QC~PLAN.
Project No. & Name: Name of Client/ Consultant: SL ACTIVITY CONTROLLING DOCUMENT Drawing Contract Specs. Drawing Contract Specs. Drawing Contract Specs. NATURE & EXTENT OF INSP./TEST Visual , 100% ACCEPTANCE CRITERIA - As per drawing / spec.
Visual , 100%
- Pipeline laid on appropriate cushioning material - Proper sleeves and packing to be provided - Adequate pipe supports and hangers to be provided - Protected against ingress of deleterious matter by plug or cap on open ended pipe or sleeve Wrapping - One layer of 'Denso' anti-corrosive tape - One layer of 'Denso' PVC backed tape Screwed Joints - To be made with the PTFE tape upto 40 mm. dia - Hemp and jointing compound for 50 mm and above size Flanged Joints - Appropriate material, full-faced, corrugated and metal joint rings of copper alloy to BS5292
Visual , 100%
Visual , 100%
d) Jointing material
Visual , 100%
225432311.xls.ms_office
XYZ
Page 2 of 3
QC~PLAN.
Project No. & Name: Name of Client/ Consultant: SL ACTIVITY CONTROLLING DOCUMENT Drawing Contract Specs. NATURE & EXTENT OF INSP./TEST Visual , 100% ACCEPTANCE CRITERIA - Fit at not more than 20 m. intervals and near equipment connection - Easy to facilitate installation and maintenance - To drain the water without accumulation of air - Provide open vent (or) automatic air vent at high points in water mains - Vent discharge located at visible place - Avoid excessive stress - Same pipe material type used for expansion loop - Stainless steel bellows type used for expansion joints - Provision for expansion checked by Customer - As per drawing - Provide blocks (if specified) at changes of directions, branches and take-off places
Visual , 100%
Visual , 100%
h) Thrust blocks
Visual , 100%
Hydrotest, 100%
- Tested at 7 bar (or) 2 times working Engineer/ pressure whichever is greater Foremen/ - Test duration: Minimum one hour Quality Engineer - Flushed after testing - Use calibrated pressure gauge
225432311.xls.ms_office
XYZ
Page 3 of 3
QC~PLAN.
Project No. & Name: Name of Client/ Consultant: SL ACTIVITY CONTROLLING DOCUMENT Drawing Contract Specs. NATURE & EXTENT OF INSP./TEST Visual, 100% ACCEPTANCE CRITERIA - Domestic waterline sterilized
Visual, 100%
d) Backfilling activities
Visual, 100%
Final Inspection
Visual, 100%
- Min. 100 mm. cover of well compacted layer of fill on pipe work. - Joints covered properly with sand after testing - Lightly compacted loose fill material. - No sharp edge stones - Fill material as per specs. - Ensure the works in accordance with contractual requirements - Thrust blocks provided (if specified) at changes of direction, branches, take offs etc. - Route markers placed at 50 m interval and at each turning point (if specified)
225432311.xls.ms_office