But - the response must be produced by the turbines in the Balancing Authority Area Because frequency changes rapidly, a major part of the complete response must be produced in a 10-20 second time frame Therefore - a major part of FRR must be primary response The Primary Controller is the Governor Primary Response is Governor Response
Primary - Response
Power increases to equal increased load
Primary Response |
Fuel Command
Grid Frequency
Primary Control Governor Responds to Frequency change Secondary Control Plant Controller Returns Power to Schedule
o - Control action involves large pieces of equipment - Temperature is not a factor - Principal limitations are in hydraulics of civil works - Rough running/draft tube stability my limit allowable dispatch ranges - but have little effect on primary response capability
- Surge tank/manifold design may affect primary respo - River hydrology often affects allowable secondary
al
al
al
GT - Primary control (governor) acts on GT - ST valves are wide open in economical output range - ST output follows GTs - behind boiler response time consta - GT component of response is fast - ST component of response is slower - Plant capability - 5 to 8 percent fast - remainder - 3 to 5%/m
100 sec
Hydro Plants
ge Modern Coal 5 % in few seconds ce Thru & Turbine follow Coal 0 % in few seconds er Boiler Follow Coal 5 % in few seconds
ro 5-10 % in 15 seconds
10-15 % in 15 seconds
8 % minute
GT 5 - 8 % in 15 seconds
5-8 % minute
al
ideal capability overidden by turbine temperature/stress limits drum level control feedwater heater level controls coal feeder/mill limitations ro low head - few limitations high head/underground/pipeline - civil works limitations
concern regarding reduced output economics wear of valves hot gas path exposure due to maneuvering GT GT as in cimple cycle plants