The CQM Opportunity


Clean Tech Gateway Project
Bigger potential then Wind & solar 7 times faster ROI Low technological RISK Short time to market Confirms with India power goals

Energy, Water and Ecology Efficiencies


Up to 30% energy savings in HVAC Up to 4% on power stations Significant energy savings in industrial processes using heat exchangers More than 50% savings in bleed water of CTs 100% savings of refuse water when replacing RO water treatment for CTs 100% chemical free 100% re-use of chemical-free water

CQM Solutions

CQM Solution Overview

SR-CT

ATCS

Improve Efficiency
Two Pronged Approach
1. Keep Condenser Tubes Clean
Automatic Tube Cleaning System (ATCS)

2. Manage Water Chemistry


Scale Removal System (SRS)

How ATCS Works

Energy Efficiency Solutions

Automatic Tube Cleaning System for Industrial Plants and Power Stations

ATCS-Industrial

Automatic Tube Cleaning System for HVAC Condensers

ATCS-HVAC

ATCS Industrial Installations

SRS-CT - How it Works


CQM SR-CT
Electrochemical Process
Creates High Ph In Tank Free Chlorine Generation Self Flushing

Redundant Sand Filtration


Scale/Bio/Corrosion Control Low Cost of Operation

Water Treatment Solutions

Cooling Tower Automatic Water Treatment and Cleaning System

SR-CT

Closed Circuit Automatic Water Treatment and Cleaning System

SR-CC

Drinking Water Automatic Water Purification and Chlorination System

SR-CL

Water Automatic Legionella Control, Bactericide and Disinfection System

SR-LB

Water Treatment Installations:


Cooling Water Circuits

Automatic Tube Cleaning System


Condenser Ball cleaning technology has existed for 50 years and is a well accepted principle. CQM has intensified ATCS technology (Patented) to level where it meets fullest potential in energy savings contribution.

The Problem

Automatic Tube Cleaning System for Power Stations and Industrial Plants

ATCS

The Problem (Cont)


... Mud Hard Scale Bio-organic Matters Seashells Odd Particles

More Power More Sales


Loss Plant Generation - MWh/year
30,000 25,000 20,000 15,000 10,000 5,000 0 0 0.006 0.012 0.018 0.024 0.03 Scale at End of Year - inch 0.036
1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 0 0.006 0.012 0.018 0.024 0.03 Scale at End of Year - inch 0.036

Loss of Sales - $/year

@ 300 MW Steam Plant ; 95% Availability ; Condenser non cleaning only ; 4.5 cents / kWh

Demo

CQM Vs. Competition


Ball Trap
CQM Patent 3.5 times pipe cross section Less then 4 sec ZERO more then 98% Competition No patent 1.5 times pipe cross section One by one 60% in 4-6 weeks Only 25% center tubes

Ball Injection Ball lost


Tube cleanest factor

Changxin Power Plant 300MW


2 x CQM 72

Changxin Power Plant 300MW


2 x CQM 72

Changxin Power Plant 300MW


2 x CQM 72

Changxin Power Plant 300MW


2 x CQM 72

Changxin Power Plant 300MW


2 x CQM 72

Changxin Power Plant 300MW 2 x CQM 72

Changxin Power Plant 300MW


2 x CQM 72

Changxin Power Plant 300MW


2 x CQM 72

CQM Power Plants Installation


Power Plant Name Bosen BIS ENERJI ZORLU MODERN ENERJI Soda Sanayii A.S IKPP Rotenberg Dead Sea Haifa Riding AEM Torino Capacity 136MW 150MW 120MW 60MW 150MW 300MW 1200MW 50MW 432MW 200MW 600MW Country Turkey Turkey Turkey Turkey Turkey Indonesia Israel Israel Israel Israel Italy

Dead Sea Works Ltd - Israel


Installed on main condenser 36 Replaces Taprogge system

Diesel Power Plant

CC Power Plant Bosen Turkey


Installed on main condenser 36

CC Power Plant Bosen Turkey


Installed on main condenser 28

CC Power Plant in IKPP Indonesia


Installed on main condenser 46

CC Power Plant in IKPP Indonesia

Installed on main condenser 42

CC Power Plant PT. INDAH KIAT PULP & PAPER CORPORATION SERANG MILL, JAKARTA, INDONESIA Installed on generator air cooler

CQM Solutions by Market


Industrial Plants Hospitals, Retirement Homes Facilities, Buildings Hotels Power Stations

ATCS Industrial
Facilities, Buildings

SR-LB

ATCS HVAC

Shopping Malls Hotels

Municipalities, Small Towns Facilities, Buildings Hotels

Energy and Water Efficiency Solutions


SR-CL SR-CT

Industrial Plants

SR-CC

Facilities, Buildings

Shopping Malls
Hotels

Sustainability Impacts
Climate Change & Energy
Reduced CO2 Emissions Improved Energy Efficiency Improve Power Generation Efficiency Creating a smaller footprint

Green Building
Reducing Water Consumption Eliminating Water Treatment Chemicals Mitigating Building Ecological Impact

Administration Involvement
Working with employees to create and maintain a healthier and cleaner institutional environment Emphasizing prevention of emissions and elimination of excursions

CQM Solutions Contributes To Sustainability Commitments

Multiple Dimensions of Value


Ease Of Use Safety

Sustainability Enhancement

Global Access

Equipment Longevity

Workload Reduction

Energy Savings

Water Savings

CQM Techs Value Added Solutions

35

Some of our Customers

C.Q.M

THANK YOU