Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
www.HRSGusers.org
Improve New Combined-Cycle/Cogen Project Designs Upgrade O&M Procedures at Existing Plants Get Top Value in Plant Sales and Acquisitions
Chapter 1 SAFETY FIRST Chapter 2 HRSG DESIGN 2.1 The HRSG as an Operating System 2.2 Developing Design Specifications 2.3 Vertical HRSGs 2.4 Small HRSGs Chapter 3 COMMISSIONING & INITIAL STARTUP 3.1 Overview of a Successful Commissioning 3.2 Steam-System Cleaning 3.3 Initial Performance Testing Chapter 4 STEAM-SYSTEM OPERATION 4.1 Best Practice Operating Procedures 4.2 Steam Bypass Systems 4.3 Duct Burner Operation 4.4 Attemperators Chapter 5 COMBINED-CYCLE PERFORMANCE 5.1 Real-World Performance Monitoring 5.2 Performance Monitoring of HRSGs 5.3 Perf Monitoring of Steam Turbines & Condensers Chapter 6 WATER TREATMENT 6.1 HRSG Failure Mechanisms 6.2 Makeup Water Treatment 6.3 Steam-Cycle Chemistry 6.4 HRSG Layup 6.5 Cooling-Water Treatment 6.6 Water-Chemistry Automation Chapter 7 ENVIRONMENTAL SYSTEMS 7.1 Emissions-Control Systems 7.2 Certifying a CEMS Chapter 8 THE MAINTENANCE PROGRAM Chapter 9 MAINTENANCE OF HRSGs 9.1 Standard Maintenance Practices to Avoid Substandard HRSG Life 9.2 Pinpointing & Repairing HRSG Tube Leaks 9.3 Welding Tube-to-Header Joints 9.4 NDE Tools for HRSG Users 9.5 Special Maintenance Practices Chapter 10 PIPING SYSTEMS 10.1 Piping Basics 10.2 Special Piping Considerations Chapter 11 VALVE MAINTENANCE Chapter 12 DUCTWORK, DAMPERS, & STACKS Chapter 13 MAINTENANCE OF DUCT BURNERS Chapter 14 INSTRUMENTATION & CONTROLS Chapter 15 PLANT STAFFING & ORGANIZATION Chapter 16 FAILURE ANALYSIS 16.1 Overview of Root-Cause Analysis 16.2 HRSG Tube-Failure Root-Cause Analysis Chapter 17 OUTAGE MANAGEMENT Appendix A. Directory of Industry Suppliers Appendix B. Presentations at Annual Conferences Appendix C. Glossary of Acronyms and Abbreviations
No. of Books Price (each) Total Order ($) Name Billing Address Shipping Address Country Fax Circle One Card Number Signature
Executive Director, HRSG Users Group PO Box 1054 Bozeman, MT 59771 USA Tel: 1-406-582-8655 Fax: 1-406-582-8657 Email: info@HRSGusers.org
_____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ O Visa O MasterCard
________________________________________________ Company ________________________________________________ City, State, Zip ________________________________________________ City, State, Zip ________________________________________________ Tel ________________________________________________ Email My check is enclosed Please bill my credit card Type of Credit Card
_____________________________________