VALORIZACION N 01

OBRA: CONSTRUCCION SISTEMA DE AGUA POTABLE EL SAUCE - YAHUARMARCA


SECTOR YAHUARMARCA

AVANCE

PRECIO
UND.

METRADO

DESCRIPCIN DE PARTIDA

ITEM

ANTERIOR

UNIT.
TOTAL S/.

ACTUAL

ACUMULADO

METRADO VALORIZ. S/ METRADO

VALORIZ. S/

METRADO

AVANCE

VALORIZ. S/

SALDO
METRADO VAL. S/

1.00 CAPTACIN DE LADERA


TRABAJOS PRELIMINARES

m2

3.74

0.69

2.58

3.74

2.58

3.74

2.58

100

0.00

m3

2.99

4.52

13.51

2.99

13.51

2.99

13.51

100

0.00

Concreto en losa superior FC=175kg/cm2

m3

0.4

256.09

102.44

0.4

102.44

0.4

102.44

100

0.00

Concreto de Muros FC=175 Kg/cm2

m3

0.9

256.09

230.48

0.9

230.48

0.9

230.48

100

0.00

Concreto en losa de fondo FC=175/kg

m3

0.68

256.09

174.14

0.68

174.14

0.68

174.14

100

0.00

Concreto FC=100 KG/cm2

m3

0.45

158.56

71.35

0.45

71.35

0.45

71.35

100

Encofrado y desencofrado de uros (02 caras

m2

11.68

14.36

167.72

11.68

167.72

11.68

167.72

100

Encofrado y desencofrado de losa maciza

m2

3.18

14.65

46.59

3.18

46.59

3.18

46.59

100

Acero FY=4200 Kg/cm2

kg.

103.95

5.22

542.62

103.95

542.62

103.95

542.62

100

Tapa metlica de 0.60m/0.60m

Kg.

133.53

267.06

267.06

267.06

100

Tapa metlica de 0.40/0.40m

Kg.

98.53

98.53

98.53

98.53

100

Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

2.38

28.21

67.1398

2.38

67.14

2.38

67.14

100

Tarrajeo en caras exteriores (mortero 1.5)

m2

8.75

6.82

59.675

8.75

59.68

8.75

59.68

100

Pintura en Muros Exteriores al Ltex

m2

8.75

2.86

25.025

8.75

25.03

8.75

25.03

100

Mortero 1.5 pendiente fondo

m2

0.48

6.56

3.1488

0.48

3.15

0.48

3.15

100

Filtro de arena

m3

0.5

55.14

27.57

0.5

27.57

0.5

27.57

100

Filtro de grava

m3

0.6

54.14

32.484

0.6

32.48

0.6

32.48

100

m3

151.01

151.01

151.01

151.01

100

Trazo y Replanteo Preliminar


MOVIMIENTO DE TIERRAS
Excavacin Manual
OBRAS DE CONCRETO ARMADO

REVOQUES ENLUCIDOS

FILTROS

VALVULAS Y ACCESORIOS
Vlvula de bronce 1"+accesorios
CERCO PERIMETRICO

1.8

7.86

14.148

1.8

14.15

1.8

14.15

100

1,435.40

0.33

473.682

1,435.40

473.68

1435.4

473.68

100

Excavacin manual de zanjas/ml(0.40x0.60)

1,349.40

0.85

1146.99

1,349.40

1146.99

1349.4

1146.99

100

Refine, nivelacin y fondo para tuberias de agua

1,349.40

0.26

350.844

1,349.40

350.84

1349.4

350.84

100

Cama de apoyo para tuberas de agua E=10 cm

1,349.40

1.34

1808.196

1,349.40

1808.20

1349.4

1808.20

100

Relleno y apisonado de zanjas

m3

323.85

2.26

731.901

323.85

731.90

323.85

731.90

100

Tuberia PVC SAP clase 7.5 1"

m3

1,435.40

3.06

4392.324

1435.4

4392.32

1435.4

4392.32

100

Prueba Hidrulica y desinfeccin en redes de agua

1,435.40

0.5

717.7

1,435.40

717.70

1435.4

717.70

100

Cerco perimtrico en captacin


LINEA DE CONDUCCIN L=1435.40 ML
TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo de zanjas ml
MOVIMIENTO DE TIERRAS

TUBERIAS Y PRUEBA HIDRAULICA

PASE AEREO N 01 (86 ml)


TRABAJOS PRELILINARES
Limpieza de terreno manual

m2

14.48

0.4

5.792

Trazo y replanteo

m2

14.48

0.58

8.3984

Excavacin manual de zanjas

m3

39.3

4.52

177.636

Relleno con material propio

m3

12.2

2.64

32.208

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Concreto FC=140 kg/cm2 cmara de anclaje

m3

4.8

158.11

758.928

Solado base

m2

9.68

14.23

137.7464

Encofrado y desencofrado de cmara de anclaje

m2

12.4

23.75

294.5

Concreto FC=175 kg/cm2 torres

m3

2.4

253.29

607.896

Concreto en zapatas FC=175 kg/cm2

m3

9.68

253.85

2457.268

Encofrado y desencofrado

m2

24

23.84

572.16

Acero FY=4200 Kg/cm2

kg.

240.21

5.25

1261.1025

OBRAS DE CONCRETO ARMADO

CABLES Y PENDULAS
Cable acero tipo SOA de 1/2" Incl.anclaje

86

16.74

1439.64

Pndolas de fierro liso 1/4 incl. Montaje

43

28.11

1208.73

TUBERIA Y ACCESORIOS
Tubera de politeleno de 1"instalaciones

incluye prueba hidrulica

86

11.21

964.06

15.19

30.38

VARIOS
Elementos de empotramiento
CAMARA ROMPE PRESIN TIPO
TIPO 6 (01 UNDAD)
Trazo y Replanteo Preliminar

m2

1.21

0.69

0.8349

Excavacin manual

m3

1.08

4.52

4.8816

Encofraado y desencofrado

m2

8.63

15.28

131.8664

Concreto FC=175kg/cm2

m3

0.54

158.56

85.6224

Acero FY=4200Kg/cm2

kg.

41.96

5.22

219.0312

Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

4.13

28.21

116.5073

Tarrajeo en muros exteriores mezcla CA=1.5 cm

m2

3.6

7.82

28.152

Pintura en Muros Exteriores al Ltex

m2

3.6

2.86

10.296

Accesorios de entrada y salida de 1 en CRP 16

m2

141.01

141.01

Tapa metlica de 0.70x0.70 m

m2

148.53

148.53

m2

6.76

0.69

4.66

6.76

4.66

6.76

4.66

100

Acarreo de material excedente hasta DPROM-30m

m3

10.56

2.64

27.88

10.56

27.88

10.56

27.88

100

Excavacin manual de zanjas

m3

8.45

3.95

33.38

8.45

33.38

8.45

33.38

100

Refine, nivelacin y compactacin

m2

6.76

0.15

1.01

6.76

1.01

6.76

1.01

100

m2

6.76

14.84

100.3184

6.76

100.32

6.76

100.32

100

Concreto de losa de fondo FC=210 kg/cm2

m3

1.01

283.39

286.22

1.01

286.22

1.01

286.22

100

Concreto en muros FC=210kg/cm2

m3

1.72

283.39

487.43

1.72

487.43

1.72

487.43

100

Concreto en losa maciza FC=210Kg/cm2 INC.tapa

m3

0.58

283.39

164.37

0.58

164.37

0.58

164.37

100

Encofrado y desencof. de muros (02 caras)

m2

21.51

14.36

308.88

21.51

308.88

21.51

308.88

100

Encofrado y desencof. De losa maciza

m2

4.49

14.55

65.3295

4.49

65.33

4.49

65.33

100

Acero FY=4200 kg/cm2

kg.

489.98

5.22

2557.6956

489.98

2557.70

489.98

2557.70

100

Tapa metlicade 0.80mx0.80mx1.8"

kg.

133.53

133.53

133.53

133.53

100

Junta water stop NEOPRENE 6"

6.11

42.77

42.77

42.77

100

RESERVORIO DE 5.00 M3 (01 UND.)


TRAZO Y REPLANTEO
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Solado E=4"
OBRAS DE CONCRETO ARMADO

Suministro y colocacin de accesorios


de ventilacin 3" PG

37.95

37.95

37.95

37.95

100

REVOQUES Y ENLUCIDOS
Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

14.25

28.21

401.99

14.25

401.99

14.25

401.99

100

Tarrajeo en caras exteriores (mortero 1.5)

m2

14.28

6.82

97.39

14.28

97.39

14.28

97.39

100

Pendiente fondo (mortero 1.5)

m2

3.61

6.56

23.68

3.61

23.68

3.61

23.68

100

Pintura en Muros Exteriores al Ltex imprimante temple


m2

14.28

42.84

14.28

42.84

14.28

42.84

100

HIPOCLORADOR FLUIDO DIFUSO


CERCO PERIMETRICO
Suministro y colocacin de hipoclorador

135.77

135.77

135.77

135.77

100

Cerco perimtrico de reservorio

21.6

7.81

168.70

21.6

168.70

21.6

168.70

100.00

m2

1.68

0.69

1.16

1.68

1.16

1.68

1.16

100.00

Excavacin manual

m3

1.18

4.52

5.33

1.18

5.33

1.18

5.33

100.00

Refine, nivelacin y compactacin

m2

1.68

0.16

0.27

1.68

0.27

1.68

0.27

100.00

Concreto en losa maciza FC=175Kg/cm2

m3

0.1

256.09

25.61

0.1

25.61

0.1

25.61

100.00

Concreto E muros FC=175/cm2

m3

0.24

256.09

61.46

0.24

61.46

0.24

61.46

100.00

Concreto en losa de fondo FC=175/kg/cm2

m3

0.15

256.09

38.41

0.15

38.41

0.15

38.41

100

Encofrado y desencofrado de muros (02 caras)

m2

1.66

14.36

23.84

1.66

23.84

1.66

23.84

100

Encofrado y desencofrado de losa maciza

m2

1.58

14.55

22.99

1.58

22.99

1.58

22.99

100

Acero FY=4200 kg/cm2

kg.

6.26

5.22

32.68

6.26

32.68

6.26

32.68

100

Tapa metlica de 0.80mx0.80m

1.00

133.53

133.53

133.53

133.53

100

m2

4.10

8.22

33.702

4.10

33.70

4.1

33.70

100

m2

4.10

3.00

12.30

4.1

12.30

4.1

12.30

100

vlvulas - entradas

1.00

95.01

95.01

Vlvula de bronce 2"+accesorios-limpia y reboce

211.26

211.26

TRAZO Y REPLANTEO
CASETA DE VALVULAS (01 UNIDAD)
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO ARMADO

REVOQUES Y ENLUCIDOS
Tarrajeo en interiores y exteriores (mortero 1.5)
Pintura en muros exteriores al latex,
imprimante temple
VALVULAS Y ACCESORIOS
Vlvula de bronce 1"+accesorios-caseta de

Vlvula de bronce 1"+accesorios-caseta de

133.01

133.01

2,750.00

0.33

907.50

2,750.00

907.50

2750

907.50

100

Excavacin manual de zanjas/ml(0.40x0.60)

2,750.00

0.95

2612.50

2,750.00

2612.50

2750

2612.50

100

Refine, nivelacin y fondo para tuberias de agua

2,750.00

0.26

715.00

2,750.00

715.00

2750

715.00

100

Cama de apoyo para tuberas de agua E=10 cm

2,750.00

1.34

3685.00

2750

3685.00

2750

3685.00

100

Relleno y apisonado de zanjas

m3

660

2.26

1491.6

660

1491.6

660

1491.6

100

7.84

5.41

7.84

5.41

100

vlvulas - salida
RED DE DISTRIBUCIN l=2750ML
TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo de zanjas ml
MOVIMIENTO DE TIERRAS

TUBERIAS Y PRUEBA HIDRAULICA


Tubera PVC SAP clase 7.5 1"

1658.5

3.54

5871.09

Tubera PVC SAP clase 7.5 3/4"

985.6

2.73

2690.688

Tubera PVC SAP clase 7.5 1/2"

839.5

2.25

1888.875

Prueba Hidrulica y desinfeccin en redes de agua

2,750.00

0.5

1375

Caja para vlvula de purga

220.04

660.12

Vlvula de bronce 1/2" y accesorios-caja de purga

138.51

415.53

Caja para vlvula de compuerta

155.78

1090.46

Vlvula de compuerta de bronce 1" y accesorios

82.2

164.4

Vlvula de compuerta de bronce 3/4" y accesorios

68.2

341

Suministro y colocacin TEE PVC SAP 1"

8.63

69.04

Suministro y colocacin TEE PVC SAP 3/4"

6.63

53.04

Suministro y colocacin TEE PVC SAP 1/2"

5.19

15.57

Suministro y colocacin reduccin PVC SAP 1"-3/4"

5.13

25.65

Suministro y colocacin reduccin PVC SAP 1"-1/2"

4.19

16.76

Suministro y colocacin reduccin PVC SAP 3/4"-1/2" u

4.63

41.67

7.84

0.69

5.41

VALVULAS DE PURGA

VALVULAS DE CONTROL

ACCESORIOS DE LA RED

CMARA ROMPE PRESIN TIPO 7


(04 UNIDADES)
CAMARA CRP-7
Trazo y Replanteo Preliminar

m2

Excavacin manual

m3

6.76

4.52

30.56

6.76

30.56

6.76

30.56

100

Encofrado y desencofrado

m2

28.32

15.28

432.73

28.32

432.73

28.32

432.73

100

Concreto FC=175 kg/cm2

m3

2.52

256.09

645.35

2.52

645.35

2.52

645.35

100

Acero FY=4200 kg/cm2

kg.

271.92

5.22

1419.4224

271.92

1419.42

271.92

1419.42

100

Tarrajeo en interiores y exteriores (mortero 1.5)

m2

31.2

8.22

256.464

31.2

256.46

31.2

256.46

100

Pintura en muros exteriores al latex, imprimante temple


m2

18.24

54.72

18.24

54.72

18.24

54.72

100

Accesorios de netrada y salida de 1"

m2

247.01

988.04

988.04

988.04

100

Tapa metlica de 0.80m x 0.80m

m2

133.53

534.12

534.12

534.12

100

Tapa metlica de 0.40m x 0.40m

m2

98.53

394.12

394.12

394.12

100

Trazo y Replanteo Preliminar

m2

90.27

0.69

62.29

Excavacin manual

m3

30.09

4.52

136.01

35.33

14.36

507.34

PILETAS DOMICILIARIAS (17 UNIDAD)


PILETA DOMICILIARIA DE UN GRIPO
SIERRA

Encofrado y desencofrado de muros (02 caras) piletasm2


domic.
Concreto FC=175 kg/cm2 sin mezcladora

m3

3.68

256.09

942.41

Acero FY=4200 kg/cm2

kg.

175.03

5.22

913.6566

Tarrajeo mortero 1.2 E=1.5 cm

m2

39.61

6.96

275.6856

Tubera PVC SAP clase 10.1/2"

280.5

2.34

656.37

Tubera desague PVC SAL 2"

46.75

4.59

214.5825

Grifo de 1/2"

17

15

255

Vlvula compuerta bronce 1/2"

17

89.26

1517.42

Codo PVC SAL 2" x 90"

17

2.67

45.39

Unin FG universal de 1/2"

34

11.67

396.78

Sumidero de bronce para piletas domic. 2"

17

5.5

93.5

Adaptadores PVC SAP 1/2"

34

3.17

107.78

Unin roscada FG 1/2"

17

3.17

53.89

Niple FG 1/2"

17

11.67

198.39

Codo PVC SAP 1/2"

17

2.67

45.39

Filtro de grava

m3

1.26

54.14

68.22

Accesorios de reboce

m3

17

7.80

132.60

glb.

1000

1000.00

FLETE
Flete en zona rural (no afecto a IGV

COSTO DIRECTO

SECTOR LA LUCMILLA

CAPTACIN DE LADERA (01 UNIDAD)


TRABAJOS PRELIMINARES

m2

3.74

0.69

2.58

3.74

2.58

3.74

2.58

100

m3

2.99

4.52

13.51

2.99

13.51

2.99

13.51

100

Concreto en losa superior FC=175kg/cm2

m3

0.4

256.09

102.44

0.4

102.44

0.4

102.44

100

Concreto de Muros FC=175 Kg/cm2

m3

0.9

256.09

230.48

0.9

230.48

0.9

230.48

100

Concreto en losa de fondo FC=175/kg

m3

0.68

256.09

174.14

0.68

174.14

0.68

174.14

100

Concreto FC=100 KG/cm2

m3

0.45

158.56

71.352

0.45

71.35

0.45

71.35

100

Encofrado y desencofrado de uros (02 caras

m2

11.68

14.36

167.7248

11.68

167.72

11.68

167.72

100

Encofrado y desencofrado de losa maciza

m2

3.18

14.55

46.269

3.18

46.27

3.18

46.27

100

Acero FY=4200 Kg/cm2

Kg.

103.95

5.22

542.619

103.95

542.62

103.95

542.62

100

Tapa metlica de 0.60m/0.60m

Kg.

133.53

267.06

267.06

267.06

100

Tapa metlica de 0.40/0.40m

Kg.

98.53

98.53

98.53

98.53

100

Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

2.38

28.21

67.14

2.38

67.14

2.38

67.14

100

Tarrajeo en caras exteriores (mortero 1.5)

m2

8.75

6.82

59.675

8.75

59.68

8.75

59.68

100

Pintura en Muros Exteriores al Ltex

m2

8.75

2.86

25.025

8.75

25.03

8.75

25.03

100

Mortero 1.5 pendiente fondo

m2

0.48

6.56

3.15

0.48

3.15

0.48

3.15

100

Filtro de arena

m3

0.5

55.14

27.57

Filtro de grava

m3

0.6

54.14

32.48

m3

151.01

151.01

1.8

7.88

14.18

Trazo y replanteo preliminar


MOVIMIENTO DE TIERRAS
Excavacin Manual
OBRAS DE CONCRETO ARMADO

REVOQUES ENLUCIDOS

FILTROS

VALVULAS Y ACCESORIOS
Vlvula de bronce 1"+accesorios
CERCO PERIMETRICO
Cerco perimtrico en captacin
LINEA DE CONDUCCIN L=1150.80 ML

TRABAJOS PRELIMINARES

1150.8

0.33

379.76

1150.8

379.76

1150.8

379.76

100

Excavacin manual de zanjas/ml(0.40x0.60)

1150.8

0.95

1093.26

1150.8

1093.26

1150.8

1093.26

100

Refine, nivelacin y fondo para tuberias de agua

1150.8

0.26

299.21

1150.8

299.21

1150.8

299.21

100

Cama de apoyo para tuberas de agua E=10 cm

1150.8

1.34

1542.07

1150.8

1542.07

1150.8

1542.07

100

Relleno y apisonado de zanjas

m3

276.2

2.26

624.212

276.2

624.21

276.2

624.21

100

Tuberia PVC SAP clase 7.5 1"

m3

1150.8

3.06

3521.448

1150.8

3521.45

1150.8

3521.45

100

Prueba Hidrulica y desinfeccin en redes de agua

1150.8

0.5

575.40

Limpieza de terreno manual

m2

14.48

0.4

5.79

Trazo y replanteo

m2

14.48

0.58

8.40

Excavacin manual de zanjas

m3

39.3

4.52

177.64

39.3

177.64

39.3

177.64

100

Relleno con material propio

m3

12.2

2.64

32.21

12.2

32.21

12.2

32.21

100

Trazo, nivelacin y replanteo de zanjas ml


MOVIMIENTO DE TIERRAS

TUBERIAS Y PRUEBA HIDRAULICA

PASE AEREO N 01 (170.20ml)


EN LINEA DE CONDUCCIN
TRABAJOS PRELILINARES

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Concreto FC=140 kg/cm2 cmara de anclaje

m3

4.8

158.11

758.93

4.8

758.93

4.8

758.93

100

Solado base

m2

9.68

14.23

137.75

9.68

137.75

9.68

137.75

100

Encofrado y desencofrado de cmara de anclaje

m2

12.4

23.75

294.5

12.4

294.5

12.4

294.5

100

OBRAS DE CONCRETO ARMADO


Concreto FC=175 kg/cm2 torres

m3

2.4

253.29

607.896

2.4

607.90

2.4

607.90

100

Concreto en zapatas FC=175 kg/cm2

m3

9.68

253.85

2457.268

9.68

2457.27

9.68

2457.27

100

Encofrado y desencofrado

m2

24

23.84

572.16

24

572.16

24

572.16

100

Acero FY=4200 Kg/cm2

kg.

240.21

5.25

1261.1025

240.21

1261.10

240.21

1261.10

100

Cable acero tipo SOA de 1/2" Incl.anclaje

170.2

16.74

2849.148

Pndolas de fierro liso 1/4 incl. Montaje

85

28.11

2389.35

Tubera de politeleno de 1"instalac.Inclye prueba hid. m

170.2

11.21

1907.942

CABLES Y PENDULAS

TUBERIA Y ACCESORIOS

VARIOS

Elementos de empotramiento

15.19

30.38

PASE AEREO N 02 (75.00ml)


EN LINEA DE CONDUCCIN
TRABAJOS PRELILINARES
Limpieza de terreno manual

m2

14.48

0.32

4.63

14.48

4.63

14.48

4.63

100

Trazo y replanteo

m2

14.48

0.46

6.66

14.48

6.66

14.48

6.66

100

Excavacin manual de zanjas

m3

39.3

4.52

177.64

39.3

177.64

39.3

177.64

100

Relleno con material propio

m3

12.2

2.64

32.21

12.2

32.21

12.2

32.21

100

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Concreto FC=140 kg/cm2 cmara de anclaje

m3

4.8

158.11

758.93

4.8

758.93

4.8

758.93

100

Solado base

m2

9.68

14.23

137.75

9.68

137.75

9.68

137.75

100

Encofrado y desencofrado de cmara de anclaje

m2

12.4

23.75

294.5

OBRAS DE CONCRETO ARMADO


Concreto FC=175 kg/cm2 torres

m3

2.4

253.29

607.896

2.4

607.90

2.4

607.90

100

Concreto en zapatas FC=175 kg/cm2

m3

9.68

254.36

2462.2048

9.68

2462.20

9.68

2462.20

100

Encofrado y desencofrado

m2

24

23.84

572.16

24

572.16

24

572.16

100

Acero FY=4200 Kg/cm2

kg.

240.21

5.26

1263.5046

240.21

1263.50

240.21

1263.50

100

75

840.75

75

840.75

100

CABLES Y PENDULAS
Cable acero tipo SOA de 1/2" Incl.anclaje

75

16.74

1255.5

Pndolas de fierro liso 1/4 incl. Montaje

38

28.11

1068.18

Tubera de politeleno de 1"instalac.Inclye prueba hid. m

75

11.21

840.75

15.19

45.57

m2

6.76

0.69

4.66

6.76

4.66

6.76

4.66

100

Acarreo de material excedente hasta DPROM-30m

m3

10.56

2.64

27.88

10.56

27.88

10.56

27.88

100

Excavacin manual de zanjas

m3

8.45

3.95

33.38

8.45

33.38

8.45

33.38

100

Refine, nivelacin y compactacin

m2

6.76

0.16

1.08

TUBERIA Y ACCESORIOS

VARIOS
Elementos de empotramiento

RESERVORIO DE 5.00 M3 (01 UND.)


TRAZO Y REPLANTEO
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE

m2

6.76

14.84

100.32

6.76

100.32

6.76

100.32

100

Concreto de losa de fondo FC=210 kg/cm2

m3

1.01

283.39

286.22

1.01

286.22

1.01

286.22

100

Concreto en muros FC=210kg/cm2

m3

1.72

283.39

487.43

1.72

487.43

1.72

487.43

100

Concreto en losa maciza FC=210Kg/cm2 INC.tapa

m3

0.58

283.39

164.37

0.58

164.37

0.58

164.37

100

Encofrado y desencof. de muros (02 caras)

m2

21.51

14.36

308.8836

21.51

308.88

21.51

308.88

100

Encofrado y desencof. De losa maciza

m2

4.49

14.55

65.3295

4.49

65.33

4.49

65.33

100

Acero FY=4200 kg/cm2

kg.

489.98

5.22

2557.6956

489.98

2557.70

489.98

2557.70

100

Tapa metlicade 0.80mx0.80mx1.8"

kg.

133.53

133.53

133.53

133.53

100

Junta water stop NEOPRENE 6"

6.11

42.77

42.77

42.77

100

37.95

37.95

37.95

37.95

100

Solado E=4"
OBRAS DE CONCRETO ARMADO

Suministro y colocacin de accesorios de ventilacin 3"PG


u
REVOQUES Y ENLUCIDOS
Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

14.25

28.21

401.9925

14.25

401.99

14.25

401.99

100

Tarrajeo en caras exteriores (mortero 1.5)

m2

14.28

6.82

97.3896

14.28

97.39

14.28

97.39

100

Pendiente fondo (mortero 1.5)

m2

3.61

6.56

23.6816

3.61

23.68

3.61

23.68

100

Pintura en Muros Exteriores al Ltex imprimante temple


m2

14.28

42.84

14.28

42.84

14.28

42.84

100

HIPOCLORADOR DE FLUIDO
DIFUSO-CERCO PERIMETRICO
Suministro y colocacin de hipoclorador

135.77

135.77

Cerco perimtrico de reservorio

21.6

7.81

168.70

m2

1.68

0.69

1.16

1.68

1.16

1.68

1.16

100

Excavacin manual

m3

1.18

4.52

5.33

1.18

5.33

1.18

5.33

100

Refine, nivelacin y compactacin

m2

1.68

0.16

0.27

1.68

0.27

1.68

0.27

100

Concreto en losa maciza FC=175Kg/cm2

m3

0.1

256.09

25.61

0.1

25.61

0.1

25.61

100

Concreto E muros FC=175/cm2

m3

0.24

256.09

61.46

0.24

61.46

0.24

61.46

100

Concreto en losa de fondo FC=175/kg/cm2

m3

0.15

256.09

38.41

0.15

38.41

0.15

38.41

100

Encofrado y desencofrado de muros (02 caras)

m2

1.66

14.36

23.8376

1.66

23.84

1.66

23.84

100

Encofrado y desencofrado de losa maciza

m2

1.58

14.55

22.989

1.58

22.99

1.58

22.99

100

Acero FY=4200 kg/cm2

kg.

6.26

5.22

32.6772

6.26

32.68

6.26

32.68

100

TRAZO Y REPLANTEO
CASETA DE VALVULAS (01 UNIDAD)
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO ARMADO

133.53

133.53

133.53

133.53

100

m2

4.1

8.22

33.70

4.1

33.70

4.1

33.70

100

Pintura en muros exteriores al latex, imprimante temple


m2

4.1

12.3

4.1

12.3

4.1

12.3

100

Tapa metlica de 0.80mx0.80m

REVOQUES Y ENLUCIDOS
Tarrajeo en interiores y exteriores (mortero 1.5)

VALVULAS Y ACCESORIOS
Vlvula de bronce 1"+accesorios-caseta de vlvulas-entrada
u

95.01

95.01

95.01

95.01

100

211.26

211.26

211.26

211.26

100

133.01

133.01

133.01

133.01

100

4,293.50

0.33

1416.855

4293.5

1416.86

4293.5

1416.86

100

Excavacin manual de zanjas/ml(0.40x0.60)

4,293.50

0.95

4078.825

4293.5

4078.83

4293.5

4078.83

100

Refine, nivelacin y fondo para tuberias de agua

4,293.50

0.26

1116.31

4293.5

1116.31

4293.5

1116.31

100

Cama de apoyo para tuberas de agua E=10 cm

4,293.50

1.34

5753.29

4293.5

5753.29

4293.5

5753.29

100

Relleno y apisonado de zanjas

m3

1,030.44

2.26

2328.7944

1030.44

2328.79

1030.44

2328.79

100

Tubera PVC SAP clase 7.5 1"

1,250.00

3.54

4425.00

1250

4425.00

1250

4425.00

100

Tubera PVC SAP clase 7.5 3/4"

1486

2.73

4056.78

1486

4056.78

1486

4056.78

100

Tubera PVC SAP clase 7.5 1/2"

1557.5

2.25

3504.375

Prueba Hidrulica y desinfeccin en redes de agua

4,293.50

0.5

2146.75

Caja para vlvula de purga

220.04

440.08

Vlvula de bronce 1/2" y accesorios-caja de purga

138.51

277.02

Caja para vlvula de compuerta

155.78

778.9

Vlvula de compuerta de bronce 1" y accesorios

82.2

246.6

Vlvula de compuerta de bronce 3/4" y accesorios

68.2

136.4

Suministro y colocacin TEE PVC SAP 1"

8.63

77.67

Suministro y colocacin TEE PVC SAP 3/4"

6.63

26.52

Suministro y colocacin TEE PVC SAP 1/2"

5.19

15.57

Suministro y colocacin reduccin PVC SAP 1"-3/4"

5.13

15.39

Vlvula de bronce 2"+accesorios-limpia y reboce

Vlvula de bronce 1"+accesorios-caseta de vlvulas-salida


u
RED DE DISTRIBUCIN l=2750ML
TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo de zanjas ml
MOVIMIENTO DE TIERRAS

TUBERIAS Y PRUEBA HIDRAULICA

VALVULAS DE PURGA

VALVULAS DE CONTROL

ACCESORIOS DE LA RED

4.19

29.33

Suministro y colocacin reduccin PVC SAP 3/4"-1/2" u

4.63

32.41

Suministro y colocacin reduccin PVC SAP 1"-1/2"

PASE AEREO N 01 (75 ml) EN LINEA


DE DISTRIBUCIN
TRABAJOS PRELILINARES
Limpieza de terreno manual

m2

14.48

0.32

4.63

14.48

4.63

14.48

4.63

100

Trazo y replanteo

m2

14.48

0.46

6.66

14.48

6.66

14.48

6.66

100

Excavacin manual de zanjas

m3

39.3

4.52

177.64

39.3

177.64

39.3

177.64

100

Relleno con material propio

m3

12.2

2.64

32.21

12.2

32.21

12.2

32.21

100

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Concreto FC=140 kg/cm2 cmara de anclaje

m3

4.8

158.11

758.93

4.8

758.93

4.8

758.93

100

Solado base

m2

9.68

14.23

137.75

9.68

137.75

9.68

137.75

100

Encofrado y desencofrado de cmara de anclaje

m2

12.4

23.75

294.5

12.4

294.5

12.4

294.5

100

Concreto FC=175 kg/cm2 torres

m3

2.4

253.29

607.90

2.4

607.90

2.4

607.90

100

Concreto en zapatas FC=175 kg/cm2

m3

9.68

254.36

2462.2048

9.68

2462.20

9.68

2462.20

100

Encofrado y desencofrado

m2

24

23.84

572.16

24

572.16

24

572.16

100

Acero FY=4200 Kg/cm2

kg.

240.21

5.26

1263.5046

240.21

1263.50

240.21

1263.50

100

OBRAS DE CONCRETO ARMADO

CABLES Y PENDULAS
Cable acero tipo SOA de 1/2" Incl.anclaje

75

16.74

1255.5

Pndolas de fierro liso 1/4 incl. Montaje

38

28.11

1068.18

Tubera de politeleno de 1"instalac.Inclye prueba hid. m

75

9.15

686.25

15.19

30.38

TUBERIA Y ACCESORIOS

VARIOS
Elementos de empotramiento

CAMARA ROMPE PRESIN TIPO 7


(04 UNDS)
CAMARA CRP -7
Trazo y Replanteo Preliminar

m2

7.84

0.69

5.41

7.84

5.41

7.84

5.41

100

Excavacin manual

m3

6.76

4.52

30.56

6.76

30.56

6.76

30.56

100

Encofraado y desencofrado

m2

28.32

15.28

432.73

28.32

432.73

28.32

432.73

100

Concreto FC=175kg/cm2

m3

2.52

256.09

645.35

2.52

645.35

2.52

645.35

100

Acero FY=4200Kg/cm2

kg.

271.92

5.22

1419.4224

271.92

1419.42

271.92

1419.42

100

Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

31.2

8.22

256.464

31.2

256.46

31.2

256.46

100

Tarrajeo en muros exteriores mezcla CA=1.5 cm

m2

18.24

54.72

18.24

54.72

18.24

54.72

100

Pintura en Muros Exteriores al Ltex

m2

247.01

988.04

Accesorios de entrada y salida de 1 en CRP 16

m2

133.53

534.12

Tapa metlica de 0.70x0.70 m

m2

98.53

394.12

Trazo y Replanteo Preliminar

m2

74.34

0.69

51.29

Excavacin manual

m3

24.78

4.52

112.01

PILETAS DOMICILIARIAS (17 UNIDADES)


PILETA DOMICILIARIA DE UN GRIPO - SIERRA

Encofrado y desencofrado de muros (02 caras) piletasm2


domic.

29.09

14.36

417.73

Concreto FC=175 kg/cm2 sin mezcladora

m3

3.03

256.09

775.95

Acero FY=4200 kg/cm2

kg.

144.14

5.22

752.41

Tarrajeo mortero 1.2 E=1.5 cm

m2

32.62

6.96

227.04

Tubera PVC SAP clase 10.1/2"

231

2.34

540.54

Tubera desague PVC SAL 2"

38.5

4.59

176.72

Grifo de 1/2"

14

15

210

Vlvula compuerta bronce 1/2"

14

89.26

1249.64

Codo PVC SAL 2" x 90"

14

2.67

37.38

Unin FG universal de 1/2"

28

11.67

326.76

Sumidero de bronce para piletas domic. 2"

14

5.5

77

Adaptadores PVC SAP 1/2"

28

3.17

88.76

Unin roscada FG 1/2"

14

3.17

44.38

Niple FG 1/2"

14

11.67

163.38

Codo PVC SAP 1/2"

14

2.67

37.38

Filtro de grava

m3

1.05

54.14

56.85

Accesorios de reboce

m3

14

7.8

109.20

glb.

1000

FLETE
Flete en zona rural (no afecto a IGV

TOTAL COSTO DIRECTO

1000.00
155608.39

91885.37

% AVANCE =

59.05

VALORIZACION N 02
OBRA: CONSTRUCCION SISTEMA DE AGUA POTABLE EL SAUCE - YAHUARMARCA
SECTOR YAHUARMARCA

AVANCE

PRECIO
UND.

METRADO

DESCRIPCIN DE PARTIDA

ITEM

ANTERIOR

UNIT.
TOTAL S/.

ACTUAL

METRADO VALORIZ. S/ METRADO

ACUMULADO

VALORIZ. S/

METRADO

AVANCE

VALORIZ. S/

SALDO
METRADO VAL. S/

1.00 CAPTACIN DE LADERA


TRABAJOS PRELIMINARES

m2

3.74

0.69

2.58

3.74

2.5806

0.00

3.74

2.58

100

0.00

m3

2.99

4.52

13.51

2.99

13.5148

0.00

2.99

13.51

100

0.00

Concreto en losa superior FC=175kg/cm2

m3

0.4

256.09

102.44

0.4

102.436

0.00

0.4

102.44

100

0.00

Concreto de Muros FC=175 Kg/cm2

m3

0.9

256.09

230.48

0.9

230.481

0.00

0.9

230.48

100

0.00

Concreto en losa de fondo FC=175/kg

m3

0.68

256.09

174.14

0.68

174.1412

0.00

0.68

174.14

100

0.00

Concreto FC=100 KG/cm2

m3

0.45

158.56

71.35

0.45

71.352

0.00

0.45

71.35

100

Encofrado y desencofrado de uros (02 caras

m2

11.68

14.36

167.72

11.68

167.7248

0.00

11.68

167.72

100

Encofrado y desencofrado de losa maciza

m2

3.18

14.65

46.59

3.18

46.587

0.00

3.18

46.59

100

Acero FY=4200 Kg/cm2

kg.

103.95

5.22

542.62

103.95

542.619

0.00

103.95

542.62

100

Tapa metlica de 0.60m/0.60m

Kg.

133.53

267.06

267.06

267.06

100

Tapa metlica de 0.40/0.40m

Kg.

98.53

98.53

98.53

98.53

100

Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

2.38

28.21

67.1398

2.38

67.1398

0.00

2.38

67.14

100

Tarrajeo en caras exteriores (mortero 1.5)

m2

8.75

6.82

59.675

8.75

59.675

0.00

8.75

59.68

100

Pintura en Muros Exteriores al Ltex

m2

8.75

2.86

25.025

8.75

25.025

0.00

8.75

25.03

100

Mortero 1.5 pendiente fondo

m2

0.48

6.56

3.1488

0.48

3.1488

0.00

0.48

3.15

100

Filtro de arena

m3

0.5

55.14

27.57

0.5

27.57

0.5

27.57

100

Filtro de grava

m3

0.6

54.14

32.484

0.6

32.484

0.00

0.6

32.48

100

m3

151.01

151.01

151.01

151.01

100

Trazo y Replanteo Preliminar


MOVIMIENTO DE TIERRAS
Excavacin Manual
OBRAS DE CONCRETO ARMADO

REVOQUES ENLUCIDOS

FILTROS

VALVULAS Y ACCESORIOS
Vlvula de bronce 1"+accesorios
CERCO PERIMETRICO

0
0

Cerco perimtrico en captacin

1.8

7.86

14.148

1.8

14.148

0.00

1.8

14.15

100

1,435.40

0.33

473.682

1,435.40

473.682

0.00

1435.4

473.68

100

LINEA DE CONDUCCIN L=1435.40 ML


TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo de zanjas ml
MOVIMIENTO DE TIERRAS
Excavacin manual de zanjas/ml(0.40x0.60)

1,349.40

0.85

1146.99

1,349.40

1146.99

1349.4

1146.99

100

Refine, nivelacin y fondo para tuberias de agua

1,349.40

0.26

350.844

1,349.40

350.844

0.00

1349.4

350.84

100

Cama de apoyo para tuberas de agua E=10 cm

1,349.40

1.34

1808.196

1,349.40

1808.196

0.00

1349.4

1808.20

100

Relleno y apisonado de zanjas

m3

323.85

2.26

731.901

323.85

731.901

0.00

323.85

731.90

100

TUBERIAS Y PRUEBA HIDRAULICA


Tuberia PVC SAP clase 7.5 1"

m3

1,435.40

3.06

4392.324

1435.4

4392.324

0.00

1435.4

4392.32

100

Prueba Hidrulica y desinfeccin en redes de agua

1,435.40

0.5

717.7

1,435.40

717.7

0.00

1435.4

717.70

100

PASE AEREO N 01 (86 ml)


TRABAJOS PRELILINARES
Limpieza de terreno manual

m2

14.48

0.4

5.792

14.48

5.79

14.48

5.79

100

Trazo y replanteo

m2

14.48

0.58

8.3984

14.48

8.40

14.48

8.40

100

Excavacin manual de zanjas

m3

39.3

4.52

177.636

39.3

177.64

39.3

177.64

100

Relleno con material propio

m3

12.2

2.64

32.208

12.2

32.21

12.2

32.21

100

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Concreto FC=140 kg/cm2 cmara de anclaje

m3

4.8

158.11

758.928

4.8

758.93

4.8

758.93

100

Solado base

m2

9.68

14.23

137.7464

9.68

137.75

9.68

137.75

100

Encofrado y desencofrado de cmara de anclaje

m2

12.4

23.75

294.5

12.4

294.50

12.4

294.50

100

Concreto FC=175 kg/cm2 torres

m3

2.4

253.29

607.896

2.4

607.90

2.4

607.90

100

Concreto en zapatas FC=175 kg/cm2

m3

9.68

253.85

2457.268

9.68

2457.27

9.68

2457.27

100

Encofrado y desencofrado

m2

24

23.84

572.16

24

572.16

24

572.16

100

Acero FY=4200 Kg/cm2

kg.

240.21

5.25

1261.1025

240.21

1261.10

240.21

1261.10

100

OBRAS DE CONCRETO ARMADO

CABLES Y PENDULAS
Cable acero tipo SOA de 1/2" Incl.anclaje

86

16.74

1439.64

86

1439.64

86

1439.64

100

Pndolas de fierro liso 1/4 incl. Montaje

43

28.11

1208.73

43

1208.73

43

1208.73

100

TUBERIA Y ACCESORIOS
Tubera de politeleno de 1"instalaciones

incluye prueba hidrulica

86

11.21

964.06

VARIOS
Elementos de empotramiento

86

964.06

86

964.06

100

15.19

30.38

30.38

30.38

100

CAMARA ROMPE PRESIN TIPO


TIPO 6 (01 UNDAD)
Trazo y Replanteo Preliminar

m2

1.21

0.69

0.8349

1.21

0.83

1.21

0.83

100

Excavacin manual

m3

1.08

4.52

4.8816

1.08

4.88

1.08

4.88

100

Encofraado y desencofrado

m2

8.63

15.28

131.8664

8.63

131.87

8.63

131.87

100

Concreto FC=175kg/cm2

m3

0.54

158.56

85.6224

0.54

85.62

0.54

85.62

100

Acero FY=4200Kg/cm2

kg.

41.96

5.22

219.0312

41.96

219.03

41.96

219.03

100

Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

4.13

28.21

116.5073

4.13

116.51

4.13

116.51

100

Tarrajeo en muros exteriores mezcla CA=1.5 cm

m2

3.6

7.82

28.152

3.6

28.15

3.6

28.15

100

Pintura en Muros Exteriores al Ltex

m2

3.6

2.86

10.296

3.6

10.30

3.6

10.30

100

Accesorios de entrada y salida de 1 en CRP 16

m2

141.01

141.01

141.01

141.01

100

Tapa metlica de 0.70x0.70 m

m2

148.53

148.53

148.53

148.53

100

m2

6.76

0.69

4.66

6.76

4.6644

0.00

6.76

4.66

100

Acarreo de material excedente hasta DPROM-30m

m3

10.56

2.64

27.88

10.56

27.8784

0.00

10.56

27.88

100

Excavacin manual de zanjas

m3

8.45

3.95

33.38

8.45

33.3775

0.00

8.45

33.38

100

Refine, nivelacin y compactacin

m2

6.76

0.15

1.01

6.76

1.014

0.00

6.76

1.01

100

m2

6.76

14.84

100.3184

6.76

100.3184

0.00

6.76

100.32

100

Concreto de losa de fondo FC=210 kg/cm2

m3

1.01

283.39

286.22

1.01

286.2239

0.00

1.01

286.22

100

Concreto en muros FC=210kg/cm2

m3

1.72

283.39

487.43

1.72

487.4308

0.00

1.72

487.43

100

Concreto en losa maciza FC=210Kg/cm2 INC.tapa

m3

0.58

283.39

164.37

0.58

164.3662

0.00

0.58

164.37

100

Encofrado y desencof. de muros (02 caras)

m2

21.51

14.36

308.88

21.51

308.8836

0.00

21.51

308.88

100

Encofrado y desencof. De losa maciza

m2

4.49

14.55

65.3295

4.49

65.3295

0.00

4.49

65.33

100

Acero FY=4200 kg/cm2

kg.

489.98

5.22

2557.6956

489.98

2557.6956

0.00

489.98

2557.70

100

Tapa metlicade 0.80mx0.80mx1.8"

kg.

133.53

133.53

133.53

133.53

100

Junta water stop NEOPRENE 6"

6.11

42.77

42.77

42.77

100

RESERVORIO DE 5.00 M3 (01 UND.)


TRAZO Y REPLANTEO
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Solado E=4"
OBRAS DE CONCRETO ARMADO

Suministro y colocacin de accesorios


de ventilacin 3" PG

37.95

37.95

37.95

37.95

100

REVOQUES Y ENLUCIDOS
Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

14.25

28.21

401.99

14.25

401.9925

0.00

14.25

401.99

100

Tarrajeo en caras exteriores (mortero 1.5)

m2

14.28

6.82

97.39

14.28

97.3896

0.00

14.28

97.39

100

Pendiente fondo (mortero 1.5)

m2

3.61

6.56

23.68

3.61

23.6816

0.00

3.61

23.68

100

Pintura en Muros Exteriores al Ltex imprimante temple


m2

14.28

42.84

14.28

42.84

14.28

42.84

100

HIPOCLORADOR FLUIDO DIFUSO


CERCO PERIMETRICO
Suministro y colocacin de hipoclorador

135.77

135.77

135.77

135.77

100

Cerco perimtrico de reservorio

21.6

7.81

168.70

21.6

168.696

0.00

21.6

168.70

100.00

m2

1.68

0.69

1.16

1.68

1.1592

0.00

1.68

1.16

100.00

Excavacin manual

m3

1.18

4.52

5.33

1.18

5.3336

0.00

1.18

5.33

100.00

Refine, nivelacin y compactacin

m2

1.68

0.16

0.27

1.68

0.2688

0.00

1.68

0.27

100.00

Concreto en losa maciza FC=175Kg/cm2

m3

0.1

256.09

25.61

0.1

25.609

0.00

0.1

25.61

100.00

Concreto E muros FC=175/cm2

m3

0.24

256.09

61.46

0.24

61.4616

0.00

0.24

61.46

100.00

Concreto en losa de fondo FC=175/kg/cm2

m3

0.15

256.09

38.41

0.15

38.4135

0.00

0.15

38.41

100

Encofrado y desencofrado de muros (02 caras)

m2

1.66

14.36

23.84

1.66

23.8376

0.00

1.66

23.84

100

Encofrado y desencofrado de losa maciza

m2

1.58

14.55

22.99

1.58

22.989

0.00

1.58

22.99

100

Acero FY=4200 kg/cm2

kg.

6.26

5.22

32.68

6.26

32.6772

0.00

6.26

32.68

100

Tapa metlica de 0.80mx0.80m

1.00

133.53

133.53

133.53

133.53

100

m2

4.10

8.22

33.702

4.10

33.702

0.00

4.1

33.70

100

0
0.00

4.1

12.30

100

TRAZO Y REPLANTEO
CASETA DE VALVULAS (01 UNIDAD)
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO ARMADO

REVOQUES Y ENLUCIDOS
Tarrajeo en interiores y exteriores (mortero 1.5)
Pintura en muros exteriores al latex,

m2

4.10

vlvulas - entradas

1.00

Vlvula de bronce 2"+accesorios-limpia y reboce

imprimante temple

3.00

12.30

4.1

12.3

95.01

95.01

1.00

95.01

95.01

100

211.26

211.26

211.26

211.26

100

VALVULAS Y ACCESORIOS
Vlvula de bronce 1"+accesorios-caseta de

0.00

0.00

133.01

133.01

133.01

133.01

100

2,750.00

0.33

907.50

2,750.00

907.5

0.00

0.00

2750

907.50

100

Excavacin manual de zanjas/ml(0.40x0.60)

2,750.00

0.95

2612.50

2,750.00

2612.5

0.00

0.00

2750

2612.50

100

Refine, nivelacin y fondo para tuberias de agua

2,750.00

0.26

715.00

2,750.00

715

0.00

0.00

2750

715.00

100

Cama de apoyo para tuberas de agua E=10 cm

2,750.00

1.34

3685.00

2750

3685

0.00

0.00

2750

3685.00

100

Relleno y apisonado de zanjas

m3

660

2.26

1491.6

660

1491.6

0.00

660

1491.6

100

0
0
0
0

1658.5

5871.09

1658.5

5871.09

100

985.6

2690.688

985.6

2690.688

100

839.5

1888.875

839.5

1888.875

100

2,750.00

1375

2750

1375

100

0
0

660.12

660.12

100

415.53

415.53

100

0
0
0

1090.46

1090.46

100

164.4

164.4

100

341

341

100

69.04

69.04

100

53.04

53.04

100

15.57

15.57

100

25.65

25.65

100

16.76

16.76

100

41.67

41.67

100

5.4096

0.00

7.84

5.41

100

Vlvula de bronce 1"+accesorios-caseta de


vlvulas - salida

#DIV/0!

RED DE DISTRIBUCIN l=2750ML


TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo de zanjas ml
MOVIMIENTO DE TIERRAS

TUBERIAS Y PRUEBA HIDRAULICA


Tubera PVC SAP clase 7.5 1"

1658.5

3.54

5871.09

Tubera PVC SAP clase 7.5 3/4"

985.6

2.73

2690.688

Tubera PVC SAP clase 7.5 1/2"

839.5

2.25

1888.875

Prueba Hidrulica y desinfeccin en redes de agua

2,750.00

0.5

1375

Caja para vlvula de purga

220.04

660.12

Vlvula de bronce 1/2" y accesorios-caja de purga

138.51

415.53

Caja para vlvula de compuerta

155.78

1090.46

Vlvula de compuerta de bronce 1" y accesorios

82.2

164.4

Vlvula de compuerta de bronce 3/4" y accesorios

68.2

341

Suministro y colocacin TEE PVC SAP 1"

8.63

69.04

Suministro y colocacin TEE PVC SAP 3/4"

6.63

53.04

Suministro y colocacin TEE PVC SAP 1/2"

5.19

15.57

Suministro y colocacin reduccin PVC SAP 1"-3/4"

5.13

25.65

Suministro y colocacin reduccin PVC SAP 1"-1/2"

4.19

16.76

Suministro y colocacin reduccin PVC SAP 3/4"-1/2" u

4.63

41.67

0
0
0
0
0
0

7.84

0.69

5.41

7.84

VALVULAS DE PURGA

VALVULAS DE CONTROL

ACCESORIOS DE LA RED

CMARA ROMPE PRESIN TIPO 7


(04 UNIDADES)
CAMARA CRP-7
Trazo y Replanteo Preliminar

m2

Excavacin manual

m3

6.76

4.52

30.56

6.76

30.5552

0.00

6.76

30.56

100

Encofrado y desencofrado

m2

28.32

15.28

432.73

28.32

432.7296

0.00

28.32

432.73

100

Concreto FC=175 kg/cm2

m3

2.52

256.09

645.35

2.52

645.3468

0.00

2.52

645.35

100

Acero FY=4200 kg/cm2

kg.

271.92

5.22

1419.4224

271.92

1419.4224

0.00

271.92

1419.42

100

Tarrajeo en interiores y exteriores (mortero 1.5)

m2

31.2

8.22

256.464

31.2

256.464

0.00

31.2

256.46

100

Pintura en muros exteriores al latex, imprimante temple


m2

18.24

54.72

18.24

54.72

18.24

54.72

100

Accesorios de netrada y salida de 1"

m2

247.01

988.04

988.04

988.04

100

Tapa metlica de 0.80m x 0.80m

m2

133.53

534.12

534.12

534.12

100

Tapa metlica de 0.40m x 0.40m

m2

98.53

394.12

394.12

394.12

100

Trazo y Replanteo Preliminar

m2

90.27

0.69

62.29

90.27

62.2863

90.27

62.2863

100

Excavacin manual

m3

30.09

4.52

136.01

30.09

136.0068

30.09

136.0068

100

35.33

14.36

507.34

35.33

507.3388

35.33

507.3388

100

3.68

942.4112

3.68

942.4112

100

175.03

913.6566

175.03

913.6566

100

39.61

275.6856

39.61

275.6856

100

280.5

656.37

280.5

656.37

100

46.75

214.5825

46.75

214.5825

100

17

255

17

255

100

17

1517.42

17

1517.42

100

17

45.39

17

45.39

100

34

396.78

34

396.78

100

17

93.5

17

93.5

100

34

107.78

34

107.78

100

17

53.89

17

53.89

100

17

198.39

17

198.39

100

PILETAS DOMICILIARIAS (17 UNIDAD)


PILETA DOMICILIARIA DE UN GRIPO
SIERRA

Concreto FC=175 kg/cm2 sin mezcladora

m3

3.68

256.09

942.41

Acero FY=4200 kg/cm2

kg.

175.03

5.22

913.6566

Tarrajeo mortero 1.2 E=1.5 cm

m2

39.61

6.96

275.6856

Tubera PVC SAP clase 10.1/2"

280.5

2.34

656.37

Tubera desague PVC SAL 2"

46.75

4.59

214.5825

Grifo de 1/2"

17

15

255

Vlvula compuerta bronce 1/2"

17

89.26

1517.42

Codo PVC SAL 2" x 90"

17

2.67

45.39

Unin FG universal de 1/2"

34

11.67

396.78

Sumidero de bronce para piletas domic. 2"

17

5.5

93.5

Adaptadores PVC SAP 1/2"

34

3.17

107.78

Unin roscada FG 1/2"

17

3.17

53.89

Niple FG 1/2"

17

11.67

198.39

Codo PVC SAP 1/2"

17

2.67

45.39

Filtro de grava

m3

1.26

54.14

68.22

Accesorios de reboce

m3

17

7.80

132.60

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

glb.

1000

1000.00

Encofrado y desencofrado de muros (02 caras) piletasm2


domic.

17

45.39

17

45.39

100

1.26

68.2164

1.26

68.2164

100

17

132.6

17

132.6

100

1000

1000

100

FLETE
Flete en zona rural (no afecto a IGV

COSTO DIRECTO

SECTOR LA LUCMILLA

CAPTACIN DE LADERA (01 UNIDAD)


TRABAJOS PRELIMINARES

m2

3.74

0.69

2.58

3.74

2.5806

0.00

3.74

2.58

100

m3

2.99

4.52

13.51

2.99

13.5148

0.00

2.99

13.51

100

Concreto en losa superior FC=175kg/cm2

m3

0.4

256.09

102.44

0.4

102.436

0.00

0.4

102.44

100

Concreto de Muros FC=175 Kg/cm2

m3

0.9

256.09

230.48

0.9

230.481

0.00

0.9

230.48

100

Concreto en losa de fondo FC=175/kg

m3

0.68

256.09

174.14

0.68

174.1412

0.00

0.68

174.14

100

Concreto FC=100 KG/cm2

m3

0.45

158.56

71.352

0.45

71.352

0.00

0.45

71.35

100

Encofrado y desencofrado de uros (02 caras

m2

11.68

14.36

167.7248

11.68

167.7248

0.00

11.68

167.72

100

Encofrado y desencofrado de losa maciza

m2

3.18

14.55

46.269

3.18

46.269

0.00

3.18

46.27

100

Acero FY=4200 Kg/cm2

Kg.

103.95

5.22

542.619

103.95

542.619

0.00

103.95

542.62

100

Tapa metlica de 0.60m/0.60m

Kg.

133.53

267.06

267.06

267.06

100

Tapa metlica de 0.40/0.40m

Kg.

98.53

98.53

98.53

98.53

100

Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

2.38

28.21

67.14

2.38

67.1398

0.00

2.38

67.14

100

Tarrajeo en caras exteriores (mortero 1.5)

m2

8.75

6.82

59.675

8.75

59.675

0.00

8.75

59.68

100

Pintura en Muros Exteriores al Ltex

m2

8.75

2.86

25.025

8.75

25.025

0.00

8.75

25.03

100

Mortero 1.5 pendiente fondo

m2

0.48

6.56

3.15

0.48

3.1488

0.00

0.48

3.15

100

Filtro de arena

m3

0.5

55.14

27.57

0.5

27.57

0.5

27.57

100

m3

0.6

54.14

32.48

0
0

Filtro de grava

0.6

32.48

0.6

32.48

100

m3

151.01

151.01

151.01

151.01

100

1.8

7.88

14.18

1.8

14.18

1.8

14.18

100

Trazo y replanteo preliminar


MOVIMIENTO DE TIERRAS
Excavacin Manual
OBRAS DE CONCRETO ARMADO

REVOQUES ENLUCIDOS

FILTROS

VALVULAS Y ACCESORIOS
Vlvula de bronce 1"+accesorios
CERCO PERIMETRICO
Cerco perimtrico en captacin
LINEA DE CONDUCCIN L=1150.80 ML

TRABAJOS PRELIMINARES

1150.8

0.33

379.76

1150.8

379.764

0.00

1150.8

379.76

100

Excavacin manual de zanjas/ml(0.40x0.60)

1150.8

0.95

1093.26

1150.8

1093.26

0.00

1150.8

1093.26

100

Refine, nivelacin y fondo para tuberias de agua

1150.8

0.26

299.21

1150.8

299.208

0.00

1150.8

299.21

100

Cama de apoyo para tuberas de agua E=10 cm

1150.8

1.34

1542.07

1150.8

1542.072

0.00

1150.8

1542.07

100

Relleno y apisonado de zanjas

m3

276.2

2.26

624.212

276.2

624.212

0.00

276.2

624.21

100

Tuberia PVC SAP clase 7.5 1"

m3

1150.8

3.06

3521.448

1150.8

3521.448

0.00

1150.8

3521.45

100

Prueba Hidrulica y desinfeccin en redes de agua

1150.8

0.5

575.40

1150.8

575.40

1150.8

575.40

100

Limpieza de terreno manual

m2

14.48

0.4

5.79

14.48

5.79

14.48

5.79

100

m2

14.48

0.58

8.40

0
0

Trazo y replanteo

14.48

8.40

14.48

8.40

100

Excavacin manual de zanjas

m3

39.3

4.52

177.64

39.3

177.636

0.00

39.3

177.64

100

Relleno con material propio

m3

12.2

2.64

32.21

12.2

32.208

0.00

12.2

32.21

100

Trazo, nivelacin y replanteo de zanjas ml


MOVIMIENTO DE TIERRAS

TUBERIAS Y PRUEBA HIDRAULICA

PASE AEREO N 01 (170.20ml)


EN LINEA DE CONDUCCIN
TRABAJOS PRELILINARES

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Concreto FC=140 kg/cm2 cmara de anclaje

m3

4.8

158.11

758.93

4.8

758.928

0.00

4.8

758.93

100

Solado base

m2

9.68

14.23

137.75

9.68

137.7464

0.00

9.68

137.75

100

Encofrado y desencofrado de cmara de anclaje

m2

12.4

23.75

294.5

12.4

294.5

12.4

294.5

100

OBRAS DE CONCRETO ARMADO


Concreto FC=175 kg/cm2 torres

m3

2.4

253.29

607.896

2.4

607.896

0.00

2.4

607.90

100

Concreto en zapatas FC=175 kg/cm2

m3

9.68

253.85

2457.268

9.68

2457.268

0.00

9.68

2457.27

100

Encofrado y desencofrado

m2

24

23.84

572.16

24

572.16

24

572.16

100

Acero FY=4200 Kg/cm2

kg.

240.21

5.25

1261.1025

240.21

1261.1025

0.00

240.21

1261.10

100

Cable acero tipo SOA de 1/2" Incl.anclaje

170.2

16.74

2849.148

170.2

2849.15

170.2

2849.15

100

85

28.11

2389.35

0
0

Pndolas de fierro liso 1/4 incl. Montaje

85

2389.35

85

2389.35

100

Tubera de politeleno de 1"instalac.Inclye prueba hid. m

170.2

11.21

1907.942

170.2

1907.94

170.2

1907.94

100

CABLES Y PENDULAS

TUBERIA Y ACCESORIOS

VARIOS

Elementos de empotramiento

15.19

30.38

30.38

30.38

100

PASE AEREO N 02 (75.00ml)


EN LINEA DE CONDUCCIN
TRABAJOS PRELILINARES
Limpieza de terreno manual

m2

14.48

0.32

4.63

14.48

4.6336

0.00

14.48

4.63

100

Trazo y replanteo

m2

14.48

0.46

6.66

14.48

6.6608

0.00

14.48

6.66

100

Excavacin manual de zanjas

m3

39.3

4.52

177.64

39.3

177.636

0.00

39.3

177.64

100

Relleno con material propio

m3

12.2

2.64

32.21

12.2

32.208

0.00

12.2

32.21

100

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE


Concreto FC=140 kg/cm2 cmara de anclaje

m3

4.8

158.11

758.93

4.8

758.928

0.00

4.8

758.93

100

Solado base

m2

9.68

14.23

137.75

9.68

137.7464

0.00

9.68

137.75

100

Encofrado y desencofrado de cmara de anclaje

m2

12.4

23.75

294.5

12.4

294.50

12.4

294.5

100

OBRAS DE CONCRETO ARMADO


Concreto FC=175 kg/cm2 torres

m3

2.4

253.29

607.896

2.4

607.896

0.00

2.4

607.90

100

Concreto en zapatas FC=175 kg/cm2

m3

9.68

254.36

2462.2048

9.68

2462.2048

0.00

9.68

2462.20

100

Encofrado y desencofrado

m2

24

23.84

572.16

24

572.16

0.00

24

572.16

100

Acero FY=4200 Kg/cm2

kg.

240.21

5.26

1263.5046

240.21

1263.5046

0.00

240.21

1263.50

100

CABLES Y PENDULAS
Cable acero tipo SOA de 1/2" Incl.anclaje

75

16.74

1255.5

75

1255.50

75

1255.50

100

38

28.11

1068.18

0
0

Pndolas de fierro liso 1/4 incl. Montaje

38

1068.18

38

1068.18

100

Tubera de politeleno de 1"instalac.Inclye prueba hid. m

75

11.21

840.75

75

840.75

0.00

75

840.75

100

15.19

45.57

45.57

45.57

100

m2

6.76

0.69

4.66

6.76

4.6644

0.00

6.76

4.66

100

Acarreo de material excedente hasta DPROM-30m

m3

10.56

2.64

27.88

10.56

27.8784

0.00

10.56

27.88

100

Excavacin manual de zanjas

m3

8.45

3.95

33.38

8.45

33.3775

0.00

8.45

33.38

100

Refine, nivelacin y compactacin

m2

6.76

0.16

1.08

6.76

1.08

6.76

1.08

100

TUBERIA Y ACCESORIOS

VARIOS
Elementos de empotramiento

RESERVORIO DE 5.00 M3 (01 UND.)


TRAZO Y REPLANTEO
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE

Solado E=4"

m2

6.76

14.84

100.32

6.76

OBRAS DE CONCRETO ARMADO

100.3184

0.00

6.76

100.32

100

Concreto de losa de fondo FC=210 kg/cm2

m3

1.01

283.39

286.22

1.01

286.2239

0.00

1.01

286.22

100

Concreto en muros FC=210kg/cm2

m3

1.72

283.39

487.43

1.72

487.4308

0.00

1.72

487.43

100

Concreto en losa maciza FC=210Kg/cm2 INC.tapa

m3

0.58

283.39

164.37

0.58

164.3662

0.00

0.58

164.37

100

Encofrado y desencof. de muros (02 caras)

m2

21.51

14.36

308.8836

21.51

308.8836

0.00

21.51

308.88

100

Encofrado y desencof. De losa maciza

m2

4.49

14.55

65.3295

4.49

65.3295

0.00

4.49

65.33

100

Acero FY=4200 kg/cm2

kg.

489.98

5.22

2557.6956

489.98

2557.6956

0.00

489.98

2557.70

100

Tapa metlicade 0.80mx0.80mx1.8"

kg.

133.53

133.53

133.53

133.53

100

Junta water stop NEOPRENE 6"

6.11

42.77

42.77

42.77

100

37.95

37.95

37.95

37.95

100

Suministro y colocacin de accesorios de ventilacin 3"PG


u
REVOQUES Y ENLUCIDOS
Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

14.25

28.21

401.9925

14.25

401.9925

0.00

14.25

401.99

100

Tarrajeo en caras exteriores (mortero 1.5)

m2

14.28

6.82

97.3896

14.28

97.3896

0.00

14.28

97.39

100

Pendiente fondo (mortero 1.5)

m2

3.61

6.56

23.6816

3.61

23.6816

0.00

3.61

23.68

100

Pintura en Muros Exteriores al Ltex imprimante temple


m2

14.28

42.84

14.28

42.84

14.28

42.84

100

135.77

135.77

100

21.6

168.696

21.6

168.696

100

1.1592

0.00

1.68

1.16

100

HIPOCLORADOR DE FLUIDO
DIFUSO-CERCO PERIMETRICO
Suministro y colocacin de hipoclorador

135.77

135.77

Cerco perimtrico de reservorio

21.6

7.81

168.70

0
0

m2

1.68

0.69

1.16

1.68

TRAZO Y REPLANTEO
CASETA DE VALVULAS (01 UNIDAD)
Trazo y Replanteo Preliminar

MOVIMIENTO DE TIERRAS
Excavacin manual

m3

1.18

4.52

5.33

1.18

5.3336

0.00

1.18

5.33

100

Refine, nivelacin y compactacin

m2

1.68

0.16

0.27

1.68

0.2688

0.00

1.68

0.27

100

OBRAS DE CONCRETO ARMADO


Concreto en losa maciza FC=175Kg/cm2

m3

0.1

256.09

25.61

0.1

25.609

0.00

0.1

25.61

100

Concreto E muros FC=175/cm2

m3

0.24

256.09

61.46

0.24

61.4616

0.00

0.24

61.46

100

Concreto en losa de fondo FC=175/kg/cm2

m3

0.15

256.09

38.41

0.15

38.4135

0.00

0.15

38.41

100

Encofrado y desencofrado de muros (02 caras)

m2

1.66

14.36

23.8376

1.66

23.8376

0.00

1.66

23.84

100

Encofrado y desencofrado de losa maciza

m2

1.58

14.55

22.989

1.58

22.989

0.00

1.58

22.99

100

Acero FY=4200 kg/cm2

kg.

6.26

5.22

32.6772

6.26

32.6772

0.00

6.26

32.68

100

Tapa metlica de 0.80mx0.80m

133.53

133.53

REVOQUES Y ENLUCIDOS

133.53

133.53

100

m2

4.1

8.22

33.70

4.1

33.702

0.00

4.1

33.70

100

Pintura en muros exteriores al latex, imprimante temple


m2

4.1

12.3

4.1

12.3

4.1

12.3

100

Tarrajeo en interiores y exteriores (mortero 1.5)

VALVULAS Y ACCESORIOS
Vlvula de bronce 1"+accesorios-caseta de vlvulas-entrada
u
Vlvula de bronce 2"+accesorios-limpia y reboce

Vlvula de bronce 1"+accesorios-caseta de vlvulas-salida


u

95.01

95.01

95.01

95.01

100

211.26

211.26

211.26

211.26

100

133.01

133.01

133.01

100

0.00

4293.5

1416.86

100

133.01

RED DE DISTRIBUCIN l=2750ML

TRABAJOS PRELIMINARES

1416.855

Trazo, nivelacin y replanteo de zanjas ml

4,293.50

0.33

1416.855

4293.5

MOVIMIENTO DE TIERRAS
Excavacin manual de zanjas/ml(0.40x0.60)

4,293.50

0.95

4078.825

4293.5

4078.825

0.00

4293.5

4078.83

100

Refine, nivelacin y fondo para tuberias de agua

4,293.50

0.26

1116.31

4293.5

1116.31

0.00

4293.5

1116.31

100

Cama de apoyo para tuberas de agua E=10 cm

4,293.50

1.34

5753.29

4293.5

5753.29

0.00

4293.5

5753.29

100

Relleno y apisonado de zanjas

m3

1,030.44

2.26

2328.7944

1030.44

2328.7944

0.00

1030.44

2328.79

100

Tubera PVC SAP clase 7.5 1"

1,250.00

3.54

4425.00

1250

4425

0.00

1250

4425.00

100

Tubera PVC SAP clase 7.5 3/4"

1486

2.73

4056.78

1486

4056.78

1486

4056.78

100

Tubera PVC SAP clase 7.5 1/2"

1557.5

2.25

3504.375

1557.5

3504.375

1557.5

3504.375

100

4,293.50

0.5

2146.75

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Prueba Hidrulica y desinfeccin en redes de agua

4,293.50

2146.75

4293.5

2146.75

100

TUBERIAS Y PRUEBA HIDRAULICA

VALVULAS DE PURGA
Caja para vlvula de purga

220.04

440.08

Vlvula de bronce 1/2" y accesorios-caja de purga

138.51

277.02

VALVULAS DE CONTROL
Caja para vlvula de compuerta

155.78

778.9

Vlvula de compuerta de bronce 1" y accesorios

82.2

246.6

Vlvula de compuerta de bronce 3/4" y accesorios

68.2

136.4

Suministro y colocacin TEE PVC SAP 1"

8.63

77.67

Suministro y colocacin TEE PVC SAP 3/4"

6.63

26.52

Suministro y colocacin TEE PVC SAP 1/2"

5.19

15.57

Suministro y colocacin reduccin PVC SAP 1"-3/4"

5.13

15.39

ACCESORIOS DE LA RED

#DIV/0!

440.08

440.08

100

277.02

277.02

100

#DIV/0!

778.9

778.9

100

246.6

246.6

100

136.4

136.4

100

77.67

77.67

100

26.52

26.52

100

15.57

15.57

100

15.39

15.39

100

#DIV/0!

4.19

29.33

29.33

29.33

100

4.63

32.41

0
0

Suministro y colocacin reduccin PVC SAP 3/4"-1/2" u

32.41

32.41

100

Suministro y colocacin reduccin PVC SAP 1"-1/2"

PASE AEREO N 01 (75 ml) EN LINEA


DE DISTRIBUCIN
TRABAJOS PRELILINARES
Limpieza de terreno manual

m2

14.48

0.32

4.63

14.48

4.6336

0.00

14.48

4.63

100

Trazo y replanteo

m2

14.48

0.46

6.66

14.48

6.6608

0.00

14.48

6.66

100

Excavacin manual de zanjas

m3

39.3

4.52

177.64

39.3

177.636

0.00

39.3

177.64

100

Relleno con material propio

m3

12.2

2.64

32.21

12.2

32.208

0.00

12.2

32.21

100

Concreto FC=140 kg/cm2 cmara de anclaje

m3

4.8

158.11

758.93

4.8

758.928

0.00

4.8

758.93

100

Solado base

m2

9.68

14.23

137.75

9.68

137.7464

0.00

9.68

137.75

100

Encofrado y desencofrado de cmara de anclaje

m2

12.4

23.75

294.5

12.4

294.5

12.4

294.5

100

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE

OBRAS DE CONCRETO ARMADO


Concreto FC=175 kg/cm2 torres

m3

2.4

253.29

607.90

2.4

607.896

0.00

2.4

607.90

100

Concreto en zapatas FC=175 kg/cm2

m3

9.68

254.36

2462.2048

9.68

2462.2048

0.00

9.68

2462.20

100

Encofrado y desencofrado

m2

24

23.84

572.16

24

572.16

24

572.16

100

Acero FY=4200 Kg/cm2

kg.

240.21

5.26

1263.5046

240.21

1263.5046

0.00

240.21

1263.50

100

CABLES Y PENDULAS
Cable acero tipo SOA de 1/2" Incl.anclaje

75

16.74

1255.5

75

1255.50

75

1255.50

100

38

28.11

1068.18

0
0

Pndolas de fierro liso 1/4 incl. Montaje

38

1068.18

38

1068.18

100

Tubera de politeleno de 1"instalac.Inclye prueba hid. m

75

9.15

686.25

75

686.25

75

686.25

100

15.19

30.38

30.38

30.38

100

TUBERIA Y ACCESORIOS

VARIOS
Elementos de empotramiento

CAMARA ROMPE PRESIN TIPO 7


(04 UNDS)
CAMARA CRP -7
Trazo y Replanteo Preliminar

m2

7.84

0.69

5.41

7.84

5.4096

0.00

7.84

5.41

100

Excavacin manual

m3

6.76

4.52

30.56

6.76

30.5552

0.00

6.76

30.56

100

Encofraado y desencofrado

m2

28.32

15.28

432.73

28.32

432.7296

0.00

28.32

432.73

100

Concreto FC=175kg/cm2

m3

2.52

256.09

645.35

2.52

645.3468

0.00

2.52

645.35

100

Acero FY=4200Kg/cm2

kg.

271.92

5.22

1419.4224

271.92

1419.4224

0.00

271.92

1419.42

100

Tarrajeo con impermeabiliz. Mezcla 1.1.E=1.5 cm

m2

31.2

8.22

256.464

31.2

256.464

0.00

31.2

256.46

100

Tarrajeo en muros exteriores mezcla CA=1.5 cm

m2

18.24

54.72

18.24

54.72

18.24

54.72

100

Pintura en Muros Exteriores al Ltex

m2

247.01

988.04

988.04

988.04

100

m2

133.53

534.12

534.12

534.12

100

Tapa metlica de 0.70x0.70 m

m2

98.53

394.12

0
0
0

Accesorios de entrada y salida de 1 en CRP 16

394.12

394.12

100

Trazo y Replanteo Preliminar

m2

74.34

0.69

51.29

74.34

51.2946

74.34

51.2946

100

Excavacin manual

m3

24.78

4.52

112.01

24.78

112.0056

24.78

112.0056

100

29.09

417.7324

29.09

417.7324

100

3.03

775.9527

3.03

775.9527

100

144.14

752.4108

144.14

752.4108

100

32.62

227.0352

32.62

227.0352

100

231

540.54

231

540.54

100

38.5

176.715

38.5

176.715

100

14

210

14

210

100

14

1249.64

14

1249.64

100

14

37.38

14

37.38

100

28

326.76

28

326.76

100

14

77

14

77

100

28

88.76

28

88.76

100

14

44.38

14

44.38

100

14

163.38

14

163.38

100

14

37.38

14

37.38

100

1.05

56.847

1.05

56.847

100

14

109.2

14

109.2

100

1000

1000

100

PILETAS DOMICILIARIAS (17 UNIDADES)


PILETA DOMICILIARIA DE UN GRIPO - SIERRA

29.09

14.36

417.73

Concreto FC=175 kg/cm2 sin mezcladora

m3

3.03

256.09

775.95

Acero FY=4200 kg/cm2

kg.

144.14

5.22

752.41

Tarrajeo mortero 1.2 E=1.5 cm

m2

32.62

6.96

227.04

Tubera PVC SAP clase 10.1/2"

231

2.34

540.54

Tubera desague PVC SAL 2"

38.5

4.59

176.72

Grifo de 1/2"

14

15

210

Vlvula compuerta bronce 1/2"

14

89.26

1249.64

Codo PVC SAL 2" x 90"

14

2.67

37.38

Unin FG universal de 1/2"

28

11.67

326.76

Sumidero de bronce para piletas domic. 2"

14

5.5

77

Adaptadores PVC SAP 1/2"

28

3.17

88.76

Unin roscada FG 1/2"

14

3.17

44.38

Niple FG 1/2"

14

11.67

163.38

Codo PVC SAP 1/2"

14

2.67

37.38

Filtro de grava

m3

1.05

54.14

56.85

Accesorios de reboce

m3

14

7.8

109.20

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

glb.

1000

1000.00

Encofrado y desencofrado de muros (02 caras) piletasm2


domic.

FLETE
Flete en zona rural (no afecto a IGV

TOTAL COSTO DIRECTO

155608.39

155608.39

% AVANCE =

100.00

447
130

649
330

1124
649

317

319
636

475

Potrebbero piacerti anche