PM-3 CAA / BLOCK46-CN 24 HOURS PRODUCTION DATA SUMMARY

(PHASE 5 PM3 SOUTHERN FIELD - ImperiaI Units)


29-May-14
MMscf CO2%
HC Gas to BRA
Flare
Vent Gas
Fuel Gas - High CO2
Fuel Gas - From BRA
0.000
0.000
0.000
0.000 0.00
0.00
BRE GAS UTILIZATION
0.00
NF Gas Received 0.000 0.00
PRODUCTION FIGURES
CPP PRODUCTION
HC Liquid Production (export BRA to FSO)
HC Liquid Production BS&W (export BRA to FSO)
Produced Water Production (BRA discharge)
Produced Water Production Oil Content (BRA discharge)
Fieldwide Water njection
0
15.00
0
0.00
120,678
bbl
% vol
bbls
ppm
bbls
bbls
0.000
BRAU Water njection
Total Condy Received bbls
0.00
FSO PRODUCTION
Oil nventory of Previous Day (0600 hrs) at Actual Cond.
Oil nventory of Today (0600 hrs) at Stock Tank
Oil nventory of Today (0600 hrs) at Actual Cond.
Oil nventory of Previous Day (0600 hrs) at Stock Tank
bbls
bbls
bbls
bbls
588,595
573,094
15,501
6,373
LIFTING SUMMARY
Next Lifting Number
Lifting Window
Nominated Lifting Volume
Nominated Export Tanker Name
bbls
Export Tanker ETA
Lifted Cumulative bbls
BR317
13-15 Jan 2014
300,000
TBA
114,994,573
14-Jan-2014
Total Water Received
Total Oil Received (last 24 hrs) at Actual Cond.
Total Oil Received (last 24 hrs) at Stock Tank
bbls
bbls
bbls
14,918
569,194
554,276
25.000 210.000 185.000
24.396 210.562 186.166
232.727 30.633 202.094
210.474 27.704 182.770
5.555 0.527 5.028
36.225 9.870 26.355
248,935.000 32,765.000 216,170.000
42,977.357 11,748.520 31,228.837
7.90
1.70
1.00
1,946
113
29,816.00
(a) Firm Nomination
(b) Best Endeavour
CPP GAS SALES
Gas SaIes Figures
Buyer's Nomination
Sales gas delivery quantity (Volume, Gross)
Sales gas delivery quantity (Volume, Net)
YTD sales gas delivery quantity (Volume, Net)
Sales gas delivery quantity (Energy)
YTD sales gas delivery quantity (Energy)
Sales gas %CO2 average
Sales gas %N2 average
Sales gas %H2S average
Sales gas water content average (Dew Point)
Sales gas export temperature average
Sales gas export pressure average
CPP GAS UTILIZATION
psia
F
lb/MMscf
ppm
% mole
% mole
TotaI
TotaI
Petronas
Petronas
PV
PV
Vol (MMscf) CO2%
Flash Gas
Lift Gas
HP Flare Gas
LP Flare Gas
Fuel Gas - High CO2 (BRA)
Fuel Gas - Low CO2 (BRA)
Fuel Gas - High CO2 (BRD)
0.000
0.000
0.000
0.000
0.000
0.000
1.374
0.00
0.00
0.00
0.00
0.00
0.00
44.60 Fuel Gas - to FSO
0.000 0.00
Additional Flash Gas 0.00 0.00
0.000 0.00 Flash Gas Compressor -C
MMscf
MMscf
MMscf
MMscf
Bscf
MMBtu
BBtu
BRE PRODUCTION
HC Liquid Production (export BRE to FSO)
HC Liquid Production BS&W (export BRE to FSO)
Produced Water Production (BRE Discharge)
Produced Water Production Oil Content (BRE Discharge)
bbls
% vol
bbls
ppm
0.00
0.00
0.80
0.00
Bscf
MTD sales gas delivery quantity (Volume, Net)
ESTIMATED PRODUCTION FIGURES (THEORETICAL & ALLOCATED)
Theory
NAG
(MP Test)
AG
(Well Test)
Total
Ref.Meter Daily Field Factor Est. Daily Back Allocation
1.408 2.894
84.317 40.900
4.301
125.217
Est. MTD
215.141
10671.073
4295.342 120.916 39.492 81.424
AG NAG AG NAG AG NAG
0.000 232.727 0.362 0.000
0.000
0.000
1.048
29.500
0.000 30.548
HC Gas Production (MMscf)
0.000 6,160.590
Theory
PM3-CAA SOUTH
TOTAL
Oil
(Well Test)
11,697
Condy
(CGF)
590
Total
12,287
Ref.
Meter
Daily
Field
Factor
Est. Daily
Back
Allocation
12,670 613 13,283 14,918 1.12
13,799
14,918
Est. MTD
PM3-CAA NORTH
374,658
441,464
32,783 0
997 974 34,024 1,119 23 B46 CN
HC Liquid Production (bbIs)
0
HC Net Gas SaIes (MMscf)
Theory
B46 CN
TOTAL
NAG
(MP Test)
AG
(Well Test)
Total
Ref. Meter Est. Daily Allocation
2.894 0.686 3.580
By Well By GSA
84.317 17.529 101.846
6.438 16.615
Daily Field Factor
NAG AG
187.609
Est. MTD
By Well By GSA
112.48
2337.54 2337.54
PM3-CAA NORTH
PM3-CAA SOUTH 2,225.06 170.993 181.170 98.266 16.843 81.423
AG NAG
0.00 187.61 2.23 0.00
187.609
0.00
457.095
1,880.444
Water Production (bbIs)
Theory
OP
(Well Test)
GP
(Curve)
Total
Ref.
Meter
Daily
Field
Factor
Est. Daily
Back
Allocation
230 31,147 31,377
2 1,880 1,882
33,027 232 33,259
6,376 0.19
6,015
361
6,376
Uptime
Gas
Uptime
Oil/Cond
NAG
Prod
AG
Prod
Oil
Prod
Condy
Prod
Water
Prod
Gas Pdt
Header T
Gas Pdt
Header P
Oil Pdt
Header P
Oil Pdt
Header T
Gaslift
Supply P
hrs hrs MMscfd MMscfd bopd bopd bwpd psig F psig F psig
BK-A 24.00 319 165 1,609 0 0 0.000 0.000
BK-C 24.00 24.00 632 305 178 1,603 158 3,341 96 7,826 12.032 5.853
BR-B 24.00 24.00 631 135 156 2,006 183 2,878 517 6,012 72.285 15.476
BR-C 24.00 247 174 1,967 1,278 0 6,200 0.000 8.373
BS-A 24.00 612 220 210 1,851 86 714 0 7,251 0.000 0.774
BT-A 24.00 261 207 2,006 914 0 5,970 0.000 10.423
TOTAL 9,125 613 33,259 84.317 40.899 24.00 24.00
OPERATIONAL SUMMARY
1. FSO lifting/nventory : Exportable dry crude inventory as of 0600 hrs is 569,194 bbls. Next lifting BR-323 (PVO) schedule date on 01st -03rd June 2014
with total parcel 350Kbbl.
2. Rolls Royce Export Compressor Train A: Continuing t/shoot unit Fuel Gas Metering Valve fault. Tested run the unit but unit tripped on Enclosure
Temperature High. On going rectification on Fuel njector seal leaking.
3. SHAPADU HUC BRB 501 Flow-line Header Extension: Continue touch up painting primer coat on new goal post pipe support. Overall completion -
90%.
4. SHAPADU BRA: New sand slurry project. Continue fit-up and welding pipe supports below cellar deck. Overall completion - 45.2%. No progress.
5. SHAPADU BKC: ACCUFLOW meter installation: n progress transferring pipe spool to location. Overall completion remain at 37%. No progress.
6. SHAPADU E& BRC Emergency Lighting installation: Completed removal of 10 out of 10 units of normal lighting and replaced with emergency light.
Overall completion 85%.
7. PONEER BRA Painting: Continue set-up vapor blasting equipment and lay out blasting hose from cooler deck to sea deck. Overall completion - 0.3%.
8. PONEER BKC Painting: Continue blasting and 1st coat application onto beam structure at mezz north east side. Overall completion - 35.17%.
9. PONEER BRE Painting: Continue power tooling and painting on structures/support and surface preparation and applied final coat to V-5600. Overall
completion - 84.0%
10. VELOS PM3-S RT Small Bore Campaign: Completed performed 158 out of 13,279 RT key points at BRA Cellar Deck. Overall completion - 1.18%
11. Harkand Harmony Cleaning operation: Completed inspection on BRBFSO6EG & 75% on BRBFSO10EC. Continue jacket inspection at BSA. Overall
completion -22.4%
12.DOOSAN BABCOCK: Continue structure & piping vibration survey at BRA. Overall completion - 50%.
13.BRB Slickline: Complete offloading Slick-line equipment for well intervention activity. Setting up equipment on going.
14.BSA Slickline: Completed offloading E-line equipment for well intervention activity.
15.HANDAL BRE Crane ME-6620: Continue perform Annual PM. Overall completion - 85%
16.ALS BRE: continue conducting area Mercury mapping monitoring. Overall completion 65%