QUALITY ASSURANCE DATA BOOK

TRANSIERRA S.A.

SIERRA 1 & 2, PD# 72871


2 EACH - TAURUS 70 GAS TURBINE DRIVEN COMPRESSOR SET

Volume 1, Unit Number 1

Solar Turbines
A Caterpillar Company

Solar Turbines
A Caterpillar Company

FOREWORD
This technical manual contains manufacturing records and quality/test documentation for Gas Turbine Driven equipment
designed and manufactured by Solar Turbines Incorporated in San Diego, California.

TECHNICAL MANUAL OVERVIEW


The technical manual is provided in volume sets. The manual contains the approved Inspection and Test Plan, Package C of C,
required records, reports, data sheets and inspection and test reports. Each volume is complete and described below.

TRANSIERRA S.A.

SIERRA 1 & 2, PD# 72871


2 EACH - TAURUS 70 GAS TURBINE DRIVEN COMPRESSOR SET

Volume 1, Unit Number 1

Solar Turbines
A Caterpillar Company

The Table of Contents items for this project correspond to the ITP item numbers identified within each section of the ITP
(Inspection and Test Plan). These items are identified with an "X" in column A of the project ITP. A copy of the Project ITP is
supplied in section 10.00 for reference.

SIERRA 1 & 2, PD # 72871


Table of Contents
ITEM
NUMBER
01.06

LUBE OIL COOLER


1. Asme Data Report

01.06

LUBE OIL COOLER


2. Pressure Test And Flush Certificate

01.07

LUBE OIL FILTERS


Asme Data Report

01.08

GAS FUEL FILTERS


Asme Data Report

01.09

ENGINE HANDLING KIT


Certificate

01.10

PACKAGE LIFTING KIT


Certificate

02.01

REVIEW WELDING PROCEDURES


Pqr, Wps

02.02

REVIEW WELDER QUALIFICATIONS


Wqr

02.03

WELD SKID/LIFTING BOLLARDS


Traveler

SIERRA 1 & 2, PD # 72871


Table of Contents, Continued

ITEM
NUMBER
02.04

LUBE OIL TANK - PNEUMATIC LEAK TEST


C Of C

02.05

SURFACE PREPARATION AND PAINT


C Of C

02.06

LUBE OIL TANK - INTERNALLY COATED WITH BRAYCO 785


C Of C

03.01

REVIEW WELDING PROCEDURES


Wps, Pqr

03.02

REVIEW WELDER QUALIFICATION


Wqr

03.03

WELD MANIFOLDS DIMENSIONAL CHECK


C Of C

03.04

NDE MANIFOLDS (RADIOGRAPHY - RT)


C Of C

03.05

HYDROSTATIC TEST MANIFOLDS


Hydro Test Log

04.01

VISUAL INSPECTION OF CONTROL WIRING


Included In The Certified Test Data In Section 08.01

04.02

HARDWARE VERIFICATION
Included In The Certified Test Data In Section 08.01

04.03

PROJECT SOFTWARE VERIFICATION


Included In The Certified Test Data In Section 08.01

SIERRA 1 & 2, PD # 72871


Table of Contents, Continued

ITEM
NUMBER
05.03.A

COMPRESSOR CASE LEAK TEST


Leak Test Chart

05.03.B

COMBUSTOR CASE LEAK TEST


Leak Test Chart

05.03.C

ENGINE FUEL MANIFOLD LEAK TEST


Leak Test Chart

05.04.A

GAS PRODUCER COMPRESSOR ROTOR


Shop Floor Information System (inspection Data)

05.04.B

GAS PRODUCER TURBINE ROTOR


Shop Floor Information System (inspection Data)

05.04.C

POWER TURBINE ROTOR


Shop Floor Information System (inspection Data)

05.04.D

BALANCE GAS PRODUCER COMPRESSOR ROTOR


Shop Floor Information System (inspection Data)

05.04.E

BALANCE GAS PRODUCER TURBINE ROTOR


Shop Floor Information System (inspection Data)

05.04.F

BALANCE POWER TURBINE ROTOR


Shop Floor Information System (inspection Data)

05.07

ENGINE PERFORMANCE TEST


Included In The Certified Test Data In Section 08.01

06.05

IMPELLER OVERSPEED SPIN TEST


Shop Floor Information System

SIERRA 1 & 2, PD # 72871


Table of Contents, Continued

ITEM
NUMBER
06.06

CENTER BODY HYDRO TEST


Shop Floor Information System (inspection Data)

06.07

END CAPS HYDRO TEST


Shop Floor Information System (inspection Data)

06.08

MECHANICAL AND ELECTRICAL RUNOUT


Inspection Data

06.08.A

ROTOR BALANCE
Balance Computer Printout

06.10

GAS COMPRESSOR AIR TEST


Air Test*

07.00

PACKAGE ASSEMBLY
No Documents Required

08.01

PACKAGE/CONSOLE ACCEPTANCE TEST


Certified Test Data

08.02

ENCLOSURE ASSEMBLY STATIC TEST


Included In The Certified Test Data In Section 08.01

08.03

NO LOAD MECHANICAL STRING TEST (ONE UNIT ONLY)


Included In The Certified Test Data In Section 08.01

09.00

PACKAGE FINAL INSPECTION


No Documents Required

10.01

QC DATA BOOK REVIEW


1. Package Certificate Of Compliance

SIERRA 1 & 2, PD # 72871


Table of Contents, Continued

ITEM
NUMBER
10.01

QC DATA BOOK REVIEW


2. Itp (reference Copy)

SECTION: 01.06
LUBE OIL COOLER
1. ASME DATA REPORT

To:

SOLAR TURBINES

Date:

9330 SKY PARK COURT

AXC Job Number

SAN DIEGO, CA 92123

Solar Project Name

April 11, 2003


023115AB
TRANSIERRA

Solar PD Number

Attn:

LYNNE MELENDREZ & SOLAR QUALITY DOCS

PD 72871

Solar Part Number

154765-72871

Dear Customer:
The following AXC Library Manual and Vendor files from the Air-X-Changers Library CD are required to
complete this job manual:
1) Installation, Maintenance, and Operating Instructions for Electric Drive Units.
2) Moore Fan-EM
3) Metrix-Vibration Switch
4) Siemens -Motor Data
5) Dodge-S-2000 Fan Shaft Bearing
6) Murphy-VS-2EX Vibration Switch

cc: WESTLAND ENGINEERING


Very truly yours,
AIR-X-CHANGERS
Pamela A. Thomas

P.O. Box 1804 Tulsa, Oklahoma 74101 918-266-1850 FAX 918-266-1322

Table of Contents

Job Specific Documentation


1
Transmittal
2
Table of Contents
Certified Drawing3
4
Parts List
Spec. Sheet 5
6-7
U1A Data Reports
8
Nameplate
Hydrostatic Test Certifications 9-10
11
Heat Treat Charts
X-Ray Test Reports12-15
Ultrasonic Test Reports 16
Hardness Survey17
11-13
Material Traceability Records
X-Ray Test Reports14-21
22-25
Dye Penetrant Test Report
Flushing Record 26-31
Final Acceptance Certificate 32
33
Form 1016
34
Electrical Device List
35-36
Final-In Process
Additional-In Process 37-38
Paint-In Process 39-40
41-42
Fan Data
43-45
Motor Data

P.O. Box 1804 Tulsa, Oklahoma 74101 918-266-1850 FAX 918-266-1322

PARTS LIST
Post Office Box 1804
Tulsa, OK 74015
Phone: (918) 266-1850
Fax (918) 266-1322

JOB NUMBER:

023115

CUSTOMER: SOLAR TURBINES


ORDER COVERS: (2) Model 60A-2H

FINISH: GALVANIZED FAN GUARDS (AND HAIL GUARDS IF REQUIRED)


SURFACE PREPARATION: Commercial Blast Cleaning - (SSP-SP6)
PRIMER COAT: Amercoat 68HS; Minimun of 3 MILS. DFT.
FINISH COAT: Amershield Color Solar Grey (RAL 7032); Minimum of 3 MILS. DFT.
(Note: Motors and Slidebases are to be painted with the above system, except no sandblast)

P.O.

QTY.

DESCRIPTION OF COMPONENTS

NOTE: AN ASTERIK (*) IN QUANTITY COLUMN INDICATES A RECOMMENDED SPARE PART


SECTION(S) IN ACCORDANCE WITH SPECIFICATION SHEET DATED: 1/30/03

60A-2H STRUCTURE(S), COMPLETE WITH: Seal Weld Entire Cooler

*4

FAN(S): 60 Inch DIAMETER, 3 BLADES, RH ROTATION, MOORE-CL5K MAKE, 6.1 ANGLE @ Clevis,
2-3/16 Inch BORE WITH 1/2 Inch X 1/4 Inch KEYWAY. MODEL/PITCH: 27-VT/Manual, HUB:TAPER

*4

FAN SHAFT(S): 2-3/16 Inch DIA. X 32 Inch LONG WITH 1/2 Inch SQ. KEYS each END,
KEYWAY LENGTH(DRIVE END): 6 Inch, KEYWAY LENGTH(FAN END): 6 Inch, KEY LENGTH: 5.5 Inch

*8

2-3/16 Inch FAN SHAFT BEARINGS, MAKE/MODEL: Dodge-S2000/P2B-S2-203R, AXC P/N BR1106

*4

MOTOR(S) Reliance, Siemens, Baldor MAKE, 5 H.P., 1800 RPM, 3 PHASE, 60 Hz, 460 VOLTS, (CSA), (115
volt Space Heater), Per Specification ES1923, w/ a 3/8-16, 1-1/8 deep threaded hole for grounding stud.
Explosion Proof (Type 5), Solar P/N: None ENCL.VARIABLE TORQUE, SINGLE WINDING, Vertical
SHAFT, W-6 MOUNTING, 184T FRAME, With SLIDEBASE, CUST. SPECIFICATIONS Yes, MOTOR DATA
REQUIRED Yes, WIRING DIAGRAMS Yes

*8

V-BELTS: 3VX-750 TYPE, 17.5 Inch CENTER DISTANCE, 5.3 HP EACH, MATCHED SETS OF 2

SHEAVE SET(S): 2 GROOVES, 3V PITCH,


FAN SHEAVE:
19 Inch OD, 2-3/16 Inch BORE WITH 1/2 Inch X 1/4 Inch KEYWAY
MOTOR SHEAVE: 4.75 Inch OD, 1-1/8 Inch BORE WITH 1/4 Inch X 1/8 Inch KEYWAY

VIBRATION SWITCH(ES): Murphy MAKE, VS-2EX, XP MODEL, CSA: YES

VELOCITY TRANSMITTER(S): Metrix MAKE, 164V-121 MODEL, CSA: YES

SET(S) WIRE BUGSCREENS PER DRAWING 023115-BPL

2
2

PIPE NIPPLE: O.D., 80 SCHEDULE, 2 LENGTH, 316L MATERIAL


UNION ORFICE: N.P.S., 3000# RATING, 1/8 ORFICE, 316L MATERIAL

6
2
4 feet

GROUND CONNECTOR: Burndy MAKE, KC23B1 MODEL, MS7001 SYMIX PART NUMBER
OUNCE(S) OF CONDUCTIVE ELECTRICAL LUBRICANT: Penetrox MAKE, P8A TYPE, MS7000 SYMIX
GROUND WIRE: 8 AWG, Tinned, Stranded, copper wire, green insulation with yellow longitudinal stripe,
MS7002 SYMIX PART NUMBER
(Contact Boyce Owens of Nelson Electric Supply)

SECTION: 01.07
LUBE OIL FILTERS
ASME DATA REPORT

SECTION: 01.08
GAS FUEL FILTERS
ASME DATA REPORT

SECTION: 01.09
ENGINE HANDLING KIT
CERTIFICATE

LOAD TEST NOT REQUIRED

SECTION: 01.10
PACKAGE LIFTING KIT
CERTIFICATE

SECTION: 02.01
REVIEW WELDING PROCEDURES
PQR, WPS

SECTION: 02.02
REVIEW WELDER QUALIFICATIONS
WQR

SECTION: 02.03
WELD SKID/LIFTING BOLLARDS
TRAVELER

SECTION: 02.04
LUBE OIL TANK - PNEUMATIC LEAK TEST
C OF C

SECTION: 02.05
SURFACE PREPARATION AND PAINT
C OF C

SECTION: 02.06
LUBE OIL TANK - INTERNALLY COATED WITH BRAYCO 785
C OF C

SECTION: 03.01
REVIEW WELDING PROCEDURES
WPS, PQR

SECTION: 03.02
REVIEW WELDER QUALIFICATION
WQR

SECTION: 03.03
WELD MANIFOLDS DIMENSIONAL CHECK
C OF C

SECTION: 03.04
NDE MANIFOLDS (RADIOGRAPHY - RT)
C OF C

SECTION: 03.05
HYDROSTATIC TEST MANIFOLDS
HYDRO TEST LOG

Part Number:

M.O. #:

QTY.

Customer:

Test Pressure:
HOLD 10 MIN.
Type in other
times.

1038463-301

3857632

SIERRA

N/A

2/12/03

39211

1011087-300

3857304

SIERRA

N/A

2/12/03

23120

1014525-302

3857312

SIERRA

150

2/13/03

22463

1044497-301

3857313

SIERRA

900

2/13/03

39211

201632-300

3857281

SIERRA

225

2/13/03

22463

1015583-301

3857273

SIERRA

225

2/13/03

23120

1015648-300

3857274

SIERRA

225

2/13/03

23120

1036476-300

3857300

SIERRA

600

2/13/03

23120

1042817-301

3857297

SIERRA

225

2/13/03

23120

1009336-301

3857268

SIERRA

N/A

2/14/03

23120

1011087-300

3857342

10

SIERRA

N\A

2/17/03

22463

1044675-300

3857282

SIERRA

225

2/17/03

22463

1051762-300

3857314

SIERRA

900

2/17/03

22463

1008396-301

3857305

SIERRA

225

2/17/03

23120

1008396-301

3857285

SIERRA

225

2/17/03

23120

1008394-301

3857286

SIERRA

225

2/17/03

23120

1055704-300

38573156

SIERRA

900

2/18/03

39211

1020153-301

3857633

SIERRA

N/A

2/18/03

39211

1046284-300

3857271

SIERRA

N/A

2/18/03

39211

1037008-301

3857301

SIERRA

600

2/18/03

39211

1007065-300

3857278

SIERRA

225

2/18/03

23120

1046283-300

3857270

SIERRA

N\A

2/19/03

22463

1028668-301

3857306

SIERRA

225/450

2/19/03

39211

66-16013-300

3857272

SIERRA

N\A

2/19/03

22463

1008394-301

3857307

SIERRA

225

2/19/03

39211

1044765-300

3857436

SIERRA

1075

2/19/03

39211

1008448-301

3857289

SIERRA

N/A

2/19/03

39211

1008447-300

3857288

SIERRA

N/A

2/19/03

39211

1018011-301

3857634

SIERRA

225

2/19/03

39211

1008871-301

3857341

SIERRA

N/A

2/19/03

39211

1007064-300

3857277

SIERRA

225

2/19/03

23120

1028081-300

3857291

SIERRA

300

2/20/03

22463

Date:

Badge #:

1044678-300

3857284

SIERRA

225

2/20/03

22463

1045040-300

3857276

SIERRA

225

2/20/03

23120

1044677-300

3857283

SIERRA

225

2/21/03

22463

1042956-300

3857299

SIERRA

225

2/21/03

22463

1031750-301

3857295

SIERRA

300

2/21/03

23120

1042020-301

3857309

SIERRA

300

2/21/03

23120

1031286-302

3857292

SIERRA

300

2/25/03

39211

1031751-302

3857296

SIERRA

300

2/25/03

22463

1020287-300

3857279

SIERRA

N\A

2/25/03

22463

1014911-301

3857635

SIERRA

N/A

2/25/03

39211

1008872-301

3857290

SIERRA

N\A

2/26/03

22463

1008394-301

3857718

SIERRA

225

2/26/03

22463

1039160-301

3857308

SIERRA

100

2/26/03

39211

1042024-300

3857310

SIERRA

225

2/26/03

39211

1046140-300

3857819

SIERRA

500

2/27/03

39211

1037121-300

3857302

SIERRA

600

2/27/03

39211

1031289-302

3857293

SIERRA

300

2/27/03

39211

1055248-300

3857298

SIERRA

300

2/27/03

23120

1025957-300

3857280

SIERRA

100

3/4/03

36068

1008403-301

3857287

SIERRA

225

3/4/03

36068

1031548-300

3857294

SIERRA

300

3/7/03

22463

1042437-300

3858140

SIERRA

225

3/13/03

23120

1042166-300

3858138

SIERRA

N\A

3/14/03

22463

1031548-300

3857294

SIERRA

300

3/19/03

22463

1038463-301

3858136

SIERRA

N\A

3/21/03

22463

1042220-301

3858139

SIERRA

N/A

3/26/03

39211

1058189-300

3100612

SIERRA

N\A

3/27/03

22463

1042094-300

3858137

SIERRA

225

3/27/03

22463

1040959-301

8085975

SIERRA

225

4/21/03

22463

1040959-301

8085876

SIERRA

225

4/21/03

22463

1042817-301

3100613

SIERRA

225

4/23/03

22463

1040959-300

3857802

SIERRA 1/2

225

2/26/03

39211

1018011-301

3857782

SIERRA -2

225

2/26/03

39211

1018007-301

3857781

SIERRA-2

2250/225

2/25/03

39211

1008396-301

3857719

SIERRA-2

225

2/25/03

39211

1020153-301

3857783

SIERRA-2

N/A

2/26/03

39211

1044765-300

3857311

SIERRA

1075

1/30/03

22463

SECTION: 04.01
VISUAL INSPECTION OF CONTROL WIRING
INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

SECTION: 04.02
HARDWARE VERIFICATION
INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

SECTION: 04.03
PROJECT SOFTWARE VERIFICATION
INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

SECTION: 05.03.A
COMPRESSOR CASE LEAK TEST
LEAK TEST CHART

SECTION: 05.03.B
COMBUSTOR CASE LEAK TEST
LEAK TEST CHART

SECTION: 05.03.C
ENGINE FUEL MANIFOLD LEAK TEST
LEAK TEST CHART

Page 1

Plotter4.vi
C:\Prueba de Presion\Plotter4.vi
Last modified on 1/24/03 at 10:57 AM
Printed on 1/24/03 at 3:53 PM
Print Report?

Yes

Printer Status

Turbotec Pressure Test


Pressure
500

Maximum Pressure

408.7

400

p
s

300

200

a
100

Temperature

125

Maximum Temperature

13

71.0

100
o

75
50
7

25
0
0

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Time (mins.)
Start Date

301504-101

Fri 01- 24- 2003

Start Time

Part Number

15 14 25

Sensor

Number of Measurements
Time Between Measurements

Finish Date

31
1

Operator

JOSE

Fri 01- 24- 2003

Finish Time

TTA03-84152 AND 84153

406.73

Last Pressure Reading

408.69
408.69

Minimum Test Pressure

Serial Number

First Pressure Reading

Maximum Test Pressure

0 - 500 psia

406.24

15 48 01

M
Test Pressure Diference

Comments

)2*

4GX



2.45

Sensor
0-500 PSIG
Comments:
Date:
Fri 01- 24- 2003
Time:
15 14 25
Operator:
JOSE M
Serial Number:
TTA03-84152 AND 84153
Part Number:
301504-101
Nominal Test Pressure:
*********
Sampling Time (mins):
31
Time (mins) Pressure (psia)
0.000
15.216
1.000
406.726
2.000
406.408
3.000
406.253
4.000
406.245
5.000
406.269
6.000
406.416
7.000
406.563
8.000
406.620
9.000
406.734
10.000
406.864
11.000
406.897
12.000
407.052
13.000
407.215
14.000
407.288
15.000
407.402
16.000
407.549
17.000
407.696
18.000
407.737
19.000
407.867
20.000
407.924
21.000
408.038
22.000
408.177
23.000
408.209
24.000
408.356
25.000
408.405
26.000
408.519
27.000
408.527
28.000
408.601
29.000
408.690
30.000
408.690
31.000
13.961
First Pressure Reading:

Temperature (F)
70.744
70.732
70.823
70.849
70.717
70.902
70.861
70.738
71.005
70.823
70.843
70.747
70.714
70.620
70.794
70.811
70.826
70.811
70.703
70.829
70.946
70.635
70.726
70.744
70.617
70.896
70.914
70.782
70.835
70.776
70.659
70.703
406.73

Last Pressure Reading:

408.69

Maximum Test Pressure:

408.69

Minimum Test Pressure:

406.24

Maximum Temperature:

71.004925

Finish Date:
Fri 01- 24- 2003
Finish Time:
15 48 01
These results are a verified copy of the data maintained in the test
conputer, according to
Es 9-78. No leaks.

SECTION: 05.04.A
GAS PRODUCER COMPRESSOR ROTOR
SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

CERTIFICATE OF COMPLIANCE
SOLAR TURBINES INCORPORATED, HEADQUARTERED IN SAN DIEGO, CALIFORNIA,
HEREWITH CERTIFIES ON INFORMATION AND BELIEF:

ROTORS ASSEMBLY COMPRESSOR AND TURBINE


MECHANICAL/ELECTRICAL RUNOUTS AND BALANCE DATA

The following rotors and their supporting documents for Engine Serial # 0203B,
PD72871 have been reviewed to ensure that they are in accordance with Solar
standards, drawings, specifications and practices and Quality requirements.
Compressor Rotor
Mechanical /Electrical
Balance

05.04.A
05.04.D

P/N
P/N

330206-103

S/N
S/N

ROB03-25533

GP Rotor
Mechanical/Electrical
Balance

05.04.B
05.04.E

P/N
P/N

199270-200

S/N
S/N

ROB03-26931

PT Rotor
Mechanical/Electrical
Balance

05.04.C
05.04.F

P/N
P/N

199351-101

S/N
S/N

ROB03-26932

Dimensional summary sheet for serial number:

ROB03-25533
March 28, 2003
Page 1 of 1

Dimension
ER0 #1
ERO #2
MRO #1
MRO #2
SPLINE

Description
ELECT R/O NO.1 BRG
ELECT R/O NO.2 BRG
MECH R/O NO.1 BRG
MECH R/O NO.2 BRG
FWD CONE SPLINE R/O

(Dim_Rpt_Opn.Rdf)

Op#

Result

Minimum

0050
0050
0050
0050
0050

.04
.02
.00005
.00005
.0001

0
0
0
0
0

Maximum Red Badge


.05
.05
.0002
.0002
.0002

39219
39219
39219
39219
39219

Date
24-FEB-03
24-FEB-03
24-FEB-03
24-FEB-03
24-FEB-03

COMPANY CONFIDENTIAL For Reference Only

Initials

Red Sign Off

SECTION: 05.04.B
GAS PRODUCER TURBINE ROTOR
SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

Dimensional summary sheet for serial number:

ROB03-26931
March 28, 2003
Page 1 of 1

Dimension
ELECT
MECH

Description
RUNOUT #3 BEARING JOURNAL
RUNOUT #3 BEARING JOURNAL

(Dim_Rpt_Opn.Rdf)

Op#

Result

Minimum

0020 .02
0020 .00005

0
0

Maximum Red Badge


.05
.0002

Date

29728 21-FEB-03
29728 21-FEB-03

COMPANY CONFIDENTIAL For Reference Only

Initials

Red Sign Off

SECTION: 05.04.C
POWER TURBINE ROTOR
SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

Dimensional summary sheet for serial number:

ROB03-26932
March 28, 2003
Page 1 of 1

Dimension
#4ELEC
#4MECH
#5ELEC
#5MECH

Description
BEARING
BEARING
BEARING
BEARING

(Dim_Rpt_Opn.Rdf)

JOURNAL
JOURNAL
JOURNAL
JOURNAL

RUNOUT
RUNOUT
RUNOUT
RUNOUT

Op#

Result

Minimum

0020
0020
0020
0020

.02
.00005
.02
.00005

0
0
0
0

Maximum Red Badge


.05
.0002
.05
.0002

28052
28052
28052
28052

Date
22-FEB-03
22-FEB-03
22-FEB-03
22-FEB-03

COMPANY CONFIDENTIAL For Reference Only

Initials

Red Sign Off

SECTION: 05.04.D
BALANCE GAS PRODUCER COMPRESSOR ROTOR
SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

Dimensional summary sheet for serial number:

ROB03-25533
March 28, 2003
Page 1 of 1

Dimension
AFTAMT
FWDAMT

Description
FINAL RESIDUAL BAL
FINAL RESIDUAL BAL

(Dim_Rpt_Opn.Rdf)

Op#

Result

0090 .0253
0090 .0435

Minimum
0
0

Maximum Red Badge


.18
.18

Date

28622 25-FEB-03
28622 25-FEB-03

COMPANY CONFIDENTIAL For Reference Only

Initials

Red Sign Off

SECTION: 05.04.E
BALANCE GAS PRODUCER TURBINE ROTOR
SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

Dimensional summary sheet for serial number:

ROB03-26931
March 28, 2003
Page 1 of 1

Dimension
ANG.-E
ANG.-F
OZ.IN-E
OZ.IN-F
R/O1
R/O2

Description
ANGLE OF IMBALANCE
ANGLE OF IMBALANCE
ALLOWABLE IMBALANCE PLANE -EALLOWABLE IMBALANCE PLANE -FFACE RUNOUT DISC #1
FACE RUNOUT DISC #2

(Dim_Rpt_Opn.Rdf)

Op#

Result

0060
0060
0060
0060
0060
0060

246
108
.023
.031
.0005
.001

Minimum
0
0
0
0
0
0

Maximum Red Badge


360
360
.1
.1
.003
.003

33644
33644
33644
33644
33644
33644

Date
21-FEB-03
21-FEB-03
21-FEB-03
21-FEB-03
21-FEB-03
21-FEB-03

COMPANY CONFIDENTIAL For Reference Only

Initials

Red Sign Off

SECTION: 05.04.F
BALANCE POWER TURBINE ROTOR
SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

Dimensional summary sheet for serial number:

ROB03-26932
March 28, 2003
Page 1 of 1

Dimension
#3R/O
#4R/O
ANGLE-F
ANGLE-G
OZ.IN.-F
OZ.IN.-G

Description
DISC #3 FACE RUNOUT
DISC #4 FACE RUNOUT
ANGLE OF IMBALANCE
ANGLE OF IMBALANCE
ALLOWABLE IMBALANCE @ PLANE -FALLOWABLE IMBALANCE AT PLANE -G-

(Dim_Rpt_Opn.Rdf)

Op#

Result

0065
0065
0065
0065
0065
0065

.001
.001
291
180
.08
.07

Minimum
0
0
0
0
0
0

Maximum Red Badge


.004
.003
360
360
.2
.2

33644
33644
33644
33644
33644
33644

Date
22-FEB-03
22-FEB-03
22-FEB-03
22-FEB-03
22-FEB-03
22-FEB-03

COMPANY CONFIDENTIAL For Reference Only

Initials

Red Sign Off

SECTION: 05.07
ENGINE PERFORMANCE TEST
INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

SECTION: 06.05
IMPELLER OVERSPEED SPIN TEST
SHOP FLOOR INFORMATION SYSTEM

SECTION: 06.06
CENTER BODY HYDRO TEST
SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

SECTION: 06.07
END CAPS HYDRO TEST
SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

SECTION: 06.08
MECHANICAL AND ELECTRICAL RUNOUT
INSPECTION DATA

SECTION: 06.08.A
ROTOR BALANCE
BALANCE COMPUTER PRINTOUT

SECTION: 06.10
GAS COMPRESSOR AIR TEST
AIR TEST*

SECTION: 07.00
PACKAGE ASSEMBLY
NO DOCUMENTS REQUIRED

SECTION: 08.01
PACKAGE/CONSOLE ACCEPTANCE TEST
CERTIFIED TEST DATA

SECTION: 08.02
ENCLOSURE ASSEMBLY STATIC TEST
INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

SECTION: 08.03
NO LOAD MECHANICAL STRING TEST (ONE UNIT ONLY)
INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

SECTION: 09.00
PACKAGE FINAL INSPECTION
NO DOCUMENTS REQUIRED

SECTION: 10.01
QC DATA BOOK REVIEW
1. PACKAGE CERTIFICATE OF COMPLIANCE

SECTION: 10.01
QC DATA BOOK REVIEW
2. ITP (REFERENCE COPY)

Solar Turbines
A Caterpillar Company

Inspection and Test Plan

Certification:

SIERRA 1 & 2 PD # 72871


Revision Number: 4

NEC

Dated: May 01, 2003

Prepared for

Transierra
This ITP was Prepared By: Larry Proctor, Quality Engineer

Equipment includes 2 Each, Taurus CS Package(s). Powered by Taurus 70-10302 turbine(s).


Driving a C402 Compressor.
FIVE (5) Working Days Notification Required For All Customer INSPECTION/OBSERVATION Items.

Inspection Points: Column A is


Solar Inspector / Engineer

Column B is
ASTRA

Column C is
TRANS

Column D is
Other

The ITP is developed from the Solar Application Check Sheet (ACS) and information provided by the Business Manager and
the Project Applications Engineer. Revisions are based on Customer input provided during project execution.
Special inspections, documents or tests above and beyond our standard are shown.
The legend at the bottom of each page indicates what inspection / test points or documents are required.
'01' Indicates Customer, Third Party or Certifying Agency inspection on 100% of units, operations or tests on that project. Every
effort is made to have the inspector present when these operations are conducted. The inspection or test has not
necessarily been performed in advance, prior to the observation point. Should the inspector be unavailable at the time of the
actual inspection or test, production is not stopped. Review of verifying documents is included. Equipment in ITP Section 1.0
shall be released if Customer's Inspector fails to respond or fails to appear.

'02' Identical to 'O1', but performed on a sampling of units, operations or tests on that project (not necessarily 100%). Every effort
is made to have the inspector present when these operations are conducted. The inspection or test has not necessarily
been performed in advance, prior to the observation point. Should the inspector be unavailable at the time of the actual
inspection or test, production is not stopped. Notification requirements are the same as for '01'. Equipment in ITP Section
1.0 shall be released if Customer's Inspector fails to respond or fails to appear.

'A1' Indicates Solar inspection or test on 100% of units, operations or tests on that project.
'A2' Indicates Solar inspection or test on only a sampling of units, operations or tests on that project.
'R1' Indicates an in-process document review is required on 100% of units on that project. The in-process review is to take place
at the operation or test location unless the document is included in the databook. A copy of the verifying document is not
supplied unless also identified with an 'X' in Solar's column 'A'.
'R2' Indicates an in-process document review is required on only a sample of units on that project. The in-process review is to
take place at the operation or test location unless the document is included in the databook. A copy of the verifying document
is not supplied unless also identified with an 'X' in Solar's column 'A'.

'M2' Indicates a sample monitoring of Solar's system is required. This monitoring will be on random equipment, and may not be
project specific.

'X'

In Solar's column 'A' indicates a copy of the document will be supplied in the Project Quality Assurance Data Book. The
Databook contains a reference copy of the ITP. Individual documents are identified with the ITP Item number and are found in
the corresponding sections. The documents consist of supplier information and Solar information.

All documents are to be submitted to: or Emailed to: solar_quality_documents@solarturbines.com


Quality Document Coordinator
Solar Turbines Incorporated (KM20)
PAGE 1
4200 Ruffin Rd.
San Diego CA 92123-1836, USA

Caterpillar Confidential: Yellow

Solar Turbines

Inspection and Test Plan

PAGE 2

A Caterpillar Company

Source Inspection Instructions for ITP Section 1.0 ONLY


Solar Turbines Supplier Quality Engineer- (Ray Greeves)
1. Create Project File.
2. Send (email/fax/mail) copies of latest revisions of ITP, Unpriced Purchase Order,
Drawings, etc. to assigned contracted Inspector.
3. Send (email/fax/mail) copies of latest revisions of ITP, Unpriced Purchase Order to
Drawings to Inspection Agency.
4. Follow up on Supplier to Inspector Second Notifications.
5. Reassign inspection to different Solar Inspector and/or Inspection Agency 24 hours after
Supplier notification to Solar that Inspector did not respond to Second Notice (see
Supplier item number 6).
6. Request Customer Inspection Waiver from Project Manager, if Customer Inspector did
not respond to Supplier within 48 hours after Supplier issued Second Notice (see
Supplier Item 6).
Suppliers Noted in Section 1.0 of this ITP1. Per ITP requirement, send (email/fax) Inspection Notification to Solar Inspector and/or
Solar Customer Inspector.
2. Send (email/fax) copy(s)of Inspection Notification(s) to Solar Supplier Quality Engineer
(Ray Greeves).
3. Send (e-mail/fax) copy of Notification to Solar Purchasing Representative.
4. Send (e-mail/fax) Second Notification to Solar Inspector and/or Solar Customer
Inspector, if required; copy Solar Supplier Quality Engineer.
5. At Inspectors arrival, confirm Inspector has latest Purchase Order and Drawing revision,
and provide Inspector with current copy(s), if required.
6. If Inspector and/or Solars Customers Inspector has not responded to a Second Notice
Notification within 48 hours, notify the Solar Turbines Supplier Quality Engineer.
Solars Contracted Source Inspector (Column A of Section 1.0)1. Upon receipt of Solar ITP, Purchase Order and Drawing, notify Supplier of your
inspection assignment.
2. Upon receiving Inspection Notification from Supplier, send (e-mail/fax) inspection
confirmation to the Supplier.
3. Send (e-mail/fax) copy of inspection confirmation to Solar Supplier Quality Engineer and
Inspection Agency.
4. Respond to Supplier Second Notification within 48 hours (see Supplier Item 6 and Solar
Turbines Supplier Quality Engineer Item 5).
5. Send Inspection Reports to Solar Quality Engineer.
Note:
For Solar Source Inspections, only a Quality Engineer, Quality Manager, or Project Manager
can waive Source Inspection requirements.
For Customer inspections, only the Customer can waive Source Inspection Requirements.
All waivers must be in writing (email or faxed).
Please address ITP Section 1.0 Source Inspection issues to Ray Greeves 858/292-3146.
Email address: greeves_ray_h@solarturbines.com

Caterpillar Confidential: Yellow

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
0.0

ITEM DESCRIPTION

0.4

COLUMN C CONTACT INFORMATION:


Transierra

Contact:

Jorge Luiz Kauer

Phone #:

591-335-86-350

Fax #:

Jaime Mellina, Project Manager


Bob Sutherland, Project Engineer

Taurus CS

ITEM DESCRIPTION

Company:
DATE:

May 01, 2003

Taurus 70-10302
ITEM

ITP approval by Solar Project Management.

PAGE 3

591-335-86-183

Cell/Pgr #:
0.1

SOLAR SOURCE INSPECTION CONTACT:

Email:

jkauer@peb.petrobras.com.br

Contact: Ray Greeves


Phone: 858-292-3146 Fax: 858-694-6733

Company:

greeves_ray_h@solarturbines.com
0.2

Contact:
Phone #:

PROJECT QE CONTACT:

Fax #:

Contact: Larry Proctor

Cell/Pgr #:

Phone #: (858) 694-6851


Fax #:
Email:

Email:

(858) 715-7770
proctor_larry_p@solarturbines.com

Company:
0.3

COLUMN B CONTACT INFORMATION:

Contact:

Company: Astra Evangelista

Phone #:

Contact:

Julio Craysman

Fax #:

Phone #:

5411-4239-3700

Cell/Pgr #:

Fax #:

5411-4239-3701

Email:

Cell/Pgr #:
Email:

jcraysmans@repsolypf.com

Company: Astra Evangelista


Contact:

Cesar Coronel

Phone #:

5411-4239-3760

Fax #:

5411-4239-3701

Cell/Pgr #: 5411-15-5400-3760
Email:

ccoronels@repsolypf.com

Company: See Additional Contact names below


Contact:
Phone #:
Fax #:
Cell/Pgr #:
Email:

Cristian Alonso - Dto. de COMPRAS - Purchasing Department A-Evangelista S.A. - Phone: 011-54-11-4239-3852
Fax: 011-54-11-4239-3702 CALONSOPE@repsolypf.com
Fabian Rivas - Cristian's backup - Phone: 011-54-11-4239 3706 frivast@repsolypf.com

Caterpillar Confidential: Yellow

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
01.00

ITEM DESCRIPTION

PSO PQ.S06.06

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

PACKAGING OPERATIONS PURCHASED PARTS Purchase Order

PAGE 4

VERIFYING
RECORD

Solar

ASTRA

TRANS

POMQ Computer
Screen

R1

On-Line Material
Review and
Corrective Action
System

R2

Engineering
Drawings
01.01

RECEIVING INSPECTION - Inspect material per


Solar practices

Purchase Order

SUPPLIERS BELOW TO NOTE THE FOLLOWING:

PSO PQ.S10.01
PSO PQ.S10.02
PSO PQ.S10.03
PSO PQ.S10.05
PSO PQ.S13.08

ALL DOCUMENTATION MARKED WITH "X" IN


COLUMN A SHALL BE PROVIDED TO SOLAR
Engineering
WITHIN 14 CALENDAR DAYS OF COMPLETION
Drawings
OF MANUFACTURING, AND/OR FINAL SOLAR
OR CUSTOMER INSPECTION. DOCUMENTATION
SHALL INCLUDE SOLAR PO#, SOLAR PART
NUMBER AND SOLAR PROJECT NAME/NUMBER.
ELECTRONIC TRANSMITTAL OF DOCUMENTS IS
PREFERRED. SEND TO:
Solar_quality_documents@solarturbines.com
DOCUMENTS SHALL BE MAILED TO:
QUALITY DOCUMENTS COORDINATOR
SOLAR TURBINES, INC. (KM20)
4200 RUFFIN RD.
SAN DIEGO, CA 92123
NOTE: RECEIVING INSPECTION VERIFYING
DOCUMENTS ARE NOT APPLICABLE TO DROP
SHIPPED ITEMS.
01.03

AIR INLET SILENCER


(Drop Ship Item)

Purchase Order
ES 1692
Engineering
Drawings

01.04

AIR INLET FILTER


(Drop Ship Item)

Purchase Order
ES 1725
Engineering
Drawings

01.05

EXHAUST SILENCER
(Drop Ship Item)

Purchase Order
ES 1632
Engineering
Drawings

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
01.06

ITEM DESCRIPTION
LUBE OIL COOLER
(Drop Ship Item)
Must Be ASME Code Stamped

Engineering
Drawings
ASME VIII

SOURCE INSPECT PER SOLAR SUPPLIER


QUALITY ASSURANCE.
01.07

LUBE OIL FILTERS

Purchase Order
Engineering
Drawings

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT
Purchase Order

PAGE 5

VERIFYING
RECORD

Solar

ASTRA

TRANS

1. ASME Data
Report

R1

2. Pressure Test
and Flush
Certificate

A1

ASME Data Report


( if applicable )

R1

ASME Data Report

R1

Certificate

R1

Certificate

R1

ASME VIII
01.08

GAS FUEL FILTERS

Purchase Order
Engineering
Drawings
ASME VIII

01.09

ENGINE HANDLING KIT

Purchase Order
Engineering
Drawings

01.10

PACKAGE LIFTING KIT

Purchase Order
Engineering
Drawings

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
02.00

ITEM DESCRIPTION

PAGE 6

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

SKID BASE PLATE


(TURBINE PACKAGE)
(TurboFab, Houston)
TurboFab Contact: Chuck Belson
Tel: 281-860-6702

02.01

Review welding procedures

TF 1009

PQR, WPS

M2

WQR

M2

Traveler

A1

AWS D1.1
02.02

Review welder qualifications

TF 1009
AWS D1.1

02.03

TF 1009

(Built to engineering specifications using ASTM


A36 material)
02.04

Weld skid/lifting bollards


Dimensional check
and visual inspection to AWS D1.1 Section 6.

AWS D1.1

Lube Oil Tank - Pneumatic leak test

TF 2005

Fabrication
Drawings

C of C
Traveler

02.05

Surface preparation and paint

PSO QAS 701


PSO QAS 710

Lube Oil Tank - Internally coated with Brayco


785

A1

C of C

ES 9-58
02.06

TurboFab
Form 3016

PSO QAS 702

C of C
Traveler

A1

X
A1

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
03.00

ITEM DESCRIPTION

PAGE 7

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

MANIFOLDS
Solar Contact: Ron Lang
Tel: 858-694-6121

03.01

Review welding procedures

ASME IX

WPS, PQR

M2

03.02

Review welder qualification

ASME IX

WQR

M2

03.03

Weld manifolds Dimensional check


and visual inspection

WPS

C of C

PSO QAS 709

Traveler

X
A1

Engineering
Drawings
03.04

NDE Manifolds (Radiography - RT)


(Standard is 5% per welder on circumferential
butt welds only. NOTE: Not per project)

ASME B31.3

C of C

03.05

Hydrostatic Test Manifolds


-(1.5 times design pressure for 10 minutes
minimum)

PSO QAS 708

Hydro Test Log

A1

Engineering
Drawings

* Hydro Test Log maintained by part number, not ASME B31.3


project specific.

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
04.00

ITEM DESCRIPTION

PAGE 8

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

CONTROLS
Solar Contact: Ron Lang
Tel: 858-694-6121

04.01

Visual inspection of control wiring

Project Electrical
Drawings

Included in the
Certified Test Data
in Section 08.01

A1

04.02

Hardware verification
of the project control system. This verification
is performed on each unit of a multi-unit Sales
Order.

Project Electrical
Drawings

Included in the
Certified Test Data
in Section 08.01

A1

O1

O1

04.03

Project software verification


using software simulators to represent the
operation of the equipment controlled by the
software. This verification is performed only
once on a multi-unit Sales Order.

Project Electrical
Drawings

Included in the
Certified Test Data
in Section 08.01

A1

O1

O1

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
05.00

ITEM DESCRIPTION

PAGE 9

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

GAS TURBINE ENGINE


Solar Contact: Ron Lang
Tel: 858-694-6121

05.01

SUPPLIER QUALITY ENGINEERING Review and approval of purchase requisitions


for first-time buy or revised parts.

Purchase Order
PSO PQ.S6.06

POMQ Computer
Screen

Engineering
Drawings
05.02

RECEIVING INSPECTION - Inspect material per


Solar practices.

Purchase Order

Check List, Check


Chart, or ENPS
Computer Screen

A2

Inspection
Accumulation
Record Form

R2

Engineering
Drawing

Leak Test Chart

A1

Engineering
Drawing

Leak Test Chart

A1

ES 9-78

Leak Test Chart

A1

PSO PQ.S10.01
PSO PQ.S10.02
PSO PQ.S10.03
PSO PQ.S10.05
PSO PQ.S13.08
Engineering
Drawings

05.03.A Compressor Case Leak Test


Cases are leak tested at the place of
manufacture. Cases are not assigned to a
specific project or a specific engine at the time
of leak testing.
05.03.B Combustor Case Leak Test
Cases are leak tested at the place of
manufacture. Cases are not assigned to a
specific project or a specific engine at the time
of leak testing.
05.03.C Engine Fuel Manifold Leak Test
Manifolds are leak tested at the place of
manufacture. Manifolds are not assigned to a
specific project or a specific engine at the time
of leak testing.

Engineering
Drawing

NOTE: Fuel manifolds are manufactured and


tested at TurboTec, Tijuana, Mexico.
05.04

ROTOR ASSEMBLY - COMPRESSOR AND


TURBINE
NOTE: Customer identification is assigned at
this point.

TMP QP 602.0

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM

ITEM DESCRIPTION

PAGE 10

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

05.04.A Gas Producer Compressor Rotor


(Mechanical and Electrical runout)

Engineering
Drawing

Shop Floor
Information System
(Inspection Data)

A1

05.04.B Gas Producer Turbine Rotor


(Mechanical and Electrical runout)

Engineering
Drawing

Shop Floor
Information System
(Inspection Data)

A1

05.04.C Power Turbine Rotor


(Mechanical and Electrical runout)

Engineering
Drawing

Shop Floor
Information System
(Inspection Data)

A1

05.04.D Balance Gas Producer Compressor Rotor

Engineering
Drawing

Shop Floor
Information System
(Inspection Data)

A1

Shop Floor
Information System
(Inspection Data)

A1

Shop Floor
Information System
(Inspection Data)

A1

TMP QAS 712


05.04.E Balance Gas Producer Turbine Rotor

Engineering
Drawing
TMP QAS 712

05.04.F Balance Power Turbine Rotor

Engineering
Drawing
TMP QAS 712

05.05

ENGINE ASSEMBLY

TMP QP 602.0

Shop Floor
Information System
(Inspection Data)

A1

05.07

ENGINE PERFORMANCE TEST


(Utilizing the Facility Test Stand and
Dynamometer to load engine)

PSOP P10.11
PSOP P10.22
PSOP P11.01

Acceptance Test
Stamp Sheet*

A1

*Included In Certified Test Data In Section 8.01

O1

O1

ES 2235

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
06.00

ITEM DESCRIPTION

PAGE 11

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

GAS COMPRESSOR ASSEMBLY


Solar Contact: Ron Lang
Tel: 858-694-6121

06.01

SUPPLIER QUALITY ENGINEERING Review and approval of purchase requisitions


for first-time buy or revised parts.

Purchase Order

POMQ Computer
Screen

PSO PQ.S6.06
POMQ Computer
Screen
Engineering
Drawings

06.02

RECEIVING INSPECTION Inspect material per Solar practices.

Purchase Order

Check List, Check


Chart, or POMQ
Computer Screen

POMQ Computer
Screen

POMQ Computer
Screen

A2

A2

Engineering
Drawings or ENPS
Computer Screen
06.03

Gas Compressor Dry Gas Seals

Purchase Order
POMQ Computer
Screen
Engineering
Drawings

06.05

Impeller Overspeed Spin Test


and Dimensional Check
One Minute at 115% speed.

Engineering
Drawings

Shop Floor
Information System
or Process Log
(Inspection Data)

A1

06.06

Center Body Hydro Test


(center body hydro test at 1.5 times design
pressure for 30 minutes minimum)

ES 9-78

Shop Floor
Information System
(Inspection Data)

A1

Shop Floor
Information System
(Inspection Data)

A1

Engineering
Drawings

NOTES:
Hydrotests performed for extended time periods
will apply to the centerbody and endcaps only.
Additional tests on services ports will be the
standard 30 minute duration.
06.07

End Caps Hydro Test


(end caps hydro test at 1.5 times design
pressure for 30 minutes minimum)

ES 9-78
Engineering
Drawing

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
06.08

ITEM DESCRIPTION
Mechanical and electrical runout

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

Engineering
Drawings

Inspection Data

A1

Engineering
Drawings

06.08.A Rotor balance

PAGE 12

Balance Computer
Printout

A1

06.09

Compressor Assembly

TMP QP 602.0

Shop Floor
Information System
or Traveler (Assy /
Inspection Data)

A1

06.10

GAS COMPRESSOR AIR TEST


(On facility test stand including 100%
mechanical run, air test and nitrogen static leak
test)

PSOP P10.22
PSOP P11.01

Air Test*

A1

O1

O1

ES 1597

* Included in the Certified Test Data in Section


08.01

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
07.00

ITEM DESCRIPTION

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

PACKAGE ASSEMBLY

PAGE 13

VERIFYING
RECORD

Solar

ASTRA

TRANS

PSOP P10.11

Solar Contact: Ron Lang


Tel: 858-694-6121
07.01

Base qualification of customer fixed interface


points prior to build-up of package.

Project Mechanical
Installation
Drawings

QC Folder Check
List

A1

07.02

Mechanical Assembly

PSO QAS 800


PSO QAS 803
PSO QAS 804
PSO QAS 805
PSO QAS 806
PSO QAS 812
PSO QAS 814
PSO QAS 815
PSO QAS 816
PSO QAS 817
PSO QAS 821
PSO QAS 826
PSO QAS 829
PSO QAS 834
PSO QAS 835

QC Folder Check
List

A2

07.03

Electrical Assembly

PSO QAS 503


PSO QAS 504
PSO QAS 506
DE.380.F01

QC Folder Check
List

A2

07.04

Review alignments

PSO QAS 806

QC Folder
Alignment Sheet

A1

Dimensional
Verification Sheet

A1

QC Folder Check
List

A1

Project Mechanical
Installation
Drawings
07.05

Dimensional check of customer connections


and interface points during build-up of package.
(Including customer connection plates and
flanges)

Project Mechanical
Installation
Drawings

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
08.00

ITEM DESCRIPTION

PAGE 14

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

PACKAGE TEST
Solar Contact: Ron Lang
Tel: 858-694-6121

08.01

Package/Console Acceptance Test

PSOP P10.11
PSOP P10.22
PSOP P11.01

Acceptance Test
Stamp Sheet

A1

O1

O1

Certified Test Data

A1

See PSO QAS list


in section 07.02
and 07.03.

Acceptance Test
Stamp Sheet*

A1

O1

O1

ES 1782

Acceptance Test
Stamp Sheet*

A1

O1

O1

ES 2153 (T70)
08.02

Enclosure assembly static test


including simulated test of fire and combustible
gas system (if present).
*Included in the Certified Test Data in Section
08.01

08.03

No Load Mechanical String Test (one unit only)


4 Hour Gas Fuel Run
1 Package Only
*Included in the Certified Test Data in Section
08.01

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM
09.00

ITEM DESCRIPTION
PACKAGE FINAL INSPECTION

PAGE 15

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

PSOP P10.11

Solar Contact: Ron Lang


Tel: 858-694-6121
09.01

Mechanical Final Inspection

See PSO QAS list


in section 07.02.

QC Folder Check
List

A1

O1

O1

QC Folder Check
List

A1

O1

O1

Project Mechanical
Drawings
09.02

Electrical Final Inspection

See PSO QAS list


in section 07.03.
Project Electrical
Drawings

09.03

Paint Final Inspection

PSO QAS 701

QC Folder Checklist

A1

O1

O1

09.04

Loose Ship

PSOP P10.11

Pack Slip

A1

O1

O1

O1

O1

O1

O1

PSO QAS 818


09.05

Pre-shipment Inspection

09.06

Package preservation and preparation for


shipment

Shipping/Traffic
OK to Ship QC Tag
Functional Practices

A1

PSOP P15.10
ES 9-249
ES 9-248

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT

SOLAR TURBINES INCORPORATED


INSPECTION AND TEST PLAN
CLIENT:

PROJECT NAME:

Transierra

PD NO: 72871

NO. UNITS: 2

ISSUED BY: Larry Proctor

REV: 4

PURCHASE ORDER:

EQUIPMENT

SIERRA 1 & 2

ITEM

ITEM DESCRIPTION

PAGE 17

May 01, 2003


Taurus CS

Taurus 70-10302

CONTROLLING
DOCUMENT

VERIFYING
RECORD

Solar

ASTRA

TRANS

REVISION RECORD SHEET


REV

DATE

BY

REMARKS

08/05/02

Larry Proctor

Revision 0 is the initial release of the ITP.

10/31/02

Larry Proctor

Revision 1: Changed PM. Moved 4 hr run from 05.07 to 08.03. Deleted item 06.11. Changed item 09.05
to 09.06 and then added pre-shipment inspection in 09.05. No other changes.

02/19/03

Larry Proctor

Revision 2: Added customer contact information. Added O1's to columns B and C in sections 5, 6, 8.
No other changes.

03/11/03

Larry Proctor

Revision 3: Changed controlling document from ES2041 to ES2235 in item 05.07. No other changes.

05/01/03

Larry Proctor

Revision 4: Added customer contact information. No other changes.

A1 SOLAR 100% INSP/TEST

R1 100% DOCUMENT REVIEW

O1 100% OBSERVE INSP/TEST

A2 SOLAR SAMPLE INSP/TEST

R2 SAMPLE DOCUMENT REVIEW

O2 SAMPLE OBSERVE INSP/TEST

M2 MONITOR SYSTEM

Caterpillar Confidential: Yellow

SOLAR SUBMIT
VERIFYING DOCUMENT