Super Area (Sq.ft appx) 3,552.

00
1,350.00 INR
# Package Unit Cost Amount
A Civil and Interior Works 620 INR 2,202,240.00 INR
B Modular Furniture 240 INR 852,480.00 INR
C Electrical Works 240 INR 852,480.00 INR
D Fire alarm System & Fire Sprinkler 70 INR 248,640.00 INR
E HVAC 140 INR 497,280.00 INR
G IT WORKS 40 INR 142,080.00 INR
It includes only cable pulling till the modular workstation , crimping and server up
will be done by the client IT team
SUBTOTAL 1,350.00 INR INR 4,795,200.00
Vat @8% 8.00% 383,616.00 INR
Service Tax @4.95% 4.95% 237,362.40 INR
Total Cost of the project (A+B+C) 5,416,178.40 INR
EXCLUSIONS
15.Any other cost such as Mathadi at site is not included it would be completely bare by client
6. Cost of DG Installation, connecting and commissioning has not been included
7. Only minor upgrades to existing base building (HS) electrical and HVAC works considered.
8. IN case provision of Floor Electrical panels is required, the same will be at additional cost.
9. IT Active works and components (Switches, Server Racks etc.) not included.
10. Kitchen Equipment (Coffee machines, fridge, microwave etc.) not included
11. Office Equipments (photocopiers, Fax machines etc.) not included.
1. The above given costing is based on the Carpet Area
4. Any modifications/ alterations or cost attached to damage over existing glass facade of the building has not been included.
5. New Construction/ furnishing/ repair of common areas/ toilets/ lifts etc. Have not been included.
2. The above calculations are strictly based on assumptions and are likely to change as per the final detailed specifications.
3. Strengthening/ altering of the existing structure (base building) if required, is not included above.
Works include supply installation of Indian Make modular furniture for Workstations includes Linear Workstations, etc. Make
Considered Green Moulds
Megas Architectural services Pvt. Ltd.
COST ESTIMATE FOR-|Boomerange A309 Office
The below has been worked out for a corporate office set up finishing requirement. (Grade 'B+' specifications)
12. AV equipment (Plasma, AV Conferencing, LCDs, projectors etc.) not included.
13. Cost of statutory approvals are not included in the above costing.
Works include all civil works, false ceiling, flooring , partitions (with doors, glazing's etc.), films,etc. as per design complete.
Finishing specifications shall include - Sound proof Solid partitions Soft board & Acrylic emulsion skin on partitions
Works include from tap off point at floor level, includes floor level Electrical distribution panel further distribution thru PVC conduits, earth pits,
FRLS wiring and cabling, light fixtures, switches and sockets & Provision for CCTV & Access Control System etc. as per design - Supply,
Installation, Testing and commissioning complete.
General Specifications shall include - Wires (Polycab or equivalent), CBs (ABB or equivalent), switches/ sockets (Roma or equivalent), Light
fixtures (Samsung LED or equivalent ISO Make)
Scope includes Fire Alarm System, Fire Sprinkler for entire office,
Specifications shall include - FAS - Apollo/System Sensor or equivalent
Scope includes low side works (ducting, insulation, grilles and diffusers) for entire office area.