Sei sulla pagina 1di 8

Government of India

Ministry of Power

North Eastern Regional Power Committee
- .
Meghalaya State Housing Finance Co-Operative Society Ltd. Building
, 793003
Nongrim Hills, Shillong 793003.

SPEED POST/FAX
Ph : 0364-2520034
Fax: 0364-2520030
email: nerpc@ymail.com
website: www.nerpc.nic.in

No. NERPC/COM/RTA/2013/4716-31
Dtd 1st May 2013
To
1. CMD, TSECL, Bidyut Bhawan, Agartala 799 001
2. Engineer-in-Chief (P&E), P&E Dept., Govt. of Mizoram, Khatla, Aizawl 796 001
3. Member (Tech.), ASEB, Bijulee Bhawan, Paltan Bazar, Guwahati 781 001
4. Member (Tech.), MeSEB, Lumjingshai, S.R. Road, Shillong 793 001
5. Chief Engineer (E Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar 791 111
6. Chief Engineer (Power), Dept. of Power, Govt. of Manipur, Keishampat, Imphal 795 001
7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima 797 001
8. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong 793 003
9. Executive Director (Comml.), NHPC Ltd., NHPC Office Complex, Sector-33, Faridabad, Haryana-121003
10. Executive Director, NERTS, POWERGRID, Lapalang, Shillong 793 006
Sub: Provisional Regional Transmission Account for April, 2013.
Sir,
The provisional Regional Transmission Account (RTA) for the month of April 2013 has
been uploaded in NERPC website www.nerpc.nic.in for observation and further necessary
actions.
Constituents may send their observation/ comments, if any on the same within 15
days from the date of issue of RTA. In case no communication is received from constituents,
the RTA as issued would be treated as final RTA.

/ Yours faithfully,

f / Member Secretary I/C

Copy for kind information to:


1.
2.
3.
4.
5.
6.

CE (G. M.), CEA, SewaBhawan, R.K.Puram, New Delhi 110 066.


Gen. Manager (Comml.), NHPC Ltd., NHPC Office complex, Sector 33, Faridabad-121003.
Member Secretary, NRPC,18-A,Shaheed Jeet Singh Marg,Katwaria Sarai, NewDelhi-110016.
Member Secretary, ERPC,14, Golf Club Road, Kolkata- 700 033.
Member Secretary, WRPC, Plot No F-3,MIDC Area, Opp Seepz,Marol,Andheri (E), Mumbai-400 093.
Member Secretary, SRPC, 29, Race Course Road, Bangalore- 560009.

f ( / Member Secretary I/C)

For the month of April 2013 dated 01-05-2013

Organisation
DICs (Demand):
Arunachal Pradesh
ASEB
Manipur
MeECL
Mizoram
Nagaland
Tripura
DICs (Injection):
LOKTAK
KHANDONG
KOPILI
DHEP
RHEP
AGTPP
AGBPP
KOPILI-II

Page 1/7

Approved
Injection/
Withdrawal

Approved Additional
Medium term Injection/
Withdrawal

PoC Charges

(in MW)

(in MW)

(in Rs/ MW/ month)

125.97
738.24
120.11
199.98
69.70
93.98
95.71

0
0
0
0
0
0
0

79350.00
109350.00
79350.00
94350.00
109350.00
109350.00
79350.00

103.95
49.50
198.00
74.25
400.95
83.16
282.27
24.75

0
0
0
0
0
0
0
0

79350.00
79350.00
79350.00
79350.00
109350.00
109350.00
109350.00
79350.00

Format 3: Regional Transmission Account (Part-I)

Page 2/7

For the month of April 2013 dated 01-05-2013

GEN / DIC

DICs:
Arunachal Pradesh
Assam
Manipur
MeECL
Mizoram
Nagaland
Tripura
DICs:
LOKTAK
KHANDONG
KOPILI
DHEP
RHEP
AGTPP
AGBPP
KOPILI-II

Zone

Withdrawal:
AP
Assam
Man
Meg
Miz
Nag
Tri
Injection:
Man
As/ Meg
As/ Meg
Nag
RHEP
Tri
Assam
As/ Meg

PoC Charges
(Rs./MW/month)

Total Transmission Charges for


Approved Injection /
Approved Injection /
Withdrawal (MW)
Withdrawal for the month
(Rs.)

(a)

(b )

(A) = (a) x (b )

79350
109350
79350
94350
109350
109350
79350

125.97
738.24
120.11
199.98
69.70
93.98
95.71

9995342.97
80726578.18
9530937.61
18867664.43
7622124.47
10276439.90
7594534.67

79350
79350
79350
79350
109350
109350
109350
79350

103.95
49.50
198.00
74.25
400.95
83.16
282.27
24.75

8248432.50
3927825.00
15711300.00
5891737.50
43843882.50
9093546.00
30866224.50
1963912.50

Format 4: Regional Transmission Account (Part-II)

Page 3/7

For the month of April 2013 dated 01-05-2013

GEN / DIC

DICs:
Arunachal Pradesh
Assam
Manipur
MeECL
Mizoram
Nagaland
Tripura
DICs:
LOKTAK
KHANDONG
KOPILI
DHEP
RHEP
AGTPP
AGBPP
KOPILI-II

Zone

Withdrawal:
AP
Assam
Man
Meg
Miz
Nag
Tri
Injection:
Man
As/ Meg
As/ Meg
Nag
RHEP
Tri
Assam
As/ Meg

PoC Charges
(Rs./MW/month)

Total Transmission Charges


Approved Additional
for Additional Medium Term
Medium Term Injection
Injection / Withdrawal for
/ Withdrawal (MW)
the month (Rs.)

(a)

(b )

(B) = (a) x (b )

79350
109350
79350
94350
109350
109350
79350

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

79350
79350
79350
79350
109350
109350
109350
79350

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Format 7
Page 4/7
WT. AVG. ENTTs. Of Beneficiaries FOR THE MONTH in CS STNS. IN NORTH EASTERN REGION BASED ON GOI ORDERS (in percentage) - for April 2013

DICs

AGBPP, NEEPCO
AGTPP, NEEPCO
Doyang, NEEPCO
Kopili-1, NEEPCO
Kopili-2, NEEPCO
Khandong, NEEPCO
Ranganadi, NEEPCO
Loktak, NHPC

Ar. Pradesh
(a)
5.694
6.132
6.852
5.191
5.992
4.194
18.462
4.940

ASEB
(b)
56.503
45.585
43.808
53.455
52.355
56.285
43.328
29.445

Manipur
(c )
8.105
8.313
7.865
7.395
6.945
6.555
8.373
30.115

MeECL
(d)
11.815
11.813
11.455
17.395
13.675
16.905
11.505
12.393

Mizoram
(e)
5.410
5.980
5.250
4.610
6.040
3.940
5.700
5.020

Nagaland
(f)
5.805
5.377
17.967
6.147
5.735
6.653
5.335
6.435

Tripura
(g)
6.668
16.800
6.803
5.807
9.258
5.468
7.297
11.652

TOTAL
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000

AA. Amount of transmission charges for raising bill of transmission charges of generators on its long term beneficiaries [for Approved Long Term Injection] - for April 2013

DICs

AGBPP, NEEPCO
AGTPP, NEEPCO
Doyang, NEEPCO
Kopili-1, NEEPCO
Kopili-2, NEEPCO
Khandong, NEEPCO
Ranganadi, NEEPCO
Loktak, NHPC
TOTAL

Arunachal
Pradesh = (A) of
page 2/7 x (a)
1757522.82
557616.24
403701.85
815573.58
117677.64
164732.98
8094457.59
407472.57
12318755.27

ASEB = (A) of
page 2/7 x (b)

Manipur = (A) of
page 2/7 x (c)

MeECL = (A) of
page 2/7 x (d)

17440342.83
4145292.94
2581052.36
8398475.42
1028206.39
2210776.30
18996677.41
2428750.95
57229574.60

2501707.50
755946.48
463385.15
1161850.64
136393.72
257468.93
3671048.28
2484015.45
11431816.15

3646844.42
1074220.59
674898.53
2732980.64
268565.03
663998.82
5044238.68
1022228.24
15127974.95

Mizoram = (A) of Nagaland = (A) of Tripura = (A) of


page 2/7 x (e)
page 2/7 x (f)
page 2/7 x (g)
1669862.75
543794.05
309316.22
724290.93
118620.32
154756.31
2499101.30
414071.31
6433813.18

1791784.33
488959.97
1058568.48
965773.61
112630.38
261318.20
2339071.13
530786.63
7548892.73

2058159.85
1527715.73
400814.90
912355.19
181819.02
214773.47
3199288.11
961107.35
9456033.62

TOTAL
30866224.50
9093546.00
5891737.50
15711300.00
1963912.50
3927825.00
43843882.50
8248432.50
119546860.50

Format 7
Page 5/7
BB. Amount of transmission charges for raising bill of transmission charges of generators on its long term beneficiaries [for Approved Additional Medium Term Injection]
April 2013

- for

DICs

AGBPP, NEEPCO
AGTPP, NEEPCO
Doyang, NEEPCO
Kopili-1, NEEPCO
Kopili-2, NEEPCO
Khandong, NEEPCO
Ranganadi, NEEPCO
Loktak, NHPC
TOTAL

Arunachal
Pradesh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ASEB

Manipur

MeECL

Mizoram

Nagaland

Tripura

TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Format 8: NET TRANSMISSION CHARGES PAYABLE BY DICs FOR THE MONTH OF APRIL 2013
Page 6/7

Part-I (Transmission Charges for Approved Long Term Injection / Withdrawal for the month)

GEN / DIC
DICS (Demand):
Arunachal Pradesh
ASEB
Manipur
MeECL
Mizoram
Nagaland
Tripura
DICS (Injection):
LOKTAK
KHANDONG
KOPILI
DHEP
RHEP
AGTPP
AGBPP
KOPILI-II

Transmission Charges Payable


(in Rs.)
= (A) of page 2/7 + (AA) of page 4/7
22314098.24
137956152.78
20962753.76
33995639.38
14055937.65
17825332.63
17050568.29
= (A) of page 2/7 - (AA) of page 4/7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Format 8: NET TRANSMISSION CHARGES PAYABLE BY DICs FOR THE MONTH OF APRIL 2013
Page 7/7

Part-II (Transmission Charges for Approved Additional Medium Term Injection / Withdrawal for the month)

GEN / DIC
DICS (Demand):
Arunachal Pradesh
ASEB
Manipur
MeECL
Mizoram
Nagaland
Tripura
DICS (Injection):
LOKTAK
KHANDONG
KOPILI
DHEP
RHEP
AGTPP
AGBPP
KOPILI-II

Transmission Charges Payable


(in Rs.)
= (B) of page 3/7 + (BB) of page 5/7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
= (B) of page 3/7 - (BB) of page 5/7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00