ABOUT US:
- CDTI IS A COMPANY THAT AIMS TO MAKE
TUNA CANNERY MORE PROFITABLE THROUGH
COMBINED EXPERTISE OF ITS PEOPLE AND
TECHNOLOGY.
- CDTI OFFERS MANY OPPORTUNITIES TO
MAXIMIZE THE COST EFFECTIVENESS OF ANY TUNA
CANNERY OPERATION WHICH WILL MAKE THE
PLANT VERY PROFITABLE. ITS PEOPLE EXPERIENCED
AND EXPERTISED WILL GIVE SIGNIFICANT
CONTRIBUTIONS IN OPTIMIZING THE OPERATION
WHICH WILL RESULT IN SUBSTANTIAL FINANCIAL
SAVINGS AND WILL HIGHLY IMPACT PROFITABILITY.
ABOUT US:
THE PRESIDENT ENGR. JAVIER E. MENDOZA
ABOUT US:
VICE PRESIDENT GAYLORD DIOKNO BAUTISTA
Has MBA degree in Ateneo Graduate School of Business. Has
more than thirty years experience in manufacturing operation of
food processing plants, twenty years of which had been in the
design, construction, machinery and plant equipment
installation, and actual operation of tuna processing plants in
the Philippines, Indonesia and Papua New Guinea. Also, has
twelve years experience in managing the plant operations,
marketing, fish procurement functions including corporate
engineering management.
ABOUT US:
TECH. DOCUMENTATION EXPERT R.W. BLANQUEZA
Has a Mechanical Engineering degree. Early in his career he
handle jobs in different position and different industries such as
semiconductor, food processing, air bag production, plastic and
aluminum can making. It include jobs at country like K.S.A. and
Ireland. In the last seven years he focus in works that
manipulate his knowledge in CAD and 3D design. A certified
Autodesk CADD and 3D MAX user.
CONSULTANTS:
WASTE WATER TREATMENT EXPERT EDUARDO DOCE
Seven years of engineering and maintenance works in various
companies and twenty three years of work experience
accumulated from the different business units of the Century
Pacific Group in various aspects of engineering, maintenance,
operations and management, including successful set-up and
operation of 8 wastewater treatment facilities, 3 fishmeal plants,
2 evaporated liquid milk line and 1 powdered milk repacking
plant.
Additional workload includes being a part of the setting-up and
improvements of various manufacturing plants of the company
and was an active player in the growth of Century Canning
Corporation to what is now the Century Pacific Group.
CONSULTANTS:
SOLID WASTE MANAGEMENT, ENVIRONMENTAL
ENGINEERING & CONSTRUCTION DICK CUTAB
SEAMER OVERHAULING, REPAIR, MAINTENANCE AND
OPERATION ROGER SEIT
PROJECT MANAGEMENT, SUPERVISION &
COORDINATION JESUS D. CASTRO
PROJECT COMPLETED:
350 MTD MAJESTIC SEAFOODS INC.
Lae, Papua New Guinea
120 MTD RD TUNA
Madang, Papua New Guinea
350 MTD MAJESTIC SEAFOODS INC.
Lae, Papua New Guinea
100 MTD PUREFOODS TUNA CANNERY
General Santos City, Philippines
100 MTD RFM TUNA CANNERY
General Santos City, Philippines
100 MTD CENTURY CANNING CORPORATION
Manila, Philippines
350 MTD GENERAL TUNA CORPORATION
General Santos City, Philippines
PICTURES OF PROJECT COMPLETED:
MAJESTIC SEAFOODS CORPORATION
Lae, Papua New Guinea
PICTURES OF PROJECT COMPLETED:
GENERAL TUNA CORPORATION
General Santos City, Philippines
PICTURES OF PROJECT COMPLETED:
307 Can Making Line
General Santos City, Philippines
PICTURES OF PROJECT COMPLETED:
BLAST FREEZER, TROLLEYS
& COMPRESSORS
PICTURES OF PROJECT COMPLETED:
PICTURES OF PROJECT COMPLETED:
PICTURES OF PROJECT COMPLETED:
PICTURES OF PROJECT COMPLETED:
PICTURES OF PROJECT COMPLETED:
CURRENT PROJECTS:
60MT FROZEN LOIN PLANT (EXPANDIBLE TO 200M)
NAMBAWAN SEAFOODS
Lae, Papua New Guinea
STATUS : CONSTRUCTION ON PROGRESS
1500MT REFRIGERATION & COLD STORAGE FACILITIES
SEATRADE CANNING CORPORATION
General Santos City, Philippines
STATUS : DESIGN IN PROGRESS
60MTD FROZEN LOIN PLATE CONTACT FREEZER
(USING CO - NH REFRIGERANT)
PHILBEST CANNING CORPORATION
General Santos City, Philippines
STATUS : DESIGN IN PROGRESS
2000MT COLD STORAGE EXPANSION
MAJESTIC SEAFOODS INC.
Lae, Papua New Guinea
STATUS : DESIGN IN PROGRESS
AREA OF EXPERTISE:
1. Engineering and Plant Design of State of the
Art Tuna Processing Plant.
2. Project Management & Construction of Tuna
Processing Plant.
3. Project Feasibility Study for Tuna Processing
Plant
(Frozen Loin and Canning Facilities)
4. Accreditation for Export license from both
USFDA and EU.
5. Training of Managers, Supervisors and Workers
in Tuna Processing Plant Operations.
6. Plant Management and Operations.
7. Yields and Total Productivity Improvement
BUDGETARY
ESTIMATE FOR
PROPOSED GENSAN
TUNA CANNERY
CAPACITIES:
PHASE 1 : 60 MTD
PHASE II : 210 MTD
RAW MATERIAL : 60 MTD RAW TUNA
RAW MATERIAL : 210 MTD RAW TUNA
FINISHED PRODUCTS : 2 FCLS(1700 CASES X 2 CANNED TUNA ,
185 G.PACK OR 24 MTD FROZEN LOINS
* 9 MTd High grade Fish Meal and 1.8
MTD Fish Oil High grade FM is 48%
protein min.
FINISHED PRODUCTS : 7 FCLS(1,700 CASES X 7 CANNED TUNA,
185 G. PACK OR 84 MT FROZEN LOINS
31.5 MT Fish meal
BUDGET SUMMARY:
FOR PHASE 1:
BUILDING, FACILITIES & LAND IMPROVEMENT : $14,657,200.00
PLANT MACHINERY & EQUIPMENT : $ 9,335,700.00
PROJECT BUDGETARY ESTIMATE FOR PHASE 1 : $23,992,900.00
PRE-OPERATING EXPENSES : $ 1,500,000.00
BUDGET BREAKDOWN:
..\PROJECT JORGE\GENSAN 60MT CANNING LINE.xlsx