Team Lead Electrical projects (SPDC east field logistics bases)-March
2013- Date.
Responsibilities.
Reviews electrical work scope to ensure that it meets relevant SPDC standard specifications.
Liaises with discipline electrical head representative to secure management of change approval
for new and upgrade electrical projects in the FLB.
Mentors newly employed engineers to develop technical competencies in relevant SPDC
requirements (Electrical/HSE).
Prepares weekly and monthly work progress report
Carries out premob inspection with HSE adviser on contractor mobilizing to site.
Evaluates both pre and post commissioning tests results on building electrical services
installations
Assigns projects to other facility coordinators
Coordinates interface between the contractors and SPDC.
ETC.
Position: Facility coordinator (GBARAN UBIE INTEGRATED OIL AND GAS
PROJECT) FLB-May 2011 to March 2013.
Responsibilities
Management of SPDC field logistics bases
Coordinates various contractors that maintain the FLB.
Review and implement method statements, ITP and JHA for equipment installation and repair
Selects electrical materials suitable for Hazardous and non hazardous area classifications.
Prepares periodic preventive maintenance schedules (PPM) for the various plants in the FLB.
Monitors equipments in the FLB to ensure that both preventive and reactive maintenance is done.
Attends interface meetings between my company and Assets owner.
Writes technical reports on both the work progress and condition of the facility
Prepares scope of work for the various projects done in the Field logistics base
2. Shell Petroleum Dev. Co. Ltd,
(Contract staff)
Position: Project Engineer/ Company Site Representative.
Date: November 2006 to March 2011
Responsibilities:
Prepares scope of work.
Carries out HSE Pre-Mobilization of contractor together with HSE adviser
Review and implement method statements, ITP and JHA for the electrical installation works.
Inspects electrical materials brought to site before use (accepts or rejects depending on the quality)
Supervised installation of Conduit Wiring, Fittings, lightening Arresters, Earth Electrodes, air
Conditioners and Water Heater.
Enforces QA/QC and HSE program
Liaised with IT for Telephone and CATV installation in new houses.
Assembled and submitted accurate weekly reports

2

Revises and evaluates works progress to project plan,
Mentors new staff to improve on technical competence and HSE knowledge.
Evaluates pre-commissioning and commissioning test result to ensure that it meets SPDC standard
construction specifications requirements (S17) and DEP.
Developed schedules for Periodic integrity checks on the buildings electrical and earthings systems.
Monitors,excutes and close out jobs/requests using maintenance soft ware tool-planon

Projects Handled
Rehabilitation twenty blocks of houses at SHELL residential area Port Harcourt.
General property maintenance of SPDC Residential area.

3. Petronella Nigeria Limited Port Harcourt
Position: Senior QA/QC Engineer
Date: Feb. 2004 to Nov.6, 2006

Responsibilities
Project monitoring, testing and documentations
Identifies quality problems and suggests possible solutions coordinating with team lead
Enforced standards in site work through issuance of non conformance and request for corrective
action report.
Enforced safety rules and regulations at site and carried out periodic safety audit.
Coordinate & oversee QA/QC Electrical Inspectors and assisted them to achieve standard works
Fully conversant and competent in relevant DEPS/ Standard construction specifications SCS17.
Review and implement method statement, ITP and JHA for equipment installation and repair
Prepared weekly work progress report and maintained QA/QC inspection files
Witnessed. Accepts / rejects pre- commissioning and commissioning test results
Reviews AS BUILT drawing.

SPDC Project Handled:
Rural Electrification of Akipelai community in Bayelsa state- involves running of 33kv line,
installation of 500KVA,Feeder pillar, Low voltage lines
Rural electrification of Owaza community.
Extension Electricity to Akenfa community in Yenogua.

4. Employer: Adadrill Nigeria Limited Port Harcourt

Position: Senior QA/QC Engineer
Date: October1998 to January 2004
Responsibilities:

Supervised, Mentored and coached other QC Engineers inspecting SPDC Electrical Projects to achieve
standard works and improve both their technical and safety competencies. Collated QC
Engineers daily reports, prepared weekly and monthly work progress reports. Maintained Inspection File.
SPDC Projects Handled:
Installation of 300KVA 33/0.415KV Transformer at SPDC microwave near Eleme Junction
3
Revamping of Obigbo gas plan
Rehabilitation of SPDC block1 and 2.
Replacement of obsolete low voltage panels in both I.A and R.A substations.
Construction of New substation 8 at Shell residential
Upgrade of UPS 1and 3 feeding data centre
Installation of 500KVA 33/0.415KV Transformer and feeder pillar at SPDC Akasa guest house
Installation of Generator set and sumo pump at Isiokpo community
Rehabilitation of Electrical power supply to SPDC transit lodge.
Installation of Generator and lighting system at Ogbodo Isiokpo Water station.
Electrical upgrade of SPDC main office blocks 1 and 2.
Installation of 300KVA transformer at 34 Old Aba Road.
Operations and Maintenance of 2 Nos 10MVA shell central power plant.
Review of As-built Drawing.
Testing/Commissioning etc.

5. Globe Inspection Nigeria Limited Port Harcourt (Secondment to SPDC)
Position QA/QC Engineer
Date: August 1995 to October1998

Responsibilities:
Reviewed work procedures/Method statements and Installation and test plan.
Supervised site installation/construction against client`s technical specifications
Managed community affairs and HSE at site
Supervised pre commissioning and commissioning activities
Prepares daily work progress report.
Witness pre- commissioning and commissioning testing.

Projects Handled

Upgrade of Agbada gas plant
Rehabilitation of Ekwulema 1 flow station
Upgrade of 11KV RMU at SPDC Industrial Area
Completion of Block 4 and Medical OPD in Shell I.A Portharcourt.

6. Employer: Adijux Nigeria Limited PH.
Position: Project Engineer -SPDC Projects
Date: July 1991- August1995.
Project Handled








4

(a) Installation of 500KVA 33KV/415V Transformer and hook up to AMF panel at substation 3/7
Shell Industrial Area.

Duties:
Scoping
Tendering
Material Sourcing/Personnel Recruitment.
Supervision of the work :
Premob exercise/mobilization
Casting of Transformer plinth
Mounting of Transformer into position
Excavation and Laying of 2nos 4Cx185mm2 Armored cable and terminations at Transformer and
AMF panel.
Laying and termination of 33kv XLPE cable.
Installation of Earth Electrodes.
Updating of HSE Manuals and Policies.
Coordinating for safety
Functional Testing of Installation
As-built Drawing
Invoicing etc.

(b)Construction of NUN River field Logistic Base Electrical Installation.
Duties:
Scoping & Tendering
Material & Personnel Sourcing
Premob & Mobilization
Coordinating for Safety etc
Conduit works installations
Wiring of the Buildings and Fixing of Fittings
Excavation and Laying of Cables.
Installation of Cable Trays
Installation of Fire Alarm Systems.
Installation of LV Switch Panel and Hook up 500KVA generator..
Installation of Lightening Arresters and Sinking of Earth Electrodes
Installation of Perimeter Lightening & Flood Lights Via Photocell.
Installation of 5 HP Sumo Pump and Float Switch.
General Earthing of the whole installations.
Pre commissioning and commissioning testing of the building electrical
Review of As-built Drawing.





5




(c)Upgrade of LV panels of NUN River and Bonny flow stations
Duties:
Management of Personnel and Materials
Selection of Material for Hazardous area.
Installation HOLEC panel
Testing and commissioning
Coordinates Safety.
Invoicing

7. Employer: Lever Brothers Nig. PLC Aba.
Position: Assistant Electrical/Instrument Engineer (NYSC).1990-March 1991.
Operations and maintenance of Electrical and Instrument system of Aba factory

Referees:
Available on Request
6

Potrebbero piacerti anche