Table A.

2 Surface and Hoisting Equipment


Note: DS-1 Category 3 is equal to API RP-7G
Equipment Category Intermediate
Inspection
frequency
Major
Inspection
Frequency
Relevant Standards
Drilling Mast & (Raising
Lines) * see note below
1 year 4 years API 9A (Wire) / RB 9B (Care) /
API RP 4G / 4F
ASTM E165 ASTM E709
Manufacturers Recommendations
Substructure 1 year 4 years API RP4G, App A
ASTM E165 ASTM E709
Stabbing Board, including
Monkey board.
6 months 1year ASTM E165
Crown Block 1 year 3 years API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Travelling Block 1 year 3 years API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Drilling Hook 6 months 3 years API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Links Elevator 6 months API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Elevators 6 months 2 years API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Rotary Table 1 year 4 years API 7K / RP 7L
ASTM E165
Manufacturers Recommendations
Kelly D. Bushing 6 months 1 year API 7K / RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Master Bushing 6 months 1 year API 7K / RP 7L
ASTM E165
Manufacturers Recommendations
Slips 6 months 6 months API 7K / RP 7L
ASTM E709
Manufacturers Recommendations
Spiders 6 months 6 months API RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Safety Clamp 6 months 6 months API RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Tongs 6 months 6 months API RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Kelly Spinner 6 months 1 year ASTM E165 ASTM E709
Manufacturers Recommendations
PDF created with FinePrint pdfFactory trial version www.pdffactory.com
Equipment Category Intermediate
Inspection
frequency
Major
Inspection
Frequency
Relevant Standards
Brake Bands & Linkages 6 months or
when Blocks
changed which
ever comes
first
1 year after
last inspection
API RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Dead Line Anchor 6 months 2 years ASTM E165 ASTM E709
Manufacturers Recommendations
Lifting Plugs 6 months ASTM E165 ASTM E709 E709
PDO ERD 80-01
Manufacturers Recommendations
Air Winches 1 year 1 year ASTM E165 ASTM E709
PDO ERD 80-01
Manufacturers Recommendations
Swivels 6 months 2 years API 8C / RP 8B
IADC Chpt H Sect 4
ASTM E165 ASTM E709
Manufacturers Recommendations
Spelters 6 months ASTM E165 ASTM E709
PDO ERD 80-01
Trailer King Pings 6 months ASTM E165 ASTM E709
Slings & Shackles 6 months 6 months API RP 9B (Care) / / RP 8B
ASTM E165 ASTM E709
PDO ERD 80-01
Personnel Basket 6 months 4 years ASTM E165 ASTM E709
Cranes (Hook Inspection) 6 months 1 year ASTM E165 ASTM E709
PDO ERD 80-01
Manufacturers Recommendations
Forklifts (Fork & Forks
Support)
6 months 1 year ASTM E165 ASTM E709
PDO ERD 80-01
Manufacturers Recommendations
* Note: Raising Lines can be separated from mast inspection. Medium rigs change out as per manufacture
recommendations. Heavy rigs should inspect raising lines after each move.