Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ISSUE NO. 01
DATE OF ISSUE:
PAGE NO. 1 OF 2
REVISION STATUS: 00
DOC NO.
B.
2.
3.
4.
Covermeter.
5.
6.
7.
8.
Phenolphthalein solution.
9.
10.
11.
12.
Check for presence of all the accessories present in the carry case of core
cutting equipment.
2.
Check for Covermeter for working and presence of all accessories in carry
case.
C.
3.
4.
5.
2.
3.
Drilling of holes shall be carried out for fixing core cutting equipment on the
member.
ISSUE NO. 01
DATE OF ISSUE:
PAGE NO. 2 OF 2
DOC NO.
4.
5.
6.
Base plate of core cutting equipment to be fixed on the concrete surface with
the help of stud anchors.
7.
8.
9.
10.
Drilling to be started to the required depth i.e., upto cover concrete provided to
the r.c. member.
11.
12.
13.
14.
If the colour change is only in part of the length, depth of carbonation from the
external face of concrete to be measured using steel measuring tape and the
result to be entered in the field test format.
15.
D.
AT LABORATORY
1.
2.
3.
PREPARED BY
APPROVED BY
********