Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
0)
SITE ADMINISTRATOR FEATURES *ite admin is the super user of the system Can create.delete 'omains Can create.delete.rename (ro#ects -ach pro#ect is a separate set of tables Can create users at global level Can modify the license details /icense files are supplied by &ercury Interactive Can modify the server locations Can set global configuration settings
SITE ADMINISTRATOR
CREATION OF DOMAIN
CREATION OF PROJECT
CREATION OF USERS
10
11
QUALITY CENTER (QC 10.0) PROJECT ADMINISTRATOR FEATURES $irst step is to customize pro#ect specific codes 0Customize1 Can create different user groups 0*etup 2ser +roups1 -ach user group can be given access rights for different portfolio 0(ermissions1 ,ccess rights are mainly add, modify, delete, vie! and administer ,ccess rights can be given right at the field level of every module 3ne can define access rights for add.modify.delete test assets Quality Center provides modification rights, to field by field level ,dd users from global user list and map them to user groups 0setup users1 Can customize pro#ect entities, by altering attributes of system defined fields and user defined
fields 4 label, history and &asked can be modified as !e need
2ser defined fields can be string, date, or list of values Can maintain different list of values for priority, severity, version, status codes etc Can configure email alert options
12
CUSTOMI;ATION <INDO<
PROJECT USER FEATURES -ach pro#ect 2ser !ill be sho!n !ith menu items, that are enabled based on
the access rights -ach user is attached to one or more user groups and inherits all the access rights of those groups Workflo! is defined internally to take the user through specific process steps
-mail notifications are made to alert and notify the users -ach user can access one of the four available options 4 )equirement, (lan,
est /ab, 'efects *earch and filter is available across all options
*tandard reports are built-in !ith the product 2sers can customize required graphs as and !hen needed )eports can be saved in 5 &/ or te"t formats he !orkflo! is initially set by the pro#ect admin and every user goes through
this !orkflo! based on access rights
13
14
15
CONFIGURE MAIL
Quality Center enables you to automatically notify users via e-mail, !hen changes are made to specified defect fields 16
17
,ll pro#ect requirements are added in a tree like fashion, arranged hierarchically We can maintain parent-child relationship of requirements )equirements I' can be made auto generated 'ata entry happens like !e enter in spreadsheets 'etailed description, priority, type, attachment etc can be provided and history !ill be
maintained
(erson in-charge to revie! the requirements can modify status accordingly )equirements can be mapped to test cases through coverage vie! )equired columns can be made visible
18
DOCUMENT :IE<
TEST PLAN
19
Create est folders 0scenarios1 in tree fashion and attach test cases at leaf level nodes 3ne can vie! in tree mode or grid mode
est folders can have description and attachments est cases !ill have detailed description, steps, priority, attachments, author
)equired columns can be made visible 9ased on settings, history !ill be maintained !hen test cases are modified
est case can be manual or automated tests ' test case can be mapped to Win)unner, /oad)unner, ;isual ,(I, ,stra /oad test or *ystem tests est cases can be separately emailed
20
21
22
TEST LAB
Quality Center est /ab &anager allo!s scheduled tests to run unattended, overnight or !hen the system is in least demand for other resources. 9y defining dependencies bet!een tests, users can realistically emulate real-life business processes, !hile making it easier to maintain and reuse the tests.
3ne can create test sets 0test rounds1 and associate test cases to that test set and provide
planned start and end dates
2sing -"ecution +rid, one can map the test cases to the test set 3ne can assign planned e"ecution date, tester, and host machine for that test as part of test
run
esters can feed the test run details 0actual results1 as part of test run for each test step along !ith pass or fail status
,utomated tests !ill launch the test automation tool and run the associated test script
est e"ecution flo! can document and run automated test suites
25
26
DEFECT MANAGEMENT
Quality Center 'efect &anager supports the entire defect life cycle - from initial problem detection through fi"ing the defect and verifying the fi". his ensures that no defect is overlooked or closed before it has been addressed. 9efore any ne! defect is submitted, Quality Center checks the database for similar defects, minimizing duplicate defects and eliminating the need for manual checking.
,dd defects by providing description, priority, severity, attachments, version code, and status code 9ased on !orkflo! as per defined process, the defect !ill be taken through the cycle 4 3pen,
$i", )etest, Close
(ro#ect admin must configure the status change permissions to define bug !ork flo! -mail notifications happen as and !hen certain fields are modified 0as defined by pro#ect
admin1
'etailed bug history is maintained *elective emailing as !ell as standard reporting are available 'isplay of required columns and filtered display are also available 9ugs can be saved in html, e"cel, !ord or te"t files
27
DEFECT DETAILS
28
,s part of ,nalysis, !e can generate reports and graphs on requirements, test plans.cases,
test sets and defects
We can generate custom reports by providing filter, sort and group conditions +raphs can be vie!ed in pie chart or bar chart +raphs can be configured based on sum or count of key fields
REPORTS
29
GRAP#S
GRAP# <I;ARD
30
REQUIREMENT REPORT
31
32
33
DEFECTS = REPORT
DEFECTS = GRAP#S?
34