9.0 EARTHWORKS
PILECAP
(a) 0 to 3 depth 320 Cu.m - 17.25 - 17.25 5,520.00 - - 6.50 6.50 2,080.00 3,440.00
9.1.5 Granular backfill between wingwalls. 10 Cu.m - 45.00 - 45.00 450.00 - 43.00 - 43.00 430.00 20.00
Or As An Alternative
RATES TO INCLUDE
iv) Standing time for all equipment and labour due to all
foregoing circumtances
9.3.2 Ditto 1st. extension in length exceeding 12.0m 864 Lin.m - 74.00 - 74.00 63,936.00 - 71.00 - 71.00 61,344.00 2,592.00
9.3.3 Ditto 2nd. extension in length exceeding 12.0m 864 Lin.m - 74.00 - 74.00 63,936.00 - 71.00 - 71.00 61,344.00 2,592.00
9.3.4 Ditto 3rd. extension in length exceeding 6.0m 432 Lin.m - 80.00 - 80.00 34,560.00 - 78.00 - 78.00 33,696.00 864.00
9.3.5 Handle, transport, pitch and drive vertical pile 3,024 Lin.m - 34.50 - 34.50 104,328.00 - 30.00 - 30.00 90,720.00 13,608.00
9.3.6 Fillet weld to vertical pile. 216 Nos - 50.00 - 50.00 10,800.00 - 40.00 - 40.00 8,640.00 2,160.00
9.3.8 Ditto 1st. extension in length exceeding 12.0m 864 Lin.m - 74.00 - 74.00 63,936.00 - 71.00 - 71.00 61,344.00 2,592.00
9.3.9 Ditto 2nd. extension in length exc. 12.0m 864 Lin.m - 74.00 - 74.00 63,936.00 - 71.00 - 71.00 61,344.00 2,592.00
9.3.10 Ditto 3rd. extension in length exc. 6.0m 432 Lin.m - 80.00 - 80.00 34,560.00 - 78.00 - 78.00 33,696.00 864.00
9.3.11 Handle, transport, pitch and drive raked pile 3,024 Lin.m - 34.50 - 34.50 104,328.00 - 30.00 - 30.00 90,720.00 13,608.00
9.3.12 Fillet weld to raked pile. 216 Nos. - 50.00 - 50.00 10,800.00 - 40.00 - 40.00 8,640.00 2,160.00
9.5.1 Allow for test piles as per clause and/or as directed by the S.O.
directed by the S.O. inclusive of supply,handle,
transport,pitch,drive,load test,remove all debris,
etc.
9.7.2 Concrete Grade 40/20 for piers 74 cu.m - 230.00 - 230.00 17,020.00 - 220.00 - 220.00 16,280.00 740.00
9.7.3 Concrete Grade 40/20 for abutments 96 cu.m - 230.00 - 230.00 22,080.00 - 220.00 - 220.00 21,120.00 960.00
9.7.4 Concrete Grade 40/20 for pile caps. 160 cu.m - 235.75 - 235.75 37,720.00 - 220.00 - 220.00 35,200.00 2,520.00
9.8.2 25mm diameter high tensile steel reinforcement bars 27,460 kg 0.40 1.50 - 1.90 52,174.00 0.40 1.40 - 1.80 49,428.00 2,746.00
9.8.3 20mm diameter high tensile steel reinforcement 16,478 kg 0.40 1.50 - 1.90 31,308.20 0.40 1.40 - 1.80 29,660.40 1,647.80
9.8.4 16mm diameter high tensile steel reinforcement bars 16,826 kg 0.40 1.50 - 1.90 31,969.40 0.40 1.40 - 1.80 30,286.80 1,682.60
9.8.5 12mm diameter high tensile steel reinforcement bars 20,316 kg 0.40 1.50 - 1.90 38,600.40 0.40 1.40 - 1.80 36,568.80 2,031.60
9.8.6 12mm diameter mild steel reinforcement bars 5,825 kg 0.40 1.50 - 1.90 11,067.50 0.40 1.40 - 1.80 10,485.00 582.50
9.8.7 10mm diameter mild steel reinforcement bars 875 kg 0.40 1.50 - 1.90 1,662.50 0.40 1.40 - 1.80 1,575.00 87.50
9.90 FORMWORK
9.9.1 To vertical of abutment and wingwalls 430 sq.m - 35.00 - 35.00 15,050.00 - 34.00 - 34.00 14,620.00 430.00
9.9.2 To vertical sides of diaphragms 223 sq.m - 35.00 - 35.00 7,805.00 - 34.00 - 34.00 7,582.00 223.00
9.9.3 To soffit of deck slab 252 sq.m - 35.00 - 35.00 8,820.00 - 34.00 - 34.00 8,568.00 252.00
9.9.4 To vertical sides of parapet 112 sq.m - 35.00 - 35.00 3,920.00 - 34.00 - 34.00 3,808.00 112.00
9.9.5 To vertical sides of pilecaps 359 sq.m - 35.00 - 35.00 12,565.00 - 34.00 - 34.00 12,206.00 359.00
9.10 SUNDRIES
9.10.1 Supply, fix, paint, testing as specified Galvanised iron post and
railing including holding down bolts embedded in concrete
parapet all as shown in drawings. (Measurement is based on per
meter length on each side of the bridge) railing including holding
down bolts embedded in concrete parapet all as shown in
drawings.(Measurement is based on per meter length on each
side of the bridge ) 100 Lin.m - 227.70 - 227.70 22,770.00 - 198.00 - 198.00 19,800.00 2,970.00
9.10.3 Supply and fix diameter 30mm x 645mm long galvanised dowels
conform to ms 146 and MS 443 in abutment and casting rubber
dowel caps as specified in the drawings. galvanised dowels
conform to ms 146 and ms 443 in abutment and casting rubber
dowel caps as specified in the drawings. 40 No - 43.70 - 43.70 1,748.00 - 32.00 - 32.00 1,280.00 468.00
9.10.7 Supply and install brass plagues for bridge. 1 No. - 1,035.00 - 1,035.00 1,035.00 - 650.00 - 650.00 650.00 385.00
9.12.6 Drive single vertical r.c. pile to set, including all 6,552 lin.m - 10.00 - 10.00 65,520.00 - 6.00 - 6.00 39,312.00 26,208.00
handling,positioning extension,etc.
9.12.6 Cut pile to the required level for gabion base. 364 no. - 18.40 - 18.40 6,697.60 - 8.00 - 8.00 2,912.00 3,785.60
9.13.1 Supply and lay 200mm well compacted hardcore under approach 15 cu.m 4.30 44.00 - 48.30 724.50 - 48.00 - 48.00 720.00 4.50