Sei sulla pagina 1di 63

DNV Presentation

Introduction to Pipelines in DNV Asle Vens Director Offshore Pipelines Poland Dec, 2011

GLOBAL PIPELINE AWARD 2009 WINNER

Agenda

Det Norske Veritas (DNV) a short introduction


Introduction to Pipelines in DNV Introduction to Offshore Pipelines in DNV Summary of Main DNV Offshore Pipeline Services Some recent project references Offshore Pipelines

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 2

DNV an autonomous independent foundation

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 3

More than 140 years of managing risk

Det Norske Veritas (DNV) is an independent and autonomous foundation and spend the major part of the profit on research and development to the benefit of our clients
DNV was established in 1864 in Norway

The main scope of work was to identify, assess and manage risk initially for maritime insurance companies

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 4

DNVs four main business areas


A world leading classification society A world leading service provider to the energy industry in safeguarding and improving business performance

DNV Maritime

DNV Energy

A world leading service provider of services for managing IT Risk

A world leading provider of certification, verification, assessment, training and solutions for managing risk

DNV IT Risk Management


Det Norske Veritas AS. All rights reserved.

DNV Industry
05 December 2011 Slide 5

Highly skilled people across the world

300
offices
Det Norske Veritas AS. All rights reserved.

100
countries
05 December 2011

9,000
employees, of which 82% have university degree
Slide 6

2,000 employees serving the energy industry from more than 40 locations worldwide

Our people a vital resource

People are the core of DNV

85 nationalities

Competency chart

DNV staff around the world

9000 employees
Det Norske Veritas AS. All rights reserved. 05 December 2011 Slide 7

Expert role in the oil and gas industry

65%
65% of the worlds offshore pipelines are designed and installed to DNVs pipeline standard
Det Norske Veritas AS. All rights reserved.

38%
38% of the worlds classed Floating Production, Storage and Offloading vessels (FPSOs) are to DNV class
05 December 2011

30%
DNV is involved in 30% of the worlds LNG terminal projects
Slide 8

The business lifecycle

DNV - assisting Energy Companies along the entire value chain for pipelines to safeguard and improve business perfomance

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 9

Our services & solutions


We provide a complete view of your organisations total risk exposure and manage these risks in an integrated way We develop, implement, maintain and continually improve best practices in SHE management

Enterprise Risk Management

SHE Risk Management

We ensure your projects are properly managed through transparent risk based verification and certification

We provide you with the confidence that technology will function reliably

Verification

Technology Qualification

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 10

Our services & solutions, continued


We safeguard integrity and maintain optimal production safely and cost-efficiently We assist you to comply with classification and statutory requirements for MOUs and FPSOs

Operations Excellence

Offshore Classification

We safely and responsibly manage risks related to ICT systems and software

We provide certification & training services to build trust and competence within your organisation and with your stakeholders

IT Risk Management

Certification & Training

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 11

DNV Energy Market Target Areas


Deep and ultra-deep water field development Utilities

Cleaner energy and renewables

MOUs and FPSOs

Refining & petrochemicals

Onshore pipelines

Managing risk

Operations excellence

Offshore pipelines

Natural Gas/LNG

Arctic Operations & Technology

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 12

Pipelines in DNV

Pipeline services are DNVs largest activity within the Energy Market
DNV is involved in all phases for both Onshore and Offshore pipelines

45% of our pipeline revenue comes from onshore projects


55% of our pipeline revenue come from offshore projects

Det Norske Veritas AS. All rights reserved.

05 December Slide 13 2011

Det Norske Veritas

In-house Multidiscipline Capabilities


DNV

has all necessary core competencies to cover the entire pipeline value chain from planning through to de-commission

Slide 14

05 Decembe r 2011

DNV Pipeline Resources

DNV has in the order of 250-300 people globally that are mainy occupied with pipeline related work. Resources are located:

Offshore Pipelines:
Norway (Hvik, Stavanger) UK (Aberdeen, London) Denmark (Copenhagen) Russia (Moscow) USA (Houston, Columbus) Brazil (Rio) South Africa (Durban) MiddleEast (AbuDhabi) India (Bombay) Singapore Malaysia (KL) Taiwan (Kaohsiung) Vietnam (Vongtau) China (Shanghai) Australia (Perth)

Onshore Pipelines:
Norway (Hvik) UK (Aberdeen, London) USA (Houston, Columbus) Canada (Calgary) Singapore Vietnam (Vongtau) China (Shanghai, Beijing) Australia (Brisbane)

Det Norske Veritas AS. All rights reserved

05 December 2011

Slide 15

DNV serving the energy industry

Offshore pipelines
Det Norske Veritas AS. All rights reserved. 05 December 2011 Slide 16

DNV Pipeline Codes History and Background


DNV Rules for Submarine Pipeline Systems, 1976
- The first complete pipeline code for offshore pipelines - Based on allowable stress format.

DNV Rules for Submarine Pipeline Systems, 1981


- Update of 1976 version and became a wide spread code

DNV Rules for Submarine Pipeline Systems, 1996


- A completely new version, incorporating the limit state format with calibrated safety factors based on the SUPERB JIP work

DNV-OS-F101-2000
- Converted to pure technical standard - Hearing process resulted in more than 3 500 comments from industry (more than 20 companies) - DNV interprets this as massive interest instead of critics

Last issue 2007 Global Pipeline Award 2009 GLOBAL PIPELINE AWARD 2009 WINNER
Tuesday, 02 February 2010 Det Norske Veritas AS. All rights reserved. 17

The Offshore Pipeline Standard

Enables the operators to reduce CAPEX without compromising safety

Technical requirements harmonized with ISO


Limit state based design criteria with calibrated safety factors Used for 60-70% of the subsea pipelines in the world !

Only code with an organized feed-back system


Supported by large portfolio of RPs
DNV-RP-F101 Corroded Pipelines DNV-RP-F102 Pipeline Field Joint Coating DNV-RP-F103 Cathodic Protection DNV-RP-F105 Free Spanning Pipelines DNV-RP-F106 Pipeline Coatings DNV-RP-F107 Pipeline Protection DNV-RP-F108 Fracture Control DNV-RP-F109 On-Bottom Stability DNV-RP-F110 Global Buckling DNV-RP-F111 Trawling DNV-RP-F113 Pipeline Subsea Repair DNV-RP-F116 Subsea Pipeline System Integrity Management (will be issued soon)
05 December 2011 Slide 18

Det Norske Veritas AS. All rights reserved.

DNV Offshore Codes


Offshore Service Specification DNV-OSS

ABC DE
Offshore Standard DNV-OS Recommended Practices DNV-RP

RECOMMENDED PRACTICE RP-F102 RECOMMENDED PRACTICE PIPELINE FIELD JOINT COATING RP-F103 AND FIELD REPAIR OF CATHODIC PROTECTION LINEPIPE EXTERNAL COATING OF SUBMARINE PIPELINES BY GALVANIC ANODES

RECOMMENDED PRACTICE RP-F203 COUPLED ANALYSES

RECOMMENDED PRACTICE RECOMMENDED PRACTICE RP-F204 RP-F205 RISER FATIGUE RISER COLLISION
DET NORSKE VERITAS

DET NORSKE VERITAS

RECOMMENDED PRACTICE RECOMM ENDED PRA CTICE RP-F10X RP-F1XX STRUCTURAL DESIGN OF RStability ECOMMENDED P RACTICE On Bottom HIGH PRESSURE/HIGH TEMPERATURE of pipelines RP - F1XX PIPELINES ECOMMENDED P RACTICE On BottomR Installation Stability calculation RP - F1XX Procedures of pipelines of pipelines On Bottom Stability Interference between Trawl gear of pipelines and pipelines

DET NORSKE VERITAS


DET NORSKE VERITAS DET NORSKE VERITAS DET NORSKE VERITAS

DET NORSKE VERIT AS

DET NORSKEVERITAS DET NORSKEVERITAS

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 19

Cooperation with the industry

DNV cooperate extensiveley with the pipeline industry, through JIPs, standardisation organisations, Universities, Committees, etc.
DNV is an active member in several pipeline standardisation and R&D organisations like ISO, ASME, API, NORSOK, NACE, PRCI, EPRG, etc

DNV has presently the President of NACE (Oliver Moghassi)


DNV runs an International Technical Offshore Pipeline Commitee

Det Norske Veritas AS. All rights reserved.

05 December Slide 20 2011

Det Norske Veritas

External DNV Pipeline Committee


Chairman: Colin McKinon (J.P.Kenny)

Operators:
BP ChevronTexaco Dong ExxonMobil Gasprom Gassco Mrsk Petrobras Shell Statoil Total Woodside

Manufacturer:
JFE-steel Tenaris VM tubes Tata-group Europipe

Regulators.
- PTIL - HSE GSI

Designers:
J. P. Kenny Atkins Boreas IntecSea

Contractors
Allseas Saipem Subsea 7 Technip Heerema

Universities:
NUS

21

Pipeline Software

FATFREE
- A professional engineering analysis software for free spanning pipelines - Based on the state of the art principles of the DNV RP-F105 for Free Spanning Pipelines

StableLines
- A professional engineering analysis software for pipelines on-bottom stability - Based on the state of the art principles of DNV RP DNV-RP-F109 - Making safe decisions on necessary weight simpler.

PET (Pipeline Engineering Tool)


- A professional engineering calculation tool for early phase pipeline assessment - Contains the following modules: DNV-OS-F101 Design Checks, Weight and Volume, End Expansion, Upheaval Buckling, On-Bottom Stability, Fatigue Screening, Reel Straining, Reel Packing, J-Lay, S-Lay, Cathodic Protection

SilverPipe
- A professional web based software for Pipeline Integrity Management - Pipeline Data Management - Risk Assessment - Inspection planning - Integrity Assessment - Condition & Change Assessment - Response and Mitigation activities - Organization and System effectiveness - Report generator
Det Norske Veritas AS. All rights reserved. 05 December 2011 Slide 23

Main Offshore Pipeline Service Areas


Early Phase Support Verification & Certification Pipeline Design & Engineering support Technology Qualification, Advisory and Specialist Services Project Management and Consultancy Services Technical Development & Research Pipeline Integrity Management inc. RBI

Re-qualification and re-assessment


Risk analysis and environmental impact analysis Supervision during Fabrication, Installation and Commissioning Material Testing & Consultancy Pipeline Control Systems (control software) Marine Warranty Surveys Pipeline Training Design and PIM Software

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 25

Pipeline Research & Development

Maintenance/update of state-of-the art Pipeline codes; Offshore Pipeline Standard OSF101 and associated Recommended Practices DNVs R&D services are used to customise pipeline theory into safe and cost effective solutions. Managing/performing Joint Industry Projects Development of Recommended Practices Development of analytical tools and methods Knowledge development & transfer Some recent JIP projects:

High Pressure / High Temperature Trawling Stability Free Spanning Pipelines Strain concentration due to concrete coating Deep pipe (s-lay in deep water) Laying Criteria Pipeline Integrity Management Corroded Pipelines Coatings & CP design Clad and lined pipes (Phase 1/2/3)
05 December 2011 Slide 32

Det Norske Veritas AS. All rights reserved.

Resent, ongoing and planned Pipeline R & D Projects


12 Internally funded project:

Recently completed projects:


EOIP: Pipelines for the future Pipeline technology for the next 10-15 years Residual stress / strain for pipeline girth weld under high strain (measure residual stress) Develop method for SENT test method for sour service Update of DNV-RP-106 External coating Development of RP for AUT System Qualification

Ongoing.
EOIP: X-Stream - Deepwater Pipelines Cost effective solution deep-water gas pipelines Update of DNV -OS-F101 Extended development of Silverpipe (Pipeline Integrity Management Software) Development of AUT workmanship style acceptance criteria Standard for verification and certification Onshore pipelines

In planning stage:
- EOIP - Floating pipelines

Det Norske Veritas AS. All rights reserved

05 December 2011

Slide 33

Resent, ongoing and planned Pipeline R & D Projects

19 JIP (DNV management):


- Recently completed: - HIPPS System Design - Ice pipe Arctic pipelines - Spiral Welded Pipes for offshore us (Phase 1 completed) - Ongoing: - Clad and liner pipe phase 3 - Pre-commissioning of pipelines - Pipeline Integrity Management (DNV RP-116) Phase 2 - HPHT pipelines (merging of Hotpipe and Safebuck) - ART ILI tool development - CO2 pipelines phase 2 - Treatment of residual stress in the ECA of pipeline girth welds under high plastic deformation - Fatigue of girth welds with defects - Reeling, ECA and sour service - Horizontal Directional Drilling - Pipeline spool design (Planning/ongoing) - In planning stage: - High strength steel (x80) & sour service - Corroded pipes (incl. update of DNV-RP-101) - Installation design and analysis - Design of concrete coating - Assessment of pipeline components

4 Other (not DNV managed):


MTI JIP Corroded pipes with complex shape corrosion (completed) NORSOK Lifetime extension offshore pipelines (completed) Sintef Fracture control Phase 2 (Ongoing) Safebuck (ongoing) PRCI un-piggable pipelines Planning
05 Decembe r 2011

Slide 34

Pipeline Training

DNV courses with external participants


In-house, tailor-made courses for clients Knowledge transfer related to pipeline codes and experience from various projects

Wide range of standard pipeline related courses:


Basic pipeline Pipeline Design Free span On-bottom stability Global Buckling Trawling Corroded pipelines Pipeline Integrity Management Cathodic protection and coating Materials Construction and Installation Pre-Commissioning and Commissioning
05 December 2011

Hydro

Det Norske Veritas AS. All rights reserved.

Slide 40

Pipeline Training - courses


Basic 2 days Trawling Interference - 1 day DNV-OS-F111 Corroded Pipelines 1 day DNV-OS-F101 PIM Offshore 2 days

Design 3 days DNV-OS-F101 Global Buckling 2 days DNV-RP-F110 Free Span - 2 days DNV-RP-F105

Cathodic Protection & Coatings 1 day

On-Bottom Stability 1 day DNV-RP-F109

OS-F101 Updated

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 41

Some Selected Projects References

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 42

Some Selected Recent Pipeline Projects

Oman-India (24, 3525m deep, 1400km long) Feasibility study


Blue Stream (24, 2150m deep, 2x380km long) Certification/Advisor Ormen Lange about 850m Advisor, verification, TQ, inspection, surveillance Langeled (42/44, 380m deep, 1200km long) Design/Installation verif.

Taichung-Tunghsiao-Tatan (36, 110m deep, 145km long) - PMC


Iran- India (24-26, 3700m deep, 1600km long) Feasibility study Blind Faith (16 and 18, 2134m deep, 2x60km long) Installation verf. Perido Norte (2x18, 2530m deep, 168 and 120km) Design/Installation verf.

Nord Stream (48, 220m deep, 2x1220km long) Certification


TAP (42, 820m deep, 115km long) FEED verification + various studies Reliance KG D6 Deep Water Project (up to 2000m) - Certification South Stream (4x32, 2150m deep, 900km long) FEED verification

IGI Poseidon (32, 1370m deep, 207km long) FEED verification


Det Norske Veritas AS. All rights reserved. 05 December 2011

Slide 43

The Blue Stream - Energy needs of Turkey

The industrialisation of Turkey


- Historically energy needs met through - Gas import from Russia via Balkan pipeline - LNG from Algeria - Crude oil import - Natural gas consumption - 10BCM in 1998 - Expected to reach 80 BCM in 2020 Challenges: - Competence, financing, insurance - Supply reliability

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 44

The Blue Stream Pipelines


2 lines; 16 BCM capacity 24 diameter (610 mm) 31.8 mm wall thickness 380/390 km long

0 -500 -1000 -1500 -2000 -2500

K.P. 15

2,150 m

Turkish side Russian side Abyssal Plain

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 45

The challenges

Water depth of 2,150 m


Sediments with high levels of H2S Seismic activity Landslides and sediment flow Difficult topography of the Russian coastal slope (very steep sloops) The required technological innovation The tight schedule Development of repair systems

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 46

Certification of Blue Stream


Certification Certificate of Compliance Blue Stream Pipeline System Statement of Compliance Design Fabrication Installation & Testing Verification

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 47

Ormen Lange and Langeled

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 48

Ormen Lange Field layout


Pigging loop / HP-RV Module In-line Tees HUBS for future hot-tap tees

20 spools

MULTIPHASE PRODUCTION LINE MEG LINE

N
05 December 2011

UMBILICAL

Det Norske Veritas AS. All rights reserved.

Slide 49

Ormen Lange Pipelines

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 50

Storegga slide area


TO SHORE
TOP OF SLIDE EDGE
WATER DEPTH = 250 m

DEVELOPMENT AREA
WATER DEPTH = 850 m

Survey coverage of the slide area


Det Norske Veritas AS. All rights reserved. 05 December 2011

10 KM
Slide 51

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 52

DNV pipeline SoW 2004/2005

Pipeline design verification


Project guideline VIV Hazid Pre-commisioning/RFO assistance Trawl protection pipelines/MEG/umbilicals Fracture arrest Environmental data verification Trawl Impact study Use of Beluga

Environmental data - current


Techn assistance MEG/30 installation contracts Independent verification analyses Fatigue testing Weld defects (ECA)

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 53

DNV pipeline SoW 2006

Pipeline design verification - continue


Techn assistance MEG/30 installation contracts

Studies:

Environmental data current


Independent verification analyses lateral buckling (abacus) Verification of pipelay in curves Fatigue safety factors during installation

MEG verification installation analyses


VIV benchmarking

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 54

Langeled

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 55

Langeled 42/44 gas pipeline

DNV Involvement:
Detailed Design verification Risk assessment Installation Surveillance Various other technical studies and support for Hydro/Statoil and Contractors

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 56

Nord Stream Pipeline Routing

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 57

DNVs Involvement in Nord Stream

Nord Stream AG is building 2 gas pipelines from Vyborg (Russia) to Greifswald (Germany) across the Baltic Sea.
- The 48'' pipelines will be the longest offshore pipelines in the world (ca 1220 km each).

DNV has verified the conceptual/FEED study of Nord Stream for Gazprom (2006). DNV has been engaged by Nord Stream AG since late 2007 to:
VERIFY that line 1 meets the requirements of DNV OS F-101 for: - design, - fabrication, and - installation

Upon successful completion of these phases, CERTIFY the pipeline system according to DNV OSS 301.

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 58

Blue Stream Pipeline Certification GASPROM


2 lines; 16 BCM capacity 24 diameter (610 mm) 31.8 mm wall thickness 380/390 km long

0 -500 -1000 -1500 -2000 -2500

K.P. 15

2,150 m

Turkish side Russian side Abyssal Plain

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 59

BS - Challenges

Water depth of 2,150 m


Sediments with high levels of H2S Seismic activity Landslides and sediment flow Difficult topography of the Russian coastal slope (very steep sloops) The required technological innovation The tight schedule Development of repair systems

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 60

Ormen Lange and Langeled Verification/Tech. Services

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 61

Ormen Lange Pipelines Norway deepest

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 62

Storegga slide area


TO SHORE
TOP OF SLIDE EDGE
WATER DEPTH = 250 m

DEVELOPMENT AREA
WATER DEPTH = 850 m

Survey coverage of the slide area


Det Norske Veritas AS. All rights reserved. 05 December 2011

10 KM
Slide 63

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 64

DNV pipeline SoW 2004/2005

Pipeline design verification


Project guideline VIV Hazid Pre-commisioning/RFO assistance Trawl protection pipelines/MEG/umbilicals Fracture arrest Environmental data verification Trawl Impact study Use of Beluga trenshing machine in deep water

Environmental data - current


Technical assistance MEG/30 installation contracts Independent verification analyses Fatigue testing Weld defects (ECA)

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 65

DNV pipeline SoW 2006

Pipeline design verification - continue


Techn assistance MEG/30 installation contracts

Studies:

Environmental data current


Independent verification analyses lateral buckling (abacus) Verification of pipelay in curves Fatigue safety factors during installation

MEG verification installation analyses


VIV benchmarking

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 66

Langeled World Longest Pipeline

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 67

Langeled 42/44 gas pipeline

DNV Involvement:
Detailed Design verification Risk assessment Installation Surveillance Various other technical studies and support for Hydro/Statoil and Contractors

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 68

Nord Stream - Certification

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 69

DNVs Involvement in Nord Stream

Nord Stream AG is building 2 gas pipelines from Vyborg (Russia) to Greifswald (Germany) across the Baltic Sea.
- The 48'' pipelines will be the longest offshore pipelines in the world (ca 1220 km each).

DNV has verified the conceptual/FEED study of Nord Stream for Gazprom (2006). DNV has been engaged by Nord Stream AG since late 2007 to:
VERIFY that the NordStream pipelines meets the requirements of DNV OS F-101 for: - design, - fabrication - Installation - Pre-commissioning

Upon successful completion of these phases, CERTIFY the pipeline system according to DNV OSS 301.
Det Norske Veritas AS. All rights reserved. 05 December 2011 Slide 70

Taichung-Tunghsiao-Tatan 36 Gas Export


Project Management and Consultancy Service for CPC
Tatan Power Plant

Two Offshore Pipeline Four Onshore Pipelines

36 existing offshore pipeline

Tunghsiao New 36 offshore pipeline

Onshore Facilities:
Receiving Terminals Meetering stations Filtering stations

Taichung terminal

26 onshore trunkline

Mixing and Distribution stations


Yung-An Terminal

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 72

Taichung-Tunghsiao-Tatan 36 Gas Export

Scope of Service for PMC Management includes:


- Pre-EPC Contract Phase - Pre-EPC Project Management - Basic Design/Engineering for Offshore Pipelines - Detailed Design for Onshore Facilities - Preparation of Tender Package - Evaluation of EPC Tender - Negotiation with potential contractors - Post-EPC Tender Phase - Post-EPC Project Management - Review and verification of detailed design by EPC Contractor - Onshore Fabrication Supervision - Offshore Installation Supervision - Pre-commissioning Supervision
Det Norske Veritas AS. All rights reserved. 05 December 2011

Segment 0-4

68 . (R 5899 FE 6) 8.

(R 5899 FE )

Segment 2

Segment 1 Tunghsiao

Segment 0-2 & 0-3

Taichung

Segment 0-1

Slide 73

Reliance Industries Ltd KG-DWN-98/3 Project (Krishna Godavari Block KG-D6) - Certification

CRP Computer Model


(from DNV Independent Analysis)

Water depth 400 2700 m


Pipelines / flowlines:
- Trunk lines (5), flowlines (21), MEG (3), vent (7). - Size ranging from 24 to 3.5

Subsea structures:
- 1 Deepwater PLEM; - 6 manifolds; - 9 Subsea Distribution Assemblies/units; - 1 umbilical distribution hub - PLETS

Umbilicals (11 nos) Control & Riser Platform


05 December 2011

Subsea wells
Slide 74

Det Norske Veritas AS. All rights reserved.

Project Highlights-2: History of DNVs Involvement

Work awarded to DNV on nomination, based on the past relationship with Reliance. DNV is perceived by RIL as most competent agency for many of the services related to the project. DNV has been the certification and verification agency for this project from Concept to Commissioning and helped Reliance in Quality, technology and integrity functions.
Concept and FEED (2002-2004): FEED Optimization & Updating (Year 2006-2007): Design, Fabrication, Installation, commissioing Phase (Year 2007-2009):

Use the risk based approach in verification according to DNV OSS 300
Certificate of Compliance issued at end of the project.

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 75

Project Activities- Multiple Locations Globally


Design review Subsea Control System Hovik, Norway Inspection of Subsea system Norway

Inspection of Line Pipes


Japan

Design review CRP Design Houston, USA Inspection of Jacket

Overall Project Management, Mumbai, India

Quantitative Risk Assessment & Hazop Studies Malaysia

Houston, USA

Inspection of Subsea equipment Inspection of Line Pipes Germany, France Malaysia Design review Main Singapore Inspection of other items: UK Houston Los Angeles Belgium Survey of Offshore Installations-India Italy Singapore

DNV has 7,000 employees

Inspection of Deck & Topsides


United Arab Emirates

DNV Energy 1,700 employees serving the energy industry from more than 40 locations worldwide
Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 76

The End

The frustration of bad quality last longer than the irritation of a high price

Det Norske Veritas AS. All rights reserved.

05 December 2011

Slide 77

Potrebbero piacerti anche