Sei sulla pagina 1di 20

UNCLASSIFIED

Author: CPT Angelique O. Brough (2005)

CONTINGENCY CONTRACT SUPPORT PLAN FOR THE KOREAN


THEATER

Table of Contents
page
References 2
1. General 2
a. FKAQ 4
b. PARC 5
c. Commander, USACCK 6
d. USACCK Detachments/Teams 7
e. Ordering Officers 9
f. USACCK Teams 9
g. Deploying Contracting Officers 11
h. Requiring Activities 11
i. Assistant Chief of Staff, RM 13
j. EUSA FINCOM 13
k. KORO RM 13
l. USACE 13
m. USFK Engineer 14
n. DLA 14
o. USAMC LSA 14
p. GSA 15
q. DCMA 15
r. USFK WHNS 15
2. Assumptions 16
3. Concept of Acquisition Support 16
4. Planning & Preparation for Contingency Contracting
Support During Armistice 18
5. Procurement by Non-Contracting Personnel 20

UNCLASSIFIED

-1-
References
a. Federal Acquisition Regulation (FAR)
b. Defense Federal Acquisition Regulation Supplement (DFARS)
c. Army Federal Acquisition Regulation Supplement (AFARS)
d. Army Federal Acquisition Regulation Supplement Manual No. 2, Contingency
Contracting
e. DOD Inst. 3020.37, Continuation of Essential DOD Contractor Services During
Crises
f. Joint Operation Planning and Execution System (JOPES), Vol II, Joint Pub 4-01,
Mobility System, Policies, Procedures
g. Joint Operation Planning and Execution System (JOPES), Vol II, Joint Pub 5-03.2,
Planning and Execution Formats and Guidance
h. Joint Pub 4-0, Doctrine for Logistic Support of Joint Operations
i. FM 63-3, Corps Support Command, 30 Sep 1993
j. FM 100-7, Decisive Force: The Army In Theater Operations, May 1995
k. FM 100-16, Army Operational Support, October 1994
l. FM 100-10-2, Contracting Support on the Battle Field
m. FM 3-100.21, Contractors on the Battlefield
UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)
n. AR 715-9, Logistics, Contractors Accompanying the Force
o. DA PAM 715-16, Contractor Deployment Guide
p. AMC-P 715-8, AMC Contractor Deployment Guide for Contracting Officers
q. UNC/CFC/and USFK Crisis Action System Operating Procedures (CASOP)
(SECRET-ROKUS), 1 Aug 96
r. USFK Regulation 715-4, Advanced Acquisition Planning Program, 27 Oct 98
s. USFK/EUSA Logistics Policies and Plans (LP&P)(SECRET-ROKUS), 1 Mar 99
t. USFK Regulation 715-2 Contracting for Supplies, Services, and Construction,
3 Aug 2004
u. USFK Regulation 700-19 US Invited Contractor and Technical Representative
Program, 5 Dec 2002
v. ASCC and EUSA Crisis Action System Operating Procedures (CASOP)(SECRET-
ROKUS), 1 Aug 98
w. USACCK TACSOP

1. General

a. Purpose. To set forth a contingency contracting operational concept and


support plan to ensure mission essential supplies and services unavailable through
normal logistics channels or Wartime Host Nation Support (WHNS) will be provided for
all US forces within the Korean Theater of Operations (KTO).

b. Scope. This document covers planning for contingency contracting under a


joint-service concept for all purchasing, renting, leasing, or otherwise obtaining supplies,
services, and construction from non-federal sources for use by all US forces in the KTO.
This document is the unclassified version of the CSP, which contains general
contracting guidance for the KTO. Although the Army Contracting Agency (ACA) is the
executive agent for contracting in Korea, US Army Contracting Command Korea
(USACCK) will serve as the lead agency and be responsible for providing contractor
support during a contingency. However, it is recognized that all DoD Services and
many DoD agencies will contribute procurement support to United States Forces Korea
(USFK). A decentralized procurement effort by these activities within a potentially
constrained, chaotic theater will best serve the warfighter.
UNCLASSIFIED

-3-
c. Baseline. For information on contractors and what function they perform in
armistice, see USFK Regulation 700-19, Invited Contractor and Technical
Representative Program and Joint Publication 4-0, Doctrine for Logistic Support for
Joint Operations. For information on how contracting works on the Korean Peninsula in
armistice, see USFK Regulation 715-2, Contracting for Supplies, Services, and
Construction and Joint Publication 3-0, Doctrine for Joint Operations.

d. Control

(1) Procurement authority for contracting in Korea flows from the ACA as
the Head of the Contracting Activity (HCA) thru the Principal Assistant Responsible for
Contracting (PARC). The Army PARC in conjunction with USFK Assistant Chief of
Staff, Acquisition Management (FKAQ) will provide contracting policy, procedures, and
contingency contract planning for the KTO. The contracting authority within the KTO for
all Services is controlled by the PARC. All other contracting activities in Korea (USACE,
DCMA) have a coordinating responsibility to the PARC in armistice and contingency.
All contracting activities will conform to theater-wide acquisition policies promulgated by
the PARC. In armistice, the PARC incumbent is also the USFK Assistant Chief of Staff,
Acquisition Management (FKAQ), Advisor to Eighth US Army (EUSA) for contracting
matters, and Commander, USACCK.

(2) Upon contingency or at the discretion of the Commander USACCK, in-


theater contracting personnel will be deployed as set forth in the USACCK TACSOP.
When mobilized, USACCK is organized into Detachments and subordinate Teams
under the USACCK Headquarters. In armistice, other contracting activities planning to
support operations in Korea will coordinate with FKAQ. Contracting activities will
convey their mission and intended deployment locations within the KTO to FKAQ. All
contracting personnel may be redeployed within theater at the discretion of the
USACCK Commander to best support the USFK mission. Deploying personnel may or
may not integrate with pre-determined USACCK Detachments and subordinate Teams
at the discretion of the USACCK Commander in order to most efficiently support
operations in the KTO. Armistice coordination is critical to ensure supported, effective
operations.

(3) The PARC will have direct access to the HCA, in order to fulfill the
PARC’s and HCA’s statutory and regulatory responsibilities.

e. Contracting Organizations and Responsibilities in Korea

(1) Operates from in Camp Coiner Bldg 1130, Yongsan, Seoul during
armistice until the staff transitions its command post to Camp Henry Bldg 1815, Taegu
when deployed in a contingency. Armistice FKAQ functions and responsibilities remain
unchanged in a contingency. FKAQ does not have contracting authority. FKAQ will:

(a) Serve as the joint staff proponent for contracting in the KTO.

(b) Coordinate on official joint staff or service component


UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)
acquisition or contracting matters with all Service components.

(c) Manage the US Invited Contractor and Technical


Representative programs in accordance with the requirements of the Republic of Korea
(ROK)-US Status of Forces Agreement (SOFA) and USFK Regulation 700-19, Invited
Contractor and Technical Representative Program.

(d) Advise any Acquisition Review Board (Contingency Acquisition


Review Board (CARB), Joint Acquisition Review Board (JARB) or Logistics
Procurement Support Board (LPSB).

(e) Conduct contingency planning with all parties supporting the US


Armed Forces in Korea (e.g. PACOM, EUSA, Service Components, USACCK, USFK
requiring activities, AAFES, NAF, DoD Agencies, etc.).

(f) Coordinate with FKJ4 and USACCK on WHNS to identify


resource shortfalls eligible for procurement. Identified shortfalls are still considered
valid requirements by the requiring activity, which may be procured through USACCK.

(g) Coordinate inter-service support agreements detailing


contracting support relationships with all Services.

(h) FKAQ contact information:

1. Armistice: Deputy International Operations (Seoul) DSN


(315) 724-6100/6211.

2. Contingency: CP Oscar (Taegu) DSN TBD.

(2) The PARC will delegate contracting authority to Contracting Officers


during a contingency. The duration of the contracting authority will be specified by the
PARC. The PARC thru the Office of the PARC (OPARC) will provide oversight to
ensure that all purchases subject to the FAR, DFARS, and AFARS are properly
executed by Contracting Officers appointed and selected pursuant to AFARS 1.603.
The PARC is located in Camp Coiner Bldg 1130, Yongsan, Seoul in armistice and in
Camp Henry Bldg 1815, Taegu when deployed. The PARC will:

(a) Maintain direct contact with the HCA.

(b) Serve as EUSA advisor on all contracting matters.

(c) Fulfill all HCA assigned and delegated statutory and regulatory
contracting responsibilities.

UNCLASSIFIED

-5-
(d) Establish policies and procedures for developing, reviewing, and
managing the contingency contracting process.

(e) Appoint contracting officers, modify and/or terminate contracting


officer warrants, as necessary, including deploying contingency contracting officers,
regardless of Service.

(f) Establish and maintain liaison with contracting personnel


deployed under the contracting authority of their parent organization.

(g) Process waivers, deviations, and special authorizations for


efficient contracting support of USFK.

(h) Coordinate on all EUSA staff contracting matters.

(i) Serve as an advisor to any Acquisition Review Board or Logistics


Procurement Support Board IAW 3(e).

(j) Conduct contingency planning with all parties supporting the US


Armed Forces in Korea. These entities include PACOM, EUSA, Service Components,
USACCK, USFK requiring activities, AAFES, NAF, DoD Agencies, etc.

(k) Maintain oversight over contracting operations, as required or


otherwise identified by the PARC, to ensure adequacy of organizational structure,
staffing, and training program of each contracting office.

(l) Direct all contracting activities assigned or attached to the KTO


except for General Services Agency (GSA), Defense Logistics Agency (DLA), US Army
Corps of Engineers (USACE), and US Army Material Command (USAMC) Life Cycle
Management Commands (LCMCs).

(m) Coordinate with ACA to request deployment of qualified


contracting personnel under contingency conditions from divisions, corps, and
MACOMs as needed.

(n) Coordinate with FKAQ to obtain qualified contracting personnel


under contingency conditions from other service components.

(o) Establish policies and procedures for developing, reviewing, and


managing the contingency contracting process and administrative plans to control
documents, maintain records, and conduct audits of contracting actions below the
simplified acquisition threshold (SAT) (imprest funds, SF 44s, Government Purchase
Cards, etc.), as well as acquisitions above the SAT.

(p) Coordinate operational plans or requirements originating with


the Department of Army Staff.

(q) Ensure automation for contracting is on-site for the main


UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)
organization, as well as forward offices to facilitate requisition document controls,
priority processing, reporting procedures, standard use of specifications for common
and repetitive requirements, and as a means of expediting accurate application of
clauses and provisions.

(r) Approve the transfer of USFK funds for contract support to


activities outside of USFK.

(s) PARC/EUSA Advisor for Contracting contact information:

1. Armistice: PARC (Seoul) DSN (315) 724-6082

2. Armistice: Alternate PARC (Seoul) DSN (315) 724-5288

3. Contingency: PARC (Taegu) DSN (315) 768-7430

(3) Commander, USACCK is located in Camp Coiner Bldg 1130,


Yongsan, Seoul in Armistice and in Camp Henry Bldg 1815, Taegu when mobilized for
a contingency. The Commander will provide contracting support to all USFK units and
activities. The Commander, USACCK will:

(a) Execute and manage contracts on behalf of all USFK activities


in armistice, contingency, and war.

(b) Receive, integrate, and execute operational control (OPCON)


over all Service Components/deployed Contracting Officers conducting contingency
contracting missions in the ROK.

(c) Conduct contingency planning with FKAQ, PARC, and USFK


requiring activities to support theater plans and ensure requirements of DODINST No.
3020.37, Continuation of Essential DoD Contractor Services During Crises, are met.

(d) Deploy contingency contracting personnel (MIL/EE/ME) to


geographic and operational centers of gravity IAW OPLAN and FRAGOs in order to
provide contracting support.

(e) Execute contracts and agreements in armistice in support of


forecasted contingency contract requirements.

(f) Identify on-peninsula and offshore vendor sources/procedures to


support OPLANs/CONPLANs.

(g) Provide MIL/EE/ME contracting personnel to participate in


theater contingency exercises.
UNCLASSIFIED

-7-
(h) Thru the Director of Contracting (DOC), execute responsibility
and authority as the Chief of the Contracting Office.

(i) Thru the DOC, plan, direct, and supervise the day-to-day
procurement of supplies, services, and construction for USFK and other DoD requiring
activities.

(j) Identify WHNS shortfalls and notify FKAQ of any shortfalls that
USACCK can support thru contingency contract planning.

(k) USACCK contact information:

1. Armistice: Commander (Seoul) DSN (315) 724-6082

2. Contingency: Commander (Taegu) DSN (315) 768-7430

(4) USACCK Divisions/Branches are subordinate to HQ USACCK and are


established at primary USFK armistice operating locations. The Divisions/Branches
become Detachments (Dets)/Teams (see Figure 1) during a contingency. The
Dets/Teams will provide geographically decentralized contracting support under the
cognizance of a centralized contingency contracting support plan aligned with USFK
requirements as specified in the OPLAN and through subsequent CONPLANS and
FRAGOs. USACCK Dets/Teams will:

(a) Execute and manage contracts on behalf of USFK requiring


activities in armistice, contingency, and war.

(b) Execute operational control (OPCON) over deployed contracting


officers/augmentees.

(c) Conduct training to ensure that contracting personnel are given


current information regarding individual and unit mobility responsibilities within their
geographic location.
UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)

Figure 1
* On-Call Teams

(d) Determine needs and if applicable, establish requirements for


equipment other than the contingency deployment kits.

(e) Prepare and maintain one pre-assembled kit for each


Det/Team.

(f) Coordinate with and incorporate finance and resource


management support for each geographical area of operation for each Det/Team as
required.

(g) Prepare written memoranda of instruction for Ordering Officers,


informing them of their duties, restrictions, limitations and responsibilities in providing
contract support.

(1) Ordering Officers: Because it is essential for the efficient


operation of the contracting mission, the DOC will issue appointment letters to qualified
ordering officers only. Ordering Officers may purchase items with imprest funds:
purchase over-the-counter goods not to exceed $2,500; place calls against basic
purchase agreements (BPAs), and place orders against pre-priced indefinite delivery
type supply and service contracts provided the contract terms permit it and all orders
are placed within the monetary limitations of the contract/BPA terms. For further
detailed guidance on ordering officers, refer to USACCK’s Field Ordering Officer (FOO)
SOP.

(h) Develop written operating procedures detailing the procedures


UNCLASSIFIED

-9-
and systems utilized for providing contract support.

(i) In conjunction with the USACCK Contingency Plans and


Operations Officer conduct future contingency contract planning with HQ USACCK and
USFK requiring activities.

(j) Conduct contingency planning for current and sustainment


operations at the Det and any subordinate Team location.

(k) USACCK Det contact information:

1. Taegu Detachment Chief DSN (315) 768-7430

2. Osan Detachment Chief DSN (315) 784-5893

3. Kunsan Detachment Chief DSN (315) 782-4920

4. Seoul Detachment Chief DSN (315) 724-6082; (*Seoul


Det also responsible for NEO Operations)

(5) USACCK Teams are subordinate to USACCK Dets. On-call Teams


will deploy, as required, in a contingency in order to support operational centers of
gravity within the theater. USACCK Teams will:

(a) Execute and manage contracts, exclusive of COR function, on


behalf of USFK activities in contingency and war.

(b) Execute operational control (OPCON) over deployed contracting


officers/augmentees.

(c) USACCK Team contact information:

1. Suwon DSN TBD

2. K2 AB DSN TBD

3. Kimhae AB DSN

4. Pohang DSN TBD

5. Kwangju DSN TBD

6. Pyongtaek DSN TBD

7. Busan DSN TBD

(6) Deployed contracting units and personnel deploying into the KTO,
except GSA, DLA, USACE, USAMC’s LCMC, or otherwise identified by the PARC, will:
UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)

(a) Coordinate Contracting Support Plans to be included in


subordinate OPLANs with FKAQ and USACCK.

(b) Provide additional planning documents to include TPFDD for


operations in the KTO to FKAQ and PARC office via secure means (GCCS-K and/or
SIPRNET).

(c) Coordinate deployment to the KTO with USACCK prior to


arriving in the theater.

(d) When deployed, operate under the control of USACCK for all
contracting activity in the KTO.

(e) Report presence in the KTO to the nearest USACCK Det/Team


and provide information and warrant documentation.

(f) Remain in the theater for a minimum of 90 days after termination


of the contingency, unless released earlier by the PARC, to close out contracts and
procurement actions or transfer administration to organic USACCK personnel.

(g) Provide their own contingency deployment kits. Augmentees


will bring military clothing and equipment. No equipment and/or clothing will be issued
by USACCK.

(h) Coordinate exercise participation and individual training with


FKAQ.

(7) Contracting officers deploying to the ROK operate under the control of
USACCK. Deploying Contracting Officers will:

(a) Report to the nearest USACCK Det/Team for integration into


theater contracting activities.

(b) Coordinate any warrant information to execute contracts within


the KTO with the PARC for approval prior to arrival, if possible, or upon arrival and prior
to executing any contracting instruments in the KTO.

(c) Deploy with all required military clothing and equipment, forms,
and personal gear for self-sustaining operations.

(d) Conduct contracting activities under the direction of USACCK


IAW theater policies. Components may utilize their service policies and procedures to
the extent it does not conflict with theater procedures and policy. The PARC will resolve
UNCLASSIFIED

- 11 -
any conflicts between theater and service policy and procedures.

(e) Prior to redeploying from the KTO, contracting officers will


submit a closeout report annotating among other items that all issued contracts are
closed out unless other arrangements are made with the PARC. As part of the
closeout report, deployed contracting officers will report all contract actions, disputes,
and claims issued and/or administered to USACCK.

(f). Utilize the Government Purchase Card (GPC) for local


purchases up to approved thresholds until economic conditions no longer allow its use.
Request Ordering Officer appointments from the nearest USACCK Det/Team to replace
GPC capability.

(8) Requiring Activities will:

(a) Coordinate requirements with organic Service Component and joint


sources of supply and support, as well as WHNS for requirements sourcing prior to
submitting a requirement for contract support to USACCK.

(b) Coordinate contracting requirements with USACCK for procurement


before utilizing the Logistics Civil Augmentation Program (LOGCAP) IAW the
LOGCAP plan for Korea. LOGCAP is a commercial contract that may be used to
supplement both WHNS and contingency contracting when requested by the theater
commander. The theater commander will determine if, when, and to what extent
LOGCAP will be utilized in the theater.

(c) Conduct appropriate planning in armistice in coordination with


WHNS and USACCK for projected contingency contract requirements.

(d) Procure supplies and services only through a properly


appointed U.S. Government Contracting Officer, properly appointed Ordering Officer, or
by Government Purchase Card.

(e) Utilize the processes and follow the guidance set forth in USFK
Regulation 715-2 to identify routine requirements and prepare requirement packages for
execution by USACCK Contracting Officers. Approval to transfer funds to contracting
activities outside of USFK is facilitated by FKAQ.

(f) Identify needs and conduct acquisition planning with USACCK


for known or projected requirements IAW USFK Reg 715-4.

(g) Contact the nearest USACCK Detachment or Team for support


of routine and emergency requirements.

(h) Ensure the supported Contracting Officer coordinates requests


Invited Contractor/Technical Representative designations, and subsequent SOFA
status, for US contracts to be performed in the ROK prior to performance start IAW
USFK Regulation 700-19.
UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)

(i) Identify resourcing shortfalls through supporting command.

(9) Units and Staff entities such as Resource Management (RM), Finance
Command (FINCOM), Korean Regional Office (KORO), USACE, DLA, USAMC, GSA,
Defense Contract Management Agency (DCMA) will:

(a) With the PARC, provide acquisition planning support to any


Theater Acquisition Review Boards IAW 3(e).

(b) Coordinate exercise planning and participation with FKAQ and


USACCK.

(c) Comply with the requirements of this CCSP.

d) Coordinate contingency planning with the Theater PARC.

e) Comply with PARC policies applicable to all contracting


activities in the KTO.

f) Provide the following information to the Theater PARC: number


of contractors brought into the KTO, number of contractors
currently in the KTO, Contracting Officers warrant information,
location of Contracting Officers, what unit(s) or geographical
areas the Contracting Officer is supporting.

(10) The Assistant Chief of Staff, RM will:

(a) Ensure resource managers obtain and certify the availability of


funds in support of USFK contracting requirements.

(b) Be responsible for monitoring and administering all contract


funding for USFK, and all contract payments to include the training and management of
Paying Agents.

(11) EUSA FINCOM will:

(a) Provide finance and accounting support to supported units.


This can be accomplished with, but not limited to:

(1) Develop written operating procedures covering finance


support required.

(2) Prepare written letters of instruction for Finance Officer’s


UNCLASSIFIED

- 13 -
Representative and imprest fund cashiers.

(b) Through deployed subordinate finance elements, coordinate


with Det/Team Chiefs to plan for sufficient assets to make payments and disbursements
for all contracting actions executed in the KTO.

(c) Coordinate planning to appoint and train unit Paying Agents to


operate in conjunction with USACCK appointed and trained Field Ordering Officers.

(12) KORO RM will:

(a) Ensure resource managers obtain and certify the availability of


funds in support of KORO contracting requirements.

(b) Be responsible for monitoring and administering all contract


funding for KORO, and all contract payments to include the training and
management of Paying Agents.

(13) The USACE will:

(a) Provide theater construction contracting support for MILCON


(new construction over $750,000).

(b) Provide theater Architect and Engineering (A & E) contracting


support.

(c) Provide theater minor construction and facilities maintenance


and repair contracting support in coordination with USACCK.

(d) Coordinate the use of the local contractor base with the PARC
and USACCK for requirements exceeding the Simplified Acquisition Threshold or any
phase-restricted procurements.

(e) Identify shortfalls in armistice or contingency to USACCK for


potential contracting support.

(14) USFK Engineer (FKEN) is the agent for real property.

(15) The DLA will:

(a) Provide armistice support through Primary and Secondary Level


Field Activities (PLFAs and SLFAs) using a decentralized, business-oriented command
and control system.

(b) In the event of hostilities, DLA will establish a Contingency


Support Team (DCST) in Korea to provide command and control of all DLA activities
and personnel in the area of operations and arriving DLA personnel.
UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)
(c) Provide supply support and technical and logistics services to all
military Services.

(d) Coordinate the use of the local contractor base with the PARC
and USACCK for requirements exceeding the Simplified Acquisition Threshold or any
phase-restricted procurements.

(e) Specific PLFAs and SLFAs in the Korean Theater include:

1. Defense Supply Center Philadelphia (DSCP)

2. Defense Energy Supply Center (DESC)

(16) The USAMC Logistics Support Element (LSE) will:

(a) Provide enhanced weapon system and equipment readiness


through the integrated application of USAMC’s national-level logistics provider and
materiel sustainment capabilities for the supported units within the Korean Theater.

(b) Manage the LOGCAP contract in the KTO.

(c) Coordinate LOGCAP planning and execution for the KTO.

(d) Coordinate the use of the local contractor base with the PARC
and USACCK for requirements exceeding the Simplified Acquisition Threshold or any
phase-restricted procurements.

(17) GSA will:

(a) Be responsible for procuring support for USFK IAW existing


contracts or through FKAQ approved contract offloads.

(b) Coordinate the use of the local contractor base with the PARC
and USACCK for requirements exceeding the Simplified Acquisition Threshold or any
phase-restricted procurements.

(18) DCMA will coordinate the use of the local contractor base with the
PARC and USACCK for requirements exceeding the Simplified Acquisition
Threshold or any phase-restricted procurements.

(19) USACE, DLA, GSA, and DCMA will comply with ROK-US SOFA and
USFK Regulation 700-19 when procuring US or Third Country National (TCN) contract
support of US Armed Forces in the KTO.

UNCLASSIFIED

- 15 -
(20) USFK Wartime Host Nation Support (WHNS) Program will:

(a) Identify WHNS shortfalls in armistice and contingency to FKAQ


for potential contracting support.

(b) Advise activities with identified WHNS shortfalls selected for


contingency contract support to develop requirements thru the responsible functional
activity as contracting requirements IAW USFK Reg 715-2.

(c) Request mobilization exemptions from the ROK Government for


assets and/or personnel utilized in contingency contracts.

(d) Advise FKAQ of the ROK Government’s disposition on all


requests.

(e) Request sources of supply/service for FKAQ-identified


contingency contract requirements.

2. Assumptions

a. During a contingency, the host nation is expected to nationalize all or part of its
industrial base. As a result, local contractor sources will become scarce. This will
potentially limit contracting operations and will create an environment of scarce
resources.

b. USACCK will continue to operate under regulatory guidance or procedures


approved through the PARC by the HCA.

c. Because of the urgent/high priority nature of most supplies and services


requested, reduced lead-times and expedited delivery requirements can be expected.

d. Limited authority and responsibility for purchasing will be delegated to


Ordering Officers IAW the instructions set forth in this plan and regulatory guidance.

e. USFK will activate a Joint Acquisition Review Board (JARB) to prioritize


requirements and determine sources of procurement support. The JARB will:

(1) Coordinate service acquisition activities.

(2) Integrate the acquisition flow with the overall theater logistics
operation.

(3) Be chaired by the CJTF J-4 and comprised of representatives from


ARFOR, NAVFOR, MARFOR, AFFOR, Civil Affairs, Legal, HNS, CJTF J-4
Rep, CJTF Controller Rep, CJTF Engineering Rep, and Host Nation
LNOs.

(4) Coordinate with J-8 section, as the J-8 section is the lead agency for
UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)
the JARB.

f. The PARC and representatives from other contracting activities in theater will
serve as non-voting advisors to the JARB.

3. Concept of Acquisition Support

a. The ACA is the executive agent for contingency contracting for the KTO. The
Theater PARC provides joint service contingency contract planning and guidance for
USFK.

b. USACCK is the designated theater contracting activity for USFK procurement


support. USFK requests for procurement support from other than USACCK are termed
“contract offloads” and require FKAQ approval IAW USFK Regulation 715-2.

c. USACCK will control all US contingency contracting activities in the theater.


All agency and service contracting personnel, except those assigned to FKAQ, OPARC,
DLA, USAMC, Surface Deployment and Distribution Command (SDDC), DCMA, GSA,
USACE, or as approved by the PARC, will be operationally controlled (OPCON) by
USACCK. Augmentees will coordinate with FKAQ in armistice or HQ USACCK in a
contingency prior to reporting to the KTO. Regardless, augmenting contracting
personnel will report their arrival in the KTO to the nearest USACCK Det/Team or HQ
identifying name, rank, unit, supported unit(s), contact information in the KTO and will
provide a copy of their home station warrant with any restrictions. After review, the
PARC will accept the home station warrant, provide KTO specific limitations/restrictions
on the warrant authority, or issue a new warrant. USACCK will assign augmenting
contracting personnel to an existing USACCK support location or assign them as direct
support to their original units under the operational control of USACCK.

d. Units or activities requesting support will submit requirements IAW procedures


in USFK Regulation 715-2.

e. Before accepting requirements for execution through the contracting process,


Contracting Officers and Field Ordering Officers will ensure that proper funds have been
certified as available by the responsible resource manager, that responsible WHNS
functional area manager validates that the requirement cannot be satisfied through
WHNS, and the requirements have been coordinated or approved through the
appropriate functional authority or commander as follows:

(1) Theater-wide requirements through the appropriate staff/organization


with O-6 approval and route to Theater PARC for final contract approval.

(2) Base or Area service support requirements (e.g., trash removal,


portable toilet placement and service) through the appropriate Base Civil or area/post
UNCLASSIFIED

- 17 -
commander.

(3) Minor construction requirements through the responsible Base Civil


Engineer or KORO/Department of Public Works (DPW).

(4) Transportation requirements through the 25th Transportation Battalion


Commander, Combined Transportation Management Committee Chief, or AF
Transportation Unit Commander.

f. Contracting Officers will utilize local sources to the greatest extent possible.
Before determining that local sources cannot provide routine supplies/services,
coordinate with the local WHNS representative to determine if the host nation can
identify sources for satisfying contracting requirements. Requiring Activities and
Contracting Officers will coordinate the method and availability of shipment before
utilizing off-peninsula sources. Requiring Activities and Contracting Officers will comply
with the US-ROK Status of Forces Agreement and USFK Regulation 700-19 before
obtaining services from other than local sources for performance in the KTO.

4. Planning and Preparation for Contingency Contracting Support During Armistice

a. USACCK is a large, established contracting command within Korea managing


an array of supply, construction, and service contracts in support of USFK. All other
operational contracting personnel within the KTO are under the Operational Control of
the USACCK Commander in armistice, contingency, and war. All deploying Contracting
Officers and Field Ordering Officers will have their warrants and appointments letters
issued/endorsed by the PARC, IAW the policy set forth below. Supporting contracting
activities (e.g., USACE, DCMA, USAMC, DLA, SDDC, etc.) will coordinate their
presence in theater with the PARC upon arrival and will report unit strength, location in
theater, chain of contracting authority, and mission prior to initiating contracting activity.
The PARC is the final authority on what constitutes operational and supporting
contracting missions. The PARC does not have procurement or warrant authority for
supporting contracting activities. However, such activities will conform to theater-wide
acquisition guidance promulgated by the PARC on behalf of the USFK Commander.
The PARC will conduct armistice planning with all operational and supporting
contracting activities with a prescribed mission in Korea.

b. Memorandums of Agreement completed in armistice are preferred to set forth


the responsibilities between USFK, PARC, USACCK, and the deploying activity (as
warrants already in place through MOAs will be accepted). However, deploying
operational Contracting Officers will report to the nearest USACCK Det/Team and
present their home station-issued warrant for review by the PARC. The PARC has the
authority to accept, reject or change deploying operational Contracting Officer warrants.
Non-operational contracting officers will report their unit strength, location in theater,
chain of contracting authority and mission prior to initiating contracting activity.

c. Continuation of Essential Services During Emergencies. IAW Department of


Defense Instruction (DoDI) 3020.37, dated November 6, 1990, requiring activities will
identify any contingency requirements associated with armistice procurements when
UNCLASSIFIED
Author: CPT Angelique O. Brough (2005)
submitting the requirements package to the contracting office. Recurring Services
contracts and ordering contracts are prime candidates for inclusion of contingency
contracting clauses. For any procurement supporting the KTO, contracting offices will
distribute one copy of all contracts and any modifications containing a contingency
clause to FKAQ.

d. Identifying Additional Contingency Contract Requirements. Requiring activities


must identify supply, construction, and service contract quantities required to support
this CCSP that differ from their armistice requirements. Contracting Officers will first
consider including contingency requirements with current funded requirements for new
armistice contracts or modifying current funded contracts, to include contingency
requirements before developing a new contingency contract. For any procurement
supporting the KTO, contracting offices will distribute one copy of all contracts and any
modifications containing a contingency clause to FKAQ.

e. Wartime Host Nation Support Shortfalls. In many cases, contingency contract


planning offers sources of support for WHNS shortfalls. Component activities
supporting this OPLAN will identify logistic shortfalls using the FKJ4’s WHNS process.
FKJ4 may submit a prioritized list of WHNS shortfalls to FKAQ as candidates for
contingency contract planning.

f. Procurement Support for WHNS Shortfalls. FKAQ will coordinate the FKJ4
prioritized list of WHNS shortfalls with available procurement activities (USACCK,
USACE Far East District, DLA, AMC-Far East) for contingency contracting support.
Contingency contract support may include adding the shortfall requirement in existing
contracts, developing a stand-alone contingency contracting vehicle or identifying
contingency sources of supplies, construction, or services. In order to maximize the
probability of contingency contract performance, the use of current, funded contracts for
the inclusion of contingency requirements as options or other contract term or condition
is the preferred method of contingency contract support for the KTO. FKAQ will identify
to FKJ4 those WHNS shortfalls that can be supported through available procurement
activities. FKJ4 will, in turn, notify the requiring activity to submit the shortfall IAW the
identified procurement activity’s processes for action. FKJ4 should also notify those
activities whose requirements could not be supported through procurement action.
Note, requiring activities must submit the requirement IAW established contracting
procedures (e.g., USFK Regulation 715-2 for USACCK actions). RAs will submit
contingency requirements through the appropriate channels to the contracting office.
Clearly identify the requirement as a contingency contract action subject to the
availability of funds. For any procurement supporting the KTO, contracting offices will
distribute one copy of all contracts and any modifications containing a contingency
clause to FKAQ.

g. Validation of Contingency Contract Requirements. Contingency requirements


will be included in USFK’s Advanced Acquisition Planning (AAP) Program and will be
UNCLASSIFIED

- 19 -
validated annually by the RA. FKAQ will be the POC for contingency requirements in
the AAP Program. Validation will occur annually to support an updated submission of
existing contingency contracts to FKJ4 to support the WHNS submission to the ROK
government. One purpose of validation is to submit the maximum number of
contingency contracts is included in the WHNS submission for inclusion in the WHNS
plan. FKJ4 will notify FKAQ at least 90 days prior to the required WHNS submission
date in order to complete the validation.

h. Contingency Contracts Not Included in the WHNS Plan. Those contracts not
included in the WHNS Plan by the ROK Government will be identified to FKAQ by FKJ4.
FKAQ will in turn notify the contracting office for coordination with the RA. FKAQ, in
coordination with the contracting office, will attempt to identify alternative sources of
support for the contingency requirement or notify the RA that the contingency
requirement cannot be supported.

i. Procurement Support for Contingency Contracts. Procurement activities filling


a USFK contingency requirement will include support for the requirement in their
internal contingency planning. Contingency planning must include initiation and
administration of the contingency requirement by the procuring office. Procurement
activities will ensure the RA is notified of any changes that affect performance of the
contingency contract. For any procurement supporting the KTO, contracting offices will
distribute one copy of all contracts and any modifications containing a contingency
clause to FKAQ.

5. Procurement By Non-Contracting Personnel

a. Government Purchase Card (GPC). The GPC will be used whenever practical
within the KTO under this CSP. Units may continue to use home-station issued and
funded purchase cards when deployed in the KTO only when CCOs (IAW DoD ratios)
are also deployed to manage the GPC program. GPC programs within the KTO will be
managed IAW USFK policy regardless of the source of issuance or funding. Units will
contact the nearest USACCK Det/Team for GPC support.

b. Field Ordering Officers. The USACCK DOC may appoint government Field
Ordering Officers when GPC use is impractical. Units are responsible for nominating
Field Ordering Officers and Paying Agents to the Det/Team Contracting Officer.
Contracting Officers will train Field Ordering Officers IAW theater policy before the
USACCK DOC appoints the Field Ordering Officer in writing. The Field Ordering
Officer’s appointment would clearly set out the procurement authority and any
limitations in the appointment letter. All appointed Field Ordering Officers and Paying
Agents would clear their appointment with their appointing authority prior to departing
the KTO.

c. CCOs will advise GPC holders and Field Ordering Officers of existing ordering
contracts and BPAs available for their use.

d. Contracting Officers and Ordering Officers will not act as Paying Agents.