Sei sulla pagina 1di 101

ANEXO 12

ESTUDIO GEOTCNICO PILA DE LIXIVIACIN






PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1 3 de 100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx



NDICE

1.0 INTRODUCCIN ...................................................................................................... 4
2.0 ANTECEDENTES .................................................................................................... 5
3.0 OBJETIVOS ............................................................................................................. 7
4.0 ALCANCES .............................................................................................................. 7
5.0 DESCRIPCIN GENERAL DEL DEPSITO ........................................................... 7
6.0 PARMETROS GEOTCNICOS PARA EL ANLISIS DE ESTABILIDAD ........... 10
7.0 ANLISIS DE ESTABILIDAD ................................................................................ 11
7.1 METODOLOGA ....................................................................................... 11
7.2 SECCIONES ANALIZADAS ...................................................................... 13
7.3 HIPTESIS DE CLCULO ....................................................................... 17
7.4 CONDICIONES ANALIZADAS .................................................................. 19
7.5 CRITERIOS DE ACEPTABILIDAD ............................................................ 19
8.0 RESULTADOS ....................................................................................................... 20
9.0 CONCLUSIONES ................................................................................................... 24

ANEXO A: ANALISIS DE ESTABILIDAD SUPERFICIES DE DESLIZAMIENTO. ETAPA INICIAL
ANEXO B: ANALISIS DE ESTABILIDAD SUPERFICIES DE DESLIZAMIENTO. ETAPA
INTERMEDIA
ANEXO C: ANLISIS DE ESTABILIDAD SUPERFICIES DE DESLIZAMIENTO.
CAPACIDAD MXIMA






PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1 4 de 100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


1.0 INTRODUCCIN
El proyecto Lobo Marte se ubica en la III Regin, al este de la ciudad de
Copiap, a una distancia del orden de 209 km, y a una altura aproximada de
4.000 msnm. El proyecto considera la explotacin de mineral de oro desde dos
rajos (Lobo y Marte), la recuperacin de oro y de cobre mediante un proceso
de lixiviacin en pila permanente y producir oro en barras de metal dor y,
como subproducto, precipitado de cobre. El procesamiento de mineral ROM
proveniente de ambos rajos se efectuar a una tasa de 47 ktpd, el que ser
posteriormente chancado y aglomerado para someterlo a la operacin de
lixiviacin.

De acuerdo a los antecedentes disponibles en la Ingeniera de Prefactibilidad,
la capacidad total requerida para la pila es de 152 Mton secas de mineral de
oro y cobre. En dicha etapa de la Ingeniera se defini el emplazamiento de la
pila de lixiviacin al este de los rajos Lobo y Marte, muy cercana a la pila de
lixiviacin existente, en una ladera de cerro con pendientes naturales del
orden de 0,5% hacia el norte y 2,5% hacia el oeste. La ubicacin seleccionada
permitira el escurrimiento por gravedad de las soluciones ricas hacia las
piscinas y la recepcin de soluciones en los bordes de menor cota y en las
confluencias de mximas descargas.

La geometra de la pila considera un rea basal de aproximadamente 2.394 m
de largo por 828 m de ancho y una altura total de la pila de 72 m, conformada
en principio por 9 niveles de 8 m cada uno.

La ubicacin del Proyecto, tanto por consideraciones climticas como
ambientales, requiere que se preste una atencin particular al diseo de los
sistemas de impermeabilizacin, de drenaje y de recoleccin de soluciones,




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1 5 de 100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


as como para la seleccin de la geometra y orientacin de la pila, que
permitan una adecuada constructibilidad de los sistemas mencionados, una
optimizacin del conjunto de los recursos, y la reduccin de riesgos en las
etapas de construccin, de operacin y de cierre.

En el presente documento se evala la estabilidad de la pila de lixiviacin
proyectada.


2.0 ANTECEDENTES

Ref. 1 : Geo-Slope International Ltd. (2008): Stability Modeling with
SLOPE/W 2007 Version. An Engineering Methodology. Fourth
Edition.

Ref. 2 : Kramer, S. (1996), Geotechnical Earthquake Engineering, Prentice
Hall Inc. 653 pp.

Ref. 3 : Day, R. (2001). Geotechnical Earthquake Engineering Handbook.
McGraw-Hill Edition.

Ref. 4 : Saragoni, R. (1993). Anlisis del Riesgo Ssmico para la
Reconstruccin del Puerto de Valparaso. Sextas J ornadas
Chilenas de Sismologa e Ingeniera Ssmica, Vol. 2. Santiago,
Chile.

Ref. 5 : ARCADIS. (2011). Base de datos de otros proyectos.





PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1 6 de 100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Ref. 6 : Bard, E. & Campaa, J . (2004): Aspectos Geotcnicos en el
Desarrollo de Pilas y Botaderos de Ripios Lixiviados. V Congreso
Chileno de Ingeniera Geotcnica. Santiago, Chile.

Ref. 7 : Bard E., Campaa J ., Garrido H (2003): Caracterizacin Interfaz
de Material Granular y Geomembrana. 12ava Conferencia
Panamericana de Mecnica de Suelos e Ingeniera Geotcnica.
Cambridge USA, J une 22 26, 2003. Vol. 2, pp 1405-1410.

Ref. 8 : Redy, D.V. & Butul, B. (1999). A Comprehensive Literature Review
of Liner Failures and Longevity. Florida Center for Solid and
Hazardous Waste Management. University of Florida.

Ref. 9 : Twede, Mark. (1999). Stability of Reclaimed Ore Heaps with
Geomembrane Lining Systems. Publicacin presentada en 16th
Annual National Conference of ASSMR, Scottsdale, Arizona.

Ref. 10 : AMEC. (2011). Prefeasibility Study Consolidated Report. Lobo
Marte Project. Kinross Gold Corporation.

Ref. 11 : Golder Associates (2011): Lnea Base Hidrogeolgica e
Hidrolgica Proyecto Lobo Marte y Modelo Hidrogeolgico Sector
Cinaga Redonda. Mayo 2011

Ref. 12 : McClellan Laboratories, Inc. (2011): Report on Heap Leach
Cyanidation Testing Lobo Marte Drill Core Composites and Bulk
ore Sample MLI J ob N3352, February 18, 2011.





PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1 7 de 100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Ref. 13 : Andrade C., Bard E., Garrido H. & Campaa J . (2001): Radomiro
Tomic Secondary Heap Leach Facility. Slope Stability in Surface
Mining. Society for Mining Metallurgy (SME). J anuary 2001. 442 pp.

Ref. 14 : SNC Lavalin: SP911641-000-45EG-0001 Site Conditions /
Condiciones del Lugar

3.0 OBJETIVOS
Validar el diseo de la pila de lixiviacin proyectada, mediante un anlisis de
estabilidad para los casos estticos y pseudo-estticos.

4.0 ALCANCES
El alcance de este estudio comprende la evaluacin de la estabilidad de la pila
de lixiviacin, mediante la aplicacin de mtodos de equilibrio lmite para
perfiles bidimensionales, considerando los siguientes casos:

Caso Esttico. Condicin Drenada
Caso Ssmico. Condicin Drenada (pseudo-esttico)
Caso Esttico. Condicin No Drenada (Licuefaccin Esttica)

Sobre la base de los resultados obtenidos, se verificar que la pila de
lixiviacin cumpla con los criterios de aceptabilidad adoptados para esta obra.

5.0 DESCRIPCIN GENERAL DEL DEPSITO
La pila de lixiviacin tendr una capacidad 152 Mton secas de mineral de oro y
cobre, las que sern extradas en 10 aos, de acuerdo a la planificacin
proyectada.




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1 8 de 100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx



La pila de lixiviacin abarca un rea basal aproximada de 2.394 m de largo por
828 m de ancho, alcanzando una altura total de la pila de 72 m conformada
por 9 capas de 8 m de altura con bermas de 10 m de ancho.

La pila se proyecta con una pendiente transversal de 2,5 % y longitudinal de
0,5 % en direccin de sentido de escurrimiento, ajustndose a las pendientes
naturales del terreno.

El carguo del mineral se ejecutar mediante un spreader de tipo radial, en el
sentido longitudinal de la pila alimentado por una correa recta, en franjas de
90 m de ancho.

El sistema de drenaje y evacuacin basal de la pila de lixiviacin presenta las
siguientes caractersticas:

El sistema de drenaje est compuesto por tuberas de HDPE 4,
ranuradas y perforadas, insertas en una capa de material drenante
denominado cover espaciadas cada 3,5 m.
El sistema de evacuacin basal se encuentra compuesto por tuberas de
HDPE 15 ranuradas y perforadas, insertas en una zanja drenante
espaciadas cada 100 m.
El material drenante denominado cover estar compuesto por material
seleccionado de alta permeabilidad.

Bajo el sistema de drenaje de la pila de lixiviacin se ubicar una
geomembrana de LLDPE doble texturada de 1,5 mm de espesor.
Perimetralmente, se utilizar una geomembrana de HDPE de 2,0 mm de




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1 9 de 100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


espesor, texturado simple contra terreno. Adicionalmente, bajo la
geomembrana se colocar una cama de apoyo de 0,3 m de espesor de
material de baja permeabilidad.

En la Figura 5-1 se presenta la ubicacin en planta de la pila de lixiviacin,
respecto al rea del proyecto.

Figura 5-1: Ubicacin pila de lixiviacin.








PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
10 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


6.0 PARMETROS GEOTCNICOS PARA EL ANLISIS DE
ESTABILIDAD
Las propiedades geotcnicas de los ripios que conforman la pila de lixiviacin
se adoptaron en base a los resultados de ensayos de laboratorio de estos
materiales (Ref. 11) y a la experiencia del consultor en faenas similares a Lobo
Marte. Se debe destacar que el mineral ser aglomerado con cal y cemento, lo
que permite presumir que tendr un comportamiento preferentemente
drenado.

Los parmetros de resistencia al corte de la interfaz Geomembrana Cama
de apoyo se adoptaron en base a antecedentes reportados en la literatura
tcnica para geomembranas HDPE y LLDPE (Ref. 6 y Ref. 13). Para lo
anterior, se llev a cabo un anlisis de sensibilidad considerando dos valores
del ngulo de friccin para la interfaz Geomembrana Cama de Apoyo: se
tomaron los valores de 18 y 22, considerados como fronteras lmites de baja
y alta resistencia, respectivamente.

Dado que el nivel fretico en el suelo de fundacin se ubica a profundidades
del orden de 58 m a 102 m de profundidad bajo el rea de pila (sondajes
hidrogeolgicos RPG 20; RPG 40; RPG 41 y RPG 42) (Ref. 12), considerando
que la base de los depsitos ser impermeabilizada y que el suelo de
fundacin est compuesto por materiales granulares con bajo contenido de
finos (Ref. 12), se asume que estos materiales presentarn siempre un
comportamiento drenado. Por otro lado, para los anlisis de estabilidad este
material se ha considerado como impenetrable, es decir, las potenciales
superficies de deslizamiento no se desarrollan a travs del basamento aluvial.
Con lo anterior, las potenciales superficies de deslizamiento se desarrollan




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
11 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


preferentemente en el contacto de la interfaz Geomembrana Cama de
apoyo.

En la Tabla 6-1 se presenta un resumen de los parmetros considerados para
los anlisis de estabilidad.

Tabla 6-1: Propiedades Geotcnicas adoptadas en los Anlisis de Estabilidad
Material
Peso
unitario
Contenido
de humedad
ngulo
de
Friccin
Cohesin
Razn de
Resistencia
No Drenada

t
(t/m
3
) e () | () c (t/m
2
) S
u
/ o
v

Mineral sin Riego
(condicin drenada)
1,72 8 38 0 -
Mineral bajo Riego
(condicin drenada)
1,76 10 38 0 -
Mineral bajo Riego
(condicin no drenada)
1,76 10 - - 0,25
(Ref. 6)

Interfaz Geomembrana
Cama de apoyo (*)
2,00 - 18 / 22 0 -
Cover 1,80 - 38 0 -
Su: resistencia no drenada v: Presin vertical efectiva
(*). Incluye geomembrana y capa de arcilla de 0,3 m

7.0 ANLISIS DE ESTABILIDAD
7.1 METODOLOGA
Los anlisis de estabilidad se efectuaron mediante mtodos de equilibrio
lmite. Estos mtodos permiten asociar un factor de seguridad a una potencial
superficie de deslizamiento con una geometra definida. El factor de seguridad
es dependiente de la geometra de la potencial superficie de deslizamiento, de
las propiedades de resistencia al corte y de las condiciones particulares que
presenta la situacin analizada (presiones de poros, sobrecargas,
solicitaciones ssmicas).




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
12 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx



Los anlisis bidimensionales se desarrollaron mediante el programa SLOPE/W
2007, el cual permite establecer los factores de seguridad asociados a un gran
nmero de potenciales superficies de deslizamiento. Este programa tiene,
entre otras, las siguientes capacidades:

Evaluar geometras con varios tipos de suelos con distintas propiedades
geotcnicas,
Adoptar distintos modelos de resistencia al corte de los suelos,
Analizar el caso ssmico mediante un anlisis pseudo-esttico,
Analizar distintos tipos de superficies de deslizamiento (planas, circulares,
o definidas por el usuario),
Verificar los resultados con distintos mtodos de equilibrio lmite (Bishop,
J anbu, Spencer, Morgenstern-Price, etc.).

Para evaluar la estabilidad de la pila durante la ocurrencia de un evento
ssmico, se utiliz un anlisis pseudo-esttico. Este anlisis consiste en
imponer fuerzas horizontales al potencial volumen de deslizamiento, que
representan las fuerzas ssmicas inerciales. Estas fuerzas, que son
proporcionales a la masa deslizante, se definen a travs de coeficientes
ssmicos.

Los factores de seguridad reportados en este estudio son calculados mediante
el mtodo de Spencer, el cual se basa en un anlisis que considera el
equilibrio de fuerzas y de momentos. Se debe destacar que este mtodo es
ms riguroso que el de J anbu o Bishop.





PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
13 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


7.2 SECCIONES ANALIZADAS
Se analiz la estabilidad de la pila para tres etapas: inicial, intermedia y
capacidad mxima, es decir, capa N2, N4 y N9, respectivamente. Se
seleccionaron las secciones ms representativas del depsito considerando
los casos a favor y contrapendiente, para 2,5 % y 0,5 %. En la Figura 7-1 se
presentan la ubicacin de los perfiles seleccionados en planta para la
capacidad mxima de la pila.

Figura 7-1: Ubicacin perfiles seleccionados para los anlisis de estabilidad.
Capacidad mxima




En la




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
14 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 7-2 se presentan los perfiles seleccionados para el anlisis de
estabilidad para la etapa de capacidad mxima (9 capas)






PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
15 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 7-2: Perfiles seleccionados. Capacidad mxima




En las siguientes figuras se presenta el modelo geotcnico tipo para la
Seccin B, para las condiciones drenada y no drenada en la etapa de
capacidad mxima.















PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
16 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 7-3: Modelo geotcnico, caso drenado. Seccin B


Figura 7-4: Modelo geotcnico, caso no drenado. Seccin B






PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
17 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


7.3 HIPTESIS DE CLCULO
7.3.1 Nivel fretico
El sistema de drenaje de la pila se ha diseado de modo que el nivel fretico
generado por la operacin de lixiviacin quede circunscrito al interior del cover,
es decir, con un mximo de 0,7 m.

Sin embargo, conservadoramente se ha considerado la presencia eventual del
nivel fretico a 1,0 m sobre el nivel del cover y en aquellas zonas en que el
grado de saturacin pudiese alcanzar el 85 %.

7.3.2 Lixiviacin
De acuerdo a lo establecido, el mineral que conforma la pila de lixiviacin ser
sometido a riego en cada capa por franja. El periodo de riego se estima en
60 das.

7.3.3 Licuefaccin Esttica
Conservadoramente, se ha asumido que el mineral que conforma la pila de
lixiviacin con alto grado de saturacin (mayor o igual a 85 %) es susceptible a
presentar el fenmeno de licuefaccin esttica. De acuerdo a la interpretacin
de los resultados de ensayos carga / permeabilidad reportados en la Ref. 12,
la densificacin que experimentan los ripios bajo una carga equivalente a 6
capas (48 m de espesor) puede generar un grado de saturacin de estos
materiales del orden de 85 %, para las humedades remanentes reportadas
(10 %). Este grado de saturacin resulta favorable para el desarrollo de la
licuefaccin esttica. De este modo, para efectos de anlisis, se consideran
propiedades de resistencia al corte no drenada para los materiales que son
susceptibles a presentar licuefaccin esttica.




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
18 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


7.3.4 Coeficiente Pseudo - Esttico
La estabilidad de la pila de lixiviacin durante la ocurrencia de un evento
ssmico se evalu a travs de anlisis pseudo - esttico, en los cuales el
efecto del sismo se simula mediante fuerzas inerciales horizontales aplicadas
a la potencial cua de deslizamiento. Estas fuerzas, proporcionales a la masa
de la cua de deslizamiento, se definen a travs de coeficientes ssmicos. En
la prctica habitual del anlisis de estabilidad de taludes, se adopta un
coeficiente ssmico horizontal, k
h
en funcin de la aceleracin mxima de
campo libre. Los criterios de seleccin se basan principalmente en el buen
juicio y la experiencia. Un criterio habitual es adoptar un coeficiente ssmico
vertical, kv, nulo, ya que en la prctica ste tiene una escasa influencia sobre
los factores de seguridad finalmente calculados.

Los estudios efectuados por Saragoni (Ref. 4) indican que para sismos de
aceleracin mxima inferior a a
max
<0,67 g, el valor representativo del
coeficiente ssmico horizontal corresponde a k
h
=0,3 a
max
/g. Por otra parte, de
acuerdo a la Ref. 10 se reportan aceleraciones mximas a
max
=0,38 g, para un
sismo mximo con periodo de 2.475 aos, en zonas cercanas a la pila
proyectada. En consecuencia, asumiendo las recomendaciones de Saragoni y
empleando los antecedentes ssmicos del rea del proyecto, se considera un
coeficiente ssmico horizontal k
h
=0,12 en los anlisis de estabilidad, el cual
se utiliza tanto en la etapa intermedia como en la etapa completa de la pila de
lixiviacin.





PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
19 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


7.4 CONDICIONES ANALIZADAS
Los anlisis de estabilidad consideran las siguientes condiciones:

Anlisis Esttico. Condicin drenada
No se incluyen solicitaciones ssmicas y se considera que los parmetros
de resistencia al corte de todos los materiales involucrados se asocian a
una condicin drenada.

Anlisis Pseudo-esttico. Condicin drenada
Se incluyen solicitaciones ssmicas y se considera que los parmetros de
resistencia al corte de todos los materiales involucrados se asocian a una
condicin drenada.

Anlisis Esttico. Condicin no drenada
No se incluyen solicitaciones ssmicas y se considera que los parmetros
de resistencia al corte del mineral con alto grado de saturacin (S 85%)
se asocian a una condicin no drenada, debido a la susceptibilidad de
ocurrencia de licuefaccin esttica. Se considera que el resto de los
materiales involucrados en el anlisis presentan propiedades de resistencia
al corte asociados a una condicin drenada.

7.5 CRITERIOS DE ACEPTABILIDAD
En base a la experiencia de ARCADIS Chile en proyectos similares, se
adoptan los siguientes factores de seguridad mnimos como criterio de
estabilidad:

Caso esttico. Condicin drenada FS >1,3
Anlisis Pseudo-esttico. Condicin drenada FS >1,0




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
20 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Anlisis Esttico. Condicin no drenada FS >1,0

Los factores de seguridad mnimos recomendados se asocian a superficies de
deslizamiento globales, que afectan la seguridad y/o la continuidad de las
operaciones. Los taludes del material depositado por volteo, en forma natural,
desarrollan una pendiente definida por el ngulo de friccin movilizado a
grandes deformaciones. Por lo tanto, los factores de seguridad asociados a
deslizamientos superficiales son cercanos a la unidad, en el caso esttico, e
inferiores a la unidad, para el caso ssmico. Debido a esta condicin, es
natural que se produzcan derrames superficiales de menor importancia, que
no representan mayores riesgos para la seguridad y/o continuidad de la
operacin de los depsitos. En efecto, en el diseo de las pilas se han
considerado bermas intercapas con un ancho de 10 m, destinadas a contener
eventuales derrames que puedan producirse durante la operacin.


8.0 RESULTADOS
En las Tabla 8-1, Tabla 8-2 y




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
21 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Tabla 8-3 se presentan los resultados obtenidos de los anlisis de estabilidad
para las etapas inicial, intermedia y capacidad mxima, respectivamente,
incluyendo el anlisis de sensibilidad de los valores del ngulo de friccin de la
interfaz Geomembrana Cama de apoyo.







Tabla 8-1: Resultados de anlisis de estabilidad pila de lixiviacin. Etapa inicial.
Perfil
Factores de Seguridad.
Interfaz Geomembrana Cama apoyo
| = 18
Factores de Seguridad.
Interfaz Geomembrana Cama apoyo
| = 22
Esttico.
Condicin
Drenada
Ssmico.
Condicin
Drenada
Esttico.
Condicin
No
Drenada
Esttico.
Condicin
Drenada
Ssmico.
Condicin
Drenada
Esttico.
Condicin
No
Drenada
A
1,49 1,03 1,21 1,67 1,19 1,36
B 1,31 0,95 (*) 1,14 1,47 1,05 1,28
C
1,51 1,04 1,23 1,67 1,19 1,37
D 1,37 0,99 (*) 1,10 1,55 1,09 1,25
(*): Resultados de Factor de Seguridad menor a criterio de aceptabilidad.

Tabla 8-2: Resultados de anlisis de estabilidad pila de lixiviacin. Etapa intermedia.
Perfil
Factores de Seguridad.
Interfaz Geomembrana Cama apoyo
| = 18
Factores de Seguridad.
Interfaz Geomembrana Cama apoyo
| = 22
Esttico.
Condicin
Drenada
Ssmico.
Condicin
Drenada
Esttico.
Condicin
No
Esttico.
Condicin
Drenada
Ssmico.
Condicin
Drenada
Esttico.
Condicin
No




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
22 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Drenada Drenada
A
1,73 1,18 1,08 1,89 1,31 1,20
B
1,54 1,07 1,33 1,70 1,20 1,51
C
1,65 1,15 1,05 1,80 1,28 1,18
D
1,65 1,13 1,39 1,81 1,27 1,59






PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
23 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Tabla 8-3: Resultados de anlisis de estabilidad pila de lixiviacin. Capacidad
mxima.
Perfil
Factores de Seguridad.
Interfaz Geomembrana Cama apoyo
| = 18
Factores de Seguridad.
Interfaz Geomembrana Cama apoyo
| = 22
Esttico.
Condicin
Drenada
Ssmico.
Condicin
Drenada
Esttico.
Condicin
No
Drenada
Esttico.
Condicin
Drenada
Ssmico.
Condicin
Drenada
Esttico.
Condicin
No
Drenada
A 1,81 1,24 1,45 1,97 1,38 1,61
B
1,59 1,10 1,30 1,76 1,24 1,46
C 1,71 1,17 1,39 1,87 1,31 1,51
D
1,65 1,14 1,33 1,82 1,29 1,49

Los resultados indican que para las condiciones y etapas analizadas, la pila de
lixiviacin cumple con los criterios de aceptabilidad, exceptuando los perfiles B
y D de la etapa inicial para la condicin de valor de ngulo de friccin de la
interfaz Geomembrana Cama de apoyo de 18. Estos perfiles resultan con
valores de factor de seguridad menor a la unidad para el caso ssmico por lo
que, bajo esta condicin de interfaz, son susceptibles a desarrollar
deformaciones de los taludes y no un potencial deslizamiento de stos.







PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
24 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


9.0 CONCLUSIONES
De acuerdo a los resultados obtenidos de los anlisis de estabilidad de la pila
de lixiviacin en sus etapas: inicial, intermedia y capacidad mxima, es posible
concluir lo siguiente:

La pila de lixiviacin cumple con los criterios de estabilidad adoptados
para las etapas y condiciones analizadas. En el caso de los perfiles B y D,
para una etapa inicial y con una condicin de valor de ngulo de friccin
de la interfaz Geomembrana Cama de apoyo de 18, se obtienen
factores de seguridad levemente inferiores a la unidad. Esta situacin, de
ocurrir, se traduce en deformaciones de los taludes que no comprometen
la estabilidad de la pila.
Las superficies de deslizamiento crticas, en todos los casos, se
desarrollan en la interfaz Geomembrana Cama de apoyo, pues sta
constituye una zona preferencial de deslizamiento.
Los factores de seguridad, para las etapas estudiadas, se evaluaron para
potenciales superficies de deslizamiento que comprometan la estabilidad
global de la pila.
El caso ms desfavorable resulta ser el ssmico para todos los casos
estudiados.

Se hace necesario destacar que la mxima lluvia de 24 horas es de 42 mm
(Ref. 14) que equivale a una tasa de riego de 1,75 l/h-m, la que es del orden
de 7 veces ms baja que los 12 l/h-m utilizados para diseo del sistema de
drenaje de la pila de lixiviacin. Al considerar una tasa de riego de operacin
de 10 l/h-m, con la mxima lluvia de 24 horas se tendra una tasa equivalente
a la tasa de riego utilizada como criterio de diseo del sistema de drenaje. Por
otra parte, bajo condiciones de derretimiento de nieves, el derretimiento se




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
25 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


produce en periodos prolongados de tiempo, generando infiltraciones
equivalentes a tasas de riego muy bajas. Con lo anterior, estas condiciones,
lluvia y nieves, no condicionan la estabilidad de la pila de lixiviacin.

Finalmente, cabe sealar que los resultados presentados en este informe son
vlidos para la configuracin geomtrica y los parmetros utilizados en el
mismo. Modificaciones en alguna de estas variables deber complementarse
con un nuevo anlisis de estabilidad, de forma de validar los resultados
presentados.





PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
26 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


ANEXO A
ANALISIS DE ESTABILIDAD SUPERFICIES DE DESLIZAMIENTO. ETAPA INICIAL





PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
27 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-1.- Seccin A. Etapa Inicial. Caso Drenado. Int Geo Cama apoyo | = 22




1.67
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
UnitWeight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
UnitWeight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
UnitWeight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
UnitWeight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S4
S1
File Name: Seccin A Caso Drenado Etapa Inicial.gsz
Method: Spencer
FOS: 1.67
S2
S3
S6
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
28 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-2.- Seccin A. Etapa Inicial. Caso Drenado. Pseudo - esttico. Int Geo
Cama apoyo | = 22




1.19
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S4
S1
File Name: Seccin A Caso Drenado (kh=0.126) Etapa Inicial.gsz
Method: Spencer
FOS: 1.19
S2
S3
S6
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
29 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-3.- Seccin A. Etapa Inicial. Caso No Drenado. Int Geo Cama apoyo | =
22



1.36
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicinno drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S5
S1
File Name: Seccin A Caso No Drenado Etapa Inicial.gsz
Method: Spencer
FOS: 1.36
S2
S3
S6
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
30 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-4.- Seccin A. Etapa Inicial. Caso Drenado. Int Geo Cama apoyo | = 18


1.49
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S4
S1
File Name: Seccin A Caso Drenado Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.49
S2
S3
S6
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
31 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-5.- Seccin A. Etapa Inicial. Caso Drenado. Pseudo - esttico Int Geo
Cama apoyo | = 18


1.03
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S4
S1
File Name: Seccin A Caso Drenado (kh=0.126) Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.03
S2
S3
S6
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
32 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-6.- Seccin A. Etapa Inicial. Caso No Drenado. Int Geo Cama apoyo | =
18


1.21
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicinno drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S5
S1
File Name: Seccin A Caso No Drenado Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.21
S2
S3
S6
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
33 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-7.- Seccin B. Etapa Inicial. Caso Drenado. Int Geo Cama apoyo | = 22


1.47
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S1 S2
S3
S6
S4
File Name: Seccin B Caso Drenado Etapa Inicial.gsz
Method: Spencer
FOS: 1.47
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
34 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-8.- Seccin B. Etapa Inicial. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 22


1.05
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S1 S2
S3
S6
S4
File Name: Seccin B Caso Drenado (kh=0.126) Etapa Inicial.gsz
Method: Spencer
FOS: 1.05
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
35 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-9.- Seccin B. Etapa Inicial. Caso No Drenado. Int Geo Cama apoyo | =
22


1.28
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicinno drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1 S2
S3
S5
S6
File Name: Seccin B Caso No Drenado Etapa Inicial.gsz
Method: Spencer
FOS: 1.28
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
36 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-10.- Seccin B. Etapa Inicial. Caso Drenado. Int Geo Cama apoyo | = 18


1.31
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1 S2
S3
S6
S4
File Name: Seccin B Caso Drenado Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.31
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
37 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-11.- Seccin B. Etapa Inicial. Caso Drenado. Pseudo - esttico. Int Geo
Cama apoyo | = 18


0.95
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1 S2
S3
S6
S4
File Name: Seccin B Caso Drenado (kh=0.126) Etapa Inicial_int18.gsz
Method: Spencer
FOS: 0.95
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
38 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-12.- Seccin B. Etapa Inicial. Caso No Drenado. Int Geo Cama apoyo | =
18


1.14
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicinno drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1 S2
S3
S5
S6
File Name: Seccin B Caso No Drenado Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.14
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
39 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-13.- Seccin C. Etapa Inicial. Caso Drenado. Int Geo Cama apoyo | = 22


1.67
S1
S2
S3
S4
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
File Name: Seccin C Caso Drenado Etapa Inicial.gsz
Method: Spencer
FOS: 1.67
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
40 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-14.- Seccin C. Etapa Inicial. Caso Drenado. Pseudo - esttico Int Geo
Cama apoyo | = 22


1.19
S1
S2
S3
S4
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
File Name: Seccin C Caso Drenado (kh=0.126) Etapa Inicial.gsz
Method: Spencer
FOS: 1.19
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
41 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-15.- Seccin C. Etapa Inicial. Caso No Drenado. Int Geo Cama apoyo | =
22


1.37
S5
S1
S2
S3
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicinno drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
File Name: Seccin C Caso No Drenado Etapa Inicial.gsz
Method: Spencer
FOS: 1.37
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
42 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-16.- Seccin C. Etapa Inicial. Caso Drenado. Int Geo Cama apoyo | = 18


1.51
S1
S2
S3
S4
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
File Name: Seccin C Caso Drenado Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.51
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
43 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-17.- Seccin C. Etapa Inicial. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 18


1.04
S1
S2
S3
S4
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
File Name: Seccin C Caso Drenado (kh=0.126) Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.04
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
44 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-18.- Seccin C. Etapa Inicial. Caso No Drenado. Int Geo Cama apoyo | =
18


1.23
S5
S1
S2
S3
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicinno drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
File Name: Seccin C Caso No Drenado Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.23
Distancia [m]
80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
45 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-19.- Seccin C. Etapa Inicial. Caso Drenado. Int Geo Cama apoyo | = 22


1.55
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
S4
File Name: Seccin D Caso Drenado Etapa Inicial.gsz
Method: Spencer
FOS: 1.55
Distancia [m]
140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
46 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-20.- Seccin C. Etapa Inicial. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 22


1.09
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
S4
File Name: Seccin D Caso Drenado (kh=0.126) Etapa Inicial.gsz
Method: Spencer
FOS: 1.09
Distancia [m]
140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
47 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-21.- Seccin C. Etapa Inicial. Caso No Drenado. Int Geo Cama apoyo | =
22


1.25
S1
S5
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicinno drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
File Name: Seccin D Caso No Drenado Etapa Inicial.gsz
Method: Spencer
FOS: 1.25
Distancia [m]
140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
48 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-22.- Seccin D. Etapa Inicial. Caso Drenado. Int Geo Cama apoyo | = 18


1.37
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
S4
File Name: Seccin D Caso Drenado Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.37
Distancia [m]
140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
49 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-23.- Seccin D. Etapa Inicial. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 18


0.99
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
S4
File Name: Seccin D Caso Drenado (kh=0.126) Etapa Inicial_int18.gsz
Method: Spencer
FOS: 0.99
Distancia [m]
140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
50 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-24.- Seccin D. Etapa Inicial. Caso No Drenado. Int Geo Cama apoyo | =
18


1.10
S1
S5
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicinno drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
File Name: Seccin D Caso No Drenado Etapa Inicial_int18.gsz
Method: Spencer
FOS: 1.10
Distancia [m]
140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
51 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


ANEXO B: ANALISIS DE ESTABILIDAD SUPERFICIES DE
DESLIZAMIENTO. ETAPA INTERMEDIA





PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
52 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-25.- Seccin A. Etapa Intermedia. Caso Drenado. Int Geo Cama apoyo | =
22


1.89
Name: S1: SuelodeFundacin
Model: (None)
Name: S2: Interfaz Geomembrana- CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajoriego(condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S4
S1
File Name: Seccin A Caso Drenado Etapa Intermedia.gsz
Method: Spencer
FOS: 1.89
S2
S3 S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
53 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-26.- Seccin A. Etapa Intermedia. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 22


1.31
Name: S1: SuelodeFundacin
Model: (None)
Name: S2: Interfaz Geomembrana- CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajoriego(condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S4
S1
File Name: Seccin A Caso Drenado (kh=0.126) Etapa Intermedia.gsz
Method: Spencer
FOS: 1.31
S2
S3 S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
54 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-27.- Seccin A. Etapa Intermedia. Caso No Drenado. Int Geo Cama apoyo
| = 22


1.20
Name: S1: SuelodeFundacin
Model: (None)
Name: S2: Interfaz Geomembrana- CamadeApoyo
Model: Mohr-Coulomb
UnitWeight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
UnitWeight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajoriego(condicinnodrenada)
Model: S=f(overburden)
UnitWeight: 1.76F/m
Tau/SigmaRatio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
UnitWeight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S5
S1
File Name: Seccin A Caso No Drenado Etapa Intermedia.gsz
Method: Spencer
FOS: 1.20
S2
S3 S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
55 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-28.- Seccin A. Etapa Intermedia. Caso Drenado. Int Geo Cama apoyo | =
18


1.73
Name: S1: SuelodeFundacin
Model: (None)
Name: S2: Interfaz Geomembrana- CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajoriego(condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S4
S1
File Name: Seccin A Caso Drenado Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.73
S2
S3 S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
56 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-29.- Seccin A. Etapa Intermedia. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 18


1.18
Name: S1: SuelodeFundacin
Model: (None)
Name: S2: Interfaz Geomembrana- CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajoriego(condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S4
S1
File Name: Seccin A Caso Drenado (kh=0.126) Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.18
S2
S3 S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
57 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-30.- Seccin A. Etapa Intermedia. Caso No Drenado. Int Geo Cama apoyo
| = 18


1.08
Name: S1: SuelodeFundacin
Model: (None)
Name: S2: Interfaz Geomembrana- CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajoriego(condicinnodrenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S5
S1
File Name: Seccin A Caso No Drenado Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.08
S2
S3 S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
58 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-31.- Seccin B. Etapa Intermedia. Caso Drenado. Int Geo Cama apoyo | =
22


1.70
S1 S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S6
S4
File Name: Seccin B Caso Drenado Etapa Intermedia.gsz
Method: Spencer
FOS: 1.70
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
59 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-32.- Seccin B. Etapa Intermedia. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 22


1.20
S1 S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0 F/m
Phi: 38
S6
S4
File Name: Seccin B Caso Drenado (kh=0.126) Etapa Intermedia.gsz
Method: Spencer
FOS: 1.20
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
60 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-33.- Seccin B. Etapa Intermedia. Caso No Drenado. Int Geo Cama apoyo
| = 22


1.51
S5
S1 S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S6
File Name: Seccin B Caso No Drenado Etapa Intermedia.gsz
Method: Spencer
FOS: 1.51
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
61 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-34.- Seccin B. Etapa Intermedia. Caso Drenado. Int Geo Cama apoyo | =
18


1.54
S1 S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S6
S4
File Name: Seccin B Caso Drenado Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.54
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
62 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-35.- Seccin B. Etapa Intermedia. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 18


1.07
S1 S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
S4
File Name: Seccin B Caso Drenado (kh=0.126) Etapa Intermedia_int18.gsz
Method: Spencer
FOS:1.07
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
63 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-36.- Seccin B. Etapa Intermedia. Caso No Drenado. Int Geo Cama apoyo
| = 18


1.33
S5
S1 S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
File Name: Seccin B Caso No Drenado Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.33
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
64 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-37.- Seccin C. Etapa Intermedia. Caso Drenado. Int Geo Cama apoyo | =
22


1.80
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S1
S2
S3
S4
S6
File Name: Seccin C Caso Drenado Etapa Intermedia.gsz
Method: Spencer
FOS: 1.80
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
65 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-38.- Seccin C. Etapa Intermedia. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 22


1.28
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S1
S2
S3
S4
S6
File Name: Seccin C Caso Drenado (kh=0.126) Etapa Intermedia.gsz
Method: Spencer
FOS: 1.28
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
66 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-39.- Seccin C. Etapa Intermedia. Caso No Drenado. Int Geo Cama apoyo
| = 22


1.18
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S1
S2
S3
S6
S5
File Name: Seccin C Caso No Drenado Etapa Intermedia.gsz
Method: Spencer
FOS: 1.18
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
67 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-40.- Seccin C. Etapa Intermedia. Caso Drenado. Int Geo Cama apoyo
| = 18


1.65
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S1
S2
S3
S4
S6
File Name: Seccin C Caso Drenado Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.65
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
68 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-41.- Seccin C. Etapa Intermedia. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 18


1.15
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicindrenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S1
S2
S3 S4
S6
File Name: Seccin C Caso Drenado (kh=0.126) Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.15
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
69 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-42.- Seccin C. Etapa Intermedia. Caso No Drenado. Int Geo Cama apoyo
| = 18


1.05
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego(condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S1
S2
S3
S6
S5
File Name: Seccin C Caso No Drenado Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.05
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
70 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-43.- Seccin D. Etapa Intermedia. Caso Drenado. Int Geo Cama apoyo
| = 22


1.81
S1
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S2
S3
S6
S4
File Name: Seccin D Caso Drenado Etapa Intermedia.gsz
Method: Spencer
FOS: 1.81
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
71 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-44.- Seccin D. Etapa Intermedia. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 22


1.27
S1
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S2
S3
S6
S4
File Name: Seccin D Caso Drenado (kh=0.126) Etapa Intermedia.gsz
Method: Spencer
FOS: 1.27
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
72 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-45.- Seccin D. Etapa Intermedia. Caso No Drenado. Int Geo Cama apoyo
|= 22


1.59
S1
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interf az Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f (overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
Minimum Strength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S2
S3 S5
S6
File Name: Seccin D Caso No Drenado Etapa Intermedia.gsz
Method: Spencer
FOS: 1.59
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
73 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-46.- Seccin D. Etapa Intermedia. Caso Drenado. Int Geo Cama apoyo
| = 18


1.65
S1
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
UnitWeight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
UnitWeight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
UnitWeight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
UnitWeight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S2
S3
S6
S4
File Name: Seccin D Caso Drenado Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.65
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
74 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-47.- Seccin D. Etapa Intermedia. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 18


1.13
S1
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sinriego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S2
S3
S6
S4
File Name: Seccin D Caso Drenado (kh=0.126) Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.13
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
75 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-48.- Seccin D. Etapa Intermedia. Caso No Drenado. Int Geo Cama apoyo
| = 18

1.39
S1
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S2
S3 S5
S6
File Name: Seccin D Caso No Drenado Etapa Intermedia_int18.gsz
Method: Spencer
FOS: 1.39
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
76 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


ANEXO C: ANLISISDE ESTABILIDAD SUPERFICIES DE
DESLIZAMIENTO. CAPACIDAD MXIMA





PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
77 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-49.- Seccin A. Capacidad Mxima. Caso Drenado. Int Geo Cama apoyo
| = 22


1.97
S4
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1
FileName: SeccinA Caso Drenado Etapa Final.gsz
Method: Spencer
FOS: 1.97
S2
S3
S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
78 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-50.- Seccin A. Capacidad Mxima. Caso Drenado. Pseudo - esttico. Int Geo
Cama apoyo | = 22



1.38
S4
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1
FileName: SeccinA Caso Drenado (kh=0.126) Etapa Final.gsz
Method: Spencer
FOS: 1.38
S2
S3
S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
79 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-51.- Seccin A. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
| = 22


1.61
S5
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8F/m
Cohesion: 0F/m
Phi: 38
S1
File Name: Seccin A CasoNo Drenado Etapa Final.gsz
Method: Spencer
FOS: 1.61
S2
S3
S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
80 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-52.- Seccin A. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
| = 22


1.81
S4
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1
FileName: SeccinA Caso Drenado Etapa Final_int18.gsz
Method: Spencer
FOS: 1.81
S2
S3
S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
81 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-53.- Seccin A. Capacidad Mxima. Caso Drenado. Int Geo Cama apoyo
| = 18


1.24
S4
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76F/m
Cohesion: 0F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1
FileName: SeccinA Caso Drenado (kh=0.126) Etapa Final_int18.gsz
Method: Spencer
FOS: 1.24
S2
S3
S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
82 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-54.- Seccin A. Capacidad Mxima. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo |= 18


1.45
S5
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - CamadeApoyo
Model: Mohr-Coulomb
Unit Weight: 2F/m
Cohesion: 0F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72F/m
Cohesion: 0F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0F/m
Phi: 38
S1
FileName: SeccinA Caso No Drenado Etapa Final_int18.gsz
Method: Spencer
FOS: 1.45
S2
S3
S6
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
83 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-55.- Seccin A. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
|= 18


1.76
S1 S2
S3
S4
S6
File Name: Seccin B Caso Drenado Etapa Final.gsz
Method: Spencer
FOS: 1.76
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
84 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-56.- Seccin B. Capacidad Mxima. Caso Drenado. Int Geo Cama apoyo
|= 22


1.24
S1 S2
S3
S4
S6
File Name: Seccin B Caso Drenado (kh=0.126) Etapa Final.gsz
Method: Spencer
FOS: 1.24
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
85 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-57.- Seccin B. Capacidad Mxima. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo |= 22


1.46
S1 S2
S3
S6
S5
File Name: Seccin B Caso No Drenado Etapa Final.gsz
Method: Spencer
FOS: 1.46
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
Minimum Strength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
86 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-58.- Seccin B. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
|= 22


1.59
S1 S2
S3
S4
S6
File Name: Seccin B Caso Drenado Etapa Final_int18.gsz
Method: Spencer
FOS: 1.59
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
87 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-59.- Seccin B. Capacidad Mxima. Caso Drenado. Int Geo Cama apoyo
|= 18


1.10
S1 S2
S3
S4
S6
File Name: Seccin B Caso Drenado (kh=0.126) Etapa Final_int18.gsz
Method: Spencer
FOS: 1.10
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
88 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-60.- Seccin B. Capacidad Mxima. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo |= 18


1.30
S1 S2
S3
S6
S5
File Name: Seccin B Caso No Drenado Etapa Final_int18.gsz
Method: Spencer
FOS: 1.30
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
Minimum Strength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
89 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-61.- Seccin B. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
| = 18


1.87
S4
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
File Name: Seccin C Caso Drenado Etapa Final.gsz
Method: Spencer
FOS: 1.87
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
90 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-62.- Seccin C. Capacidad Mxima. Caso Drenado. Int Geo Cama apoyo
|= 22


1.31
S4
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
File Name: Seccin C Caso Drenado (kh=0.126) Etapa Final.gsz
Method: Spencer
FOS: 1.31
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
91 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-63.- Seccin C. Capacidad Mxima. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 22


1.51
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
S5
File Name: Seccin C Caso No Drenado Etapa Final.gsz
Method: Spencer
FOS: 1.51
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
92 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-64.- Seccin C. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
|= 22


1.71
S4
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
File Name: Seccin C Caso Drenado Etapa Final_int18.gsz
Method: Spencer
FOS: 1.71
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
93 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-65.- Seccin C. Capacidad Mxima. Caso Drenado. Int Geo Cama apoyo
| = 18


1.17
S4
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
File Name: Seccin C Caso Drenado (kh=0.126) Etapa Final_int18.gsz
Method: Spencer
FOS: 1.17
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
94 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-66.- Seccin C. Capacidad Mxima. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 18


1.39
S1
S2
S3
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
Minimum Strength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
S6
S5
File Name: Seccin C Caso No Drenado Etapa Final_int18.gsz
Method: Spencer
FOS: 1.39
Distancia [m]
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
95 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-67.- Seccin C. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
| = 18


1.82
S1
S4
S2
S3
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
File Name: Seccin D Caso Drenado Etapa Final.gsz
Method: Spencer
FOS: 1.82
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
96 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-68.- Seccin D. Capacidad Mxima. Caso Drenado. Int Geo Cama apoyo
|= 22


1.29
S1
S4
S2
S3
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
File Name: Seccin D Caso Drenado (kh=0.126) Etapa Final.gsz
Method: Spencer
FOS: 1.29
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
97 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-69.- Seccin D. Capacidad Mxima. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 22


1.49
S1
S2
S3
S5
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 22
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
Minimum Strength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
File Name: Seccin DCaso No Drenado Etapa Final.gsz
Method: Spencer
FOS: 1.49
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
98 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-70.- Seccin D. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
| = 22


1.65
S1
S4
S2
S3
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: Interfaz Geomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
File Name: Seccin DCaso Drenado Etapa Final_int18.gsz
Method: Spencer
FOS: 1.65
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
99 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-71.- Seccin D. Capacidad Mxima. Caso Drenado. Int Geo Cama apoyo
| = 18


1.14
S1
S4
S2
S3
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S4: Mineral bajo riego (condicin drenada)
Model: Mohr-Coulomb
Unit Weight: 1.76 F/m
Cohesion: 0 F/m
Phi: 38
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
File Name: Seccin D Caso Drenado (kh=0.126) Etapa Final_int18.gsz
Method: Spencer
FOS: 1.14
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120




PROYECTO LOBO MARTE Revisin Pgina

INFORME ANLISIS DE
ESTABILIDAD 2D:
PILA DE LIXIVIACIN
641S001-3300-41ER-0002
P1
100 de
100


V:\Mineria\PY\3878 Ing Factibilidad Pila Lixiviacion Lobo Marte\06 Traspaso\Documentos 30-03-2012\3878-0000-
GE-INF-001-P1.docx


Figura 9-72.- Seccin D. Capacidad Mxima. Caso Drenado. Pseudo esttico. Int Geo
Cama apoyo | = 18

Figura 9-73.- Seccin D. Capacidad Mxima. Caso No Drenado. Int Geo Cama apoyo
=18

1.33
S1
S2
S3
S5
S6
Name: S1: Suelo de Fundacin
Model: (None)
Name: S2: InterfazGeomembrana - Cama de Apoyo
Model: Mohr-Coulomb
Unit Weight: 2 F/m
Cohesion: 0 F/m
Phi: 18
Name: S3: Mineral sin riego
Model: Mohr-Coulomb
Unit Weight: 1.72 F/m
Cohesion: 0 F/m
Phi: 38
Name: S5: Mineral bajo riego (condicin no drenada)
Model: S=f(overburden)
Unit Weight: 1.76 F/m
Tau/Sigma Ratio: 0.25
MinimumStrength: 0
Name: S6: Cover
Model: Mohr-Coulomb
Unit Weight: 1.8 F/m
Cohesion: 0 F/m
Phi: 38
File Name: Seccin D Caso No Drenado Etapa Final_int18.gsz
Method: Spencer
FOS: 1.33
Distancia [m]
60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
E
l
e
v
a
c
i

n

[
m
]
0
20
40
60
80
100
120