Sei sulla pagina 1di 22

DESIGN PRACTICE

INSTRUMENT LAYOUT AND CONNECTION DRAWING EXECUTION CRITERIA

Document type DR 06274.DOC.STA.PRG

Rev. 1 September 1997

1 0

Computerized issue General Revision

STIE STIE

STIE STIE

STIN STIN

SEP. 97 DIC. 92

REV.

DESCRIPTION

PREP.D CHK.D APPR.D DATE

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 2

FORWARD Rev. 0 Rev. 1 Sheet 26 December 1992 Sheet 22 September 1997 Computerized issue

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 3

INDEX

1. 2. 3. 4. 5. 6. 6.1. 6.2. 6.2.1. 6.2.2. 7. 7.1. 7.2. 7.3.

SCOPE APPLICABILITY RESPONSIBILITY REFERENCE DOCUMENTS ISSUE SCOPES, PROJECT PHASES AND REVISION CONTENT Application Description and work execution criteria Graphic part Table part GRAPHIC SYMBOLS General description Formats Symbols

8. ESTRACTIONS APPENDIX 1 ALTERNATIVE TABLE FOR PNEUMATIC INSTRUMENTS

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 4

1.

SCOPE This document aims at defining the contents, the drawing methods, the production sequence and the issue responsibilities of the Instrument Connection Drawings (DR) of a plant. This procedure represents a descripti on of the drawi n g general con tent, wi th a reference to the standard symbols to be used, and a indication of the tables belonging to it. The production criteria and the sequence are independent from their handmade or computer aided, by means of CAD or PC tools, drawing up. The plans of this standard represent the main instrument layout drawings of a plant and are initial]y produced before the mechanical equipment arrangement plans, while, to be completed, they require the execution of the piping routes and the ventilation conduits drawings, sice instrument are often layed upon conduits or on items supported by those (valves, rolling shutters, etc.) In any case, we should keep in mina that a part of the instruments trave already been placed contemporarly to the execution of the safety layout drawings and, therefore, for a full description of the layout of all the plant instruments, we need to use both kinds of drawings.

2.

APPLICABILITY This standard can be applied to the industrial processes used by Agip for the designing of both liquid and gas tuhydrocarbons treatment plants, either Onshore or Offshore.

3.

RESPONSIBILITY The Engineering Unit in charge of the preparation, the control and the issue of the planimetry of this standard is the "INSTRUMENT" one; both in the case of this document being produced by Agip and in the case of it being produced by external Contractors. The instruments assemblind drawingsare mono-discipline documenta; they do not require, therefore, any kind of control from civil, electrical, mechanic and safety discipline. The unit in charge of issue and updating this standard is the Standardization one.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 5

4.

REFERENCE DOCUMENTS Ref. 1 05496.DOC.GEN.SPC Ref. 2 04120.DOC.GEN.PRG Ref. 3 05428.DOC.GEN.PRG Ref.4 06247.DOC.GEN.PRG Ref. 5 06248.DOC.GEN.PRG Ref. 6 06272.DOC.GEN.PRG Ref. 7 06285.DOC.GEN.PRG Ref. 8 0XXXX.DOC.MEC.PRG INDICE CODICI NUMERAZIONE DOCUMENTI DI COMMESSA ITEM NUMBERING AND CODINO SYSTEM FORMATS, DRAWINGS, SPECIFICATION EXECUTION CODE PLAN DRAWING GEN ERAL EXECUTION CRITERIA PLOT PLAN EXECUTION CRITERIA HVAC EQUIPMENT ARRANGEMENT AND ROUTE DRAWING EXECUTION CRITERIA MECHANICAL EQUIPMENT ARRANGEMENT DRAWING EXECUTION CRITERIA PIPING ROUTES

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 6

5.

ISSUE SCOPES. PROJECT PHASES AND REVISIONS The instrument connection plan drawings (DR) will be produced before the first phases of a project design, with different issue scopes; less frequently than those required by the equipment arrangement plans and the tubes and ducts routing plans, from which they are logically influenced, even if they do not necessarly report the full content. On each plan label the project phase and the issue scope should be written; along with every project phase, which is identified with one of the characters of the drawing identification, the issue scope should be expressed by means of two alphabet letters, to be written in the appointed space within the label. The combinations of project phases and issue scopes, which we can usually foreseen for the production of a project DR plan, are the following:

PROJECT PHASE F(feasibility ) B (basic)

ISSUE SCOPE Comments Comments Bid Request Approval Comments Approval Order Costruction/Erection Comments Approval As Built

CODE PR PR RO AP PR AP RA CO PR AP AB

D (detail)

C (construction)

There is no possibility that the instrument connection plans could be published with an issue scope for "Start up". The revisions of such plans should be done following the seme criteria, valid for all the drawings of a project, and they should be written on the label, according to the document of Ref. 3.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 7

6.

CONTENT This chapter presents the content, the execution criteria, the reference symbols and the different detail levels re]ated to the issue phase of the document of this standard. It is important to keep in mina that, in the instrument connection drawings, also the instrument already inserted in the safety layout drawings should appear.

6.1.

Application The i ns trument con necti on plan w il l present sufficently detailed i nformation on the plant layout in order to allow: a definition of the topographic description of all the instruments requiring an electrical and/or pneumatic interconnession (safety ones included); a definition and location of eventual locai support racks for instruments, or a portion of the seme, compatibly with the space available within the plant; a definition and location of junction boxes for the collection and connection of near and compatible instrument cables, in order to sena the signals through a single cable, to be connected with the instrument panels; a definition and location of the instruments pneumatic feeding manifolds and of the detachment po in t of the tubing connecting the mani fold to the instrument ; representing a reference during the instrument connection mounting and permitting a fast finding and accessibility in case of accident or during the plant maintenance; a definition of the cable route planimetrie drawings and, in particular, of the cable trays of instrument cables or air, nitrogen or gas distribution tubing, related to the instruments; a definition or a contributi on to the producti on of the drawing (or of the tables) defining the cable or tubing routing; a contribution to the instrument list production, with particular regard to topologie, data and to the definition of the racks and the boxes connected to them. So the quality of these fast ones can be defined, in view of the purchasing needs, for their beig tipically objects depending on the layout.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 8

6.2

Description and execution criteria The instrument connection plans (DR) representthe plan arrangement of all the plant instruments requiring an electric and/or pneumatic interconnession, both inside the buildings or the platforms, and on the "round, with the presence of civil works and structures, and with a particular reference to their topographic position. The instrument already positioned on the safety drawings are included too. DR plans should, above al1, present information allowing the identification of the instrument and the implementing of the interconnession design between instrument and connecting boxes or manifolds; of course the information will be more complete when we get closer to the final issue of the drawings. The instrument connection plans always trave the seme content, independently from the complexity of the plant they are made for, and from the scope they are produced fon The instrument arrangement is done by overimposing to every single copy of the process equipment arrangement drawing, or in particular cases on the piping route drawing, the suitable item symbols; these, for a good reading of the drawing, can be divided into two or three groups (and therefore create two or three different drawings) of omogeneus items or of common management: a) b) c) electrical or electro-pneumatic instruments pneumatic or electro-pneumatic instruments fusitele plugs network (always on a separate document).

If for the seme plant area three documenta are produced, each one for a set of items, as Agip designing methods preferably require, these are given the following names: a) b) c) Electrical instrument connection plan. Pneumatic instrument connection plan. Fusible plug network connection plan.

The first two mentioned drawings are usua]ly made up of a graphic part and a table part, describing the grouping of the instruments presented in the graphic part. The instrument connection plans should always be separately identified, every time the plant area represented is changed; but if one of the areas needs to be subdivided among several sheets, these must trave the seme drawing identification and a progressive sheet number starting from 1. Naturally a suitable scale should be chosen, in order to reduce the number of sheets , whi le al lowing a good interpreting of the whole plant drawn. In the case the plant complexity permits it, it is advisable that the scale adopted for the safety layout drawings production should also be used for the electrical and pneumatic instrument connection drawings, and for the fusitele plug ones.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 9

6.2.1.

Graphic part The instrument connection plans should present all the instruments requiring an electrical interconnession, or a interconnession to the pneumatic network, which are located in the plant (included the ones already placed in the safety drawings), NOT in scale, indepently from their phisical size. Along with the instruments these plans should trave all the locai racks, or the instrument containers, the cable junction boxes, the pneumatic feeding manifolds till the instrument air barrels, indication every air detachment to the users. All the instrument and the mentioned items will trave to be identified, writing the identification of every single one, with no blank space or any kind of separation, on a suitable rim, located as near as possible to the item itself and placed in such a way to make the reading as easy as pos sible (the i de n tifi c ati on al ign emen t cou l d make the reading much easier). If a symbol covering several instruments is used, we need to piace its identifications within a single rectangle. Naturally, in this case, all the instrument should be placed at the seme elevation. No identification is required for the fuse plugs. The instruments are marked with letters, in agreement with the document in Ref. 2. In the case of overimposed items, there is the need to point out the covered one by moving its symbol a little bit, and it is important to highlight the identification of each one, putting the related identifications one over the other, vertically, following the items order. In the plans related to the pneumatic instruments and to the fuse plugs, there is the need to report and identify the entire tubing (and the manifolds in particular), and to point out the type of fluid contained and its pressure, expressed in Barg. The tubing identification criteria should follow the one already mentioned for the identification of the process linee. All the feeding detachments from the manifolds should be marked with letters, in order to write, in the suitable table, the instrument they are directed tot When possible, we suggest giving the manifold a progressive multiple of a hundred. In such a way we can use the artifice of numbering the detachments with the seme first character of the progressive given to the manifold. In the fuse plugs network connection drawings it is important to highligh the equipment requiring the presence of dedicated caps, locating around the equipment map the related tubing and, connected to this, the caps symbols. Also in the other types of instrument connection plans we need to highlight, and identify, the equipment influencing the instruments arrangement. It is also possible to avoid representing, on the instrument connection drawing, the mechanical or electric equipments which trave no influence on the instrument presence , on the i nstrument mounting and maintenance.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 10

To make the work clear, we should avoid representing the route of the cable trays reserved for instrument cables, expecially in the case of a pneumatic instrument connection and of a fuse plug network drawing . Instruments, manifolds and junction boxes need to be placed according to the real position they trave within the plant, even if the indication of the instrument coordinates isn't usually prescribed; we should only make explicit, by means of general notes, the distance limite for the position of some individual instrument types, from ceilings, floors, walls or process connections. Conversely, all the instruments should present the elevation they are placed at; such elevation should be written next to the instrument identification, above the fine connecting the instrument symbol to its identification. Coordinates and elevations will be expressed in mm. A greater precision than + 50 mm. is not required As for the sensore, there is the need to point out if they are placed under the floating floor or into the false ceiling, this is done by placing the typical writing "false ceiling" and "floating floor" under the instrument identification. The portion of compressed air distribution network of the fuse plugs, normally circulating in the rooms, should be identified with a continuous fine; the one underlying the floating floor, with a hatched fine; the one in the false ceiling with a dotted fine. As to the general part of the instrument connection drawing, what will be mentioned hereafter should appear in the drawing itself. The drowings presents the orutes and the squares, the maintenance spaces, the stairs, the catwalks, the gride, the pipe racks, the gates and hinged or dismantable panels, the temporary pluggings: The accesses, the trap-doors and the openings for the tube passages inside the walls and the floors, having an impact on the instruments and the related feeding, should be pointed out. The walls, the slabs, the paved areas, the columns do not require details or precise statements on the adopted type, but their sole existence should result. The ground elevations outside the buildings, and the internal slabls elevations of buldings and platforms should always be indicated. The elevation should be expressed in mm., referred to the sea level. In particular cases, the elevation could be expressed according to locai values, taking care of writing the geographical reference on the datum point. In the case of a plan presenting some Packages, made up of items whose identification is required, a rim with a hatched fine around all these package items should be drawn; a rhombus should be placed on such a rim (the seme symbol as the one used for P&ID) and the package identification, if known. When the planned plant area represents an addition to an already existing plant, or when some are as or equipment to be implemented in the future are poi nted out for a newly planned plant, this must be shown with a suitable graphic symbol, indicating the different implementing time. We recali and summarize here the information, already presented in detail in the Ref. 4 document, that shou]d always appear in the drawing belonging to this standard: the geographical and the conventional north, the plant key map, the main reference point (datum point) the locai reference points, with a indication of the locai p]an coordinates,
Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 11

the "columns network"; the plant surface limite: the representation of all the work estraneus to the plant (i.e. electrical linee, sewages, canale, etc.), Take care of laying out the plant with the conventional north oriented upwards, and in any case always keep the chosen arrangement for all the plans of all the plant areas. The marking, with a small cloud, of all the DR portions which trave undergone some changes since the previous revision is always required. In the cloud, the revision number bringing the change about should appear within a suitable small triangle. The instrument connection drawings, when related to housing units or to building porti on s usually hous i ng the staff, should gi ve a description of the different rooms functions, by the use of a suitable table.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 12

6.2.2.

Table part The portion of the plan drawing placed above the label should be filled with the following information, which follow the seme upward order: the key map the drawing general notes the table listing all instruments appearing in the plant the table of the rooms, in the case of buildings or housing units the interpreting key for the used symbols the list of the plan drawings related with the interested one (i. e. the mechanical equipment arrangement plan, the equipment arrangement and HVAC route drawing, the cable route drawings, etc.).

The key map should systematically appear in the plant detailed drawings, and it should be hatched in the equivalent position to the one being detailed in the related plan. Among other things the general notes, in the specific case of the pneumatic instruments connection plans, should trave a complete list of the spere branches comprised in the drawing. The instruments connection plans related to the electrical and to the pneumatic instruments always require a table Bach, while the fuse plugs network connecting plans require no table. Here follows an example for the filling in of an electrical and electro-pneumatic instruments table, related to the contents of the Italia Gas Platform Base Bridge plan, and then an example of a pneumatic and electro-pneumatic instruments table for the Service Bridge of the seme platform. Both table contents corresponds to the contents of Figures I and 2. The electric and electro-pneumatic instruments table presents a list of all the instruments appearing on a single plan, reported with the elevation they are placed at, with the coordinates on the sheet, and with the distance saparating every single instrument from the junction box the interested cable is connected to, expressed as a sum of the absolute values of the X, Y, and Z incrementa of the related geographic coordinates. The electrical instruments appear in the table according to a growing identification order, within the junction box they are connected tot The instruments unconneted to a junction box, or connected to a box not appearing in the plan, should be listed before those connected to a box. The pneumatic and electro-pneumatic intruments table presents a list of those instruments connected to a junction located on one of the instruments air manifolds, either a feeding one or a set or a signal sending one, only.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 13

When executing the pneumatic instruments connection plans by means of computerbased tools, we could think of creatina a more complete instrument table, in which all the pneumatic instrument could be summarized and even their feeding sequence could be pointed out. On this argument see what has been suggested in Appendix 1. In every drawing we should reproduce a list of the graphic symbols used, or that could be used, for the individual plan. Figure 3 presents the list of the symbols to tee, respectively, used for the electrical instruments plan and for the fuse plugs network connection plan. ELECTRICAL AND ELECTRO-PNEUMATIC INSTRUMENTS TABLE

JUNCTION BOX
IDENTIFICATION ELEVATION

INTERCONNECTED INSTRUMENTS COOR


INSTRUMENT ELEVATION Minimum Distance (mm) DeltaX+DelatY+DeltaZ

0935 JT 101

5620

0660 ZSH 101 0660 ZSL 101 0660 ZSH 102 0660 ZSL 102 0660 ZSH 103 0660 ZSL 103 0660 ZSH 104 0660 ZSL 104 0660 ZSH 105 0660 ZSL 105 0660 ZSH 106 0660 ZSL 106 0660 ZSH 107 0660 ZSL 107 0660 BY 151 0660 BY 152 0660 BY 153 0660 BY 154 0660 ZSH 108 0660 ZSL 108 0660 ZSH 109 0660 ZSL 109 0660 ZSH 110 0660 ZSL 110 0660 ZSH 112 0660 ZSL 112 0660 ZSH 114 0660 ZSL 114

3800 3800 3800 3800 3800 3800 3800 3800 7000 7000 7000 7000 7000 7000 3800 7000 7000 7000 7000 7000 7000 7000 7000 7000 7000 7000 7000 7000

4100 4100 2800 2800 3700 3700 3700 3700 4500 4500 3400 3400 2600 2600 4000 4000 5600 2900 5100 5100 5600 5600 3400 3400 4400 4400 4700 4700

E3 E3 E4 E4 E4 E4 E4 E4 G3 G3 G4 G4 G4 G4 E3 G3 H4 G4 H4 H4 H4 H4 G5 G5 G5 G5 G5 G5

0935 JT 102

5620

0935 JT 103

5620

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 14

ELECTRICAL AND ELECTRO-PNEUMATIC INSTRUMENTS TABLE


NUMBER VALVE OR PNEUM. INSTRUMENT IDENTIFICAT FEEDING COLLECTOR TUBINO SPEC/SECT BARG COOR. PRESS.

601 602 603 604 605 606 607 608 620 621 622 623 701 702 703 704 704 704 705 706 801 802 803 804 910

0660 HS 017 0660 HS 018 0660 HS 019 0660 HS 020 0660 HS 021 0660 HS 022 0660 HS 023 0660 HS 024 0660 UY 056 0660 UY 057 0660 UY 054 0660 UY 055 0660 TC 016 0660 TC 017 0660 TC 018 0660 TT 002 0660 TT 003 0660 TT 015 0660 TT 010 0660 TC 020 0660 TC 016 0660 TC 017 0660 TC 018 0660 TC 020 0660 SDV 001

0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 800 IA 0660 800 IA 0660 800 IA 0660 800 IA 0660 900 IA

10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 18.0 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4

E4 E5 E9 E10 G4 F11 H12 G12 F3 F3 F4 F4 H4 H5 H7 F3 F3 F4 F4 G8 H4 H5 H7 G8 I13

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 15

In the case of DR plans related to rooms of buldings occupied by civil parte, or of plans related to housing unite, not only the instrument table has to be produced; it is also important to list the rooms into which every single plant area has been subdivided. Only the letter marking and a short functional descripti on of the rooms should be given. As an example, we give here the room partitioning of the areas composing the Service Bridge of the housing unit on "Italia Gas Platform".

A10 CODICE LOCALI Room Codes A11 A12 A13 A14 A15 A16 A17 A18 A19 A1A

SERVICE BRIDGE (ELEVATION + 640) DESCRIZIONE Description CONDITIONING SYSTEM ROOM INSTRUMENT CONTROL ROOM ACCUMULATOR ROOM AIR COMPRESSOR ROOM ELECTR. EMERG. SYSTEM CONTR. ROOM. IGIENE ROOM ELECTR. PANEL ROOM - NORMAL ELECTR. PANEL ROOM - EMERGENCY. CORRIDOR WATER SYSTEM CONTROL ROOM

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 16

7. 7.1.

GRAPHIC SYMBOLS General description For an easy reading of the instrument connection plan drawings these should be reproduced, for most parte, on drawing paper, using a very light hand, if handmade; or they should be plotted with a very thin fine (0.2 mm.) if produced with the aid of computer-based tools. That is all the graphic parts related to roads, squares, building shapes, walls, columns, stairs, cable trays, gardens, gravines, "round water works, subterranean works , structural works , gride , el evation definiti ons , column networks , internal hatchings, area limite, symbols of general kind which are thaught as necessary for the instruments arrangement should be reproduced using a very thin fine. An existing plant "future" or "newly planned" parts should be highlited with a thin hatching (if handmade), or with some dots (if CAD produced) entirely covering the interested area. These drawings, used to control the existence and the correct arrangement of all the instruments, should absolutely be devoided of all the information not helping a good reading of the seme. The junction boxes identifications hould be written above a fine, possibly an orizontal one, as near as possible to the seme, and 0.2 mm. thick. The single or paired off instruments identifications should be written inside a rectangle, as near as possible to them, drawn with a 0.2 mm. thick fine and connected to the instrument, or to the instruments pair, by means of a fine of the seme thickness. The scale to be used for the production of the instrument connection plans should tee, if possible, the seme as the one used to produce the mechanical equipment arrangement plan, from which the rest of the drawing has been derived, including the equipment but leaving out the related dimensionings. In some cases we can use the piping arrangement plan, if this gives a valid help in determining the instrument valves location, or that of other instruments located on the piping. Therefore the scalee will vary from a minimum of 1:25 to a maximum of 1:1000, with intermediate values of 1:33.3, 1:50, 1:75. Different values will be exceptionally used, if required by a need of clarity of the work.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 17

7.2.

Formats The drawings are generally done in A1 format or, only if absolutely necessary, in A0 format. The information appearing on the format should respect the general criteria of space occupation imposed by the Ref. 3 document, besides the drawing should be numbered according to the rules expressed by the Ref. 1 document. As a con sequence the i n struments tabl es or the li st of presented rooms should be positioned above the label, between the related drawings list and the notes.

7.3.

Symbols The plans require the use of some standard general symbols, whose appearance is presented in figure 3 of this document. Other graphic symbols, related to the drawing general part, and foreseen by the company standard, should appear on the drawing according to the seme criteria presented by the Ref. 4, 5, 6, and 7 documenta. The instrument symbols should be used as they are, therefore they should not be influenced by the scale use to draw the plan. In locating the symbols we should respect, as much as possible, the coordinetes where the instrument should be located; in any case we should avoid overimposing such symbols.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 18

8.

ESTRACTIONS When the instrument connection plans are made with computer -based tools (CAD) it is possible to extract from them a series of information of general interest, and complementary to what has already been extracted from the process diagrams (PID); such information can be sent to the seme database previously prepared to hold the information extracted from PID, or they can be sent to a specific database. The information which can be extracted from DR are: Instrument identification Plan type Item type CAD code Description of CAD code Plant area Belonging package Geographic coordinated related to Datum Point (X and Y) Elevation Cable junction box Instrument air feeding manifold Detachment from feeding manifold Signal sending manifold Detachment from signal sending manifold Old, present or future implementing Added notes to the symbol Local coordinated related to locai walls DR plan identification DR sheet, revision and issue scope Coordinates in DR sheet

The mentioned information should all be visualized at the seme time, in the form of a CAD printing, and extracted, as a "file" to be sent to a data base. The printing has the only purpose of allowing a fast control on the plan correct execution.

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 19

FIGURE 1

Example of a Connection Plan for ELECTRICAL INSTRUMENTS

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 20

FIGURE 2

Example of a Connection Plan for PNEUMATIC INSTRUMENTS

File S06274IC.DWG (LATER)

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 21

FIGURE 3

Example of a Symbols List for Instruments Connection Planes

Electrical and electro-pneumatic equipment connection plan single electrical instrument double end fine of valves or grids cables junction box electro-pneumatic instrument

Peumatic and electro-pneumatic instrument connection plan

electro-pneumatic instrument pneumatic instrumen hand-controlled depressurization valve air cut-off to users instruments air feeding manifold: xxxxx instruments air feeding manifold; xxxxx instruments air feeding manifold: xxxxx thermostat set point air manifold: xxxxx

Fusible plugs network connection plan

fusible cap Amount: xxxx air feeding manifold fusible cap network: xxxx

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

06274.DOC.STA.PRG Rev. 1 September 1997 Sheet 22

APPENDIX 1 PNEUMATIC INSTRUMENTS ALTERNATIVE TABLE

JUNCT. N 601

VALVE OR PNEUM. INSTRUMENT IDENTIFICATION 0660 HS 017 0660 BY 054 0660 BSV 005 0660 BSV 006 0660 BSV 027 0660 BY 053 0660 BSV 004 0660 BY 051 0660 BSV 001 0660 BY 052 0660 BSV 002 0660 BSV 003 0660 HS 018 0660 BY 055 0660 BSV 007 0660 BSV 008 0660 BY 056 0660 BSV 009 0660 HS 019 0660 BY 057 0660 BSV 010 0660 BSV 011 0660 HS 020 0660 BY 058 0660 BSV 012 0660 BSV 013 0660 HS 021 0660 BY 059 0660 BSV 014 .......... 0660 UY 056 0660 UV 001 0660 UY 057 0660 UV 002 0660 UY 054 0660 UV 003 0660 UY 055 0660 UV 004 0660 TC 016 0660 TZ 016 0660 TC 017 0660 TZ 017 0660 TC 018 0660 TZ 018 0660 TT 002 0660 TT 003 0660 TT 015 0660 TT 010 0660 TC 020 0660 TZ 020 0660 SDV 001 0660 TC 016 0660 TC 017 0660 TC 018 0660 TC 020

AIR FEEDING MANIFOLD 0660 600 IA

TUBING SEC./SPEC 10X8 T01

BARG COOR. PRESS. E4 F4 F4 F3 G3 F4 F4 F2 F2 F5 F5 F2 E5 G6 G6 G7 G7 G7 E9 F9 F9 F9 E10 F10 F10 F10 G4 G3 G3 ... F3 F3 F3 F3 F4 F4 F4 F4 H4 G4 H5 G7 H7 H7 F3 F3 F4 F4 G8 F7 I13 H4 H5 H7 G8

602

0660 600 IA

10X8 T01

603

0660 600 IA

10X8 T01

604

0660 600 IA

10X8 T01

605

0660 600 IA

10X8 T01

... 620 621 622 623 701 702 703 704 704 704 705 706 910 801 802 803 804

........... 0660 600 IA 0660 600 IA 0660 600 IA 0660 600 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 700 IA 0660 900 IA 0660 800 IA 0660 800 IA 0660 800 IA 0660 800 IA

........ 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01 10X8 T01

.....

1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 18.0

Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato. This document is CONFIDENTIAL and the sole property of AGIP. It shall neither be shown to third parties nor used for purposes other than those for which it has been sent.

Potrebbero piacerti anche