Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Organised by:
Register Now!
Features:
v CAESAR program and usage
explained.
v Solving real life problems and
application of what is learned.
v Interactive workshop with Q&A at
end of every session.
v Application to Process piping
systems as referenced in ASME
B31.3.
v Random failure case studies along
with the course.
Objectives:
Upon completion of this course, attendees will be able to
v Have better understanding of the process plant piping subjected to normal
weight, and other occasional loads helps ensure the structural integrity of piping
and safety of the plant
v Understand requirements of ASME B31.3 to process plant piping systems and
structures.
potential pipe stress problems reduces the cost of the piping systems
Targeted
Audiences:
Beginners and Intermediate level
v Graduate Piping Engineers Stress,
layout and materials.
v Plant Engineers responsible for
operating and maintaining piping
systems.
v Graduate Mechanical Engineers.
v Vessel & Civil Mechanical Engineers.
v Project Engineers or Managers.
Organised by:
problems in order to reduce the cost of the piping system and supports.
Register Now!
Workshop Day 1
Workshop Day 3
Workshop Day 2
Assorted modelling, analysis and compliance topics:
- Resolution of overstress due to thermal expansion
- Friction effects
- Adding flexible connections (vessels)
- Assessing equipment allowable loads API 610, WRC 107 etc
- Cold Spring
- Combining piping systems
- Load case combinations
- Designing for sustained loads; support configuration issues, optimization of
sustained loads.
- Designing for expansion loads; flexibility
- Concept of Thermal Expansion
- Providing Flexibility in Piping
- Types of Expansion Loops
- Minimum Leg Required to Absorb Thermal Expansion
- Expansion Loop Sizing for Hot Piping
- FRP/GRP Piping Using ISO 14692
- Flange Leakage Modelling & Calculation
Organised by:
Register Now!
Blended Learning
| New Available
* Highly-qualified, profesional trainers with
many years of industry experience
* Training tailored to your industry
* Nationally-recognized qualifications and
units of competency
* Access to expert advice and support
* Real value for money
Workshop Timetable
Exercise 2: Analysing the system for vibration and Dynamic loads. Participants get the opportunity to evaluate piping system
and predict vibration or failure under application of dynamic loads.
- Best Practices in Air Pollution Control and Industrial Gas Filtration / 22-23 May 2014
- Valve Types- Selection, Installation and Operation / 26-29 May 2014
- Bearing Technology & Maintenance / 16-18 Jun 2014
- Best Practices of Pressure Vessel & Other Pressure Equipments / 23-27 Jun 2014
Organised by:
Register Now!
Delegate 1
Name (Dr / Mr / Mrs / Ms)
Job Title & Department
Mobile
Email Address
Delegate 2
Name (Dr / Mr / Mrs / Ms)
Job Title & Department
Mobile
Email Address
Approving Manager
Name :
Signature :
Email :
Company Name :
Conversion Rate of USD to RM is 3.40
5 days Workshop
USD 3688
USD 3888
Payment Methods
All payments to be made payable to Top Link Conference & Event Management in
RM or USD and are net of bank charges. Bank charges are to be borne by registrants.
Please tick and fill in the following:
c Cheque / Bank Draft No.
Please mail payment in RM (Ringgit Malaysia) with registration form to Suite 13-06, Level 13,
JB City Square (Office Tower), 106-108, Jalan Wong Ah Fook, 80000, Johor Bahru, Johor.
Normal Rate
USD 3988
c
c
c
c
c
REGISTER
NOW!