Site Inspection Notes

Date : 14-04-2014.

Name of work: CONSTRUCTION OF RESIDENTIAL AND COMMERCIAL
HIGH RISE BUILDINGS AT GULBARGA , KARNATAKA STATE.

Date of visit: - 14-04-2014 TIME: 11.00 A.M


Members present :

1.Mr.R.C.KALHANTRI Managing Partner BHARATH PRIDE PARK

2.Mr.RAVI KUMAR AGARWAL Partner BHARATH PRIDE PARK

3.Mr.SRIVASTAVA Consultant KB Landscaping

4.Mr.B.RAMESH Sr.ENGINEER NR CONSULTANTS

5.Mr.RAJASHEKHAR Sr.ENGINEER BHARATH PRIDE PARK

6.Mr.ABRAR Jr.ENGINEER BHARATH PRIDE PARK

7.Mr.RAHMAN Sr.ENGINEER BHARATH PRIDE PARK

8.Mr.RAHEEM Jr.ENGINEER BHARATH PRIDE PARK

Status of work :

WING-A:

1. Arrangement of Steel Reinforcement for the Roof Slab and Beams completed for

Flats A3 & A4 at 300 lvl.

2. Aerocon Block work is in progress In Ground Floor, First Floor, Second Floor, Third Floor, Fourth

Floor and Fifth Floor.



WING-B:


1. Arrangement of Steel Reinforcement for the Floor Slab and Beams completed for

Flats B1,B2,B3,B4 & B5at 300 lvl.


N.R.CONSULTANTS
AND PLANNERS INDIA PVT LTD
ARCHITECTS & ENGINEERS
901 TO 905, Taramandal Complex,
Saifabad, HYDERABAD 500 004.
Tel: 91 40 66736369, 23230253, Fax : 91 40 66736371
E-mail: ynr@nrconsultants.org, nrconsultants@rediffmail.com
Web : www.nrconsultants.org

CERTIFIED FIRM
AN ISO 9001





2.Slab Shuttering and Arrangement of Steel Reinforcement are under progress at +300 Level for Flats

B6,B7,B8,B9,B10,B11 & B12.

3. Aerocon Block work is in progress In Ground Floor and First Floor level.


HEALTH CLUB:


1. Aerocon Block work is in progress at ground floor level.

UNDER GROUND SUMP:

1.Under Ground Sump bottom Raft mat and Columns Reinforcement work is under progress.

During the Inspection following points were discussed / observed as noted below:

1. At Balconies Main Reinforcement steel to be provided as per drawings.

2. Provide stirrups at column and beam junctions, in columns.

3. Slab main bars to be tied to the beams properly.

4.In A-Wing B 1A Top and Bottom overlaps to be provided as per drawing only.

5.In B-Wing B 3A Bottom 1No -16mm Dia. Curtail Bar missed.

6.In B-Wing Flats 2 & 4 in Balconies area 3 projection missed.

7.In B-Wing Flats 3 & 5 in S2 Slab 2Nos 12mm Dia bars missed.

8.Alcranks to be bent correctly in slab and to be aligned and chairs to be provided at double mat area In

A-Wing and B-Wing Flats at 300lvl and 300 level.


9. Materials used at site:

STEEL: SHREE TMT,BHARAT GOLD TMT 500

CEMENT: VASAVADATTA O.P.C 53 GRADE

Thanks & Regards