Sei sulla pagina 1di 23

CONTENTS

Chapter Particulars Page


GENERAL NOTE 1

BASIC RATES
I LABOUR RATES 2
II SUPPLY OF MATERIAL 5
III CARRIAGE OF MATERIAL 19
IV HIRE CHARGES OF PLANTS AND MACHINERIES
30

MAIN WORKS
V EARTHWORK IN EXCAVATION/EMBANKMENT
AND PROTECTION WORK
33
VI MORTAR 72
VII CONCRETE AND CANAL LINING 79
VIII MASONRY 102
IX PLASTERING AND POINTING 125
X CENTERING, SHUTTERING AND RCC 141
XI FOUNDATION AND SURFACE TREATMENT 144












DATA SHEET
1 Hire charges of Truck 1200.00 Per shift of 8 hours
2 Cost of Diesel 39.88 Per litre
3 Wages


Mate 145.00 P day


Beldar 135.00 P day


Stone Braker Grade I 155.00 P day


Stone Braker Grade II 145.00 P day


Excavators 135 P day


Chawalia 175.00 P day


Stone dresser Grade I 275.00 P day


Stone dresser Grade II 250.00 P day


Mistri 205.00 P day


Driller/Grout pump drive 145.00 P day


Helper 145.00 P day


Fitter 205.00 P day


Blaster 205.00 P day


Mason Grade I 250.00 P day


Mason Grade II 205.00 P day


Royalties


Aggregate, stone 0.00 P. Cum


Earth 0.00 P. Cum





Material


Amonium nitrate 30.00 Kg


Gelatin 70.00 Kg


Fuse Coil 5.00 RM


Ordinary detonator 10.00 Each


Drill Rod 800 mm long 3000.00 Each


Electric Detonator 25.00 Each


Sealing Compound 140.00 Kg


Air hose double braided 110.00 Mt


Claw coupling 45.00 Each


Hose clamps 40.00 Each


Valve 350.00 Each


Suction pipe 3" dia 230.00 Mt


Foot Valve 3" 500.00 Each


GI pipe 3" dia 400.00 Mt.


Extention Rod 1" hex 800 mm 2700.00 Each


Extention Rod 1" hex 1600 mm 5400.00 Each


Extention Rod 1" hex 2400 mm 8100.00 Each


Extention Rod 1" hex 3200 mm 13000.00 Each


Coupling sleeves1" 1900.00 Each


Shank Rod 2500.00 Each


Bit 48 mm dia 4350.00 Each


Water Body 1000.00 Each


Water body washer 20.00 Each


Lubricating oil 110.00 lit


Grinding wheel 1250.00 Each


Bit adopter 1000.00 Each


Shank adopter 1000.00 Each


T.C.T. Cross bit 4350.00 Each


GI/MS pipe 65 mm dia 150.00 Mt


Grout pump including water hose,
air hose, fittings, repairs etc.
300.00 Each





Cost of Crusher broken Gr


Upto 150 mm 437.50 P. Cum


Upto 80 mm 488.50 P. Cum 458.665


Upto 40 mm 528.00 P. Cum


Upto 20 mm 535.00 P. Cum





Cost of Natural Graded Ag


Upto 150 mm 435 P. Cum


Upto 80 mm 459 P. Cum


Upto 40 mm 487 P. Cum


Upto 20 mm 530.6 P. Cum






GENERAL NOTES
1 Notes have been given before each chapter wherever necessary,
which must be read thoroughly before using the B.S.R. for
incorporating appropriate provisions and specifications in estimates
and tender documents.

2 Rates are for complete finished items and inclusive of all ancillary
works necessary for the completion of work covered under
respective item as per standard specification unless otherwise
specified in the description of the item.

3 Rates of all items provided in this BSR are inclusive of all taxes,
overheads and contractor's profit and labour welfare, camping,
medical and sanitation facilities to labour, tools and plants etc.,
required to complete the work as per standard specifications.

4 In case of disputes if any, regarding interpretation of the description
of items in this Schedule of Rates, the decision of the Chief
Engineer, Water Resources Rajasthan, Jaipur shall be final and
binding.

5 OPC/PPC (Fly ash based ) Cement of grade 43N/m2 shall be used
unless otherwise specified.











CHAPTER-I

LABOUR RATES


1 The labour rates are inclusive of all allowances including weekly holidays and no extra
element will be admissible on this account.

2 The rates of skilled and unskilled labours are inclusive of necessary tools, which are
normally carried by them according to the trade practice.

3 The rates do not include contractor's profit unless otherwise specified.

4 The rate provided in item No. 13 may also be permissible for water arrangement from tube
well/open well through electric / diesel operated pump sets. If water supply arrangements
is not required for 8 hours a day than proportionate rate shall be permitted.

5 Labour rates shall be governed by minimum wages act in force.

6 These rates are for analysis and estimation purpose only.


S. No. Item Unit
Rate

(in `)

UNSKILLED
1 (a) Beldar/Women Cooli / Chowkidar /Water man / Earth- dresser Per Day 135
(b) White washer/store or laboratory attendant/floor polisher Per Day 145
(c) Dak Runner with his own cycle Per Day 155
(d) Sweeper part time
i) For 2 hours 45
ii) For 1/2 day (Four hours) 80
iii) Per Day 155

SEMI SKILLED
2 Mate Per Day 145
3 Helper for Carpenter /Black smith / Mechanic/Electrician /
Plumber / Steel fabricator /Fitter / Driller / Truck / Tractor
/Compressor/ Jack Hammer /Dumper
Per Day 145

4 (a) Security Guard with licensed gun owned by him Per Day 205
(b) Security Guard without gun Per Day 190
5 Munshi/Survey Amin/ Density Observer/ Record Keeper/Time
Keeper/ Gate Keeper/ Core Observer/ Laboratory Assistant /
Gauge Reader / Telephone Assistant

(a) Grade I (Secondary Pass) Per Day 205
(b) Grade II Per Day 155
6 Cook cum Chowkidar Per Day 155
7 Stone breaker (unsing Ghan) / Turriya
(a) Grade I Per Day 155
(b) Grade II Per Day 145
8 Chawalia Per Day 175
9 Gharat with Gharat man and bullock/buffalo Per Day 300
10 Billock/Camel/Buffalo pair with bullock man and plough para /
cart/ drum if required
Per Day 350
11 Rahat/Charas with bollock /Camel/Buffalo pair and driver
including cost of water and lifting device etc. complete
Per Day 350
12 4-wheel hand "thela" with hammal Per Day 205
13 (a) Donkey man with six donkey and carrier bags. Per Day 445
(b) Add/Subtract for each donkey Per Day 50
14 Operator for Jack Hammer/ Vibrator/ Pneumatic Tamper or
pavement Breaker/shot-crete placer
Per Day 155
SKILLED
15 Gardener
(a) Grade I Per Day 155
(b) Grade II Per Day 145
16 (a) Driver for pumps/Concrete Mixers Per Day 145
(b) Driver for Compressor/Generators Per Day 155
(c) Heavy vehicle driver for Trucks/Dumpers/Tractors/ Stone crusher
etc. (License holder)
Per Day 205
17 Boat man/Blaster (with license) Per Day 205
18 Welder/Fitter/Line-man/Turner/Wireman/Driller Per Day 205
102.5
19 Stone Dresser/cutter (Silawat)
(a) Grade I Per Day 275
(b) Grade II Per Day 250
20 Mason/ Painter/ Carpenter/ Electrician /Black smith / plumber


(a) Grade I Per Day 250

(b) Grade II Per Day 205
21 Survey Mistry / earthwork Mistry / Work Mistry
(Experienced/Trained) Patwari (Trained) / Tracer (I.T.I.) / Wireless
Operator (Trained) / Receptionist
Per Day 205
22 (a) Typist having knowledge of typing in computer Per Day 205
(b) Computer Operator having knowledge of M.S. Office/Excel/Power
point

(i) with own computer Per Day 255
(ii) without computer Per Day 205
23 Light vehicle driver for Jeep/Car/Station wagon etc. (License
holder) (Grade I)
Per Day 205
24 Driver with life jackets and all accessories for working under water.
Duty hours at site
Per
Hour
250
25 Driver for Heavy Machine like chain type Dozers/Shovels, etc.
(License Holder) Boring/Wagonet machine operator
Per Day 325
26 Work Agents/Surveyors/Supervisors


(a) Possessing Civil Engineering Degree or equivalent. Per Day 460
(b) Possessing Civil Engineering Diploma Per Day 400








CHAPTER - II


SUPPLY OF MATERIALS

NOTES:
1 These rates are at work site inclusive of all leads and also inclusive of all taxes,
levies, turn over tax, service tax, income tax, sales tax, octroi, panchayat tax,
contractor's profit & royalty etc.



2 The rates are also inclusive of making proper approaches to quarry, removal of
over-burden and other essential operations required at quarry site, including
opening of quarry.



3 Measurments shall be made on the basis of stacks and effective height for payment
purpose will be as prescribed below. No separate payment shall be made made for
laying of stacks.



4 Effective height of stacks for various materials shall be as under:



i Stone,boulders,brick bats,morrum,sand,surkhi,flyash etc. 85 % of Av. Ht.



ii Un-slacked lime, aggregates etc. 90% of Av. Ht.



5
These rates are for analysis and estimation purpose only.


S. No. Item Basic rate in `
Rate in `
Unit

Labour Material Total

1 (i) Crusher broken stone aggregate of various sizes in
accordance with IS:383 1970 for concrete work
for dams, canals, and other important structures,
well graded with size of aggregate.

(a) 150 to 80 mm size

310.00 Cum
(b) 80 to 40 mm size

430.00 Cum
(c) 40 to 20 mm size

530.00 Cum
(d) 20 to 10 mm size

550.00 Cum
(e) 10 to 4.75 mm size

500.00 Cum
(ii) Hand broken stone aggregate of various sizes in
accordance with IS:383 1970 for concrete work
for dams, canals, and other important structures,
well graded with size of aggregate.

(a) 150 to 80 mm size
0.75 Beldars for collection and
breaking @
135.00 101.25
T&P & labour welfare @ 3% on
101.25 3.0375
Sundries 1% on
101.25

1.0125
Contractor's profit @ 10% on
101.25 10.13
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
299.43 12.16


114.41 197.17


Say 114.00 197.00 311.00 Cum

(b)
80 to 40 mm ( Hand broken)

i 1.5 Beldars for collection and
breaking @
135.00 202.50
ii T&P & labour welfare
@ 3% on
202.50 6.08
iii Sundries 1% on
202.50

2.025
v Contractor's profit @10% on
202.50 20.25
vi Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
vii Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
414.85 16.84


228.83 202.87


Say 229.00 203.00 432.00 Cum


(c)
40 to 20 mm ( Hand broken)
i 2 Beldars for collection and
breaking @
135.00 270.00
ii T&P & labour welfare @ 3% on
270.00 8.10
iii Sundries 1% on
270.00

2.7
v Contractor's profit @10% on
270.00 27.00
vi Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
vii Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
491.80 19.97


305.10 206.67


Say 305.00 207.00 512.00 Cum

(d)
20 to 12.5 mm ( Hand broken)


i 3.0 Beldars for collection and
breaking @
135.00 405.00
ii T&P & labour welfare @ 3% on
405.00 12.15
iii Sundries 1% on
405.00

4.05
v Contractor's profit @10% on
405.00 40.50
vi Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
vii Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
645.70 26.22



457.65 214.27


Say 458.00 214.00 672.00 Cum

2 Stones for Random Rubble masonry work at least
90% stones weighing not less than 37.50 Kg. and
no dimension less than 23 cm for massive work
(a) Drilling and blasting charges
Labour Material
Drilling charges 2/3
of Item No.
Chapter V 1.30 50.90 0.87 33.93
Blasting charges 2/3
of Item No.
Chapter V 1.71 68.11 1.14 45.41


2.01 79.34
(b) Labour charges for mucking
sorting and stacking for 10 cum
2 Stone breakers @
155.00 310.00
3 Excavators @
135.00 405.00
4 Chawalias @
175.00 700.00
2 Carriers @
135.00 270.00
1 Beldar for sorting small stone and
spalls & their disposal @
135.00 135.00
2 Beldars for stacking @
135.00 270.00


Say Rs. 2090.00


or P.Cum 209.00
(c) Other charges
i Removal of over burden,
approaches & mines Cost etc.
L.S.

35.00
ii T&P Labour welfare @ 3% on
209.00 6.27
iii Sundries 1% on
209.00

2.09
iv Contractor's profit @ 10% on
209.00 20.9
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00

vi Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
538.61 21.87


238.18 322.30 560.48




Say 238.00 322.00 560.00 Cum
3 Stones for Random Rubble masonry, at least 75%
stones not less than 15 cm in size in any direction
and weighing not less than 23 kg.
(a) Labour charges
i 1 No. stone breaker
@ 155.00

155
ii 3/8 No. Beldar for
collection and
stacking @ 135.00

50.63
iii Removal of over
burden at quarry L.S.


3.30 2.20
iv Drilling and blasting
charges 15 % of item
(a+b) of chapter no
V 3.01 119.01 0.45 17.85


209.38 20.05


b) Miscellaneous
charges.


i Removal of over burden,
approaches & mines Cost etc.
L.S.

35.00
ii T&P Labour welfare @ 3% on
209.38 6.28
iii Sundries 1% on
209.38

2.09
iv Contractor's profit @ 10% on
209.38 20.94
v Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
vi Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
442.74 17.98


236.60 259.12 495.72


Say 237.00 259.00 496.00 Cum

4 C.R. Masonry stone for face work of massive
structures duly hammer dressed on all beds and
sides, the beds joints & faces shall be chisel
dressed for at least 8 cm back from face and at
least 4 cm from sides height not less than 25 cm
and weighing not less then 50 kg., 50% stones to
have depth more than 45 cm & tail area not less
than half the face area.

(a) Rate as per item No. 2
II above

238.00 322.00
Add extra for
wastage due to
selecting suitable size
stones 25% on 238.00 322.00 59.5 80.5


Sub toatl 'a' 297.50 402.50
(b) Add extra for
1.5 stone dressers for dressing of
stones @
275.00 412.50
Chawalieas for rehandling of
stones @
175.00 87.50
1 Beldar for sorting and disposal of
wastage @
135 117.50
1/5 Mistry @
205.00 41.00




Sub toatl 'b' 658.50 0.00
Other charges.
i T&P Labour welfare @ 3% on
658.50 19.76
ii Sundries 1% on
658.50

6.59
iii Contractor's profit @ 10% on
658.50 65.85
iv Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
750.69 30.48


Sub toatl ' c ' 85.61 37.06


Total of (a+b+c) 1041.61 439.56 1481.17


Say 1042.00 440.00 1482.00 Cum

5 (a) C.R. Masonry stone for face work of general
structures duly hammer dressed not less than 20
cm in any direction and at least 50% stones to be
more than 23 cm in depth.
(a) Rate as per item No. 3
II above

237.00 259.00
Add extra for
wastage due to
selecting suitable size
stones 25% on 237.00 259.00 59.25 64.75


Sub toatl 'a' 296.25 323.75
(b) Add extra for
1.0 stone dressers for dressing of
stones @
275.00 275.00
Chawalieas for rehandling of
stones @
175.00 87.50
1 Beldar for sorting and disposal of
wastage @
135.00 135.00
1/5 Mistry @
205.00 41.00




Sub toatl 'b' 538.50 0.00
Other charges.
i T&P Labour welfare @ 3% on
538.50 16.16
ii Sundries 1% on
538.50

5.39
iii Contractor's profit @ 10% on
538.50 53.85
iv Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
613.89 24.92


Sub toatl ' c ' 70.01 30.31


Total of (a+b+c) 904.76 354.06 1258.81


Say 905.00 354.00 1259.00 Cum
(b) C.R. stones headers, hammer dressed finished size
not less than 20 cm x 20 cm and depth not less than
30 cm
Rate as per item No. 5 (a) above
905.00 354.00
Add 10% extra for headers
90.50 35.40


995.50 389.40


Say 996.00 389.00 1385.00 Cum


6 Stones for soling , boulder for rock toe, toe drain ,
rock fill etc. not less than 15 cm in any direction.
i Labour charges.`
1 Stone breaker @
155.00 155.00
ii Other charges.


T&P Labour welfare @ 3% on
155.00 4.65
Sundries 1% on
155.00

1.55
Contractor's profit @ 10% on
155.00 15.50
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
360.70 14.64


175.15 200.19


Say 175.00 200.00 375.00 Cum

7 (a) Quarry spalls properly screened and graded but
not more than 10 cm and not less than 10 mm in
size,
(i) Labour charges
Beldar for collection of 1.00 cum
quarry spall @
135 67.5
(ii) Other charges
T&P Labour welfare @ 3% on
67.50 2.03


Sundries 1% on
67.50

0.68
Contractor's profit @ 10% on
67.50 6.75
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
260.95 10.59


76.275 195.27


Say 76.00 195.00 271.00 Cum



b Quarry rubish not more than 10 cm in size.

184.00 Cum

8 (a) Pitching stones atleast 75% stones to be more than
40 kg, in weight and 23 cm x 25 cm x 30 cm in size


Rate as per item No. 8(b)

213.00 202.00
Add 25 % extra for bigger size stones
53.25 50.5


266.25 252.50


Say 266.00 253.00 519.00 Cum



(b) Pitching stones atleast 75% stones to be more than
25 kg , in weight and 20 cm x 20 cm x 23 cm in size.
i Labour charges
1 stone breaker @
155.00 155.00
Beldar for 1 cum @
135.00 33.75


188.75
ii Other charges
T&P Labour welfare @ 3% on
188.75 5.66
Sundries 1% on
188.75

1.89
Contractor's profit @ 10% on
188.75 18.88
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
Rs.
399.18 16.21


213.29 202.09


Say 213.00 202.00 415.00 Cum
(c ) Stones for Rip Rap at least one side not less than 23
cm in size.
i Labour charges.`
1 Stone breaker @
155.00 155.00


ii Other charges.


T&P Labour welfare @ 3% on
155.00 4.65


Sundries 1% on
155.00

1.55


Contractor's profit @ 10% on
155.00 15.50


Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00


Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
360.70 14.64




175.15 200.19


Say 175.00 200.00 375.00 Cum
9 Cement (in bags) 50 Kg in weight. As per IS 1489
and IS 8112 as per requirment (excluding cost of
bags)

200.00 Bag

10 Un Slaked Lime.(Sojat or equivalent)

5250.00 Cum

11 Surkhi pulverized as per IS specification i.e.,
passing through IS Sieve No. 9

630.00 Cum

12 Sand (Un-screened)
i Labour charges


1/8 beldar for clearance of
overburden such as silt, mucking
boulders, and debries etc. for I cum
@
135.00 16.88
2/5 Beldar will excavate one cum
of unscreened sand @
135.00 54.00


70.88
ii Other charges


Cost of sand at quarry

50.00


T&P Labour welfare @ 3% on
70.88 2.13
Sundries 1% on
120.88

1.21
Contractor's profit @ 10% on
70.88 7.09


Average lead for transportation of
material from quarry to work site
15 km @
251.00

251.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
382.30 15.52


80.09 317.73




Say 80.00 318.00 398.00 Cum


13 Sand screened and free from organic and
deleterious material.
a Labour charges
As per item no 12
above

80.00 318.00
Wastage 15% on 318.00

47.70


Add extra labour charges for
screening sand 2/5 beldar @
135.00 54.00
b
Other charges




T&P Labour welfare @ 3% on
54.00 1.62
Sundries 1% on
54.00

0.54
Contractor's profit @ 10% on
54.00 5.40
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
109.26 4.44


141.02 370.68


Say 141.00 371.00 512.00 Cum
Bikaner Bajri having F.M. from 2.2
to 3.2 as per IS specifications.

not required in Udaipur
Zone Cum
Tibba sand F.M. not less than 0.75

not required in Udaipur
Zone Cum
14 Natural Aggregate


(a) 150 to 80 mm size
For 1 Cum
1.0 Beldar required for excavation,
sorting, collection, screening and
stacking @
135.00 135.00
T&P Labour welfare @ 3% on
135.00 4.05
Sundries 1% on
135.00

1.35
Contractor's profit @ 10% on
135.00 13.50
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
337.90 13.72


152.55 199.07


Say 153.00 199.00 352.00 Cum
(b) 80 to 40 mm size

For 1 Cum

1.33 Beldar required for excavation,
sorting, collection, screening and
stacking @
135.00 179.55
T&P Labour welfare @ 3% on
179.55 5.39
Sundries 1% on
179.55

1.80
Contractor's profit @ 10% on
179.55 17.96
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
388.69 15.78


202.89 201.58


Say 203.00 202.00 405.00 Cum
(c) 40 to 20 mm size
For 1 Cum
1.66 Beldar required for excavation,
sorting, collection, screening and
stacking @
135.00 224.10
T&P Labour welfare @ 3% on
224.10 6.72
Sundries 1% on
224.10

2.24
Contractor's profit @ 10% on
224.10 22.41
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
439.47 17.84


253.23 204.08


Say 253.00 204.00 457.00 Cum

(d) 20 to 10 mm size
For 1 Cum
2.17 Beldar required for excavation,
sorting, collection, screening and
stacking @
135.00 283.50
T&P Labour welfare @ 3% on
283.50 8.51
Sundries 1% on
283.50

2.84

Contractor's profit @ 10% on
283.50 28.35
Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00
Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
507.19 20.59


320.36 207.43


Say 320.00 207.00 527.00 Cum

(e) 10 to 4.75 mm size
For 1 Cum
2.17 Beldar required for excavation,
sorting, collection, screening and
stacking @
135.00 292.95


T&P Labour welfare @ 3% on
292.95 8.79


Sundries 1% on
292.95

2.93


Contractor's profit @ 10% on
292.95 29.30


Average lead for transportation of
material from quarry to work site 5
km
184.00

184.00


Income tax 2.06% + Sale tax
1.5%+Royalti 0.50% I.e= 4.06 % on
517.96 21.03




331.03 207.96




Say 331.00 208.00 539.00 Cum

15 Morrum or Murda
As per chapter V item 1 c

47.00


Average lead for transportation of
material from quarry to work site
1/2 km
40.00

40.00


87.00 87.00 Cum
16 Mild steel


(a) Mild steel and medium tensile steel bars as per IS :
432-1982

35.00 Kg.


(b) HYSD steel bars as per IS 1786-1985

39.00 Kg.


(c) Structural steel

40.00 Kg.
17 Supply of bricks as per IS : 1077-1992


(a) Well burnt clay bricks ( size 230x110x70 mm) class
designation 100 as per specification

3200
1000
Nos.


(b) Well burnt clay bricks ( size 230x110x70 mm) class
designation 75 as per specification

2800
1000
Nos.
(c) Comman burnt clay bricks ( size 230x110x70 mm)
class designation 50 as per specification

2400
1000
Nos.
(d) Brick bats

275 Cum
(e) Supply of pucca clay tiles (size 30 x 15 x 5 cm) class
designation 105 as per IS:3367-1993

3580
1000
Nos.
18 Hydraulically compressed P.C.C. tiles 40 mm thick
(50 mm compressed to 40 mm) in cement, sand,
aggregate upto 10 mm (well graded crusher
broken) as per specifications conforming to ISI
10646-1991 with concrete of M15 grade.
(a) 300 x 300 mm size

13.00 Each
(b) 150 x 300 mm size

8.00 Each
19 Stone patties edges hammer dressed
(a) Length up to 1.50 m and thickness 50 mm and
above

270.00 Sqm
(b) Length up to 1.50 m to 2.50 m and thickness 70
mm and above

300.00 Sqm
(c) Length up to 2.50 m to 4 m and thickness 80 mm
and above

430.00 Sqm
20 Cut stone sills, slab, or lintels one face plain and
edge hammer dressed.
(a) 100 to 125 mm thick

365.00 Sqm
(b) 126 to 150 mm thick

380.00 Sqm
(c) 151 to 200 mm thick

400.00 Sqm
21 Fly ash confirming to IS 3812-1981( in bags) 20 Kg
in weight

25.00 Per bag
22 Chemical for curing as per ASTM

36.00 Per Lit
23 Empty bag of 50 kg capacity in good condition
a. Jute

12.00 Each


b. Plastic / Polythene

3.00 Each

24 ISI marked low Density Poly Ethylene (LDPE) film
black, High Impact resistant, Heavy duty Grade
030 in thickness of 125, 200 & 250 micron in the
form of flat sheet of 6 to 9 metre width without
having any joints as per IS: 2508-1984

120.00 Kg.
25 (a) Distance stone well dressed of required shape and
size 60 cm x 23 cm x 7 cm with exposed faces
chiesel dressed.

75.00 Each


(b) Distance stone well dressed of required shape and
size 60 cm x 23 cm x 7 cm with distance marked
engraved and exposed faces well painted.

100.00 Each

26
Cost of Diesel

39.88 Lit

27
Amonium nitrate

30.00 Kg

28
Gelatin

70.00 Kg

29
Fuse Coil

5.00 RM

30

Ordinary detonator

10.00 Each

31

Drill Rod 800 mm long

3000 Each

32

Electric Detonator

25.00 Each

33

Sealing Compound

140 Kg

34

Air hose double braided

110 Mt

35

Claw coupling

45 Each

36

Hose clamps

40 Each

37

Valve 3" dia

350 Each

38

Suction pipe 3" dia

230 Mt

39

Foot Valve 3"

500 Each

40

GI pipe 3" dia

400 Mt.

41

Extention Rod 1" hex 800 mm

2700 Each

42

Extention Rod 1" hex 1600 mm

5400 Each

43

Extention Rod 1" hex 2400 mm

8100 Each

44

Extention Rod 1" hex 3200 mm

13000 Each

45

Coupling sleeves1"

1900 Each

46

Shank Rod

2500 Each

47

Bit 48 mm dia

4350 Each

48

Water Body

1000 Each

49

Water body washer

20 Each

50

Lubricating oil

110 lit

51

Grinding wheel

1250 Each

52

Bit adopter

1000 Each

53

Shank adopter

1000 Each

54

T.C.T. Cross bit

4350 Each

55

GI/MS pipe 65 mm dia

150 Mt

Potrebbero piacerti anche