Sei sulla pagina 1di 10

REQUIREMENT OF LIBRARY

SCHEDULE OF SPACES

NO OF PEOPLE

EQUIPMENTS

ILLUMINATION

Neuferts/tss

NBC

Remarks (w.r.t. spaces)

public

Staff

Equipment name

no

watt

usage

total

interior required lux

day light factor

lighting fixture

ADMINISTRATION/BMS Directors cabin + toilet Accounts department Security department HR room Fire control room First aid department Staff rest room Toilets gents ladies Board Room Conference room/Discussion room

Requirement 1 1 1 1 1 1 1 1 1 1 1

Area of each (sq.m) 15 12 30 18 15 10 30 as per design as per design 30 50

Total area (sq.m) 15 12 30 18 15 10 30 2 1 2 2

lower floor parking lightting fixture

2 batwing louvered, fan 1 batwing louvered, fan 4 batwing louvered, fan, 2 batwing louvered, fan 2 batwing louvered, fan 1 batwing louvered, fan 4 batwing louvered, fan
passive passive passive

10

30 50

7 1

4 batwing louvered, fan 6 batwing louvered, fan

passive passive passive

FINANCE finance departemnt security cabin 1 1 1 1 1 20 10 30 30 50 20 10 30 30 50 1 1 2 batwing louvered, fan 1 batwing louvered, fan 4 batwing louvered, 4 batwing louvered, 6 batwing louvered,

passive

passive

STORAGE Cold storage wet storage dry storage BILLING COUNTER & DISPATCH AREA No.of billing counter are
INVENTORY passive

as per design 1 20 20

1 2

troffer, monitor,scanner,cctv camera

SECURITY Checking counter baggage counter security cabine as per design as per design as per design 1 as per design 20 20 1 1 1

17

653

passive

41

12756

active cooling system passive passive

7 8

BMS ROOM ACHV

17 8

653 634

10

VERTICAL TRANSPORTATION

Circulation area (area not to be included in built up area) 11 SERVICE AREAS Service corridoors Gents toilets Ladies toilet Janitor's toilet (4 nos.- 5sq m each) Handicapped WC Freight lift Freight lift lobby Passenger lift Passenger lift lobby Escalators Staircase Fire exit Staircase AHU room Electrical Panel room Loading unloading area 12 STAFF AREA

25%

11 8 6

401 539 203 467

as per design as per design as per design as per design as per design as per design as per design as per design as per design as per design as per design as per design as per design as per design as per design

12

972

acitive passive

203

MIDC - Revised development Control Regulation 2009 One space for every 150 Sq.m.of total floor area. 25% of total parking space for visitors 25% of total parking space for 2- wheeler parking Total The norms of parking spaces shall be increased by 25% in case of Mumbai, Nagpur, Pune and Nashik Metropolitan Regions. DC rules old limit Congested area Beds 4- wheeler 2- wheeler Cycle 300 45 30 60 FSI 40,000 Nos. 267 67 67 400

Auditorium - 150 capacity DC rules old limit Congested area Capacity 4- wheeler 2- wheeler Cycle 1 Per 4 seats Auditorium - 150 capacity DC rules old limit Congested area Capacity 4- wheeler 2- wheeler Cycle 150 30 60 10 150 4 30 15 37.5

Final requirement to be considered doubled the requirement which are mentioned in the DCR 90 180 (cycle doubled and added the nos in 2 wheelers)

Final requirement to be considered

Final requirement to be considered 3 nos. per car 1 per 2 wheeler For cleaners

Water consumption per day Water Closet Total staff Total student 100 student per department assume water consumption is designed for 75%=780 person per day Total Usage Every Flush Total uses 20% of 7525 uses are for solid waste 80% of 7525 uses are for liquid waste add 5% for flushing solid waste add 2% for flushing liquid waste the total water consumption is

= =

40 1000

nos. nos.

= = = = = = = = = = = 1040 5 6 3 3510 702 2808 737.1 2864.16 185250 nos. times litres for solid waste litres for liquids waste usage litres/day litres/day litres/day litres/day litres/day

Wash Hand Basin

Sr. No.

Activity Water Closets As per the calculated requirements, occupancy in the offices is 1800 considering 50% male and 50% female Usage frequency of males using the toilet per day Liters/flush for solid waste Ablution taps (3 litres per use)males frequency of females using the toilet per day Ablution taps (3 litres per use)females Liters/flush for solid waste Total requirement (litres / day) Wash basin Total requirement (litres / day) Urinals No. of employeesincluding staff and floating population Total requirement (litres / day) Kitchen sinks Total requirement (litres / day) Drinking water fountains Water consumed per person Total requirement (litres / day) Cooking Usage : Assume water required per day per person Total requirement (litres / day) Cleaning Water required in (ltr/sqm)

Area in sq m

WC- male - 1 for every 25 persons or part thereof exceeding 15, for females - 1 for every 15 pers

2500

Total requirement (litres / day) Water required for office purpose per day = required water storage capacity for 1.5 days 18237 27355.5 27355.5

Total population of mall = (fix+total)=3180 Activity Water Closets As per the calculated requirements, occupancy in the offices is 1800 considering 50% male and 50% female Usage frequency of males using the toilet per day Liters/flush for solid waste frequency of females using the toilet per day Liters/flush for solid waste Total requirement (litres / day) Wash basin Total requirement (litres / day) Urinals No. of employeesincluding staff and floating population Total requirement (litres / day) Cleaning total floor area assumed Total requirement (litres / day) Cleaning 6000 Area in sq m

WC- male - 1 for every 25 persons or part thereof exceeding 15, for females - 1 for every 15 pers

Water required in (ltr/sqm) Total requirement (litres / day) Landscape Considering softscapento be 70% of the area Total requirement (litres / day) Water required for office purpose per day = required water storage capacity for 1.5 days total water requirement for commercial hub approx size of tank required=

5000

4200

52515 78772.5 78772.5 106128 height 3

UGWT sizing for office purpose As per calculated, required water storage capacity for office = 27.35 cu.m assume approximate required capacity as 28 cu.m Hence, tank size - 3.8 x 5 x1.8 = 34.2 cu.m UGWT Size = 34.2cu.m UGWT sizing for mall purpose As per calculated, required water storage capacity for mall = 78.72 cu.m assume approximate required capacity as 79 cu.m Hence, proposing no. of tanks as per design

liters

Total in Nos.

No. of times

Total Water usage in liters

for females - 1 for every 15 persons or part thereof exceeding 10 0 1 6 3 3 6 2.5 35 35 58 58 90 2 1 1 1 174 348 837 450 450 2.5 0.5 35 900 2 1 175 175 450 450 210 105

1800ppl 3600

0.25

900

225 225

0.25

10

12500

12500

27.3555 cu.m

liters

Total in Nos.

No. of times

Total Water usage in liters

for females - 1 for every 15 persons or part thereof exceeding 10 0 1 6 6 15 1 15 90 180 90

2.5

25

63

2.5

29

72.5 73

0.25

12000 12000

0.25

15000 15000

25200 25200

78.7725 cum 106.128 cum area 26.2575

Potrebbero piacerti anche