Request for change (RFC) form must be filled out completely. Does the entire change stand on its own? if there is an implementation plan, can some steps be implemented or backed out together?
Request for change (RFC) form must be filled out completely. Does the entire change stand on its own? if there is an implementation plan, can some steps be implemented or backed out together?
Request for change (RFC) form must be filled out completely. Does the entire change stand on its own? if there is an implementation plan, can some steps be implemented or backed out together?
Change Request Number: RFC Date of Submission Requestor Person submitting the RFC Phone: (000)000-0000 For Requestor's name if not self Phone: (000)000-0000 Backup contact Enter BACKUP'S name Phone: (000)000-0000
All fields must be filled out completely. Incomplete RFCs will be returned.
Does the entire change stand on its own? If there is an implementation plan, can some of the steps be implemented or backed out together? If some steps can remain though others fail, the Request for Change (RFC) should be broken down into individual RFCs.
Field 1: Brief Description (80 chars max)
Field 2: Detailed Description What the change is intended to accomplish, why it is necessary, and what will happen if the change is NOT executed. (80 Chars max)
Field 3: Type of Change Check all subsystems that apply
Type of Subsystem Hardware Software Config Setup Host Network Storage Application Database Environment/ Facilities Firewalls (attach Firewall RFC Form)
OTHER - describe subsystem
Copyright Red Engine Consulting 2009-2010 Page 2
Field 4: Reason for Change Check all that apply
TITLE Reason Reason Reason Maintenance Preventative Corrective Other Capacity Install Upgrade Swap/Reconfig Functionality /Service New Expanded Obsolete Testing Functionality Stress Recovery Security Preventive Corrective Other Other (Identify)
Field 5: Potential Impacts Describe overall impact:
Known/ Best Case Impacts Worst Case Impacts Affected Location And/or Service Name Production Stage Development Test Internet/External
Field 6: Production Outages: Expected duration
Hours: Minutes:
Field 7: Affected Host Names and Applications
Field 8: Change Type Select one.
Normal Standard - Pre-Authorized (Original Change Request Number - RFC ) Emergency Information Only Host Name Application
Copyright Red Engine Consulting 2009-2010 Page 3
Field 9: Schedule Information
Implementation Group/ Representative
Day, Date Time of Day Duration of Implementation
: AM PM Days Hours Minutes Target Date(s) Alternate Date(s) Implementation Location Related or Pre-requisite change activities:
Field 10: Implementation Steps What steps are required to implement the change? 1. 2. 3. 4. 4)... (if necessary)
Field 11: Affected Documentation What databases or documentation need to be updated prior to the completion of this change?
Field 12: Is this an Emergency Change?
Yes No If this is an Emergency Change, can the change be backed out in its entirety? Or, is a partial back-out possible? Back-out Plan provided? If this is an Emergency Change, please explain the emergency.
Field 13: Acceptance Criteria What tests will be used to confirm successful implementation?
Test Describe
Field 14: Backout Contingency Plan If the acceptance criteria are not met, what steps will be performed to backout the change?
1. 2. 3. 4. (if needed)
Copyright Red Engine Consulting 2009-2010 Page 4
Field 15: Backout Criteria When the backout steps are performed, what tests will be used to confirm successful backout?
Test Describe
Field 16: Escalation Plan If the backout criteria are not met, what method will be used to escalate and resolve the problem?
1. 2. 3. 4. (if necessary)
Field 17: Other Considerations/Issues
Prior History Special notification or visibility
Helpdesk symptoms or concerns
Field 18: CMDB Which Configuration Items (CIs) have been updated?
Configuration Item (CI) Name(s) and related Information:
Field 19: Related Request for Change Is this change related to other RFCs?
ChatGPT Side Hustles 2024 - Unlock the Digital Goldmine and Get AI Working for You Fast with More Than 85 Side Hustle Ideas to Boost Passive Income, Create New Cash Flow, and Get Ahead of the Curve
ChatGPT Money Machine 2024 - The Ultimate Chatbot Cheat Sheet to Go From Clueless Noob to Prompt Prodigy Fast! Complete AI Beginner’s Course to Catch the GPT Gold Rush Before It Leaves You Behind
ChatGPT Millionaire 2024 - Bot-Driven Side Hustles, Prompt Engineering Shortcut Secrets, and Automated Income Streams that Print Money While You Sleep. The Ultimate Beginner’s Guide for AI Business
YouTube Secrets: The Ultimate Guide on How to Start and Grow Your Own YouTube Channel, Learn the Tricks To Make a Successful and Profitable YouTube Channel