PROJECT MEETING
DATE
TIME
VENUE
: No. 8
: 17th September 2013
: 12.55pm 2.45pm
: Meeting Room @ MMAS Office
Members Present:
1) Norabid Omar
2) Wei Jia Wen
3) Mohamad Shamsuddin
4) Mohd Khairiul Ezwan
5) Aida Shafawati
6) Mohd Fikri
7) Nurul Haziella
8) Noor Zairie
Absent With Apologies :
1) Nur Syafini
ITEM
1.0
2.0
2.1
2.2
MATTER OF DISCUSSION
INTRODUCTION
Principal called for meeting in order at 12.55pm
NKRA
Data Focus (Sub-pakej 7)
- permohonan untuk dijalankan ujian oleh pihak Emasjasa.
BTAS (sub-pakej 2)
ACTION
DATE LINE
REMARKS
Info
Abid
Abid
9/10/13
2.3
2.4
2.5
2.6
2.7
2.8
3.0
4.0
5.0
6.0
7.0
- BOMBA
Warisan Athira
- Material Approval (reminder from Aida Ramli email on
28/8/13)
My Hijrah ( Sub-pakej 8)
- SMK Paduka Tuan
a. Site condition comment from Pengetua
b. To get PIC to communicate with us about the status
KH Majubina (Sub Pakej 3)
- Permohonan Lanjutan Masa No.2 (letter on 5/9/13)
EOT & schools handing over matters
- Format EOT to get from Aida Ramli
To issue letter to KPM regarding of appoint 3rd party for
contractor (Tenaga Arah & Alor Setar Saujana)
Senarai sekolah yang bermasalah / tergendala
(discussed with En.Abid)
Wen
Abid
Urgent
Wen
Wen
Din
Abid
Kyo
- Done.
Principal
- Done.
Wen
Abid
Done. Collected on 2/10/13
- OSC Meeting attended
8.0
PAJAM
9.0
10.0
11.0
12.0
12.1
- in principal approval
- full council meeting on 30/9/13 for
penyerahan kelulusan pelan.
- According to J.Bangunan payment to
be made prior to plan endorsement.
Abid
- submitted (PH2)
- Already discussed with Hj.Atan. PIJ
will issue letter of appointment for PH3
proposal.
- KM submission pending
- approval of TNB compact sub as
appeal by HSK & PIJ
Abid
TEBRAU TEGUH
Botanica Sales Gallery (according to minutes meeting CCM No.1)
Submission to Authority
MMA to proceed with submission in 2weeks time 19/9/13 as
temporary building
- done
-not yet submit
- plan endorsed & obtained forwarded to
owner
-RC plan & calculation to submit
- already inform Proteam to prepare (2
weeks)
Abid
19/9/13
12/10/13
12.3
12.4
12.5
12.6
12.7
12.8
13.0
13.1
Early Commencement
MMA to advice BBD for early commencement after TP
submission
MMA to pre-consult with MBJB about early commencement
Project Cost Plan
MMA to advice design input to meet the budget
Design Matters
MMA to resubmit design report as per latest comment
MMA to improvise the design to meet project cost.
Next Meeting (CCM No. 2) 19/9/13
Basic drawing to follow up with Oton, once ok to distribute to all
consultant
Oton to prepare floor area calculation
To request submission documents from the Client
BUKIT GAMBIR
Submission
Kebenaran Merancang (to recommend to Mr. Tee)
Kerja Tanah
Building plan
- bit police & guard house
T.I.A & S.I.A report
SBKS
13.2
Preliminary drawings
i.
Bit police
ii.
Guard house /entrance
iii.
Shop office
iv.
Terminal
14.0
9/9/13
- in process
Principal
Din
19/9/13
12/9/13
Oton
RAF Consult
MMA
VV
(pending)
VV
(pending)
12/9/13 (Thu)
15.0
15.2
UTM Space
Letter of appointment
16.0
SAP Ph2D5
3STH dry kitchen wall to be tiles finished.
Height of house fencing COW to check and confirm as per
construction drawing.
Detail milestone and physical work program Block 15 by UMLB.
- refer work program from progress report
EOT No.3
M & E size of TNB meter compartment to confirm (PCM)
- TNB said ok, to issue instruction to contractor
Submission
Submission permit sementara (works quarters)
PVO/VO
Pending signature from Principal
SAP PH3C2
S&P drawing
Fencing
i.
Also was revised and to amend as per comment and site table
(for PS submission & Tender drawing) & to reduce green wall
comment about landscape meeting with Kyo on 9/5/13.
ii.
Change of perimeter fencing & guard house at tender based on
perspective.
iii.
Mr. Freddie concern about the maintenance.
16.1
16.2
17.0
17.1
17.2
18.0
Road Names
road names & house number proposal
SERI AUSTIN PH1G (Sales Galley)
Had to ask for keyplan from C&S.
- key plan to go through today
There is some issue with the structure, site plan, setting out, and
etc that has to amend and look back.
Kyo
10/9/13
(tues)
Aida
- Done
Ziella
9/9/13
Abid
15/7/13
9/9/13
18.1
18.2
19.0
19.1
SAP PH5B4
Temporary Permit
i.
Hoarding + signboard + site office
ii.
Guard house & perimeter fencing (critically long overdue)
iii.
Road name to get client approval
iv.
Pre-consult check with Majlis : house no.
19.2
4th Schedule
19.3
20.0
20.1
20.2
21.0
22.0
22.1
SAP PHSP3
Submission :
i.
KM Submission
Din
Wen
9/9/2013
11/9/2013
30/8/13 13/9/13
17/9/13
1/10/13
2/10/13
1/4/14
Wen
Ziela
26/9/13
9/9/13
1/8/13
Wen
Info
- submitted on 26/9/13
- Done. Ready for submission.Pending
signature SAP
- Tiles issues. To setup back and inform
the client
Feb 2014
Commencement date will be 23/9/2013.
Done. Submit during handling over and
1st site meeting on 23/9/2013.
- Done. Discussed & email to Pulai
22.2
22.3
22.4
22.5
22.6
22.7
23.0
Design
MMA scope of work :
Phase 1 house + entrance statement
Phase 2 House + clubhouse
SAP Requirement
Building to building 30 minimum (9m)
Structure - wall precast
- Party wall precast w/out hollow.
M&E
Special street lighting design
Building electrical supply single phase
11/9/13
25.0
(Wed)
SAP PH3C1
Submission
i.
Hoarding / signboard
ii.
TNB (single or double chamber)
iii.
Guardhouse & perimeter fencing
Wait for client comment (design confirmation)
Din
SAP PH5A4
Illustration perspective
- color scheme & few comments
Din
11/9/13