An Introduction to Block and Panel Caving

Allan Moss, General manager Rio Tinto Copper Projects

Agenda

Context why the interest in caving How block caving works and key technical considerations Risks Value drivers

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

Greater Depths of Mining

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

Trends in Mining ~ to 2013

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

Trends in Mining ~ after 2013

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

Why Caving?
Use of gravity to break the rock (instead of explosives), thus low operating cost compared with other underground methods High production rates can be achieved allowing economies of scale Allows high degree of mechanization Safe However High initial capital costs Conceptually simple let gravity do the work - but technically very challenging Requires large design effort; high quality construction; and rigorously managed operations
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 6

Cave Mining ~ When is it Applicable?


Orebodies with a substantial vertical dimension; massive or pipe like Rock strength not a limitation but need sufficient orebody dimensions Primarily used in copper mining but also molybdenum and diamonds,

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

Evolution of daily production rates


New generation Caves; under construction

160000
Palabora Henderson Homestake - S Dakota

140000
1000m

Magma

Western Deeps

Kidd Creek

TONNES PER DAY

120000 100000 80000 60000 40000 20000 0 1880

Open pits

2000m

Super caves

3000m

4000m

San Manuel Climax Kiruna Malmberget Premier Kidd Creek Salvador Henderson Andina

Conventional underground

Olympic Dam Palabora Freeport IOZ/DOZ Ridgeway

Miami Mount Isa

1900

1920

1940

1960

1980

2000

2020

2040

YEAR
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference

(after Brown 2004a)


8

Modernisation of an Old Method

LHD Grizzley Block Block Cave Cave


1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 9

With Increasing Production comes need for Size


Questa Perseverance Parkes Premier San Manuel Palabora

DOZ

Henderson

Oyu Tolgoi

Resolution

Waste Unexploited resource Caved waste Exploited resource

Note: size is for illustrative purpose only and has been sourced from published information
BMO Capital Markets 2011 Global Metals & Mining Conference 10

1 March 2011

Major block and panel cave mines

1 March 2011

Rio Tinto Planned Currently operating Closed mines BMO Capital Markets 2011 Global Metals & Mining Conference

11

Rio Tinto a leader in cave mining


Involved in 5 block caves in operation or development Applying experience from operating mines to developing next generation block cave mines Advancing technology and innovation in block cave mining Building an Underground Technology Centre to ensure objectives are met, particularly with regard to people
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 12

Agenda

Context why the interest in caving How block caving works and key technical considerations Risks Value drivers

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

13

Where Does Caving fit in the Spectrum of Underground?

Method Resuing Cut and Fill Shrinkage Room and Pillar Open Stoping Sub-level Caving Block Caving
1 March 2011

T / Manshift 0.2 - 0.5 12 - 48 20 - 28 15 - 150 20 - 115 65 - 180 300 - 2000

Avg. T / Day 50 - 100+ 500 1,500 200 - 800 1,500 10,000 1,500 25,000 1,500 50,000 10,000 100,000

Relative Operating Cost per tonne 70+ 20 to 70 20 to 50 7 to 20 7 to 25 7 to 17 1 to 2.5


Underground mining methods modified from Brown, 2003

BMO Capital Markets 2011 Global Metals & Mining Conference

14

Five Key Components of a Cave Mine


Orebody access Undercut Level Shafts Tunnels Extraction Level Undercutting The level where caving is initiated Extraction Ore flow Sizing and transfer of ore to surface
Haulage Level Infrastructure Exhaust Level Vent Raise Ore Pass

Orebody

Where ore is removed from the broken rock

Support systems, ventilation, power, water, supplies, men


1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 15

Block Cave Concept


Plant Crushed Ore

Shaft Ore body

Draw bells

Production tunnels

Haulage system

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

16

Caving Process
20
Progressive spalling

Block cave mining is based on the principle that, once a sufficiently large area of a block has been undercut by drilling and blasting, the overlying block of ore will start to cave under the influence of gravity. The process will continue until caving propagates through the entire block to surface or to the open pit above

25

35

45

1. Develop undercut level 2. Develop production tunnels


1 March 2011

3. Drill and blast undercut rings 4. Open troughs


17

BMO Capital Markets 2011 Global Metals & Mining Conference

What are we trying to achieve?

Caved Ground

Undercut

Extraction LHD Loading


1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 18

Block Caving Concept


VALUE REALIZATION CAPITAL INVESTMENT
100%

$
CAVEDYNAMICS SOURCESOF UNCERTAINTY
Vyazmensky 2007

TIME CAVEMANAGEMENT
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 19

Section Through Cave

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

20

Key Technical Issues

cave propagation cave flow

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

cave fragmentation

21

Critical dimensions to initiate caving

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

22

Geometry of drawbells

DRAWBELLS

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

23

Fragmentation: the key to a successful operation

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

24

Impacts of Fragmentation

IMPLICATIONS ON RESOURCE RECOVERY

PRODUCTIVITY

SECONDARY BLASTING

VALUE AT RISK
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 25

Caving the block


Index of Interruptions Frequency (Salvador mine, draw point 04W20)

Primary Fragmentation

Secondary fragmentation

HoD

Initialsecondary fragmentation Blastingeffect


Blastedundercutmaterial

FlowInterruptionIndex (events/tonsx1000)

Secondary Fragmentation

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

26

Rock Structure and fragmentation

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

27

Fragmentation is complex: risks!!!


zone of loosening

Primary fragmentation

expansion void

Secondary fragmentation

f(fragment size)

fragment size evolution with draw

Fine material

higher mobility of finer fragments within a draw column

Coarse material

IDZ

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

28

Cave Flow
Zone of Loosening
(blocks that were displaced vertically at least once)

Waste

waste Entry ore

waste

waste

ore

ore

ore

IDZ ~ Ellipsoid of Motion


(extracted blocks)
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 29

HoD

Flow dictates Revenue Stream

WASTE ROCK

CAVED ORE UNCAVED ORE

WASTE ENTRY
cylindrical IEZ

EXTRACTED ORE

elliptical or frustum shaped IEZ; height equivalent to~100-200 mean fragment size

RILLING and MASS FLOW


1 March 2011

PREDOMINATLY MASS FLOW


30

BMO Capital Markets 2011 Global Metals & Mining Conference

What do we draw?- the recovery issue


Highgradeore Dilutionentry

ORE BODY

$
WASTE ROCK

WASTE ROCK

Vyazmensky Vyazmensky 2008 2008

TIME

REPEAT
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 31

What do we draw?- the recovery issue


Highgradeore Dilutionentry

ORE BODY

$
WASTE ROCK

WASTE ROCK

Vyazmensky Vyazmensky 2008 2008

TIME

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

32

Undercutting
UNCAVED ORE
Rings to be blasted

CAVED ORE

Blasted undercut rings

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

33

Purpose of the Extraction Level

ALLOW DEVELOPMENT OF DRAWBELLS

ACCESS TO ORE ABOVE

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

34

Light at the End of the Tunnel

A video of some of the concepts outlined can be found http://www.argylediamonds.com.au/video_block_cave.html


1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 35

Agenda

Context why the interest in caving How block caving works and key technical considerations Risks Value drivers

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

36

Cant define risk - Cant define value


Block caving is not for marginal projects Complete knowledge of the future is an impossibility The question then becomes how representative is the information we have on hand? This information is used to develop a robust enough plan to cater for the inherent uncertainty. Uncertainty translates to risk (Flexibility costs money)

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

37

Differences in Knowledge therefore differences in Uncertainty

Initiation point close to surface Substantial information No geotechnical constraints Ore drilled and typically sampled as part of mining process detailed knowledge for short term planning Initiation point remote from surface Limited information Substantial geotechnical constraints

Limited knowledge of ore- sampling after the fact

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

38

Scale

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

39

Access and Extraction Complexity


DOZ Mine Freeport, Indonesia

GBT Area I & II

Escondida, Chile
IOZ

DOZ

Courtesy of PTFI
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 40

Control
OPENPITMINING CAVEMINING
uncertainty

reducedknowledge wellestablishedmethod goodcontrol morecertainty


BETTERTECHNOLOGYISAKEYTO BETTERVALUE
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 41

limitedcontrol

Risk
Characterisation the resource; understanding the size of the prize Design resource to reserve; time for imagination Construction the big spend and first taste of reality Operation recovery and payback
Paper (Design) Value vs. Actual Value

1,5 m

CONCRETE DAMAGE

CONCRETE DAMAGE

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

42

Lesson learned at Palabora


Palabora successfully transitioned from an open pit to a 30,000 tpd underground block cave but. Surface subsidence

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

Mine infrastructure

dilution of the ore reserve and subsequent reduction in life of mine


43

Agenda

Context why the interest in caving How block caving works and key technical considerations Risks Value drivers

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

44

Ore grade and value

Value is a function of Run of Mine (ROM) grade which is an outcome of three interrelated factors

1. The resource grade; a measure of the metal that is in the ground 2. The reserve grade, a measure of the effectiveness of the design 3. The recovered grade, a measure of how the cave is managed and cave dynamics

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

45

Indicative Costs
Capital
The capital and operating costs shown are relative and provide an indication of the spread. Both green field and brown field projects are included as are operations where access is via shaft or by decline. They were developed simply by normalising to lowest cost producers in terms of capital and operating cost.

Operating

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

46

How Soon do you Get your Money Back?

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

47

Realising Value
New generation of Cave Mines represent a step change in the size of operations require investment levels of $2 to 10 billion and require significant time to achieve operating targets

There are value drivers common to any mining project: 1. Costs (capital and operating) 2. Revenue 3. Time
1 March 2011 BMO Capital Markets 2011 Global Metals & Mining Conference 48

Investment in technology and innovation to drive value


Cave dynamics Block caving is inflexible and value locked in at the design phase Important to understand cave behaviour and reliably forecast metal production (tons and grade)

Mine of the Future

Intelligent Mining Autonomous equipment Block cave operations well suited to concept of intelligent mining; real time information Operating efficiencies

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

49

Investment in technology and innovation to drive value


Rapid development Tunnelling concepts that are more productive and cost effective than traditional methods Integrated shaft boring machinery with the potential to dramatically improve safety while reducing construction time Optimised design and management Building on ability to predict cave behaviour Improved planning techniques and software to improve grade sequencing

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

50

The Vision an Ore Factory


Required Fragmentator

In Situ Fragment Size Crushing and Grinding

Energy (Distance Traveled) Reliable Ore Flow Predictable Fragmentation (+ grade) Ore Transport and Sizing

The Factory The Ore Rock Factory

1 March 2011

BMO Capital Markets 2011 Global Metals & Mining Conference

51

Thank You
Allan Moss, General manager Rio Tinto Copper Projects