International Conference on Urban Drainage, Porto Alegre/Brazil, 11-16 September 2011
_____________________________________________________________________________
Torres et al. 1
Proposal and assessment of rainwater harvesting scenarios on the
Javeriana University campus, Bogota

Torres A.
1*
, Estupin Perdomo J.L.
1
, Zapata Garca H.O.
1

1
Grupo de Investigacin Ciencia e Ingeniera del Agua y el Ambiente, Facultad de
Ingeniera, Pontificia Universidad Javeriana, Carrera 7 # 40 62, sede Bogota,
Colombia
*Corresponding author, e-mail andres.torres@javeriana.edu.co


ABSTRACT
Globally, rainwater harvesting is becoming more important as a concept that can
support urban sustainable development. The objective of this work was to assess the
infrastructural requirements to use rainwater at the Pontificia Universidad Javeriana
campus in Bogota, through an inventory of water uses, rainfall measurements of the
study area and water quality assessment coupled to pipe hydraulics modeling. The
proposed system allows supplying 14 % of the total use of non-potable water, which
represents savings of 24.174.754 Colombian Pesos (COP) (12.723 USD). Due to a high
initial investment of 694.967.383 COP (365.772 USD), the return of the investment is
assessed as more than 30 years and the proposed rainwater harvesting system therefore
has a low financial viability.

KEYWORDS
Rainwater harvesting, water balance, University Campus, Environmental sustainability


INTRODUCCIN

Globally, rainwater harvesting is becoming more important as a concept that can support
urban sustainable development. Nowadays, rainwater in urban areas is principally used
for toilet discharges and irrigation of gardens (Hatt et al., 2004), through technical,
scientific, socioeconomic concepts, associated to sustainable construction processes
(Coombes et al., 2000; Mbugua, 2002). In Latin America, Brazil, Mexico and Chile are
forerunners using this practice for non-potable purposes (Ghisi et al., 2006; May, 2004;
Pachauri, 2008).

With few exceptions, in Colombia rainwater is used for non-potable purposes by
employing handmade tools for water collection, as well as for storage and distribution
processes (Castaeda, 2010; Ramrez, 2009; Snchez & Caicedo, 2004). This practice
represents high morbimortality risks associated to malaria and other gastrointestinal
ailments. Moreover, in Colombia few research experiences on rainwater harvesting have
been conducted and reported (Castaeda, 2010; Lara Borrero et al., 2007; Surez et al.,
2006; Torres et al., 2011).

Pontificia Universidad Javerianas Campus in Bogota is located at the foothills of the
mountain chain that surrounds Bogota in the east and therefore receives high levels of
precipitation (around 1000 mm/year), which is potentially attractive for planning
2 Rainwater Harvesting on the Javeriana University Campus
rainwater harvesting strategies. Lara Borrero et al. (2007) studied the water resource
availability on the campus with supply and demand balances. Although the conclusions
of that study were enhanced in relation with rainwater availability on the campus,
questions about the water quality and infrastructural demands for a correct rainwater
harvesting were not addressed.

The main objective of the present research is the determination of the infrastructural
requirements in order to fulfill different requirements on the campus by means of
rainwater considering the following criteria: (i) variability on runoff water quality, (ii)
water use on campus, (iii) existing topographical and infrastructural conditions, (iv)
potential collection and storage zones, (v) relationship between supply and demand and
their location on the campus, (vi) economical and environmental benefits, and (vii)
installation and operating costs.

METHODS

The campus of Pontificia Universidad Javeriana in Bogota (PUJB) includes 18 hectares
and almost 200.000 m
2
of constructions where academic, administrative, parking areas,
chapels, banks, meeting and other service buildings, as well as sport fields and green
zones can be found (see location of buildings in Figure 1). Every day, approximately
30.000 people enter the campus, whose buildings are up to 70 years old, but mostly
around 40 years and several are recent constructions. The Bogota Water and Sewage
Company (EAAB) provides potable water service to the 46 buildings on campus, which
is accounted by a mean of 16 water flow meters. The variations in consumption were
analyzed, obtaining the historical monthly mean drinking water consumption on
campus.


Figure 1. Location of the buildings on PUJB campus (source: www.javeriana.edu.co)

Water use assessment was realized by means of a field study of the campus, using a site
record form. For each water use, three levels were attributed (minimal, mean and high)
according to consumption scenario analysis. Additionally, variations on water demand
were taken into account using (i) maximum flow rates for water pipes considered, under
the assumption that all the systems are operating simultaneously, (ii) adjusted water
demands using simultaneous demand coefficients for sanitary facilities (Prez Carmona,
2004) and (iii) evaluation of the system in critical periods by using the augmentation
coefficients proposed by the national Development Ministry (Ministerio de Desarrollo
12
th
International Conference on Urban Drainage, Porto Alegre/Brazil, 11-16 September 2011
_____________________________________________________________________________
Torres et al. 3
Econmico, 2000), in order to take into account the behavior regarding a non-expected
increase of the demand (for example growth of campus population).

The analysis of the hydrological supply was executed using the collected inter-monthly
precipitation information between 1936 and 2009 from a rain gauge near the university
campus (San Luis). From this analysis, monthly historic mean values were obtained and
adapted to the campus area. In this way, the mean monthly supply on rainwater was
estimated.

Additionally, the runoff coefficients for the surfaces of the campus were assessed and
different water balances were set up with the aim of examining behaviors related to the
supply and demand of rainwater on campus.

The proposed use scenarios were described as follows: (i) rainwater harvesting for
100% of the universitys uses by means of collecting rainwater on the whole campus
area; (ii) rainwater harvesting for non-potable uses only by means of collecting
rainwater on the whole campus area; (iii) rainwater harvesting for non-potable uses by
means of collecting rainwater on roofs and the soccer field; (iv) rainwater harvesting for
external uses supplying 40 % of the total demand, by means of rainwater collecting on
roofs and the soccer field; (v) rainwater harvesting for external uses supplying 38 % of
the total demand, by means of collecting rainwater on roofs and the soccer field, hard
surfaces and gardens.

The results showed the need of dividing the campus in different potential water
exploitation sub-basins to distribute requirements of infrastructure related to different
uses, especially for the storage facilities. According to the results, two sub-basins were
identified and taking into account the water balance analysis, the supply in each sub-
basin was determined. In accordance with topography and location criteria, zones that
could be supplied with water were identified and this way, the demand in each sub-
basin was determined. The demand values were estimated using a trial and error
methodology for different case scenarios, establishing a definition of storage volumes
for the final scenario, according to water balances assessments based on: (i)
consumption scenarios and expected water quality related; (ii) hydrological supply
based on information from San Luis rain gauge station; (iii) rain-runoff parameters
allowing to transform raw into net hydrological supply.

Different pipe materials (PVC and PE), as well as two options for the topology of the
pipe systems (tree-type and mesh network), were taken into account. The software
WaterCAD (Bentley) was used with the goal of dimensioning a hydraulic infrastructure,
taking into account existing pipes, diameters and optimal pipe materials, accessories and
valves, as well as service levels with respect to pipe pressures and water levels in tanks
and storage facilities. No collecting pipe design was proposed, as our proposal is to use
existing facilities in order to supply rainwater from the storage tanks to the usage areas,
and for this purpose only some modifications of the existing rain water drainage
systems would be necessary.
With the design and definition of all requirements of infrastructure according to their
technical viability, a cost viability study was created, which allowed quantifying the
economical investments needed to implement the rainwater harvesting project.
Moreover, a financial evaluation was realized using tools like Net Present Value (NPV),
Internal Rate of Return (IRR) and Benefit-Cost Ratio (BCR), with the objective of
4 Rainwater Harvesting on the Javeriana University Campus
assessing the economical feasibility, the return periods of the investment and the
economical benefits of the project in comparison to the reduction of water consumption
from the conventional water supply system.


RESULTS AND DISCUSSION

It was established that PUJB uses around 16.651 m
3
of water each month and 199.807
m
3
yearly. Historically, the water use decreased between 2004 and 2007, but increased
again in 2008 and 2009, so that the use was higher than in 2004. The minimum, mean
and maximal use of water for each building was determined and varied between 134 L/d
(building 35, Figure 1) for the minimal use scenario to 111.751 L/d (buildings 50, 51
and 52, Figure 1) for the maximal use scenario. Additionally, the buildings with highest
(buildings 2, 11, 25, 50-53, 67 and 115, between 14.971 L/d and 78.051 L/d) and lowest
demands (buildings 5, 23 and 35, between 219 L/d and 1.978 L/d) were determined
(consult Figure 1 for locations of the buildings).

With the analysis of water use it was assessed that floor cleaning and irrigation of
external gardens, toilet discharges and cleaning of hard surfaces are the uses with the
highest demands (72 % on the total campus). Likewise, it was also established that the
uses that mainly need potable water are hand washing, laboratory activities, drinking
water, showers and dishwashing, which correspond to only 20 % of the total uses of the
campus.

Moreover, it was observed that the mean monthly water demand on campus varies
substantially and is bimodal. The periods of highest use are the months of academic
activity (February-May and August-November), while use is substantially reduced in
vacation times between semesters (December-January and June-July). The highest use
was registered in September and the lowest in January.

Regarding water supply, the analysis on San Luis rain gauge allowed establishing that
the mean annual precipitation of the zone is 1.007,6 mm.

A preliminary analysis of the different scenarios showed that the first four were
financially not feasible for the following reasons: (i) due to the topography of the
campus, an implementation of an expensive pumping system would be necessary; (ii)
the water storage volumes were excessive (above 4.500 m
3
), demanding high
investments and space requirements on campus.

For scenario no.5 (rainwater harvesting for external uses supplying 38 % of the total
demand), with the aim of reducing storage tank volumes and taking into account the
topography and existing water pipe distributions, the potential exploitation zones and
placing of the demands, two sub-basins were estimated, defined as Soccer Field and
Baron sub-basins (see Figure 2). As a result of the balances, storage volumes of 912 m
3

and 473 m
3
, were estimated for the sub-basins. The Soccer Field sub-basin would
supply external uses of the lower zone of the campus for irrigation and floor, faade and
hard surface cleaning purposes. The Baron sub-basin would supply water for non-
potable uses at the first three levels of the Engineering Faculty (Building no. 11).

12
th
International Conference on Urban Drainage, Porto Alegre/Brazil, 11-16 September 2011
_____________________________________________________________________________
Torres et al. 5
As a result of the hydraulic analysis, aimed at achieving the service levels demanded by
the national Development Ministry (Ministerio de Desarrollo Econmico, 2000) in
terms of pressure (39 kPa), we obtained simple commercial diameters of 2 for most of
the pipes (290 m, representing 41 % of the total length) of 1.5 for intermediate
networks (199 m, 28 %) and 1 for end networks (225 m, 31%) after 12 simulations
using the software WaterCAD (Bentley). A detailed analysis of the Soccer Field sub-
basin allowed to establish that the network of this sub-basin needs to increase the pipes
diameters significantly in order to distribute the demanded volumes in a better way in
case of an increase in actual water demand.


Figure 2. Location of sub-basins PUJB campus (modified: www.javeriana.edu.co)

The identified collecting pipes of the following types: (i) for Soccer Field sub-basin,
two 8 supplying networks from building 115 were identified; (ii) for the Baron sub-
basin, four 8 supplying networks were identified from the south-western part of the
campus.

Regarding the campus results of runoff water quality obtained in Torres et al. (2009), it
was possible to detect that most of the pollutants are heavy metals, such as iron, lead,
cadmium and mercury, organic matter (BOD
5
), ammonia, suspended solids and
coliform bacteria. Therefore, treatment processes for both sub-basins were selected as
following: (i) multiple-step filtration systems, (ii) settling systems and (iii) activated
carbon film treatment.

For the proposed Soccer Field sub-basin harvesting system, the estimated budget is
448.200.453 Colombian Pesos (COP) (235.895 USD). For the Baron sub-basin
harvesting system the budget is proposed as 246.776.930 COP (129.878 USD). So, the
total cost for the construction of the exploitation systems would be 694.967.383 COP
(365.772 USD).

6 Rainwater Harvesting on the Javeriana University Campus
Therefore, the total percentage of rainwater use on the university campus would be 14%
of the total water use, reducing the potable water consumption by 2.014.563 COP
(1.060 USD) per month, which would result in total savings of 24.174.754 COP (12.723
USD) per year due to an exploitable rainwater volume of around 28.000 m
3
per year.

The following are the financial indicators calculated for the Soccer Field and Baron sub-
basins, respectively: (i) NPV: 6.665.291 COP (3.508 USD) and 10.245.752 COP (5.393
USD); (ii) IRR: 3,52 and 3,68; (iii) BCR: 1,01 and 1,04. An evaluation period of 30
years was established, but, as the indicators do not show feasibility, an additional return
period of 3 years was added. Increasing the projection analysis, it was established that
an equilibrium point was obtained in year 33, when the project would became stable and
profitable.

CONCLUSIONS

The present work consisted in estimating the infrastructural requirements to supply for
rainwater harvesting, several demands at the Pontificia Universidad Javeriana campus in
Bogota were evaluated through an inventory of water uses and studying rainfall
measurements of the zone and runoff water quality assessments coupled with hydraulic
modeling.

Two potential sub-basins were identified for the exploitation of the elevated part of the
campus supplying approximately 14 % of the total water use of the campus: (i) Soccer
Field sub-basin with a storage structure of 912 m
3
for external uses in the lower part of
the campus (irrigation and cleaning of faade and hard surfaces) as well as public toilets;
(ii) Baron sub-basin with a storage structure of 473 m
3
for non-potable uses in the first
three levels of building 11 (see Figure 1).



Based on 12 hydraulic modeling results, optimal pipe sections (1 to 2), pipe material
(PVC) and accessories, and required regulation valves were selected, as well as service
levels in terms of pressures in the pipe system and water levels in tanks and storage
structures. In accordance to runoff rainwater quality on university campus (presence of
heavy metal, suspended solids, ammonia and organic matter concentrations), a multiple-
step filtration system was selected in association with an activated carbon film and a
settling process in storage tanks.

Accounting for hydraulic and treatment structures and facilities, the investment required
for implementing the rainwater harvesting system proposed was assessed to
694.967.383 COP (365.772 USD), representing annual savings of 24.174.754 COP
(12.723 USD) due to the reduction of potable water consumption, nevertheless, the
BCR indicator is higher than unity. The return of investment is assessed to more than 30
years, which indicates that the proposed project has a low financial viability.
Nonetheless, in this paper some benefits, such as environmental ones, obtained by
implementing a rainwater harvesting system were not assessed. On the other hand,
solutions proposed were not faced to the campus development policies and impacts on
the construction phase with regard to service coverage were not assessed, either. These
aspects will be studied subsequently, where additionally Sustainable Urban Drainage
Systems (SUDS) will be considered as components of the rainwater harvesting system.

12
th
International Conference on Urban Drainage, Porto Alegre/Brazil, 11-16 September 2011
_____________________________________________________________________________
Torres et al. 7
ACKNOWLEDGEMENT
The authors wish to thank Pontificia Universidad Javeriana Campus Administration and
Bogota Water and Sewage Company (Empresa de Acueducto y Alcantarillado de
Bogota - EAAB) for the information used in this work under collaboration agreement
number 9-07-26100-1060-2008.

REFERENCES
Castaeda, P. (2010). Propuesta de un sistema de aprovechamiento de agua lluvia, como
alternativa para el ahorro de agua potable, en la institucin educativa Mara
Auxiliadora de Caldas, Antioquia Universidad de Antioquia, Medelln.
Centro de Produccin ms Limpia de Medelln. (2009). Estimacin de gastos de agua a
nivel domstico y comercial. In C. d. P. m. L. d. Medelln (Ed.). Medelln-Colombia.
Coombes, P., Argue, J., & Kuczera, G. (2000). Figtree Place: a case study in water
sensitive urban development (WSUD). Urban Water, 1(4), 335-343.
Ghisi, E., Montibeller, A., & Schmidt, R. (2006). Potential for potable water savings by
using rainwater: An analysis over 62 cities in southern Brazil. Building and
Environment, 41(2), 204-210.
Hatt, B., Deletic, A., & Fletcher, T. (2004). Integrated Stormwater Treatment and Re-
use Systems-Inventory of Australian Practice. CRC Catchment Hydrology Industry
Report.
Lara J.A., Torres A., Campos M.C., Duarte L., Echeverri J.I., Villegas P.A. (2007).
Aprovechamiento del agua lluvia para riego y para el lavado de zonas duras y fachadas
en el campus de la Pontificia Universidad Javeriana (Bogot). Ingeniera y
Universidad, 11(2), 193-202. ISSN 2011-2769.
May S. (2004). Estudo da viabilidade do aproveitamento de gua de chuva para
consumo no potvel em edificaes. Sao Paulo, Sao Paulo.
Mbugua, J. (2002). Artificial Recharge. Small Community Water Supplies. Technology
people and partnership. Technical Series Paper No. 40. IRC, 3(8) 129-149.
Ministerio de Desarrollo Econmico (2000). Repblica de Colombia. Reglamento
Tcnico del Sector de Agua Potable y Saneamiento Bsico, RAS - 2000. Seccin II,
Ttulo B Sistemas de Acueducto.
Pachauri, R. (2008). El cambio climtico y el agua. Documento tcnico VI del IPCC.
Prez Carmona, R. (2004). Instalaciones hidrulicas, sanitarias y de gas en
edificaciones. Santaf de Bogota, DC; Grupo Editar, 2004, 419 p. Ilus, Tablas.
Ramrez, J. (2009). Construccin verde en concreto. Noticreto, revista de la tcnica y la
construccin, 2, 20-27.
Snchez, L., & Caicedo, E. (2004). Uso del agua lluvia en La Bocana-Buenaventura.
CINARA; Universidad del Valle. Usos Mltiples del Agua: para la Vida y el
Desarrollo Sostenible. Cartagena de Indias, CINARA, 2004, p. 1-9 Ilus, Tab.
Surez, J., Garca, M., & Mosquera, R. (2006). Historia de los sistemas de
aprovechamiento de agua lluvia. Paper presented at the VI SEREA - Seminrio
8 Rainwater Harvesting on the Javeriana University Campus
Iberoamericano sobre Sistemas de Abastecimento Urbano de gua Joo Pessoa
(Brasil), 5 a 7 de junho de 2006.
Torres A., Lara J., Torres Murillo O. M., Estupin Perdomo, J. L., & Mndez Fajardo
S. (2009). Aprovechamiento de Aguas Lluvias en el Campus de la Pontificia
Universidad Javeriana, Sede Bogota (PUJB). AGUA 2009: La gestin integrada del
recurso hdrico frente al cambio climtico., 10.
Torres, A., Mndez-Fajardo, S., Lpez-Kleine, L., Marn, V., Gonzlez, J.A., Surez,
J.C., Pinzn, J.D., Ruiz, A. (2011). Evaluacin preliminar de la calidad de la
escorrenta pluvial sobre tejados para su posible aprovechamiento en zonas
periurbanas de Bogota. Rev. U.D.C.A Act. & Div. Cient. 14(1) (in press).